Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned Start Planned Finish Traffic Management Removal of vegetation on cycleway links Footway and Cycleways Vegetation Removal Various TBC - 2020/2021 TBC - 2020/2021 Off Highway Work Various Location upgrades of PROW surfacing PROW Network PROW Footway surfacing Various TBC - 2020/2021 TBC - 2020/2021 Off Highway Work CHAPEL LANE Addlethorpe Surface Dressing 1 days 18/05/2020 18/05/2020 Short duration road closure A1104, Market Place, crossing Alford Replace anti- skid/red with new surfacing TBC TBC in 2021 TBC in 2021 TBC Various locations through village Alford Street Lighting Improvements 30 days 06/07/2020 14/08/2020 Give & Take RED BARN LN / MOORES LN / ELM LN Algarkirk Surface Dressing 1 days 17/05/2020 17/05/2020 Short duration road closure PITCHER ROW LN Algarkirk Surface Dressing 1 days 17/05/2020 17/05/2020 Short duration road closure YARBURGH ROAD Alvingham Surface Dressing 1 days 21/05/2020 21/05/2020 Short duration road closure SUTTERTON DRO. Amber Hill Surface Dressing 1 days 15/06/2020 15/06/2020 Short duration road closure SUTTERTON DRO. Amber Hill Surface Dressing 1 days 23/06/2020 23/06/2020 Short duration road closure Camp to B1191 junction Ashby Carriageway structural patching TBC TBC in 2021 TBC in 2021 TBC MAIN STREET Ashby De La Launde Surface Dressing 1 days 02/06/2020 02/06/2020 Short duration road closure THURLBY ROAD Aubourn Carriageway Resurfacing 5 days 08/10/2020 14/10/2020 Road Closure

Highways works programme 2020-2021

  • Upload
    others

  • View
    10

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Removal of vegetation on

cycleway links

Footway and

Cycleways

Vegetation

Removal

Various TBC -

2020/2021

TBC -

2020/2021

Off Highway

Work

Various Location upgrades of

PROW surfacing

PROW Network PROW Footway

surfacing

Various TBC -

2020/2021

TBC -

2020/2021

Off Highway

Work

CHAPEL LANE Addlethorpe Surface Dressing

1 days 18/05/2020 18/05/2020 Short duration road closure

A1104, Market Place, crossing Alford Replace anti-skid/red with new surfacing

TBC TBC in 2021

TBC in 2021

TBC

Various locations through village

Alford Street Lighting Improvements

30 days 06/07/2020 14/08/2020 Give & Take

RED BARN LN / MOORES LN / ELM LN

Algarkirk Surface Dressing

1 days 17/05/2020 17/05/2020 Short duration road closure

PITCHER ROW LN Algarkirk Surface

Dressing

1 days 17/05/2020 17/05/2020 Short duration

road closure YARBURGH ROAD Alvingham Surface

Dressing

1 days 21/05/2020 21/05/2020 Short duration

road closure

SUTTERTON DRO. Amber Hill Surface Dressing

1 days 15/06/2020 15/06/2020 Short duration road closure

SUTTERTON DRO. Amber Hill Surface Dressing

1 days 23/06/2020 23/06/2020 Short duration road closure

Camp to B1191 junction Ashby Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

MAIN STREET Ashby De La Launde Surface Dressing

1 days 02/06/2020 02/06/2020 Short duration road closure

THURLBY ROAD Aubourn Carriageway

Resurfacing

5 days 08/10/2020 14/10/2020 Road Closure

Page 2: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

ROYAL OAK LANE Aubourn Minor Drainage

Repairs

20 days 07/09/2020 02/10/2020 Road Closure

B1190 HORNCASTLE ROAD Bardney Carriageway

Resurfacing

6 days 28/09/2020 05/10/2020 Road Closure

A607 - GRANTHAM ROAD Barkston Surface Dressing

1 days 10/06/2020 10/06/2020 Convoy

CHAPEL NOOK LANE Bassingham Surface Dressing

1 days 26/05/2020 26/05/2020 Short duration road closure

THURLBY ROAD Bassingham Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

MAIN STREET Belton Surface Dressing

1 days 21/05/2020 21/05/2020 Short duration road closure

BILLINGBOROUGH DROVE Billingborough Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

Links to village Centre Billinghay New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure

HIGH STREET Billinghay Surface

Dressing

1 days 06/07/2020 06/07/2020 Stop & Go

MILL LN Billinghay Surface

Dressing

1 days 06/07/2020 06/07/2020 Stop & Go

FIELD ROAD (PART) Billinghay Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

MEADOW WAY Billinghay Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

LOUTH RD Binbrook Footway Works 5 days 20/04/2020 24/04/2020 Road Closure

ATTERBY CARR LANE-SOUTH RAMPER

Bishop Norton Carriageway Reconstruction

5 days 15/09/2020 21/09/2020 Road Closure

Atterby Carr Lane Bishop Norton Carriageway

Reconstruction

TBC TBC in

2021

TBC in

2021

TBC

Page 3: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

C003, LONG WOOD CULVERT

(BR NO 05/59/61)

Blankney Structures

Improvements

16 days 06/07/2020 27/07/2020 Road Closure

B1188 - LINCOLN ROAD Blankney Surface

Dressing

1 days 09/06/2020 09/06/2020 Convoy

STATION ROAD Blyton Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

RED CAP LANE - TBC Boston Carriageway Patching

5 days 16/11/2020 20/11/2020 Road Closure

PENN STREET Boston Carriageway Resurfacing

5 days 03/08/2020 07/08/2020 Road Closure - NIGHTS

WIDE BARGATE Boston Carriageway Resurfacing

4 days 10/08/2020 13/08/2020 Road Closure - NIGHTS

A1138 Dock Road Boston Carriageway Resurfacing

8 weeks 28/09/2020 20/11/2020 Road Closure - NIGHTS

ARUNDLE CRESCENT Boston Footway Works 31 days 22/07/2020 02/09/2020 Road Closure

AMBERLEY CRESCENT Boston Footway Works 31 days 22/07/2020 02/09/2020 Road Closure

Various locations BOSTON Street Lighting Improvements

20 days 15/02/2021 12/03/2021

C849, TOWN BRIDGE (BR NO 34/24/70)

Boston Structures Improvements

65 days 08/06/2020 06/09/2020 Lane Closure

RAWSON'S BRIDGE Boston Structures Improvements

10 days 22/06/2020 03/07/2020 Road Closure

RICHARDSONS BRIDGE,

COWBRIDGE

Boston Structures

Improvements

5 days 17/08/2020 21/08/2020 Road Closure

A16, SOUTH FORTY FOOT

DRAIN BRIDGE (34/22/59)

Boston Structures

Improvements

TBC TBC TBC 2-way Signals

HORNCASTLE RD Boston Surface Dressing

1 days 18/06/2020 18/06/2020 Stop & Go

Page 4: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

RED LION ST Boston Surface

Dressing

1 days 24/07/2020 24/07/2020 Short duration

road closure WELLAND RD/ SOUTH

PARADE

Boston Surface

Dressing

1 days 24/07/2020 24/07/2020 Stop & Go

CHURCH RD Boston Surface Dressing

1 days 24/07/2020 24/07/2020 Stop & Go

FRESHNEY WAY Boston Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

GLEN DRI Boston Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

CHESTER WAY Boston Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

MEDLAM RD Boston Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

FENSIDE RD Boston Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

GPR SURVEY -

HORNCASTLE RD O/S NEW PROPERTIES

Boston Traffic Signals

Improvements

2 days 06/07/2020 07/07/2020 Mobile Works

SLEAFORD ROAD/BROTHERTOFT ROAD

Boston Traffic Signals Improvements

25 days 27/07/2020 28/08/2020 Road Closure

A151 Bourne Carriageway Resurfacing

3 weeks 27/07/2020 14/08/2020 Road Closure

HARRINGTON STREET Bourne Footway Micro-asphalt surfacing

9 days 20/05/2020 01/06/2020 Give and Take

RECREATION ROAD Bourne Footway Micro-

asphalt surfacing

9 days 20/05/2020 01/06/2020 Give and

Take

Page 5: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

MANNING ROAD EAST Bourne Footway Micro-

asphalt surfacing

8 days 21/05/2020 01/06/2020 Give and

Take

STANTON CLOSE Bourne Footway Micro-asphalt surfacing

5 days 26/05/2020 01/06/2020 Give and Take

NORTH ROAD(EAST SIDE) Bourne Footway Micro-asphalt

surfacing

6 days 26/05/2020 02/06/2020 Give and Take

CHERRY HOLT ROAD Bourne Footway Micro-

asphalt surfacing

8 days 26/05/2020 04/06/2020 Give and

Take

WEST ROAD(SOUTH SIDE) Bourne Footway Micro-asphalt surfacing

6 days 29/05/2020 05/06/2020 Give and Take

STEPHENSON WAY Bourne Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give and Take

CHERITON WAY Bourne Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

THE SPINDLES Bourne Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

LINDEN RISE Bourne Footway Micro-

asphalt surfacing

10 days 09/06/2020 22/06/2020 Give and

Take

Page 6: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

BRYONY GARDENS Bourne Footway Micro-

asphalt surfacing

10 days 10/06/2020 23/06/2020 Give and

Take

THE BRAMBLES Bourne Footway Micro-asphalt surfacing

10 days 10/06/2020 23/06/2020 Give and Take

BRIAR WALK Bourne Footway Micro-asphalt

surfacing

10 days 10/06/2020 23/06/2020 Give and Take

NORTHFIELDS Bourne Footway Micro-

asphalt surfacing

10 days 10/06/2020 23/06/2020 Give and

Take

RANGOON WAY Bourne Footway Micro-asphalt surfacing

10 days 11/06/2020 24/06/2020 Give and Take

WINGATE WAY Bourne Footway Micro-asphalt

surfacing

10 days 12/06/2020 25/06/2020 Give and Take

MOUNTBATTEN WAY Bourne Footway Micro-asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and Take

ARAKAM WAY Bourne Footway Micro-asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and Take

MANDALAY DRIVE Bourne Footway Micro-

asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and

Take

Page 7: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

ARNHEM WAY Bourne Footway Micro-

asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and

Take

PEGASUS GROVE Bourne Footway Micro-asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and Take

BARKSTON CLOSE Bourne Footway Micro-asphalt

surfacing

10 days 15/06/2020 26/06/2020 Give and Take

LONSDALE GROVE Bourne Footway Micro-

asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and

Take

OOSTERBEEK CLOSE Bourne Footway Micro-asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and Take

ANCASTER ROAD Bourne Footway Micro-asphalt

surfacing

10 days 15/06/2020 26/06/2020 Give and Take

BLACKTHORN WAY Bourne Footway Micro-asphalt surfacing

10 days 15/06/2020 26/06/2020 Give and Take

MILL DROVE Bourne Footway Micro-asphalt surfacing

10 days 17/06/2020 30/06/2020 Give and Take

BALDWIN GROVE Bourne Footway Micro-

asphalt surfacing

10 days 18/06/2020 01/07/2020 Give and

Take

Page 8: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

SOUTHFIELDS

(INC.LINKPATH)

Bourne Footway Micro-

asphalt surfacing

10 days 19/06/2020 02/07/2020 Give and

Take

WESTWOOD DRIVE Bourne Footway Micro-asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and Take

HARVEY CLOSE Bourne Footway Micro-asphalt

surfacing

10 days 22/06/2020 03/07/2020 Give and Take

OSTLER DRIVE Bourne Footway Micro-

asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and

Take

CECIL CLOSE Bourne Footway Micro-asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and Take

CHURCHILL AVENUE Bourne Footway Micro-asphalt

surfacing

14 days 22/06/2020 09/07/2020 Give and Take

MANOR LANE Bourne Footway Micro-asphalt surfacing

14 days 22/06/2020 09/07/2020 Give and Take

BERKELEY DRIVE Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

STRETHAM WAY Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

LARCH CLOSE Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

WILLOW DRIVE Bourne Surface

Dressing

1 days 26/06/2020 26/06/2020 Short duration

road closure

Page 9: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

ELDER CLOSE Bourne Surface

Dressing

1 days 26/06/2020 26/06/2020 Short duration

road closure HOLLY DRIVE Bourne Surface

Dressing

1 days 26/06/2020 26/06/2020 Short duration

road closure

LAVENDER WAY Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

LILAC CLOSE Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

CEDAR DRIVE Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

ROWAN WAY Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

SHARPES CLOSE Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

OAK CRESCENT Bourne Surface Dressing

1 days 26/06/2020 26/06/2020 Short duration road closure

ASH GROVE Bourne Surface

Dressing

1 days 27/06/2020 27/06/2020 Short duration

road closure SAXON WAY Bourne Surface

Dressing

1 days 27/06/2020 27/06/2020 Short duration

road closure

EDWIN GARDENS Bourne Surface Dressing

1 days 27/06/2020 27/06/2020 Short duration road closure

KINGSLEY AVENUE Bourne Surface Dressing

1 days 27/06/2020 27/06/2020 Short duration road closure

FOREST AVENUE Bourne Surface Dressing

1 days 27/06/2020 27/06/2020 Short duration road closure

WESTBOURNE PARK Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

Page 10: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

PINEWOOD CLOSE Bourne Surface

Dressing

1 days 28/06/2020 28/06/2020 Short duration

road closure CHESTNUT WAY Bourne Surface

Dressing

1 days 28/06/2020 28/06/2020 Short duration

road closure

FIR AVENUE Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

BEECH AVENUE Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

WATLING CLOSE Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

STONE CLOSE Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

AKEMAN CLOSE Bourne Surface Dressing

1 days 28/06/2020 28/06/2020 Short duration road closure

DERE CLOSE Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

ERMINE CLOSE Bourne Surface

Dressing

1 days 29/06/2020 29/06/2020 Short duration

road closure ST GILBERTS ROAD Bourne Surface

Dressing

1 days 29/06/2020 29/06/2020 Short duration

road closure

EXETER COURT Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

EXETER CLOSE Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

MAPLE GARDENS Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

BALDWIN GROVE Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

Page 11: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

ARNHEM WAY Bourne Surface

Dressing

1 days 29/06/2020 29/06/2020 Short duration

road closure OOSTERBEEK CLOSE Bourne Surface

Dressing

1 days 29/06/2020 29/06/2020 Short duration

road closure

BARKSTON CLOSE Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

PEGASUS GROVE Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

RANGOON WAY Bourne Surface Dressing

1 days 29/06/2020 29/06/2020 Short duration road closure

WINGATE WAY Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

MOUNTBATTEN WAY Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

ARAKAN WAY Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

MANDALAY DRIVE Bourne Surface

Dressing

1 days 30/06/2020 30/06/2020 Short duration

road closure SOUTHFIELDS Bourne Surface

Dressing

1 days 30/06/2020 30/06/2020 Short duration

road closure

AUSTERBY CLOSE Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

GROVENSOR AVENUE Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

ESSEX WAY Bourne Surface Dressing

1 days 30/06/2020 30/06/2020 Short duration road closure

SYCAMORE GROVE Bracebridge Heath Footway Micro-asphalt surfacing

5 days 11/05/2020 15/05/2020 Give & Take

Page 12: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

KING DRIVE Bracebridge Heath Footway Micro-

asphalt surfacing

4 days 12/05/2020 15/05/2020 Give & Take

CARDYKE WAY Bracebridge Heath Footway Micro-asphalt surfacing

4 days 12/05/2020 15/05/2020 Give & Take

MAREHAM CLOSE Bracebridge Heath Footway Micro-asphalt

surfacing

3 days 13/05/2020 15/05/2020 Give & Take

FOSSE COURT Bracebridge Heath Footway Micro-

asphalt surfacing

3 days 13/05/2020 15/05/2020 Give & Take

PEDDARS COURT Bracebridge Heath Footway Micro-asphalt surfacing

9 days 14/05/2020 26/05/2020 Give & Take

AKEMAN DRIVE Bracebridge Heath Footway Micro-asphalt

surfacing

9 days 14/05/2020 26/05/2020 Give & Take

SALTERS CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

ICKNIELD CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

SEWSTERN CLOSE Bracebridge Heath Footway Micro-

asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

Page 13: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

STANE DRIVE Bracebridge Heath Footway Micro-

asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

APPIAN WAY Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

ERMINE COURT Bracebridge Heath Footway Micro-asphalt

surfacing

8 days 15/05/2020 26/05/2020 Give & Take

HADRIANS ROAD Bracebridge Heath Footway Micro-

asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

WATLING CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

OAKDENE AVENUE Bracebridge Heath Footway Micro-asphalt

surfacing

8 days 15/05/2020 26/05/2020 Give & Take

MAPLE CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give & Take

CAISTOR DRIVE Bracebridge Heath Footway Micro-asphalt surfacing

8 days 15/05/2020 26/05/2020 Give and Take

NORFOLK CRESCENT Bracebridge Heath Footway Micro-

asphalt surfacing

8 days 15/05/2020 26/05/2020 Give and

Take

Page 14: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

LICHFIELD ROAD Bracebridge Heath Footway Micro-

asphalt surfacing

10 days 18/05/2020 29/05/2020 Give and

Take

CARLISLE WAY Bracebridge Heath Footway Micro-asphalt surfacing

10 days 18/05/2020 29/05/2020 Give and Take

WINCHESTER CLOSE Bracebridge Heath Footway Micro-asphalt

surfacing

10 days 18/05/2020 29/05/2020 Give and Take

CANTERBURY ROAD Bracebridge Heath Footway Micro-

asphalt surfacing

10 days 18/05/2020 29/05/2020 Give and

Take

NORWICH DRIVE Bracebridge Heath Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and Take

SALISBURY DRIVE Bracebridge Heath Footway Micro-asphalt

surfacing

9 days 26/05/2020 05/06/2020 Give and Take

CHICHESTER ROAD Bracebridge Heath Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and Take

DURHAM CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and Take

YORK WAY Bracebridge Heath Footway Micro-

asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and

Take

Page 15: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WORCESTER CLOSE Bracebridge Heath Footway Micro-

asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and

Take

ROCHESTER CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and Take

RIPON CLOSE Bracebridge Heath Footway Micro-asphalt

surfacing

9 days 26/05/2020 05/06/2020 Give and Take

WELLS DRIVE Bracebridge Heath Footway Micro-

asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and

Take

GLOUCESTER CLOSE Bracebridge Heath Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give and Take

BATH ROAD Bracebridge Heath Footway Micro-asphalt

surfacing

10 days TBC TBC Give and Take

SOUTHWELL COURT Bracebridge Heath Footway Micro-asphalt surfacing

10 days TBC TBC Give and Take

WESTMINSTER DRIVE Bracebridge Heath Footway Micro-asphalt surfacing

10 days TBC TBC Give and Take

SYCAMORE GROVE Bracebridge Heath Surface

Dressing

1 days 12/07/2020 12/07/2020 Short duration

road closure ELY CLOSE Bracebridge Heath Surface

Dressing

1 days 26/07/2020 26/07/2020 Short duration

road closure

Page 16: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

LICHFIELD ROAD (PART) Bracebridge Heath Surface

Dressing

1 days 26/07/2020 26/07/2020 Short duration

road closure SALISBURY DRIVE Bracebridge Heath Surface

Dressing

1 days 26/07/2020 26/07/2020 Short duration

road closure

YORK WAY Bracebridge Heath Surface Dressing

1 days 26/07/2020 26/07/2020 Short duration road closure

WORCESTER CLOSE Bracebridge Heath Surface Dressing

1 days 26/07/2020 26/07/2020 Short duration road closure

NORFOLK CRESCENT Bracebridge Heath Surface Dressing

1 days 26/07/2020 26/07/2020 Short duration road closure

MAIN ROAD Brampton Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

Magnolia Close Branston Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

SWINHOPE ROAD Brookenby Surface Dressing

1 days 12/05/2020 12/05/2020 Short duration road closure

KENT RD Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure DALE VIEW RD Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

JAVELIN RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

CANBERRA RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

LINCOLN RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

WINDSMOOR RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

Page 17: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

EDINBURGH RD Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure SAINT DAVIDS RD Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

DRIGH RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

MERLIN RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

HUNTER RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

CUMBERLAND TERRACE Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

SAILSBURY AVE Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

CHICHESTER RD Brookenby Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

SUSSEX CLOSE Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure YORK RD Brookenby Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

C502 BARDNEY ROAD Bucknall Carriageway Resurfacing

7 days 14/09/2020 22/09/2020 Road Closure

BURGH ON BAIN O/S VILLAGE STORE

Burgh On Bain Minor Drainge Repairs

5 days 28/09/2020 02/10/2020 2-way Signals

A46 Caistor Carriageway Resurfacing

3 weeks 25/05/2020 12/06/2020 Road Closure - NIGHTS

C248 NORTH KELSEY ROAD Caistor Carriageway Resurfacing

6 days 26/10/2020 02/11/2020 Road Closure

Page 18: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Various locations through Town Caistor Street Lighting

Improvements

35 days 15/07/2020 01/09/2020

BLACKTHORNE LANE Cammeringham Carriageway

Reconstruction

5 days 09/09/2020 15/09/2020 Road Closure

A158 Main road to Gunby Candlesby Carriageway Resurfacing

TBC TBC in 2021

TBC in 2021

TBC

A1028 BLUESTONE HEATH ROAD (AVOID POSTPONING, SUNDAY WORKING)

Candlesby Surface Dressing

1 days 17/05/2020 17/05/2020 Convoy

GRANGE LANE / HALL DRIVE Canwick Surface Dressing

1 days 13/07/2020 13/07/2020 Short duration road closure

A6121 Carlby Carriageway Resurfacing

TBC TBC in 2021

TBC in 2021

TBC

CHURCH STREET Carlby Surface

Dressing

1 days 25/06/2020 25/06/2020 Short duration

road closure THE AVENUE Carlby Surface

Dressing

1 days 25/06/2020 25/06/2020 Short duration

road closure

TEMPLEMEN DRIVE/FENTON DRIVE

Carlby Surface Dressing

1 days 25/06/2020 25/06/2020 Short duration road closure

HIGH STREET/HOLYWELL ROAD

Carlby Surface Dressing

1 days 25/06/2020 25/06/2020 Short duration road closure

A6121 - BOURNE ROAD Carlby Surface Dressing

1 days 25/06/2020 25/06/2020 Convoy

NAVENBY LANE Carlton Le Moorland Carriageway Patching

4 days 01/09/2020 04/09/2020 Road Closure

BROUGHTON ROAD C1 JUNCTION

Carlton Le Moorland Carriageway Resurfacing

2 days 13/07/2020 14/07/2020 Road Closure

BROUGHTON ROAD Carlton Le Moorland Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

Page 19: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A607 Carlton Scroop Carriageway

Resurfacing

6 weeks 14/09/2020 23/10/2020 Road Closure

NEWARK ROAD Carlton Scroop Minor Drainge

Repairs

10 days 30/11/2020 11/12/2020 TBC

HOUGH LANE (LOOP) Carlton Scroop Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

COLD HARBOUR LANE Carrington Surface Dressing

1 days 20/05/2020 20/05/2020 Short duration road closure

NEWHAM DRAIN Carrington Surface Dressing

1 days 20/05/2020 20/05/2020 Short duration road closure

NORTHLANDS ROAD Carrington Surface Dressing

1 days 20/05/2020 20/05/2020 Short duration road closure

Regal Gardens Castle Bytham Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

SUNNINGDALE DRIVE Chapel St Leonards Footway Works 25 days 05/10/2020 06/11/2020 Road Closure

SUNNINGDALE CLOSE Chapel St Leonards Footway Works 25 days 09/11/2020 11/12/2020 Road Closure

MAIN STREET Claypole Minor Drainge Repairs

10 days 07/12/2020 18/12/2020 Road Closure

MAIN STREET Claypole Surface Dressing

1 days 10/06/2020 10/06/2020 Stop & Go

A153 - TUMBY ROAD/HIGH STREET

Coningsby Surface Dressing

1 days 19/05/2020 19/05/2020 Stop & Go

C719 DECOY FM TO

CROWLAND - TBC

Crowland Carriageway

Patching

20 days 23/11/2020 18/12/2020 Road Closure

HALL MEADOW ROAD Deeping St James Carriageway

Patching

5 days 19/10/2020 23/10/2020 Road Closure

FROGNALL Deeping St James Carriageway Patching

3 days 26/10/2020 28/10/2020 Road Closure

Page 20: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

C418 CHURCH ST Denton Carriageway

Resurfacing

1 days 22/07/2020 22/07/2020 Road Closure

THE HURN Digby Surface

Dressing

1 days 10/07/2020 10/07/2020 Short duration

road closure

CHESTNUT CLOSE Digby Surface Dressing

1 days 10/07/2020 10/07/2020 Short duration road closure

CHURCH STREET/BECK STREET/STATION ROAD

Digby to Walcott Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

CHURCH STREET/BECK STREET/STATION ROAD/DIGBY ROAD

Digby to Walcott Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

A152 School Lane Donington Replace anti-skid/red with

new surfacing

TBC TBC in 2021

TBC in 2021

TBC

CHURCH ST Donington Surface Dressing

1 days 24/06/2020 24/06/2020 Stop & Go

DODDINGTON RD Dry Doddington Carriageway Patching

7 days 07/09/2020 15/09/2020 Road Closure

WESTBOROUGH ROAD Dry Doddington Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

DODDINGTON LANE Dry Doddington Surface Dressing

1 days 11/06/2020 11/06/2020 Convoy

Chapel Lane Dunston Carriageway structural

patching

TBC TBC in 2021

TBC in 2021

TBC

Front Street/ Middle Street Dunston Carriageway

structural patching

TBC TBC in

2021

TBC in

2021

TBC

Page 21: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

MEADOW ROAD Dunston Surface

Dressing

1 days 10/07/2020 10/07/2020 Short duration

road closure SPRING COURT Dunston Surface

Dressing

1 days 10/07/2020 10/07/2020 Short duration

road closure

FEN LANE Dunston Surface Dressing

1 days 10/07/2020 10/07/2020 Short duration road closure

B1188 - SLEAFORD ROAD Dunston to Nocton Surface Dressing

1 days 31/05/2020 31/05/2020 Convoy

SWINDERBY ROAD Eagle Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

MAIN ROAD East Torrington Surface Dressing

1 days 11/05/2020 11/05/2020 Short duration road closure

TORRINGTON LANE East Torrington Surface Dressing

1 days 01/06/2020 01/06/2020 Road Closure

A158 LINCOLN ROAD Edlington Carriageway Resurfacing

10 days 11/05/2020 22/05/2020 Road Closure

SHEARMANS

WATH/DOCKINGS LANE

Edlington Surface

Dressing

1 days 17/05/2020 17/05/2020 Short duration

road closure EVEDON EAST LANE Ewerby Carriageway

Reconstruction

2 days 24/08/2020 25/08/2020 Road Closure

SPRIDLINGTON ROAD Faldingworth Surface Dressing

1 days 27/05/2020 27/05/2020 Short duration road closure

JUBILEE AVENUE Faldingworth Surface Dressing

1 days 27/05/2020 27/05/2020 Short duration road closure

Farthorpe Road Farthorpe Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

Page 22: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

KETTLETHORPE ROAD Fenton Footway Micro-

asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and

Take

ADDISON PLACE Fenton Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

MALKILN ROAD Fenton Footway Micro-asphalt

surfacing

10 days 20/04/2020 01/05/2020 Stop & Go

A156 LINCOLN ROAD Fenton Footway Micro-

asphalt surfacing

10 days 20/04/2020 01/05/2020 2-way Signals

WILLINGHAM ROAD Fillingham Surface Dressing

1 days 30/05/2020 30/05/2020 Road Closure

FERRY ROAD Fiskerton Carriageway Patching

15 days 16/11/2020 04/12/2020 Road Closure

Ferryside Gardens Fiskerton Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Mill Bank Fleet Carriageway structural

patching

TBC TBC in 2021

TBC in 2021

TBC

Strongs Bank Fleet Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

Torrington Lane Fleet Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

WINSLOW GATE (STH) Fleet Surface

Dressing

1 days 18/05/2020 18/05/2020 Short duration

road closure

Page 23: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

PUTTOCK LANE Fosdyke Carriageway

Patching

4 days 28/09/2020 01/10/2020 Road Closure

A16 - MAIN ROAD Fotherby Surface

Dressing

1 days 12/05/2020 12/05/2020 Stop & Go

BARTON STREET/FOTHERBY COMMON

Fotherby Surface Dressing

1 days 12/05/2020 12/05/2020 Short duration road closure

HARRIS' BRIDGE Frampton Structures Improvements

10 days 13/07/2020 24/07/2020 2-way Signals

SPITTAL HILL RD / BRAND END RD

Freiston / Butterwick Surface Dressing

1 days 16/06/2020 16/06/2020 Short duration road closure

SHORT FERRY Friskerton Traffic Signals Improvements

20 days 15/06/2020 10/07/2020 2-way Signals

GREENFIELD LANE Friskney Surface Dressing

1 days 14/05/2020 14/05/2020 Short duration road closure

EAUDYKE ROAD Friskney Surface Dressing

1 days 18/05/2020 18/05/2020 Short duration road closure

B1183 BOSTON ROAD Frithville Carriageway

Patching

10 days 02/11/2020 13/11/2020 Road Closure

B1183 WESTVILLE ROAD Frithville Carriageway

Resurfacing

7 days 17/08/2020 25/08/2020 Road Closure

U/C, SCHOOL CULVERT (BR NO 35/10/56)

Frithville Structures Improvements

12 days 14/05/2020 29/05/2020 3-way Signals

BELCHFORD ROAD Fulletby Surface Dressing

1 days 16/05/2020 16/05/2020 Short duration road closure

B1399 FULNETBY BANK SLIP Fulnetby Structures Improvements

15 days 27/07/2020 14/08/2020 Road Closure

THORESBY ROAD/FULSTOW TOP

Fulstow Surface Dressing

1 days 13/05/2020 13/05/2020 Short duration road closure

Page 24: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

OCCUPATION LANE Fulstow Surface

Dressing

1 days 13/05/2020 13/05/2020 Short duration

road closure MAIN STREET Fulstow Surface

Dressing

1 days 10/06/2020 10/06/2020 Short duration

road closure

CORRINGHAM RD/ THORNEDYKE WAY, GAINSBOROUGH

Gainsborough Junction Improvement

50 days 14/09/2020 20/11/2020 TBC

TRINITY STREET/ TESCO'S + N503 PED

Gainsborough Traffic Signals Improvements

30 days 07/09/2020 16/10/2020 TBC

MAIN STREET Gayton Le Marsh Carriageway Reconstruction

3 days 28/08/2020 02/09/2020 Road Closure

WEST DROVE SOUTH Gedney Hill Carriageway Reconstruction

6 days 05/08/2020 12/08/2020 Road Closure

C427 GELSTION ROAD WELL

HILL FM

Gelston Carriageway

Patching

3 days 24/08/2020 26/08/2020 Road Closure

LOVEDON HOUSE LANE Gelston Surface

Dressing

1 days 26/05/2020 26/05/2020 Short duration

road closure

B1397 BOSTON RD Gosberton Footway Works 50 days 07/09/2020 13/11/2020 2-way Signals

WESTHORPE RD Gosberton Surface Dressing

1 days 16/06/2020 16/06/2020 Short duration road closure

COLD HURN LN Gosberton Surface Dressing

1 days 24/06/2020 24/06/2020 Short duration road closure

CHEAL RD Gosberton Cheal Surface Dressing

1 days 24/06/2020 24/06/2020 Short duration road closure

WINDMILL LN / SILTSIDE Gosberton Risegate Surface

Dressing

1 days 18/05/2020 18/05/2020 Short duration

road closure BEACH LN Gosberton Risegate Surface

Dressing

1 days 06/07/2020 06/07/2020 Short duration

road closure

Page 25: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

HFP. HALL'S FOOTBRIDGE

(BR NO 27/59/72)

Goulceby Structures

Improvements

30 days 07/12/2020 15/01/2021 Road Closure

CHAPEL LANE Grainthorpe Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

WHYALLLA CLOSE Grainthorpe Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

JACKLIN CLOSE Grainthorpe Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

STAPES GARTH Grainthorpe Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

Pasture Close Grantham Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

HUNTINGTOWER ROAD Grantham Carriageway Resurfacing

10 days 29/03/2021 09/04/2021 Road Closure

ST CATHERINES RD Grantham Footway Works 18 days 19/08/2020 11/09/2020 Road Closure

ST CATHERINES RD Grantham Investigation Works

2 days 02/07/2020 03/07/2020 TBC

Church Lane Grayingham Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

GREAT HALE DROVE Great Hale Fen Surface Dressing

1 days 21/05/2020 21/05/2020 Short duration road closure

A18 HIGH STREET Great Limber Carriageway Resurfacing

5 days 26/05/2020 30/05/2020 Road Closure

Various locations GREAT LIMBER Street Lighting

Improvements

25 days 09/02/2021 15/03/2021

U/C. EASTFIELD LANE

CULVERT (BR NO 46/54/31)

Great Steeping Structures

Improvements

5 days 15/05/2020 21/05/2020 Road Closure

Page 26: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

GREAT STEEPING Great Steeping Structures

Improvements

TBC TBC TBC TBC

WEST ROAD, MAIN STREET Haconby Surface

Dressing

1 days 10/06/2020 10/06/2020 Short duration

road closure

CHURCH ST Haconby Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

HALL LANE/HACONBY LANE Haconby to Morton Surface Dressing

1 days 10/06/2020 10/06/2020 Short duration road closure

A157 SCHOOL LANE/LOUTH RD

Hainton Minor Drainge Repairs

10 days 14/09/2020 25/09/2020 3-way Signals

SCHOOL LANE Hainton Surface Dressing

1 days 15/05/2020 15/05/2020 Short duration road closure

A157 LOUTH RD Hainton Surface Dressing

1 days 16/05/2020 16/05/2020 Convoy

A631 Harpswell Carriageway Resurfacing

3 weeks 01/03/2021 19/03/2021 Road Closure

BANKS LANE Heckington Carriageway

Resurfacing

2 days 06/10/2020 07/10/2020 Road Closure

Fen Road Heighington Carriageway

structural patching

TBC TBC in

2021

TBC in

2021

TBC

BELLS MEADOW Heighington Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

BACK LANE Heighington Footway Micro-asphalt

surfacing

9 days 26/05/2020 05/06/2020 Give & Take

Page 27: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CLARKE AVENUE Heighington Footway Micro-

asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

ST AUBINS CRESCENT Heighington Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

EDWARD BARKER ROAD Heighington Footway Micro-asphalt

surfacing

9 days 26/05/2020 05/06/2020 Give & Take

MARTIN CLOSE Heighington Footway Micro-

asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

GARRATT CLOSE Heighington Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

LINTIN CLOSE Heighington Footway Micro-asphalt

surfacing

9 days 26/05/2020 05/06/2020 Give & Take

CHAPEL LANE Heighington Footway Micro-asphalt surfacing

9 days 26/05/2020 05/06/2020 Give & Take

STATION ROAD Heighington Footway Micro-asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

CURTIS DRIVE Heighington Footway Micro-

asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

Page 28: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

KENYON CLOSE Heighington Footway Micro-

asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

STEVENSONS CLOSE Heighington Footway Micro-asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

CURTIS DRIVE Heighington Surface Dressing

1 days 13/07/2020 13/07/2020 Short duration road closure

KENYON CLOSE Heighington Surface Dressing

1 days 13/07/2020 13/07/2020 Short duration road closure

STEPHENSON CLOSE Heighington Surface

Dressing

1 days 13/07/2020 13/07/2020 Short duration

road closure B1398 MIDDLE STREET Hemswell Carriageway

Patching

10 days 10/08/2020 21/08/2020 Road Closure

B1168 NEW RIVER GATE Holbeach Carriageway Patching

5 days 12/10/2020 16/10/2020 Road Closure

FROSTLY GATE - TBC Holbeach Carriageway Patching

5 days 02/11/2020 06/11/2020 Road Closure

BATTLEFIELDS LN STH Holbeach Surface Dressing

1 days 25/06/2020 25/06/2020 Short duration road closure

STAR LANE Holbeach Bank Surface Dressing

1 days 18/05/2020 18/05/2020 Short duration road closure

CAMPLING PL Holbeach Bank Surface Dressing

1 days 25/06/2020 25/06/2020 Short duration road closure

DOG DROVE NORTH Holbeach Drove Carriageway Reconstruction

3 days 14/08/2020 18/08/2020 Road Closure

FROGS ABBEY GATE Holbeach Drove Carriageway

Reconstruction

5 days 17/08/2020 21/08/2020 Road Closure

Page 29: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

NEW ROAD Holbeach St Marks Surface

Dressing

1 days 18/05/2020 18/05/2020 Short duration

road closure LAPWATER LN Holbeach St Marks Surface

Dressing

1 days 25/06/2020 25/06/2020 Short duration

road closure

B1192, LANGRICK RD Hollend Fen with Brothertoft

Surface Dressing

1 days 15/06/2020 15/06/2020 Road Closure

B1202 - WRAGBY ROAD Holton Cum Beckering

Surface Dressing

1 days 26/05/2020 26/05/2020 Stop & Go

LOUTH ROAD Holton Le Clay Surface Dressing

1 days 11/05/2020 11/05/2020 Stop & Go

A52 Horbling Carriageway Resurfacing

4 weeks Spring 2021

TBC Road Closure

CROSS DROVE Horbling Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

HORBLING FEN DROVE Horbling Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

JUBILEE WAY Horncastle Improvement

Scheme

10 days 07/09/2020 18/09/2020 2-way Signals

A158 Jubiliee Way Horncastle Replace anti-

skid/red with new surfacing

TBC TBC in

2021

TBC in

2021

TBC

A158 - LINCOLN ROAD (AVOID POSTPONING, SUNDAY WORKING)

Horncastle Surface Dressing

1 days 17/05/2020 17/05/2020 Stop & Go

SAXON WAY Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

ISLIP COURT Horncastle Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure

Page 30: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

BANOVALLUM GARDENS Horncastle Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure BANOVALLUM GARDENS Horncastle Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure

BANOVALLUM GARDENS Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

LODDINGTON COURT Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

LODDINGTON COURT Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

BONNTABLE ROAD Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

MADELY CLOSE Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

JESSOP CLOSE Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

THOMAS GIBSON DRIVE Horncastle Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure WESELY WAY Horncastle Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure

CARLISLE GARDENS Horncastle Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

A158 Main Road Horncastle/Wragby White Lining works

TBC 2020/2021 2020/2021 2 Way Lights

A52 Huttoft Carriageway Resurfacing

7 weeks 06/04/2020 22/05/2020 Road Closure

LINCOLN RD/HIGH STREET/ CHURCHILL

Ingham Surface Dressing

1 days 01/06/2020 01/06/2020 Road Closure

Page 31: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A52 - CHAPEL ROAD (AVOID

POSTPONING)

Ingoldmells Surface

Dressing

1 days 18/05/2020 18/05/2020 Convoy

PINFOLD LANE Irby in the Marsh Surface

Dressing

1 days 14/05/2020 14/05/2020 Short duration

road closure

PADLEYS LANE Keal Cotes Carriageway Reconstruction

2 days 26/08/2020 27/08/2020 Road Closure

A57 DRINSEY KNOOK, FERRY LANE

Kettlethorpe Carriageway Resurfacing

2 days 01/06/2020 02/06/2020 Road Closure

UPTON ROAD Kexby Carriageway Resurfacing

2 days 26/08/2020 27/08/2020 Road Closure

B1202 BARDNEY ROAD Kingthorpe Carriageway Resurfacing

10 days 08/06/2020 19/06/2020 Road Closure

B1191 Main Road Kirkby Green Carriageway Reconstruction

TBC TBC in 2021

TBC in 2021

TBC

WASH ROAD Kirton Improvement Scheme

10 days 26/10/2020 06/11/2020 TBC

C791, GRAVES PARK

CULVERT (BR NO 33/08/94C)

Kirton Structures

Improvements

30 days 21/09/2020 30/10/2020 Road Closure

B1192 Main Road Langrick Bridge New Footway TBC 2021 - TBC 2021 - TBC Footway Closure

A15, DEEPING RD/BOURNE RD

Langtoft Surface Dressing

1 days 10/06/2020 10/06/2020 Convoy

Hoop Lane Langton By Wragby Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

A158 Main Road Langworth Carriageway

Resurfacing

TBC TBC in

2021

TBC in

2021

TBC

Page 32: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A158 Wragby Road crossing Langworth Replace anti-

skid/red with new surfacing

TBC TBC in

2021

TBC in

2021

TBC

A158 - LINCOLN ROAD Langworth to Reepham

Surface Dressing

1 days 26/05/2020 26/05/2020 Convoy

BLYTON ROAD Laughton Minor Drainge Repairs

6 days TBC TBC TBC

A607 - GRANTHAM ROAD Leadenham Surface Dressing

1 days 08/06/2020 08/06/2020 Convoy

LEASINGHAM, LINK FOOTWAY

Leasingham Footway Works 15 days 17/08/2020 04/09/2020 TBC

ROXHOLM ROAD Leasingham/Roxholm

Surface Dressing

1 days 02/06/2020 02/06/2020 Short duration road closure

C418 FOLKINGHAM ROAD Lenton Carriageway

Resurfacing

10 days 31/08/2020 11/09/2020 Road Closure

FOLKINGHAM ROAD Lenton Surface

Dressing

1 days 20/05/2020 20/05/2020 Short duration

road closure

Beaufort close Lincoln Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Campus Way Lincoln Carriageway Resurfacing

2 weeks 08/07/2020 17/07/2020 Road Closure - NIGHTS

TOWER CRESCENT Lincoln Carriageway Resurfacing

5 days 19/10/2020 23/10/2020 Road Closure

160 WRAGBY RD Lincoln Footway Works 10 days 06/04/2020 17/04/2020 2 & 3 way Signals

BRISTOL DRIVE Lincoln Footway Works 60 days 04/01/2021 26/03/2021 Road Closure

HILLSIDE AVENUE Lincoln Footway Works 75 days 04/01/2021 16/04/2021 Road Closure

HILLSIDE APPROACH Lincoln Footway Works 75 days 04/01/2021 16/04/2021 Road Closure

Page 33: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

B1182 Cabourne Ave Lincoln Replace anti-

skid/red with new surfacing

TBC TBC in

2021

TBC in

2021

TBC

BRANT ROAD Lincoln Street Lighting Improvements

25 days 28/09/2020 30/10/2020

HFP, ST. MARK'S FOOTBRIDGE (BR NO 97/70/17B)

Lincoln Structures Improvements

10 days 07/09/2020 18/09/2020 Footway Closure

A15, PELHAM BRIDGE (BR NO 97/70/88)

Lincoln Structures Improvements

85 days 18/01/2021 14/05/2021 Lane Closure

MARIGOLD CLOSE Lincoln Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure LUPIN ROAD Lincoln Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure

WOODRUSH ROAD Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

PENNYCRESS ROAD Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

ASTER CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

THISTLE CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

AZALEA ROAD Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

BLACKTHORN CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

BELLFLOWER CLOSE Lincoln Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure

Page 34: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CHATSWORTH CLOSE Lincoln Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure ARABIS CLOSE Lincoln Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure

WINDEREMERE ROAD Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

MARLBOROUGH CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

HURSTWOOD CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

WESTHOLM CLOSE Lincoln Surface Dressing

1 days 29/05/2020 29/05/2020 Short duration road closure

LARKSPUR ROAD Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

SWAYNE CLOSE Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

THURLOW COURT Lincoln Surface

Dressing

1 days 30/05/2020 30/05/2020 Short duration

road closure LILFORD ROAD Lincoln Surface

Dressing

1 days 30/05/2020 30/05/2020 Short duration

road closure

LILFORD CLOSE Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

HALE CLOSE Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

FAWSLEY CLOSE Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

HOLDENBY ROAD Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

Page 35: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

HOLDENBY CLOSE Lincoln Surface

Dressing

1 days 30/05/2020 30/05/2020 Short duration

road closure ATWATER GROVE Lincoln Surface

Dressing

1 days 30/05/2020 30/05/2020 Short duration

road closure

ATWATER CLOSE Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

ATWATER COURT Lincoln Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

NEVILLE CLOSE Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

BULLINGHAM ROAD Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

WINNIFFE GARDENS Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

MONTAIGNE CRESCENT Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

MONTAIGNE CLOSE Lincoln Surface

Dressing

1 days 31/05/2020 31/05/2020 Short duration

road closure MONTAIGNE GARDEN Lincoln Surface

Dressing

1 days 31/05/2020 31/05/2020 Short duration

road closure

LANEY CLOSE Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

GLYNWELL GROVE Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

REMIGIUS GROVE Lincoln Surface Dressing

1 days 31/05/2020 31/05/2020 Short duration road closure

WALTHAM ROAD Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

Page 36: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WALTHAM CLOSE Lincoln Surface

Dressing

1 days 03/06/2020 03/06/2020 Short duration

road closure AYNSLEY ROAD (INCL.

AYNSLEY CLO)

Lincoln Surface

Dressing

1 days 03/06/2020 03/06/2020 Short duration

road closure

KIRMINGTON CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

GRAVELEY CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

WITCHFORD ROAD Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

WITCHFORD CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

CHEDBURGH CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

ELVINGTON ROAD Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

LANGER CLOSE Lincoln Surface

Dressing

1 days 03/06/2020 03/06/2020 Short duration

road closure LISSETT CLOSE Lincoln Surface

Dressing

1 days 03/06/2020 03/06/2020 Short duration

road closure

ELVINGTON CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

WYTON CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

SNAITH CLOSE Lincoln Surface Dressing

1 days 03/06/2020 03/06/2020 Short duration road closure

ABINGDON AVENUE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

Page 37: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WOODVALE AVENUE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure WOODVALE CLOSE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

ALCONBURY CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

SHAWBURY CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

ABINGDON CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BENSON CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

LOCKING CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

SYWELL CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

KINLOSS CLOSE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure BOSCOMBE CLOSE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

KELSTERN ROAD Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

KELSTERN CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BRIGG CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BRIGG GROVE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

Page 38: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

HARLAXTON CLOSE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure HARLAXTON DRIVE Lincoln Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure

BLYTON ROAD Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BLYTON CLOSE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BLYTON GROVE Lincoln Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

BENSON CRESCENT Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

MELBOURNE ROAD Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

RIDGEWELL CLOSE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

MELBOURNE CLOSE Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure CAISTOR ROAD Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure

FALDINGWORTH CLOSE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

CAISTOR CLOSE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

HIBALDSTOW ROAD Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

HIBALDSTOW CLOSE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

Page 39: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

DIGBY CLOSE Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure BINBROOK CLOSE Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure

ALMOND AVENUE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

ALMOND CRESCENT Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

HARTSHOLME DRIVE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

WESTWOOD DRIVE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

SIXFIELD CLOSE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

EARLS DRIVE Lincoln Surface Dressing

1 days 15/07/2020 15/07/2020 Short duration road closure

GRESLEY DRIVE Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure PEPPERCORN CLOSE Lincoln Surface

Dressing

1 days 15/07/2020 15/07/2020 Short duration

road closure

Various locations LINCOLN SOUTH Street Lighting Improvements

50 days 26/10/2020 15/01/2021

MILL LANE/LISSINGLY LANE Linwood Surface Dressing

1 days 22/05/2020 22/05/2020 Road Closure

FEN ROAD Little Hale Fen Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

BENINGTON LANE Long Benington Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

Page 40: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Main Road off A1 Long Bennington New Cycleway TBC 2021 - TBC 2021 - TBC Footway

Closure B1520 LONDON RD Louth Surface

Dressing

1 days 21/05/2020 21/05/2020 Stop & Go

MONKS DYKE ROAD Louth Surface Dressing

1 days 12/06/2020 12/06/2020 Short duration road closure

SOMERSBY WAY Louth Surface Dressing

1 days 12/06/2020 12/06/2020 Short duration road closure

BUCKINGHAM ROAD Louth Surface Dressing

1 days 12/06/2020 12/06/2020 Short duration road closure

CHATSWORTH DRIVE Louth Surface Dressing

1 days 12/06/2020 12/06/2020 STOP/GO WITH EXTRA TM

OPERATIVES

LONGLEET DRIVE Louth Surface Dressing

1 days 12/06/2020 12/06/2020 Short duration road closure

MERIDIAN VIEW Louth Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

ST JAMES VIEW Louth Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

SUDBURY PLACE Louth Surface Dressing

1 days 17/07/2020 17/07/2020 Short duration road closure

VANESSA ROAD Louth Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure HUNTER PLACE Louth Surface

Dressing

1 days 17/07/2020 17/07/2020 Short duration

road closure

ARUNDEL DRIVE Louth Surface Dressing

1 days 17/07/2020 17/07/2020 Stop & Go

Page 41: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WOOD LANE Louth Minor Drainge

Repairs

5 days 15/02/2021 19/02/2021 Road Closure

A18 - PEAR TREE

LANE/LINCOLNGATE

Ludbourgh Surface

Dressing

1 days 11/05/2020 11/05/2020 Stop & Go

LIVESEY ROAD Ludbourgh Surface Dressing

1 days 12/05/2020 12/05/2020 Stop & Go

CHAPEL LANE Ludbourgh Surface Dressing

1 days 10/06/2020 10/06/2020 Short duration road closure

STATION ROAD Ludbourgh Surface Dressing

1 days 10/06/2020 10/06/2020 Short duration road closure

LUDBOURGH PARK Ludbourgh Surface Dressing

1 days 10/06/2020 10/06/2020 Short duration road closure

POKES HOLE Ludford Surface Dressing

1 days 13/05/2020 13/05/2020 Short duration road closure

B1195 HUNDLEBY TO LUSBY Lusby with Winceby Surface Dressing

1 days 14/05/2020 14/05/2020 Stop & Go

HIGH STREET Mablethorpe Footway Works TBC TBC TBC TBC

Various locations MABLETHORPE Street Lighting Improvements

26 days 04/01/2021 08/02/2021

MAREHAM LE FEN FEN LANE Mareham Le Fen Minor Drainge Repairs

10 days 13/07/2020 24/07/2020 2-way Signals

A155 Main Road Mareham le Fen Replace anti-skid/red with new surfacing

TBC TBC in 2021

TBC in 2021

TBC

A155 - MAREHAM LE FEN Mareham Le Fen Surface

Dressing

1 days 15/05/2020 15/05/2020 CONVOY &

STOP/GO FEN LANE Mareham Le Fen Surface

Dressing

1 days 15/05/2020 15/05/2020 Short duration

road closure

Page 42: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

HORNCASTLE ROAD Mareham Le Fen Surface

Dressing

1 days 15/05/2020 15/05/2020 Road Closure

BEGGARS LANE Mareham Le Fen Surface

Dressing

1 days 20/07/2020 20/07/2020 Short duration

road closure

MOORSIDE/FIELDSIDE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

CHURCH RISE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

CHURCH LANE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

RECTORY LANE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

FIELD SIDE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

LAMMINS LANE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

SCHOOL LANE Mareham Le Fen Surface

Dressing

1 days 20/07/2020 20/07/2020 Short duration

road closure HAZELNUT CLOSE Mareham Le Fen Surface

Dressing

1 days 20/07/2020 20/07/2020 Short duration

road closure

ORMSBY HOUSE DRIVE Mareham Le Fen Surface Dressing

1 days 20/07/2020 20/07/2020 Short duration road closure

BIRKWOOD LANE Mareham Le Fen/ Tumby

Surface Dressing

1 days 15/05/2020 15/05/2020 Short duration road closure

C469 TOWNGATE EAST Market Deeping Carriageway Patching

3 days 16/09/2020 18/09/2020 Road Closure

BLENHEIM WAY/WHITLEY WAY

Market Deeping Carriageway Resurfacing

4 days 27/07/2020 30/07/2020 Road Closure - NIGHTS

Page 43: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Various locations MARKET DEEPING Street Lighting

Improvements

15 days 30/11/2020 18/12/2020

A631 Market Rasen Carriageway

Resurfacing

TBC TBC TBC Road Closure

A46 Gallamore Lane crossing Market Rasen Replace anti-skid/red with new surfacing

TBC TBC in 2021

TBC in 2021

TBC

HALLGARTH Marshchapel Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

MILL LANE Marshchapel Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

MILL CLOSE Marshchapel Surface Dressing

1 days 11/06/2020 11/06/2020 Short duration road closure

PLUM TREE DRIVE Marshchapel Surface

Dressing

1 days 11/06/2020 11/06/2020 Short duration

road closure B1191 South Drove Martin Carriageway

Resurfacing

9 weeks 27/07/2020 25/09/2020 Road Closure

JUBILEE CLOSE Martin Footway Micro-asphalt surfacing

10 days 14/05/2020 27/05/2020 Give & Take

TIMBERLAND ROAD Martin Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

POUND ROAD Martin Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

MILL LANE Martin Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

Page 44: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WYATT CLOSE Martin Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

B1191 HIGH STREET Martin Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

C389, RED HOUSE BRIDGE (BR NO 16/41/42)

Martin Structures Improvements

10 days 06/04/2020 17/04/2020 Road Closure

Churchill Drive Martin Dales Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Alfred Ave Metheringham Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

Londesborough Road Metheringham Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

Westfield Close Metheringham Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

CALVARY COURT Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

SADDLERS CLOSE Metheringham Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give and Take

PADDOCK LANE Metheringham Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and

Take

CHESTNUT CLOSE Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

Page 45: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

THE CHASE Metheringham Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and

Take

BLACKSMITHS COURT Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

HUNTERS DRIVE Metheringham Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give and Take

ROSSINGTON CLOSE Metheringham Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and

Take

SHIREGATE Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give and Take

BARLEY CLOSE Metheringham Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give and Take

HARVEST CLOSE Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

GRANARY CLOSE Metheringham Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

MILLFIELD ROAD Metheringham Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

B1189 - MOOR LANE Metheringham Surface Dressing

1 days 17/06/2020 17/06/2020 Convoy

Page 46: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

B1189 - STATION ROAD Metheringham Surface

Dressing

1 days 10/07/2020 10/07/2020 Stop & Go

THE CHASE Metheringham Surface

Dressing

1 days 13/07/2020 13/07/2020 Short duration

road closure

SADDLERS CLOSE Metheringham Surface Dressing

1 days 13/07/2020 13/07/2020 Short duration road closure

HUNTERS DRIVE Metheringham Surface Dressing

1 days 13/07/2020 13/07/2020 Short duration road closure

CHESTNUT CLOSE Metheringham Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

ROSSINGTON CLOSE Metheringham Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

BLACKSMITH COURT Metheringham Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

CAVALRY COURT Metheringham Surface Dressing

1 days 14/07/2020 14/07/2020 Short duration road closure

SHIREGATE Metheringham Surface

Dressing

1 days 14/07/2020 14/07/2020 Short duration

road closure PADDOCK LANE Metheringham Surface

Dressing

1 days 14/07/2020 14/07/2020 Short duration

road closure

Fodderdyke bank extension Midville Carriageway Reconstruction

TBC TBC in 2021

TBC in 2021

TBC

FODDERDYKE BANK Midville Carriageway Resurfacing

12 days 20/08/2020 07/09/2020 Road Closure

BELLWATER BANK Midville Surface Dressing

1 days 18/05/2020 18/05/2020 Short duration road closure

B1434, RIVERHEAD CULVERT (BR NO 09/79/30)

Moortown Structures Improvements

20 days 20/04/2020 15/05/2020 Road Closure

Page 47: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

SCOTTEN DIKE DRO/NORTH

FEN

Morton Surface

Dressing

1 days 20/06/2020 20/06/2020 Short duration

road closure SOUTH FEN Morton Surface

Dressing

1 days 20/06/2020 20/06/2020 Short duration

road closure

EAUGATE RD Moulton Chapel Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

WASHDYKE LANE Mumby Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

CUMBERWORTH LANE Mumby Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

COOTS LANE Mumby Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

MUMBY MEADOWS Mumby Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

OFF A52 - LOOP Mumby Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

HEATH LANE Navenby Carriageway

Resurfacing

8 days 22/06/2020 01/07/2020 Road Closure

LOWFIELDS ROAD Navenby Carriageway

Resurfacing

7 days 02/07/2020 10/07/2020 Road Closure

HIGH STREET Nettleham Carriageway Resurfacing

5 days 10/08/2020 14/08/2020 Road Closure

FIELD CLOSE Nettleham Footway Works 7 days 14/04/2020 22/04/2020 Road Closure

PARKSIDE Nettleham Footway Works 50 days 04/05/2020 10/07/2020 Road Closure

THE DENE Nettleham Footway Works 40 days 19/05/2020 13/07/2020 Road Closure

HIGHFIELDS Nettleham Footway Works 45 days 06/07/2020 04/09/2020 Road Closure

WASHDYKE LANE Nettleham Surface Dressing

1 days 28/05/2020 28/05/2020 Stop & Go

Page 48: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

KINGSWAY Nettleham Surface

Dressing

1 days 28/05/2020 28/05/2020 Short duration

road closure DALDERBY CRESCENT Nettleham Surface

Dressing

1 days 28/05/2020 28/05/2020 Short duration

road closure

MANOR COURT Nettleham Surface Dressing

1 days 28/05/2020 28/05/2020 Short duration road closure

SUTTON CLOSE Nettleham Surface Dressing

1 days 28/05/2020 28/05/2020 Short duration road closure

GREETWELL LANE Nettleham Surface Dressing

1 days 04/06/2020 04/06/2020 Road Closure

Danby Hills Nettleham New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure

BECKSIDE Nettleham & Nettleton

Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

CHURCH LANE Nettleham &

Nettleton

Footway Micro-

asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and

Take

B1205, RIVERMEADE RETAINING WALL (STR NO 09/89/07)

Nettleton Beck Structures Improvements

17 days 24/08/2020 15/09/2020 Road Closure

C18 CHAPEL LANE, H3E0091 New Bolingbroke Carriageway Patching

5 days 08/06/2020 12/06/2020 Road Closure

A158 -NEWBALL Newball to Langworth Surface

Dressing

1 days 26/05/2020 26/05/2020 Convoy

A57 / A1133 Newton and Girton Carriageway

Resurfacing

12 weeks Spring

2021

TBC Road Closure

A1133 - LAUGHERTON ROAD Newton on Trent to Laughterton

Surface Dressing

1 days 30/05/2020 30/05/2020 Stop & Go

Page 49: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

THE GREEN Nocton Footway Micro-

asphalt surfacing

10 days 01/05/2020 14/05/2020 Give & Take

WELLHEAD LANE Nocton Footway Micro-asphalt surfacing

10 days 01/05/2020 14/05/2020 Give & Take

B1202 MAIN STREET Nocton Footway Micro-asphalt

surfacing

10 days 01/05/2020 14/05/2020 Give & Take

B1202 POTTERHANWORTH

RD

Nocton Footway Micro-

asphalt surfacing

11 days 04/05/2020 18/05/2020 Stop & Go

BLOXHOLME LANE Nocton / Dunston Surface Dressing

1 days 01/06/2020 01/06/2020 Short duration road closure

B1188 - SLEAFORD ROAD Nocton to Potterhanworth

Surface Dressing

1 days 31/05/2020 31/05/2020 Convoy

CARLTON LANE North Carlton Carriageway Resurfacing

5 days 15/07/2020 21/07/2020 Road Closure

SCHOOL LANE North Cockerington Surface Dressing

1 days 21/05/2020 21/05/2020 Short duration road closure

LOCK ROAD North Cockerington Surface

Dressing

1 days 21/05/2020 21/05/2020 Short duration

road closure TETNEY LOCK RD North cotes Surface

Dressing

1 days 11/05/2020 11/05/2020 Short duration

road closure

C6 - BINBROOK ROAD North Elkington Surface Dressing

1 days 12/05/2020 12/05/2020 Short duration road closure

NORTH ELKINGTON LANE North Elkington to Fotherby

Surface Dressing

1 days 12/05/2020 12/05/2020 Short duration road closure

Page 50: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Westfield Avenue North Greetwell Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

Westfield Drive North Greetwell Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

MILLMOOR WAY North Hykeham Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

SEDGEMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

HAWKSMOOR CLOSE North Hykeham Footway Micro-

asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and

Take

EXMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

HEBDON MOOR WAY North Hykeham Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

LADDSMILL CLOSE North Hykeham Footway Micro-

asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and

Take

SPENNYMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

ALFORD MILL CLOSE North Hykeham Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

Page 51: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

KEXBY MILL CLOSE North Hykeham Footway Micro-

asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and

Take

RIGSMOOR CLOSE North Hykeham Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

GRASSMOOR CLOSE North Hykeham Footway Micro-asphalt

surfacing

10 days 04/05/2020 15/05/2020 Give and Take

MILLBROOK CLOSE North Hykeham Footway Micro-

asphalt surfacing

10 days 04/05/2020 15/05/2020 Give and

Take

PATELY MOOR CLOSE North Hykeham Footway Micro-asphalt surfacing

10 days 04/05/2020 15/05/2020 Give and Take

MALVERN CLOSE North Hykeham Footway Micro-asphalt

surfacing

10 days 04/05/2020 15/05/2020 Give and Take

U/C, ARDEN MOOR CULVERT (BR NO 96/45/19)

North Hykeham Structures Improvements

5 days 17/08/2020 21/08/2020 2-way Signals

B1434 North Kelsey Carriageway Resurfacing

3 weeks 16/03/2020 06/04/2020 Road Closure - NIGHTS

TOM LANE North Rauceby Footway Micro-asphalt surfacing

6 days 02/06/2020 09/06/2020 Stop & Go

MAIN STREET North Rauceby Footway Micro-asphalt

surfacing

10 days 22/06/2020 03/07/2020 Give and Take

Page 52: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CHURCH LANE North Rauceby Footway Micro-

asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and

Take

U/C, FORD FOOTBRIDGE (BR NO 92/22/80)

North Witham Structures Improvements

16 days 27/07/2020 17/08/2020 Road Closure

A52 Main Road Old Leake Replace anti-skid/red with new surfacing

TBC TBC in 2021

TBC in 2021

TBC

STATION RD Old Leake Surface Dressing

1 days 23/07/2020 23/07/2020 Stop & Go

GREEN LN Old Leake Surface

Dressing

1 days 23/07/2020 23/07/2020 Short duration

road closure FORTY FOOT LN /

SANDYFORD LN

Old Leake

(Commonside)

Surface

Dressing

1 days 15/05/2020 15/05/2020 Short duration

road closure

WASHDYKE LN Old Leake (Commonside)

Surface Dressing

1 days 15/05/2020 15/05/2020 Short duration road closure

FOLD HILL RD Old Leake (Commonside)

Surface Dressing

1 days 16/05/2020 16/05/2020 Short duration road closure

RISEWOOD LANE Old Somerby Surface Dressing

1 days 20/05/2020 20/05/2020 Short duration road closure

A15 - LONDON ROAD (LAYBY)

Osbournby Surface Dressing

1 days 12/07/2020 12/07/2020 Short duration road closure

MAIN STREET/LOW RD Osgodby Surface Dressing

1 days 27/05/2020 27/05/2020 Short duration road closure

MILL LANE Osgodby Surface Dressing

1 days 28/05/2020 28/05/2020 Short duration road closure

SAND LANE Osgodby Surface

Dressing

1 days 28/05/2020 28/05/2020 Short duration

road closure

Page 53: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A158 Partney By pass Partney Replace anti-

skid/red with new surfacing

TBC TBC in

2021

TBC in

2021

TBC

PILHAM LANE Pilham Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

B1180 PINCHBECK, GLENSIDE SOUTH

Pinchbeck Carriageway Patching

5 days 23/06/2020 29/06/2020 Road Closure

CROSS LN Pinchbeck Surface Dressing

1 days 16/06/2020 16/06/2020 Short duration road closure

COWARDS LN / OLD FEN LN PT / HERRING LN

Pinchbeck Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

B1202 NOCTON ROAD Potterhanworth Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

B1202 MAIN ROAD Potterhanworth Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

B1202 MOOR LANE Potterhanworth Footway Micro-asphalt surfacing

10 days 01/06/2020 12/06/2020 Give and Take

FOSTERS GARDENS Potterhanworth Footway Micro-

asphalt surfacing

10 days 27/07/2020 07/08/2020 Give and

Take

STATION ROAD Potterhanworth Footway Micro-asphalt surfacing

10 days 27/07/2020 07/08/2020 Give and Take

CROSS STREET Potterhanworth Footway Micro-asphalt

surfacing

10 days 27/07/2020 07/08/2020 Give and Take

Page 54: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

MIDDLE STREET Potterhanworth Footway Micro-

asphalt surfacing

10 days 27/07/2020 07/08/2020 Give and

Take

RECTORY CLOSE Potterhanworth Footway Micro-asphalt surfacing

10 days 27/07/2020 07/08/2020 Give and Take

WOODLANDS CLOSE Potterhanworth Footway Micro-asphalt

surfacing

10 days 27/07/2020 07/08/2020 Give and Take

THE PARK Potterhanworth Footway Micro-

asphalt surfacing

10 days 27/07/2020 07/08/2020 Give and

Take

B1178 - STATION ROAD Potterhanworth Surface Dressing

1 days 31/05/2020 31/05/2020 Stop & Go

FOSTERS GARDENS Potterhanworth Surface Dressing

1 days 12/07/2020 12/07/2020 Short duration road closure

B1202 - MOOR ROAD Potterhanworth / Potterhanworth

Booths

Surface Dressing

1 days 31/05/2020 31/05/2020 Convoy

GOULCEBY RD Ranby Surface

Dressing

1 days 14/05/2020 14/05/2020 Short duration

road closure

Elmtree Road Ruskington Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

B1188 - SLEAFORD ROAD Ruskington Surface Dressing

1 days 30/05/2020 30/05/2020 Short duration road closure

MEADOWBROOK Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

BROOK WAY Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

Page 55: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

FIELD CLOSE Ruskington Surface

Dressing

1 days 08/07/2020 08/07/2020 Short duration

road closure WESTBECK Ruskington Surface

Dressing

1 days 08/07/2020 08/07/2020 Short duration

road closure

HOLLOWBROOK CLOSE Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

BECK CLOSE Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

WINCHELSEA ROAD Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

SYCAMORE ROAD Ruskington Surface Dressing

1 days 08/07/2020 08/07/2020 Short duration road closure

ASHTREE CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

WILLOW CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

LIME CLOSE Ruskington Surface

Dressing

1 days 09/07/2020 09/07/2020 Short duration

road closure BLACKTHORN CLOSE Ruskington Surface

Dressing

1 days 09/07/2020 09/07/2020 Short duration

road closure

BEECHTREE CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

CEDAR CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

LARCH CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

HURN CLOSE Ruskington Surface Dressing

1 days 09/07/2020 09/07/2020 Short duration road closure

Page 56: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

GRANGE ROAD Ruskington Surface

Dressing

1 days 09/07/2020 09/07/2020 Short duration

road closure GRANGE CLOSE Ruskington Surface

Dressing

1 days 09/07/2020 09/07/2020 Short duration

road closure

B1200 MAIN RAOD Saltfleet St Peter Carriageway Resurfacing

7 days 03/11/2020 11/11/2020 Road Closure

Three Bridges Lane Saltfleetby Carriageway Reconstruction

TBC TBC in 2021

TBC in 2021

TBC

A158 Main Road Sausthorpe Carriageway Resurfacing

TBC TBC in 2021

TBC in 2021

TBC

THE SIDINGS Saxilby Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

MANOR ROAD Saxilby Footway Micro-

asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and

Take

ROSEHILL CLOSE Saxilby Footway Micro-asphalt surfacing

10 days 20/04/2020 01/05/2020 Give and Take

ORCHARD LANE Saxilby Footway Micro-asphalt

surfacing

10 days 20/04/2020 01/05/2020 Give and Take

OTTER AVENUE Saxilby Footway Micro-

asphalt surfacing

14 days 20/04/2020 07/05/2020 Give and

Take

MEADOW RISE Saxilby Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

Page 57: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

FOSDYKE GARDENS Saxilby Footway Micro-

asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and

Take

ELM CLOSE Saxilby Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

WILLOW CLOSE Saxilby Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

HIGHFIELD ROAD Saxilby Footway Micro-

asphalt surfacing

10 days 04/05/2020 15/05/2020 Give and

Take

SYKES LANE Saxilby Footway Micro-asphalt surfacing

10 days 04/05/2020 15/05/2020 Give and Take

OAKFIELD Saxilby Footway Micro-asphalt

surfacing

10 days 11/05/2020 22/05/2020 Give and Take

TORKSEY AVENUE Saxilby Footway Micro-asphalt surfacing

4 days 12/05/2020 15/05/2020 Give and Take

HARDWICK CLOSE Saxilby Footway Micro-asphalt surfacing

10 days 12/05/2020 25/05/2020 Give and Take

BLANKNEY CLOSE Saxilby Footway Micro-

asphalt surfacing

8 days 13/05/2020 22/05/2020 Give and

Take

Page 58: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

NORTHFIELDS RISE Saxilby Footway Micro-

asphalt surfacing

10 days 13/05/2020 26/05/2020 Give and

Take

BROAD HOLME ROAD Saxilby Footway Micro-asphalt surfacing

11 days 13/05/2020 27/05/2020 Give and Take

ST BOTOLPHS Saxilby Footway Micro-asphalt

surfacing

7 days 14/05/2020 22/05/2020 Give and Take

QUEENSWAY Saxilby Footway Micro-

asphalt surfacing

7 days 14/05/2020 22/05/2020 Give and

Take

THONOCK DRIVE Saxilby Footway Micro-asphalt surfacing

7 days 14/05/2020 22/05/2020 Give and Take

WOODHALL CRESCENT Saxilby Footway Micro-asphalt

surfacing

7 days 14/05/2020 22/05/2020 Give and Take

ST GEORGES MEWS Saxilby Footway Micro-asphalt surfacing

7 days 14/05/2020 22/05/2020 Give and Take

ST ANDREWS DRIVE Saxilby Footway Micro-asphalt surfacing

9 days 14/05/2020 26/05/2020 Give and Take

WARWICK CLOSE Saxilby Footway Micro-

asphalt surfacing

9 days 14/05/2020 26/05/2020 Give and

Take

Page 59: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CHURCH ROAD Saxilby Footway Micro-

asphalt surfacing

10 days 14/05/2020 27/05/2020 Give and

Take

WESTCROFT DRIVE Saxilby Footway Micro-asphalt surfacing

9 days 14/05/2020 26/05/2020 Give and Take

KENILWORTH CLOSE Saxilby Footway Micro-asphalt

surfacing

10 days 18/05/2020 29/05/2020 Give and Take

LINGFIELD CLOSE Saxilby Footway Micro-

asphalt surfacing

10 days 18/05/2020 29/05/2020 Give and

Take

EASTCROFT Saxilby Footway Micro-asphalt surfacing

10 days 18/05/2020 29/05/2020 Give and Take

ST BOTOLPHS(CHURCH PATH)

Saxilby Footway Micro-asphalt

surfacing

10 days 18/05/2020 29/05/2020 Give and Take

WOODCROFT ROAD Saxilby Footway Micro-asphalt surfacing

8 days 19/05/2020 28/05/2020 Give and Take

NORTHCROFT Saxilby Footway Micro-asphalt surfacing

9 days 19/05/2020 29/05/2020 Give and Take

SALISBURY CLOSE Saxilby Footway Micro-

asphalt surfacing

9 days 19/05/2020 29/05/2020 Give and

Take

Page 60: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A57, SAXILBY RAILWAY

BRIDGE (BR NO 87/95/60)

Saxilby Structures

Improvements

28 days 26/10/2020 02/12/2020 3-way Signals

A57, FOSSDYKE CANAL BRIDGE (BR NO 97/61/93)

Saxilby Structures Improvements

10 days 07/12/2020 18/12/2020 3-way Signals

Farriers Court Scopwick Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Vicarage Lane Scopwick Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

BROOKSIDE Scopwick Minor Drainge

Repairs

5 days TBC TBC TBC

A159 Scotter Carriageway

Resurfacing

10 weeks 28/09/2020 04/12/2020 Road Closure

GORSE DROVE/CLAY LANE Scredington Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

Sleaford Road Silk Willougby New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure

LUDFORD ROAD Sixhills Surface Dressing

1 days 16/05/2020 16/05/2020 Road Closure

SCARBOROUGH AVE Skegenss Carriageway Resurfacing

8 days 12/11/2020 23/11/2020 Road Closure

A52 Roman Bank (East) Skegness Carriageway Resurfacing

2 weeks Spring 2021

TBC Road Closure

Skegness Road Skegness Footway Micro-asphalt

surfacing

TBC TBC in 2021

TBC in 2021

2 Way Lights

Town Centre Skegness Footway works TBC 2020/2021 2020/2021 Footway Closure

Page 61: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Town Centre Skegness Guardrail

replacement

TBC 2020/2021 2020/2021 Off Highway

Work Scarborough Avenue Skegness Joint Treatment TBC 2020/2021 2020/2021 2 Way Lights

DAVID DRIVE Skegness Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

HUCKLES WAY Skegness Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

TAGGS DRIVE Skegness Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

ST VALENTINES WAY Skegness Surface Dressing

1 days 22/07/2020 22/07/2020 Short duration road closure

SCOTTS CLOSE Skegness Surface

Dressing

1 days 22/07/2020 22/07/2020 Short duration

road closure LINCOLN ROAD Skegness Traffic Signals

Improvements

14 days 26/05/2020 12/06/2020 2-way Signals

LUMLEY ROAD (GYRATORY) Skegness Traffic Signals Improvements

25 days 04/01/2021 05/02/2021 TBC

GRAND PARADE (SCARBOROUGH AVE)

Skegness Traffic Signals Improvements

25 days 25/01/2021 26/02/2021 TBC

SAXILBY ROAD Skellingthorpe Carriageway Resurfacing

5 days 07/09/2020 11/09/2020 Road Closure - NIGHTS

DALBY ROAD Skendlby Surface Dressing

1 days 14/05/2020 14/05/2020 Short duration road closure

U/C, SADDLEBACK CULVERT (1)

(BR NO 49/22/91A)

Skidbrooke Structures Improvements

21 days 16/09/2020 14/10/2020 Road Closure

Oak Road Sleaford Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

Page 62: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

SOUTHFIELDS Sleaford Surface

Dressing

1 days 01/07/2020 01/07/2020 Short duration

road closure OAK ROAD / HAWTHORN

DRIVE

Sleaford Surface

Dressing

1 days 02/07/2020 02/07/2020 Short duration

road closure

CHESTNUT CLOSE Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

PINE CLOSE Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

JUNIPER WAY Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

ALDER ROAD Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

ASPEN DRIVE Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

LAVENDER CLOSE Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

CYPRESS CLOSE Sleaford Surface

Dressing

1 days 02/07/2020 02/07/2020 Short duration

road closure MULBERRY CLOSE Sleaford Surface

Dressing

1 days 02/07/2020 02/07/2020 Short duration

road closure

ACACIA CLOSE Sleaford Surface Dressing

1 days 02/07/2020 02/07/2020 Short duration road closure

REDWOOD AVENUE Sleaford Surface Dressing

1 days 03/07/2020 03/07/2020 Short duration road closure

MAGNOLIA ROAD Sleaford Surface Dressing

1 days 03/07/2020 03/07/2020 Short duration road closure

LIMETREE CLOSE Sleaford Surface Dressing

1 days 03/07/2020 03/07/2020 Short duration road closure

Page 63: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

ROWAN CLOSE Sleaford Surface

Dressing

1 days 03/07/2020 03/07/2020 Short duration

road closure PEAR TREE CLOSE Sleaford Surface

Dressing

1 days 03/07/2020 03/07/2020 Short duration

road closure

LARCH WAY Sleaford Surface Dressing

1 days 03/07/2020 03/07/2020 Short duration road closure

HOLLY CLOSE Sleaford Surface Dressing

1 days 03/07/2020 03/07/2020 Short duration road closure

ROSEWOOD DRIVE Sleaford Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

BRIDLE CLOSE Sleaford Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

SNITTERBY CARR LANE Snitterby Carriageway Reconstruction

6 days 18/09/2020 25/09/2020 Road Closure

PF FOOTWAY South Hykeham Footway Works 50 days 05/10/2020 11/12/2020 TBC

THE DROVE South Hykeham Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

FOX COVERT (PART) South Hykeham Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

LAKEVIEW CLOSE / POST MILL CLOSE (PART)

South Hykeham Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

PENROSE CLOSE South Hykeham Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

Thornton lane South Kelsey Carriageway Reconstruction

TBC TBC in 2021

TBC in 2021

TBC

HPF, VILLAGE FOOTBRIDGE (BR NO 14/79/46)

South Kyme Structures Improvements

10 days 24/08/2020 04/09/2020 Footway Closure

COW DROVE South Kyme Surface

Dressing

1 days 22/05/2020 22/05/2020 Short duration

road closure

Page 64: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Brinkhall Road South Ormsby Carriageway

structural patching

TBC TBC in

2021

TBC in

2021

TBC

MAIN STREET South Rauceby Footway Micro-asphalt surfacing

7 days 04/06/2020 12/06/2020 Give & Take

TOM LANE South Rauceby Footway Micro-asphalt

surfacing

7 days 05/06/2020 15/06/2020 Stop & Go

SOUTHGATE SPINNEYS South Rauceby Footway Micro-

asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and

Take

PINFOLD LANE South Rauceby Footway Micro-asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and Take

CLIFFE VIEW South Rauceby Footway Micro-asphalt

surfacing

10 days 22/06/2020 03/07/2020 Give and Take

BEECH RISE South Rauceby Footway Micro-asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and Take

CHAPEL CLOSE South Rauceby Footway Micro-asphalt surfacing

10 days 22/06/2020 03/07/2020 Give and Take

HOLYROOD WALK Spalding Carriageway

Patching

4 days 05/10/2020 08/10/2020 Road Closure

WOOLRAM WYGATE Spalding Carriageway

Resurfacing

4 days 21/04/2020 24/04/2020 Road Closure

Page 65: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

B1356 PARK ROAD Spalding Carriageway

Resurfacing

4 days 01/09/2020 04/09/2020 Road Closure

MALVERN AVE/DRIVE Spalding Footway Works 30 days 09/11/2020 18/12/2020 Road Closure

TOLLGATE Spalding Footway Works TBC TBC TBC 4-way Signals

CLAY LAKE BANK Spalding Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

PENNYGATE Spalding Surface

Dressing

1 days 16/07/2020 16/07/2020 Stop & Go

HORSESHOE BRIDGE Spalding Traffic Signals

Improvements

25 days 09/11/2020 11/12/2020 Road Closure

WILLOUGHBY DRIVE Spilsby Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

ASHBY MEADOWS Spilsby Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

FALDINGWORTH ROAD Spridlington Surface Dressing

1 days 11/05/2020 11/05/2020 Short duration road closure

Cycle Route 63 Stamford New Cycleway TBC 2021 - TBC 2021 - TBC Footway Closure

Various locations through Town STAMFORD Street Lighting Improvements

40 days 05/10/2020 27/11/2020

HIGH ST Stapleford Carriageway Patching

2 days 27/08/2020 28/08/2020 Road Closure

C53, BROUGHTON CLAYS

BRIDGE (BR NO 85/87/51B)

Stapleford Structures

Improvements

5 days 20/04/2020 24/04/2020 Road Closure

A16 - MAIN ROAD Stickney Surface Dressing

1 days 19/05/2020 19/05/2020 Convoy

C604, DICKINSON'S BRIDGE (BR NO 16/86/98)

Stixwould Structures Improvements

35 days 18/05/2020 03/07/2020 Road Closure

Page 66: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

STAGGLETHORPE LANE Stragglethorpe Surface

Dressing

1 days 11/07/2020 11/07/2020 Short duration

road closure MAIN STREET -

PROGRAMME WITH W87.1

Stubton Surface

Dressing

1 days 10/06/2020 10/06/2020 Stop & Go

A1500 - TILLBRIDGE LANE Sturton by Stow Surface Dressing

1 days 26/05/2020 26/05/2020 Stop & Go

A1500 - TILLBRIDGE LANE Sturton by Stow Surface Dressing

1 days 26/05/2020 26/05/2020 Stop & Go

B1241 - HIGH STREET Sturton by Stow Surface Dressing

1 days 29/05/2020 29/05/2020 Stop & Go

Ellison Close Sudbrooke Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

COURTFIELD CLOSE Sudbrooke Footway Works 25 days 27/04/2020 29/05/2020 No Through Road &

Priority Boards

A158 Wragby Road Sudrooke Replace anti-skid/red with new surfacing

TBC TBC in 2021

TBC in 2021

TBC

WIGTOFT RD Sutterton Surface Dressing

1 days 15/06/2020 15/06/2020 Stop & Go

Old A17 Bridge road Sutton Bridge Replace anti-skid/red with

new surfacing

TBC TBC in 2021

TBC in 2021

TBC

Marine Ave West (Part) Sutton on Sea Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Morrison Close Sutton on Sea Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

Page 67: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

William Green Close Sutton on Sea Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

William Tow Close Sutton on Sea Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

CRABTREE LANE Sutton On Sea Carriageway Resurfacing

10 days 24/11/2020 07/12/2020 Road Closure

Various locations through village

Sutton on Sea Street Lighting Improvements

23 days 29/06/2020 29/07/2020 Give & Take

LUTTON GATE Sutton St Edmonds Carriageway Reconstruction

10 days 20/07/2020 31/07/2020 Road Closure

INLEY DROVE Sutton St James Carriageway Reconstruction

4 days 11/08/2020 14/08/2020 Road Closure

B1165 FISHERGATE / CHAPEL GATE / DRAW DYKE

Sutton St James Surface Dressing

1 days 27/06/2020 27/06/2020 Stop & Go

PARSONS DROVE Swaton Surface Dressing

1 days 06/07/2020 06/07/2020 Short duration road closure

HIGH STREET Swayfield Footway Micro-

asphalt surfacing

6 days 02/06/2020 09/06/2020 Give and

Take

OVERGATE ROAD Swayfield Footway Micro-asphalt surfacing

10 days 17/06/2020 30/06/2020 Give and Take

CORBY ROAD Swayfield Footway Micro-asphalt

surfacing

10 days 17/06/2020 30/06/2020 Give and Take

THE CRESCENT Swayfield Footway Micro-

asphalt surfacing

10 days 17/06/2020 30/06/2020 Give and

Take

Page 68: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CASTLE BYTHAM LANE Swayfield Footway Micro-

asphalt surfacing

10 days 17/06/2020 30/06/2020 Give and

Take

C164 NEWARK ROAD - TBC Swinderby Carriageway Patching

5 days 09/11/2020 13/11/2020 Road Closure

STATION ROAD Swinderby Surface Dressing

1 days 07/07/2020 07/07/2020 Short duration road closure

HIGH STREET Swinderby Surface Dressing

1 days 07/07/2020 07/07/2020 Short duration road closure

COW LANE Swinderby Surface Dressing

1 days 07/07/2020 07/07/2020 Short duration road closure

MOOR LANE Swinderby Surface Dressing

1 days 07/07/2020 07/07/2020 Short duration road closure

VILLA LANE Swineshead Carriageway

Resurfacing

2 days 23/09/2020 24/09/2020 Road Closure

- NIGHTS Station Road Swineshead Carriageway

structural patching

TBC TBC in

2021

TBC in

2021

TBC

WESTFIELD DRIVE Swineshead Surface Dressing

1 days 25/07/2020 25/07/2020 Short duration road closure

B1203 BINBROOK RD/HATCLIFFE RD

Swinhope Surface Dressing

1 days 27/05/2020 27/05/2020 Convoy

MAIN STREET (LOOP) Syston Surface Dressing

1 days 01/07/2020 01/07/2020 Short duration road closure

CHURCH LANE Syston Surface Dressing

1 days 01/07/2020 01/07/2020 Short duration road closure

THE DRIFT Syston Surface

Dressing

1 days 01/07/2020 01/07/2020 Short duration

road closure

Page 69: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

RIVER LANE Syston Surface

Dressing

1 days 01/07/2020 01/07/2020 Short duration

road closure Cromwell Place Tattershall Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

U/C, OLD TATTERSHALL BRIDGE (BR NO 15/96/62)

Tattershall Bridge Structures Improvements

25 days 02/11/2020 04/12/2020 None

A153 SLEAFORD RD Tattershall to Kirkstead Bridge

Surface Dressing

1 days 19/05/2020 19/05/2020 Convoy

B1203 - RASEN ROAD Tealby Surface Dressing

1 days 28/05/2020 28/05/2020 Convoy

SOUTH OMSBY TO TETFORD Tetford Carriageway Patching

5 days 30/06/2020 06/07/2020 Road Closure

ORMSBY ROAD Tetford Carriageway

Patching

10 days 07/07/2020 20/07/2020 Road Closure

HARRINGTON ROAD Tetford Carriageway

Patching

4 days 20/07/2020 23/07/2020 Road Closure

South Road Tetford Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

A1031 Tetney Carriageway Resurfacing

6 weeks 21/09/2020 30/10/2020 Road closure

CHURCH LANE/HOOP END Tetney Surface Dressing

1 days 11/05/2020 11/05/2020 Road Closure

B1190 - THIMBLEY Thimbleby Surface Dressing

1 days 20/05/2020 20/05/2020 Stop & Go

ORFORD ROAD Thoresway Surface

Dressing

1 days 22/05/2020 22/05/2020 Convoy

Page 70: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

LINCOLN LANE Thorpe Le Fallows Carriageway

Reconstruction

3 days 03/09/2020 07/09/2020 Road Closure

THORPE LANE Thorpe Le Fallows Carriageway

Reconstruction

4 days 07/09/2020 10/09/2020 Road Closure

LYMN BANK Thorpe St Peter Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

B1195, MILL HILL BRIDGE (BR NO 46/71/59)

Thorpe St. Peter Structures Improvements

25 days 21/09/2020 23/10/2020 Road Closure

U/C, THORPE BRIDGE (BR NO 98/00/46)

Thorpe-le-fallows Structures Improvements

4 days 14/04/2020 17/04/2020 Road Closure

THORNTON ROAD - TBC Thorton Le Moor / South Kelsey

Carriageway Patching

10 days 14/01/2021 27/01/2021 Road Closure

A15 THURLBY NEAR BOURNE

THURLBY NEAR BOURNE

Street Lighting Improvements

30 days 04/01/2021 12/02/2021

BAYFIELDS ROAD Timberland Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give & Take

CHURCH LANE Timberland Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

WEST STREET Timberland Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

MARTIN ROAD Timberland Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

FOSTER CLOSE Timberland Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

Page 71: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

AUCKLAND CRESCENT Timberland Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

FEN ROAD Timberland Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

MAIN STREET Timberland Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give & Take

STATION ROAD Timberland Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

B1189 - SLEAFORD ROAD Timberland/Thorpe Tilney

Surface Dressing

1 days 01/06/2020 01/06/2020 Convoy

A6121 MAIN ROAD Toft Minor Drainge Repairs

20 days 28/09/2020 23/10/2020 2-way Signals

TOFT LANE Toft newton Surface Dressing

1 days 28/05/2020 28/05/2020 Short duration road closure

SAND LANE Torksey Footway Micro-asphalt

surfacing

9 days 27/04/2020 07/05/2020 Give and Take

STATION ROAD Torksey Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 Give and Take

A156 MAIN ROAD Torksey Footway Micro-asphalt surfacing

9 days 27/04/2020 07/05/2020 2-way Signals

LEA ROAD Torksey Footway Works TBC TBC TBC 2-way Signals

Page 72: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A156 TORKSEY DUAL

CARRIAGWAY

Torksey Surface

Dressing

1 days 26/05/2020 26/05/2020 LANE

CLOSURE CHURCH STREET, TORSKEY Torskey Surface

Dressing

1 days 29/05/2020 29/05/2020 Short duration

road closure

COUNTER DRAIN DRO Tounge End Surface Dressing

1 days 16/07/2020 16/07/2020 Short duration road closure

CHAPEL LANE Toynton St Peter Carriageway Reconstruction

2 days 26/08/2020 27/08/2020 Road Closure

CHURCH LANE Toynton St Peter Carriageway Reconstruction

1 days 27/08/2020 27/08/2020 Road Closure

Various sites across the County Traffic Signals Removal of pedestrian barriers

Various TBC - 2020/2021

TBC - 2020/2021

Footway Closure

Willows Close Tydd st Mary Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

CHURCH LANE Ulceby Surface

Dressing

1 days 23/07/2020 23/07/2020 Short duration

road closure

A1104 - ALFORD ROAD Ulceby Cross Surface Dressing

1 days 14/05/2020 14/05/2020 Stop & Go

Various locations through village

Waddington Street Lighting Improvements

38 days 03/08/2020 23/09/2020

A607 - GRANTHAM ROAD Waddington Surface Dressing

1 days 08/06/2020 08/06/2020 Convoy

MELBOURNE WAY Waddington Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

ADELAIDE CLOSE Waddington Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

HOBART CLOSE Waddington Surface Dressing

1 days 11/07/2020 11/07/2020 Short duration road closure

Page 73: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

CAIRNS WAY Waddington Surface

Dressing

1 days 11/07/2020 11/07/2020 Short duration

road closure A607 Cliff Road villgae Links Waddington to

Welbourn

New Cycleway TBC 2021 - TBC 2021 - TBC Footway

Closure

C661 CROFT BANK Wainfleet Carriageway Patching

5 days 03/08/2020 07/08/2020 Road Closure

STATION RD Wainfleet Footway Works 15 days 30/11/2020 18/12/2020 Road Closure

WINCHESTER ROAD Wainfleet Footway Works 9 days 14/12/2020 24/12/2020 Road Closure

HALLGATE Wainfleet Surface

Dressing

1 days 14/05/2020 14/05/2020 Short duration

road closure

CROWS LANE Wainfleet Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

COLLISON GATE Wainfleet Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

BREWSTER LANE Wainfleet Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

ABRAHAMS LANE Wainfleet Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

LADY LANE Wainfleet All Saints Carriageway Reconstruction

2 days 27/08/2020 28/08/2020 Road Closure

ST MICHAELS LANE Wainfleet St Mary Surface Dressing

1 days 23/07/2020 23/07/2020 Short duration road closure

ST EDMUND CLOSE Wainfleet St Mary Surface

Dressing

1 days 23/07/2020 23/07/2020 Short duration

road closure QUEENS ESTATE Wainfleet St Mary Surface

Dressing

1 days 23/07/2020 23/07/2020 Short duration

road closure

LONG DROVE Walcot Surface Dressing

1 days 02/06/2020 02/06/2020 Short duration road closure

Page 74: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

Drake Avenue Washingborough Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

Grosvenor Mews Washingborough Carriageway

resurfacing

5 Days TBC in

2021

TBC in

2021

Road Closure

SCHOOL LANE Washingborough Footway Micro-asphalt surfacing

10 days 14/05/2020 27/05/2020 Give & Take

HIGH MEADOWS Washingborough Footway Micro-asphalt surfacing

10 days 14/05/2020 27/05/2020 Give & Take

TURNBERRY CLOSE Washingborough Footway Micro-

asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

LINDRICK CLOSE Washingborough Footway Micro-asphalt surfacing

10 days 01/06/2020 12/06/2020 Give & Take

LYTHAM CLOSE Washingborough Footway Micro-asphalt

surfacing

10 days 03/06/2020 16/06/2020 Give & Take

NORWICH CLOSE Washingborough Footway Micro-

asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

WELLS CLOSE Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

READING CLOSE Washingborough Footway Micro-asphalt

surfacing

10 days 03/06/2020 16/06/2020 Give & Take

Page 75: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

MALVERN AVENUE Washingborough Footway Micro-

asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

BECKETT CLOSE Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

REPTON CLOSE Washingborough Footway Micro-asphalt

surfacing

10 days 03/06/2020 16/06/2020 Give & Take

PARK CRESCENT Washingborough Footway Micro-

asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

JULIA ROAD Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

TROON CLOSE Washingborough Footway Micro-asphalt

surfacing

10 days 03/06/2020 16/06/2020 Give & Take

ROWAN COURT Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

WENTWORTH CLOSE Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

BIRKDALE CLOSE Washingborough Footway Micro-

asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

Page 76: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

SUNNINGDALE GROVE Washingborough Footway Micro-

asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

GLENEAGLES GROVE Washingborough Footway Micro-asphalt surfacing

10 days 03/06/2020 16/06/2020 Give & Take

MANOR ROAD Washingborough Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give & Take

NELSON DRIVE Washingborough Footway Micro-

asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

LEE AVENUE Washingborough Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

GERRARD MEWS Washingborough Footway Micro-asphalt

surfacing

10 days 08/06/2020 19/06/2020 Give & Take

JERMYN MEWS Washingborough Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

BURTON MEWS Washingborough Footway Micro-asphalt surfacing

10 days 08/06/2020 19/06/2020 Give & Take

THE GREEN Welbourn Minor Drainge

Repairs

45 days 01/10/2020 15/11/2020 Road Closure

HIGH ST/ CROSBY LANE Welbourn Minor Drainge

Repairs

45 days 01/10/2020 15/11/2020 Road Closure

Page 77: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

HIGH ST (JOINERS ARMS) Welbourn Minor Drainge

Repairs

45 days 01/10/2020 15/11/2020 Road Closure

MAIN ROAD Welbourn Minor Drainge

Repairs

45 days 01/10/2020 15/11/2020 Road Closure

CASTLE HILL & MOAT LANE Welbourn Minor Drainge Repairs

45 days 01/10/2020 15/11/2020 Road Closure

A607 MAIN ROAD Welbourn Minor Drainge Repairs

45 days 01/10/2020 15/11/2020 2-way Signals

HIGH ST (O/S SCHOOL) Welbourn Minor Drainge Repairs

5 days 01/10/2020 15/11/2020 Road Closure

High Barn Lane Well Carriageway structural patching

TBC TBC in 2021

TBC in 2021

TBC

C307 POTTERGATE ROAD Wellingore Carriageway

Patching

6 days 15/06/2020 22/06/2020 Road Closure

A607 Cliff Road Wellingore Carriageway

structural patching

TBC TBC in

2021

TBC in

2021

TBC

EASTFIELD LANE Welton Surface Dressing

1 days 28/05/2020 28/05/2020 Short duration road closure

B1196 - HANBY LANE Welton Le Marsh Surface Dressing

1 days 14/05/2020 14/05/2020 Stop & Go

C6 - DARK LANE Welton Le Wold Surface Dressing

1 days 13/05/2020 13/05/2020 Short duration road closure

C553 - BUNKERS HILL Welton Le Wold Surface Dressing

1 days 13/05/2020 13/05/2020 Short duration road closure

A153 - LOUTH ROAD West Ashby Surface

Dressing

1 days 17/05/2020 17/05/2020 Convoy

Page 78: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WEST DROVE NORTH West Drove Carriageway

Reconstruction

5 days 03/08/2020 07/08/2020 Road Closure

A155 - WEST KEAL West Keal Surface

Dressing

1 days 19/05/2020 19/05/2020 Convoy

HALL LANE West Keal Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

NORTH GATE West Pinchbeck Surface Dressing

1 days 09/06/2020 09/06/2020 Short duration road closure

GLENSIDE NORTH West Pinchbeck Surface Dressing

1 days 16/06/2020 16/06/2020 Short duration road closure

MARKET RASEN RD/TORRINGTON RD

West Torrington Surface Dressing

1 days 15/05/2020 15/05/2020 Road Closure

WESTLABY LANE Westaby Surface Dressing

1 days 29/05/2020 29/05/2020 Road Closure

C427 EASE LANE Westborough Carriageway Patching

4 days 21/09/2020 24/09/2020 Road Closure

A151 weston roundabout Weston Replace anti-

skid/red with new surfacing

TBC TBC in

2021

TBC in

2021

TBC

PARSONS LANE Whaplode Carriageway Reconstruction

3 days 13/07/2020 15/07/2020 Road Closure

COMMON ROAD Whaplode Carriageway Reconstruction

5 days 15/07/2020 21/07/2020 Road Closure

COOPERS CLOSE Whaplode Carriageway Resurfacing

1 days 15/10/2020 15/10/2020 Road Closure

EAST GATE / CRANESGATE NORTH

Whaplode Surface Dressing

1 days 25/06/2020 25/06/2020 Short duration road closure

BARS LANE Whaplode Drove Carriageway Reconstruction

2 days 13/08/2020 14/08/2020 Road Closure

Page 79: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

WHISBY ROAD Whisby Surface

Dressing

1 days 05/06/2020 05/06/2020 Stop & Go

MOOR LANE Whisby Surface

Dressing

1 days 05/06/2020 05/06/2020 Short duration

road closure

STATION ROAD/SHORTWOOD LANE

Wickenby to Friesthorpe

Surface Dressing

1 days 19/06/2020 19/06/2020 Short duration road closure

LINGHALL LANE Wildmore Surface Dressing

1 days 19/05/2020 19/05/2020 Short duration road closure

MILL LANE Wildmore Surface Dressing

1 days 20/05/2020 20/05/2020 Short duration road closure

TAVERN WAY Willoughby Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

JOHN SMITHS CLOSE Willoughby Surface Dressing

1 days 21/07/2020 21/07/2020 Short duration road closure

A153 SLEAFORD ROAD / BACK LANE/ TOWN END

Wilsford Surface Dressing

1 days 11/06/2020 11/06/2020 Convoy

CAMP ROAD Witham St Hughs Surface

Dressing

1 days 16/06/2020 16/06/2020 Convoy

WARREN ROAD Witham St Hughs Surface

Dressing

1 days 11/07/2020 11/07/2020 Short duration

road closure

HORNCASTLE ROAD Wood Enderby Surface Dressing

1 days 15/05/2020 15/05/2020 Short duration road closure

Tor O Moor Gardens Woodhall Spa Carriageway resurfacing

5 Days TBC in 2021

TBC in 2021

Road Closure

A158 Crossroads Wragby Guardrail replacement

TBC 2020/2021 2020/2021 TBC

A158 Main Road Wragby to Lincoln Ironwork replacement

TBC 2020/2021 2020/2021 2 Way Lights

Page 80: Highways works programme 2020-2021

Highways works programme 2020-2021 Street Name Area/Parish Works Type Duration Planned

Start

Planned

Finish

Traffic

Management

A52 Main Road Wrangle Carriageway

Resurfacing

TBC TBC in

2021

TBC in

2021

TBC

DOUBLE BANK Wrangle Surface

Dressing

1 days 16/05/2020 16/05/2020 Short duration

road closure

HALL END RD / HALL LN Wrangle Surface Dressing

1 days 16/05/2020 16/05/2020 Short duration road closure

COMMON DRO (AKA PINDERS DRO)

Wrangle Surface Dressing

1 days 24/07/2020 24/07/2020 Short duration road closure

JUDE GATE / MILL LN Wrangle Surface Dressing

1 days 24/07/2020 24/07/2020 Short duration road closure

Various locations through village

Wyberton Street Lighting Improvements

30 days 24/08/2020 02/10/2020

SALTERS LANE Wyham Surface Dressing

1 days 12/05/2020 12/05/2020 Short duration road closure