HIMS Case July, 2001 Group Modeling of IT‑Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement David Andersen Luis Luna Ignacio Martinez George Richardson Rockefeller College

HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

HIMS CaseJuly, 2001

Group Modeling of IT‑Based Innovationsin the Public Sector

Anthony Cresswell

Theresa Pardo

Center for Technology in Governement

David Andersen

Luis Luna

Ignacio Martinez

George Richardson

Rockefeller College

Page 2: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Group Modeling at Albany

• The modeling group at the University at Albany has more than 15 years working with techniques for building computer models directly with groups (Mumpower et al, 1998; Richardson et al, 1992; Rohrbaugh, 1992; Schuman and Rohrbaugh, 1991).

Page 3: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Group Modeling at Albany

• These techniques have been used to construct system dynamic models (Richardson and Andersen, 1995 and 1997; Rohrbaugh, 2000).

• The work in group model building (GMB) at Albany links to other efforts in the field (Vennix, 1996).

Page 4: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Group Modeling at Albany

• Five different roles (Richardson and Andersen, 1995):– Facilitator, modeler/reflector, process coach,

recorder and gatekeeper.

• The modeling team has worked in a set of scripts (Andersen and Richardson, 1997).

Page 5: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Group Modeling at Albany

• This paper documents the procedures used and products created for a small scale GMB effort using the approaches developed at Albany.

• The paper reports on tasks completed over a four-month period in 2001.

• A web site provides complete documentation of all the products developed in the GMB sessions (http://www.albany.edu/cpr/sdgroup/HIMS/).

Page 7: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Homeless Information Management System (HIMS)

• HIMS purpose was to develop a new management information system that would assist the Bureau of Housing Services (State of New York) and state-funded homeless shelter providers better assess programs.

• The operation and regulation of homeless shelters is a multi-government, inter-organizational operation.

Page 8: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Homeless Information Management System (HIMS)

• The field research on this project was connected with the activities of the Center for Technology in Government (CTG) with the New York State Office of Temporary and Disability Assistance, Bureau of Housing Services (BHS).

• Over a 2+year period, the project participants were able to achieve the necessary collaboration and share highly detailed and complex operational knowledge. The result was the design and development of a successful prototype information system.

Page 9: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Group Model Building Time Line

Jan/2001Modeling group starts talking with potential participants – Paper proposal

Mar/13/2001 First project scoping meeting

Mar/20/2001Second project scoping meeting with CTG’s team

Mar/29/2001Meeting with modeling group – HIMS project selected / session scheduled

Apr/13/2001 First modeling session

May/08/2001 Second modeling session

Page 10: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Effort Distribution of the Modeling Support Team

Task Effort (Man*hour)

Managing Collaboration 15

Concept Model 20

Planning Meetings 15

Facilitation 32

Modeling 45

Writing Reports 20

Gatekeeping 8

Total 155

Page 11: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Effort Distribution of the Modeling Support Team

Managing Collaboration

10%

Concept Model13%

Planning Meetings10%

Facilitation21%

Modeling28%

Writing Reports13%

Gatekeeping5%

Page 12: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Effort Distribution of the CTG Team

Task Effort (Man*hour)

First project scope meeting 2

Second project scope meeting 16

Meeting with modeling team 10

First modeling session 20

Second modeling session 20

Total 68

Page 13: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Project Products

• Concept model

• Script for the modeling sessions

• Agenda for the modeling sessions

• Minutes for the sessions

• Preliminary model – Trust1

• Model – Trust2 (In process)

• Model Documentation (In process)

Page 14: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

First Modeling Session

Page 15: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Pre-meeting Activities

• Create Script (Richardson and Andersen, 1995)– Roles in the GMB sessions

• Facilitator Andersen• Modeler/Reflector Richardson• Process Coach Richardson• Recorder Luna/Martinez• Gatekeeper Cresswell

• Get CTG approval• Create Concept Model

– Luna and Martinez

• Complete logistics

Page 16: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Agenda

8:30 · Review Agenda for the day· Purpose, discussion and clarification· Concept Model: a fast overview of final product· Boundary Clarification – stakeholders, actors, sectors in the model, key variable (especially stocks) elicitation, key variables and the reference mode

 10:20 BREAK 10:30 · Stock mapping

· Feedback loop mapping· Modeler Feedback· Next steps and future tasks

Page 17: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Modelling Group

David Andersen Rockefeller College

Donna Canestraro Center for Technology in Government

Meghan Cook Center for Technology in Government

Anthony Cresswell Center for Technology in Government

Luis Luna Rockefeller College

Ignacio Martinez Rockefeller College

Theresa Pardo Center for Technology in Government

George Richardson Rockefeller College

Fiona Thompson Center for Technology in Government

Page 18: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Hopes• Product of value for both

teams• Make a model that works

Understand the key variables that made BHS a successful project

• This is useful to CTG• Understand how feedback

SD models work• To be able to use this

experience to think about our projects using different lens

• This is useful KDI• Hope that we can narrow

the variables to a manageable size, so that it is a somewhat straightforward model

• New insights into HIMS• There is humor in today• That it works so well that

we can use it to explore the other projects as well

Page 19: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Fears• Ability to talk in SD

terms• It won’t be applicable

to us, only to you• Too hard for us• That my own biases

will cloud its outcome• This is a waste of time• Too hard

• That I won’t get it• CTG do not have enough

detailed data about BHS• Talk, talk, talk and not get

anywhere• Have lunch• Too little time to get to the

good stuff• Not understanding or

being shown what happens behind the curtain

Page 21: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Concept Model

Tasks to doFinished

workProgress rate

People

People on project

Peopleproductivity

Fraction of peopleassigned to project

TrustTrust building

rateTrust erosion

Trust built per taskaccomplished

Time for trust tobreak down

Page 22: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Concept ModelProject and Trust Progress

600

450

300

150

0

0 10 20 30 40 50 60 70 80 90 100Time (Day)

Tasks to do : Final1 TaskFinished work : Final1 TaskTrust : Final1 Task

Page 24: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Concept Model

Tasks to doFinished

workProgress rate

People

People on project

Peopleproductivity

Fraction of peopleassigned to project

Projectdefinition

Fractionremaining

TrustTrust building

rateTrust erosion

Trust built per taskaccomplished

Time for trust tobreak down

Effect of trust overproductivity

R

B

Page 25: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Project and Trust Progress

600

450

300

150

0

0 18 36 53 71Time (Day)

Tasks to do : Trust Normal TaskFinished work : Trust Normal TaskTrust : Trust Normal Task

Concept Model

Page 27: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Tasks to doFinished

workProgress rate

People

People on project

Peopleproductivity

Fraction of peopleassigned to project

Projectdefinition

Fractionremaining

TrustTrust building

rateTrust erosion

Trust built per taskaccomplished

Time for trust tobreak down

Effect of trust overproductivity

R

Concept Model

Page 28: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Project and Trust Progress

600

450

300

150

0

0 10 20 30 40 50 60 70 80 90 100Time (Day)

Tasks to do : Normal TaskFinished work : Normal TaskTrust : Normal Task

Concept Model

Page 29: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Key Variables Elicitation

Page 30: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reference Modes

Page 31: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Boundary Clarification(Original image redrawn in Word)

Page 32: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation(Original image redrawn in Vensim)

Feasibleprototype

components

Commonunderstanding ofwhat and how

componentgrowth

CTG involvement

Use of SMARTIT tools

Page 33: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation(Original image redrawn in Vensim)

Feasibleprototype

components

Commonunderstanding ofwhat and how

Collaboration

Capacity tocollaborate

Willingness tocollaborate

Trust

LeadershipProvider

Engagement

componentgrowth

Responsibiliy forcollaboration

CTG involvement

Use of SMARTIT tools

Page 34: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation(Original image redrawn in Vensim)

Feasibleprototype

components

Commonunderstanding ofwhat and how

ExpectationsDemonstrated

results

Collaboration

Capacity tocollaborate

Willingness tocollaborate

Trust

LeadershipProvider

Engagement

Personal priorexperience

componentgrowth

Responsibiliy forcollaboration

CTG involvement

Opportunity to act

Use of SMARTIT tools

Pressure to beaccountable

Welfare reformpressure

Bob activity

Page 35: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation(Original image redrawn in Vensim)

Feasibleprototype

components

Commonunderstanding ofwhat and how

ExpectationsDemonstrated

results

Collaboration

Capacity tocollaborate

Willingness tocollaborate

Trust

LeadershipProvider

Engagement

Personal priorexperience

componentgrowth

Responsibiliy forcollaboration

CTG involvement

Bob usednegative

experience

Opportunity to act

Use of SMARTIT tools

BHS and QAengagement

Role ofcorporate

partner

Pressure to beaccountable

Welfare reformpressure

Bob activity

Page 36: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation(Original image redrawn in Vensim)

Feasibleprototype

components

Commonunderstanding ofwhat and how

ExpectationsDemonstrated

results

Collaboration

Capacity tocollaborate

Willingness tocollaborate

Trust

LeadershipProvider

Engagement

Personal priorexperience

componentgrowth

Responsibiliy forcollaboration

CTG involvement

Bob usednegative

experience

Opportunity to act

Use of SMARTIT tools

BHS and QAengagement

Role ofcorporate

partner

Pressure to beaccountable

Welfare reformpressure

Bob activity

Page 37: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 38: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Inter-session Modeling Activities

Page 40: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Multi-stage process

Prototypecomponents

Commonunderstanding ofwhat and how

Developingprototype

components

Systemdevelopment

Developingcomponents

Developingcommon

understanding

SystemimplementationImplementing

Page 41: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Single-stage process

FeasibleComponents

Unsolvedproblems

Unsolved problemgeneration

Progress rate

Productivity

Unsolved problemsper component

Projectdefinition

Perceived progressfraction

People on projectdevelopment

Average unsolvedproblems percomponent

Page 42: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Second Modeling Session

Page 44: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Structure Elicitation

Feasibleprototype

components

Commonunderstanding ofwhat and how

ExpectationsDemonstrated

results

Collaboration

Capacity tocollaborate

Willingness tocollaborate

Trust

LeadershipProvider

Engagement

Personal priorexperience

componentgrowth

Responsibiliy forcollaboration

CTG involvement

Bob usednegative

experience

Opportunity to act

Use of SMARTIT tools

BHS and QAengagement

Role ofcorporate

partner

Pressure to beaccountable

Welfare reformpressure

Bob activity

Page 45: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Uncommittedproviders

Committedproviders

Gainingcommitment

Loss ofcommitment

Involvement ofproviders

Involvement of theState (BHS, QA)

Involvement ofCTG

PerceivedPotential

Perceivedthreat

Level ofcommitment

of thecommittedBuilding Eroding

Positive word ofmouth

+

+

-

+

+

++

+ +

R1

Collaboration

FeasiblePrototype

Components

++

+

+

Perceivedvalidity of

the process

Satisfaction indemostrated results

Positive priorexpectations

(process)

Negativeexpectations

(process)

+

+-+

+

+

+

+R2

+/-

+/-

-

+ +

CommonUnderstanding

Vision

Opportunity/pressureto actInfeasible

PrototypeComponents- +

+

+

+

-+

+

+

+

Trust

Involvement ofCorporate Partner

+

Page 46: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

ModelFeasible

Components

Unsolvedproblems

Unsolved problemgeneration

Progress rate

Satisfaction indemonstrated results

Productivity

Unsolved problemsper component

Projectdefinition

Perceived progressfraction

People on projectdevelopment

CommittedprovidersGaining

commitmentLossing

commitment

Provider totalpopulation

Engagement ofcommittedprovidersBuilding Eroding

Fraction of providerscommitted

Time for commitmentto break down

CollaborationBHS and QAengagement

Total CTG effort

CTG effort onCollaboration

Fraction of CTG efforton collaboration

Availableproviders effort

Indicated stateengagement

CTG Effort onproject tasks

Effect of collaboration onUnresolved Components

Effect of Collaborationon Productivity

Willingness to adjustworkforce

Average unsolvedproblems percomponent

Effect of averageproblems onsatisfaction

PerceivedPotential

Positive word ofmouth effect

Average commitmentper provider

Saturation effect

Contacts

Maximum effort perprovider

Indicatedengagement

Available people

Engaging

Time to perceivepotential

Effect of CTG efforton collaboration

CTG Effort onresponsibility of

collaboration

Effect of responsibility ofcollaboration on contacts

Weight onresponsibility

Effect of responsibility ofcollaboration on time to

commitment to break down

Available StateEffort

Potential StateEffort

Potential providereffort

Page 47: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Team Experiments

Project

800 People*Hour/Month2 Dmnl

100 People200 Component

4 Unsolved problem/Component

0 People*Hour/Month0 Dmnl0 People0 Component2 Unsolved problem/Component

5 5 5 55

44

44

4

3 3 3 33

2 2 2 2 2

2

11

1

1

1

1

0 4 8 12 16 20 24 28Time (Month)

Available State Effort : Base People*Hour/Month1 1 1 1Collaboration : Base Dmnl2 2 2 2 2 2 2Committed providers : Base People3 3 3 3 3 3Feasible Components : Base Component4 4 4 4 4 4Average unsolved problems per component : Base Unsolved problem/Component5 5

Project

800 People*Hour/Month0.04 Dmnl

1 People200 Component

4 Unsolved problem/Component

0 People*Hour/Month0 Dmnl0 People0 Component2 Unsolved problem/Component

5 5 5 5 5

4 44

4

4

3

33 3 3

22

2

2

2

2

11

1

1

1

1

0 7 14 21 28 35 42 49 56 63Time (Month)

Available State Effort : NoCTG People*Hour/Month1 1 1 1Collaboration : NoCTG Dmnl2 2 2 2 2 2 2Committed providers : NoCTG People3 3 3 3 3Feasible Components : NoCTG Component4 4 4 4 4 4Average unsolved problems per component : NoCTG Unsolved problem/Component5 5

Page 48: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Team Discussion

Page 49: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 50: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 51: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 52: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 53: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 54: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Reflector Feedback

Page 55: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Future Directions

• Fix known problems• Add to providers capacity to learn (2)• Explore how CTG allocates effort dynamically• Expand to multi-phase view• Elaborate inputs to effects of and from

collaboration (1)• Elaborate trust dynamics (1)• Capture feedback insights from the work (1)

Page 56: HIMS Case July, 2001 Group Modeling of IT ‑ Based Innovations in the Public Sector Anthony Cresswell Theresa Pardo Center for Technology in Governement

Known problems

• No way to solve problems

• “Epidemic” nature of committed units (all or nothing)

• Satisfaction never takes off

• Parameter issues