1
Location 100 Lakeside Avenue East, Cleveland, OH Engineer Karpinski Engineering Cleveland, OH Installing Contractor Coleman Spohn, Mechanical Inc., JV, CSMI, Cleveland, OH Construction Manager Turner, Ozanne, VAA, A Joint Venture The RLD Project Team Josh Looper, PE John Emmendorfer Mike Kennedy Challenge The city of Cleveland was chosen as the site for the Republican National Convention in 2016. However, the hotel itself was only 40% designed when the project bid was accepted. To have this hotel operational for the convention required a strong collaboration effort between all the different stakeholders, leaving very little room for error. Why R.L Deppmann? Trust was an important part of the decision to go with Deppmann. This project required the construction to start before the HVAC, steam, and hydronic system designs were completed. The engineer chose to consult with the Deppmann engineering sales team to ensure that the solutions would perform as needed and be implemented within the required timeline. In essence, the engineering team had the confidence that R. L. Deppmann would get it right the first time and deliver as promised for a fair price. Solution R. L. Deppmann provided the knowledge needed to meet the equipment pressure requirements of this mul-zone high-rise design. We provided high-pressure B&G GPX Plate Exchangers for the CHW system and B&G SU Shell & Tube Converters for the district steam-to-water heang system. The large pressure differences across the exchangers required experse. The Deppman engineer was very conscious of energy recovery. He used his deep knowledge of heat transfer and steam to suggest modificaons to a Cemline Condensate Heat Recovery Tank with B&G TC tank heater that improved the energy recovery over tradionally supplied designs. Hilton Cleveland Downtown “Working with RLD was critical in the design of the custom heat recovery tank. They were a design assist partner who helped create a solution for our process of recovering heat for snow melt and domestic hot water, while cooling steam condensate. ” - James Dudt, Karpinski Engineering Cleveland | Detroit | Grand Rapids | Saginaw 800.589.6120 | deppmann.com

Hilton Cleveland Downtown · Hilton Cleveland Downtown “Working with RLD was critical in the design of the custom heat recovery tank. They were a design assist partner who helped

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hilton Cleveland Downtown · Hilton Cleveland Downtown “Working with RLD was critical in the design of the custom heat recovery tank. They were a design assist partner who helped

Location100 Lakeside Avenue East,Cleveland, OH

EngineerKarpinski EngineeringCleveland, OH

Installing ContractorColeman Spohn, Mechanical Inc., JV, CSMI, Cleveland, OH

Construction ManagerTurner, Ozanne, VAA, A Joint Venture

The RLD Project TeamJosh Looper, PEJohn EmmendorferMike Kennedy

ChallengeThe city of Cleveland was chosen as the site for the Republican National Convention in 2016. However, the hotel itself was only 40% designed when the project bid was accepted. To have this hotel operational for the convention required a strong collaboration effort between all the different stakeholders, leaving very little room for error.

Why R.L Deppmann?Trust was an important part of the decision to go with Deppmann. This project required the construction to start before the HVAC, steam, and hydronic system designs were completed. The engineer chose to consult with the Deppmann engineering sales team to ensure that the solutions would perform as needed and be implemented within the required timeline. In essence, the engineering team had the confidence that R. L. Deppmann would get it right the first time and deliver as promised for a fair price.

SolutionR. L. Deppmann provided the knowledge needed to meet the equipment pressure requirements of this multi-zone high-rise design. We provided high-pressure B&G GPX Plate Exchangers for the CHW system and B&G SU Shell & Tube Converters for the district steam-to-water heating system. The large pressure differences across the exchangers required expertise.

The Deppman engineer was very conscious of energy recovery. He used his deep knowledge of heat transfer and steam to suggest modifications to a Cemline Condensate Heat Recovery Tank with B&G TC tank heater that improved the energy recovery over traditionally supplied designs.

Hilton Cleveland Downtown

“Working with RLD was critical in the design

of the custom heat recovery tank. They were

a design assist partner who helped create a

solution for our process of recovering heat

for snow melt and domestic hot water, while

cooling steam condensate. ”

- James Dudt, Karpinski Engineering

Cleveland | Detroit | Grand Rapids | Saginaw 800.589.6120 | deppmann.com