(Version 2.07; Released October 2016)
TIP No.: B-5994 County(ies): Jones Page 1 of 3
TIP Number: Date:
Phone: Phone:
Email: Email:
County(ies):
CAMA County?
Yes
Design/Future: Year: 2032 Existing: Year:
Aquatic T&E Species? Comments:
Yes No
No
Wetlands within Project Limits?
Swamp Waters (Sw) Supplemental Classification:
Nutrient Sensitive Waters
(NSW)
Rural / Agricultural
Tuckahoe Creek 27-101-5
0.9
0.14
Project Description
Proposed Project
NeuseRiver Basin(s):
City/Town:
1.2
Typical Cross Section Description:
Surrounding Land Use:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
No
Address:
9/7/2018
JonesComfort
Robert T. Turnbull, Enviornmental Services, Inc.
Raleigh, NC 27610
WBS Element:
Bridge ReplacementWBS Element:
HNTB North Carolina, P.C.NCDOT Contact:
(919) 212-1760
Suite 200
Raleigh, NC 27609
Contractor / Designer:
(919) 424-0444
343 E. Six Forks Road
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
4901 Trademark Dr. Address:
General Project Information
B-5994
Impairments:
Other Stream Classification:
Primary Classification:
Project Built-Upon Area (ac.)
Project B-5994 involves the replacement of Bridge #510032 on SR 1142 (Weyerhaeuser Rd.) over Tuckahoe Creek in Jones County. The existing bridge #510032 consists of 1
@ 17'-7", 1 @ 17'-4", 1 @ 17'-0", 1 @ 17'-5", 1 @ 16'-11", 1 @ 16'-10", 1 @ 16'-7", 1 @ 17'-6", and 1 @ 17'-8" timber floor on continuous I-beams, timber caps, and timber
piles. It is to be replaced with a 1 @ 40'-0", 1 @ 70'-0", 1 @ 60'-0" 24" Cored Slab units with a 3.75" asphalt wearing surface at the same location. The overall bridge length will
be 170.0' and a width of 33.0'. The project also includes 0.05 mi of roadway improvements to the south and 0.06 mi of roadway improvements to the north.
The proposed bridge does not contain deck drains. Storm water will discharge into the proposed drainage ditches in the northeast, northwest, southeast, and southwest
quadrants, where it will follow existing drainage patterns.
The roadside ditches in the northeast, northwest, southeast, and southwest quadrants will be impacted. The redesigned ditches, with the exception of the ditch in the northeast
quadrant, will tie into Tuckahoe Creek, and match the existing drainage patterns. The proposed ditch in the southwest quadrant will begin as a V-ditch with 3:1 slopes, and
transition into a 4' special lateral base ditch with 2:1 slopes and Class I Rip Rap lining. The Rip Rap is proposed on the southwest ditch to stabilize the side slopes. The
northwest and southeast ditches will be special lateral V-ditches with 3:1 slopes and will tie into the existing wetlands. The southeast ditch will be lined with Class I Rip Rap at
the end to minimize velocity and prevent erosion. The northeast ditch will be a special lateral V-ditch with a 4:1 front slope and 3:1 back slope. The northeast ditch will flow north,
away from the project.
NeuseBuffer Rules in Effect:
410
2 - 11' asphalt paved lanes with 2' to 5' paved shoulders, 3' grass shoulders. Ditches in
all four quadrants will be impacted.
Waterbody Information
2012
NCDWR Stream Index No.:
NRTR Stream ID:
Annual Avg Daily Traffic (veh/hr/day):
Existing Site
Project Length (lin. miles or feet):
ac.
Surface Water Body (1):
Class CNCDWR Surface Water Classification for Water Body
ac.
2 - 10' asphalt paved lanes with grass shoulders. Wetlands are present in all four
quadrants but not impacted. Roadside ditches are present in all four quadrants with
one being jurisdictional and tying directly into Tuckahoe Creek. Two others outlet into
the wetlands, and the fourth flows away from the stream.
820
James Byrd ([email protected])
Project Includes Bridge Spanning Water Body? Deck Drains Discharge Over Buffer? Dissipator Pads Provided in Buffer? No
Deck Drains Discharge Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
(Version 2.07; Released October 2016)
TIP No.: B-5994 County(ies): Jones Page 2 of 3
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water
Body
Base
Width
(ft)
Front
Slope
(H:1)
Back
Slope
(H:1)
Drainage
Area
(ac)
Recommended
Treatm't Length
(ft)
Actual
Length
(ft)
Longitudinal
Slope
(%)
Q2
(cfs)
V2
(fps)
Q10
(cfs)
V10
(fps)
Rock
Checks
Used
BMP
Associated w/
Buffer Rules?
-L- 15+50 LT
35.031671 / -77.579449
-L- 16+40 LT
35.031892 / -77.579508
-L- 16+50 RT
35.031981 / -77.579284
-L- 18+05 LT
35.032324 / -77.579676
-L- 22+50 RT
35.033559 / -77.579800
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLANFOR NCDOT PROJECTS
Additional Comments
No
No
Yes
No
No
(1)Tuckahoe
Creek
(1)Tuckahoe
Creek
(1)Tuckahoe
Creek
(1)Tuckahoe
Creek
(1)Tuckahoe
Creek
Swales
6303.0
No3.610.2 1020
0.20% 0.6
2.6
1.3150 3.40.50%
0.6
0.0
2.0 3.02.50% 8.6
5.00% 7.5
11.80.0 3.0 3.0
3.0 3.0 8.7 870
4.0 2.0
2000
1020
4 8.6
3.3
6.34 0.0
4
10.2
WBS Element:
3.3
2.8
4 No100
2100 No
3.00%
11.8
2504 0.0 4.0 3.0 0.5 50
3.0 No
0.7 No
1.5
10.3
4.7
0.9
(Version 2.07; Released October 2016)
TIP No.: B-5994 County(ies): Jones Page 3 of 3
Sheet
No.
Station & Coordinates
(Road and Non Road
Projects)
Surface
Water Body Riprap Type
Drainage
Area
(ac)
Conveyance
Structure
-L- 16+21.26 RT
35.031900 / -77.579271
* Refer to the NCDOT Best Management Practices Toolbox (2014), NCDOT Standards, the Federal Highway Administration (FHWA) Hydraulic Engineering Circular No. 14 (HEC-14), Third Edition, Hydraulic Design of Energy
Dissipators for Culverts and Channels (July 2006), as applicable, for design guidance and criteria.
STORMWATER MANAGEMENT PLANFOR NCDOT PROJECTS
BMP
Associated w/
Buffer Rules?
Pipe0.2Class I
Q10
(cfs)
Pipe/Structure
Dimensions
(in)
0.5 N/A15
V10
(fps)
Energy Dissipator
TypeRiprap Energy
Dissipator Basin
North Carolina Department of Transportation
Additional Comments
Highway Stormwater Program
WBS Element:
(1)Tuckahoe
Creek4 2.6
Preformed Scour Holes and Energy Dissipators
JONES COUNTY
D
T
V
=
=
=
=
=
=
%
%
MPH
ADT
ADT
% *
FUNC CLASS =
K
0
0
0
PROFILE (HORIZONTAL)
17BP.2.R.77 P.E.
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION
NO.TOTALSHEETS
N.C.SHEET
1
DESIGN DATA
SIGNATURE:
SIGNATURE:
P.E.
P.E.
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
HYDRAULICS ENGINEER
ENGINEER
ROADWAY DESIGN
LOCATION:
TYPE OF WORK:
09/08/99
DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA
0
00
9/10/2018
...\
17B
P.2.R.7
7_pr
m_tsh.d
gn
HN
TB CO
NT
RA
CT:
TIP P
ROJE
CT:
AR
TM
E
N
N
A
S
O H
DE
P
TOF TRA
SPO
RT
TIO
N
TA
TE
OF N RTC
A
RO
LIN
A
SR 1142 (WEYERHAEUSER ROAD)
REPLACE BRIDGE NO. 32 OVER TUCKAHOE CREEK
GRADING, DRAINAGE, PAVING AND STRUCTURE
RIGHT OF WAY DATE:
LETTING DATE:
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
PROJECT ENGINEER
PROJECT DESIGN ENGINEER
MONICA J. DUVAL
NCDOT CONTACT
HEATHER C. LANE, PE
NOVEMBER 8, 2017
50 10050 25
50 10050 25
10 2010 5
SUBREGIONAL TIER
MINOR COLLECTOR
2012
2032
410
820
10
60
6
60
* TTST =2% DUAL 4%
**
**
VICINITY MAP
OFFSITE DETOUR
LIMITSPROJECT
1149
1151 1150
1142
1143
1130
41
258
LEN
OIR
ON
SLO
W
CREE
K
TU
CK
AH
OE
4
SR 1142 WEYERHAEUSER ROAD
-L-
17BP.2.R.77 ROW/UTIL.
DOUGLAS M. WHEATLEY, PE
TO SR 1143
TO SR 1130
2018 STANDARD SPECIFICATIONS
3. DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE (480.47') AND HORIZONTAL SSD (215') V = 35 MPH
2. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
1. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
NOTES:
WATER IMPACTS PERMITWETLAND AND SURFACE
SHEET 1 OF 7PERMIT DRAWING
-L- POC STA 14+00.00BEGIN PROJECT B-5994BEGIN CONSTRUCTION
-L- POC STA 21+50.00END PROJECT B-5994
B-5994
B-5994
CONST.BRZ-1142(013)48189.3.1
=
=
=
0.142 MILES
0.033 MILES
0.109 MILES
TOTAL LENGTH OF PROJECT B-5994
LENGTH OF STRUCTURE PROJECT B-5994
LENGTH OF ROADWAY PROJECT B-5994
-L- STA 22+50.00PROJECT B-5994END CONSTRUCTION-L- POT STA 18+13.75
END BRIDGE
-L- POT 16+41.25BEGIN BRIDGE
OCTOBER 24, 2018
TU
CK
AH
OE
CR
EE
K
CR
EE
KT
UC
KA
HO
E
Great
Rattle
snake
Cypress
Joshua
Trent
Br.
Cr.
Cr.
Br.
Br.
Rattlesnake
NA 2011
NAD 83/
WOODED
FALLOW
FALLOW
WOODED
WOODED
FALLOW
FALLOW
FALLOW
WOODED
WOODED
T
T
B
24" CMP
18" RCP
15" RCP
FINISHED FLOOR IS NATURAL GROUND
FINISHED FLOOR ELEVATION=50.47'EXISTING R/W
EXISTING R/W
GUY
GUY
TU
CK
AH
OE
CR
EE
K
EXISTING R/W
EXISTING R/W
DAVY HUSSEY, HEIRS
DAVY HUSSEY, HEIRSERIC PROPPER
20' BST SR 1142 WEYERHAEUSER ROAD
SR 1142 W
EYE
RH
AEUSE
R ROAD
20' BST
CR
EE
KT
UC
KA
HO
E
GREU, TL-3
GREU, TL-3
IIITYPE
IIITYPE
IIITYPE
IIITYPE
-L- POT STA 16+30.50BEGIN APPROACH SLAB
-L- POT STA 16+42.50BEGIN BRIDGE
-L- POT STA 18+12.50END BRIDGE
-L- POT STA 18+24.50END APPROACH SLAB
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
-L-
NAD 83/ NA 2011 DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
10
20
30
40
50
60
0
10
20
30
40
50
60
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
-L-
RELATIONSHIP TO PAVEMENTSKETCH OF BRIDGE IN
NOT TO SCALE
04
03
TAPER
8:1
8:1 TAPER
01
00
01
02
025
025
-L-
30.8
4'
16.8
4'
14'
11'
11'
ELEV. = 51.23-L- STA 20+75.59, 138.52' LTRR SPIKE SET IN 24" HARDWOODBM#1
MATERIAL TO BE REMOVED
HORIZONTAL SSD (215') - V=35 MPH 2: DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE (480.47')
NOTES: 1: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS.
TU
CK
AH
OE
CR
EE
K
WETLAND & STREAM IMPACTSW2
FILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF
W1
FILL IN WETLANDS = 0.00 Ac / 0 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF W4
FILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF
W3
S SSURFACE WATER
DENOTES IMPACTS IN
TS TSIMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TEMPORARY STREAM IMPACTS = 28 LFPERMANENT STREAM IMPACTS = 88 LFFILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = <0.00 Ac / 0.00 SF
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
4B-5994
R/W SHEET NO.8/17/99
9/7/2018
...\
17
BP.2.R.7
7_hyd_pr
m_psh4.d
gn
HN
TB
-L- POT STA 21+50.00END PROJECT B-5994
-L- STA 22+50.00PROJECT B-5994END CONSTRUCTION-L- POC STA 14+00.00
BEGIN PROJECT B-5994BEGIN CONSTRUCTION
15
20
-L- P
CC Sta. 13
+28.21
-L-
PC Sta. 18
+30.6
7
-L-
PT
Sta. 20+73.0
6
-L- PT Sta. 16+28.17
C
C
C
F
F
C
C
C
F
C
F
F
C
F
C
-BL1-
-BL2-
-BL3-
BM1
1
21
CHORD
CHORD
CHORDCHORD
15" RCP-IV
REMOVE EXIST. BRIDGE
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 3
SPECIAL LAT. 'V' DITCH
SEE DETAIL 2
4' BASE DITCH
SPECIAL LAT.
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
D
FROM -L- STA. 18+05 TO STA. 19+50 LTFROM -L- STA. 14+00 TO STA. 16+50 RTFROM -L- STA. 14+00 TO STA. 15+50 LT
Min. D= 1.5 Ft.
DETAIL 1
Ground
Natural
Slope
Fill3:1 3:
1
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
3:1D
FROM -L- STA. 20+00 TO STA. 22+50 RT
Min. D= 1.0 Ft.
DETAIL 3
Ground
Natural
Flatter4:
1 or
Slope
Fill
2:1
B
D
( Not to Scale)
SPECIAL LATERAL BASE DITCH
FROM -L- STA. 15+50 TO STA. 16+40 LT
Slope
Fill
DETAIL 2
Ground
Natural
Geotextile
2:1
Type of Liner= Class 'I' Rip-Rap
B= 4.0 Ft.
Min. D= 1.0 Ft.
LIMIT (TYP.)EXCAVATION
LIMIT (TYP.)EXCAVATION
STA. 16+17.5 (LT)BEGIN SBG -L-
STA. 16+30.5 (LT)END SBG -L-
24"
15"
PI = 14+90.00
EL = 52.27'
(-)0.3000% (+)0.3000%
VC = 160'K = 267
PI = 19+05.00
EL = 53.51'
(+)0.3000% (-)0.6796%
VC = 160'K = 163
V = 80 MPH+/-
V= 61 MPH
ELEV. = 52.54-L- STA 14+00.00BEGIN GRADE
ELEV. = 51.85-L- STA 21+50.00END GRADE
SURVEY 06-13-17
WS EL.= 41.4'
El = 49.46
PI = 14+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 49.26
PI = 14+00.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 48.46
PI = 16+00.00 (RT)El = 45.96
PI = 16+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
El = 50.10
PI = 20+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 46.73
PI = 19+50.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 46.01
PI = 18+05.00
LAT. 'V' DITCH (LT)
END SPECIAL
(-) 3.0000%
(-) 2.5000%
(-) 0.5000% (-) 5.0000%
(+) 0.5000%
El = 49.60
PI = 22+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
(-) 0.2000%
El = 42.51
PI = 16+40.00
LAT. BASE DITCH (LT)
END 4' SPECIAL
El = 44.76
PI = 15+50.00
LAT. BASE DITCH (LT)
BEGIN 4' SPECIAL
LAT. 'V' DITCH (LT)
END SPECIAL
-L- STA 18
+13.7
5E
ND
BRID
GE
-L- STA 16
+41.25
BE
GIN
BRID
GE
REMOVE
REMOVE
REMOVE
TB2GI FG
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2000
= 10
= 49.9
= 4466
= 100
= 53.1
= 2030
= 10+
= 50.0
= 06-13-17
= 41.4
SHEET 2 OF 7PERMIT DRAWING
WOODED
FALLOW
FALLOW
WOODED
WOODED
FALLOW
FALLOW
FALLOW
WOODED
WOODED
T
T
B
24" CMP
18" RCP
15" RCP
FINISHED FLOOR IS NATURAL GROUND
FINISHED FLOOR ELEVATION=50.47'EXISTING R/W
EXISTING R/W
GUY
GUY
TU
CK
AH
OE
CR
EE
K
EXISTING R/W
EXISTING R/W
DAVY HUSSEY, HEIRS
DAVY HUSSEY, HEIRSERIC PROPPER
20' BST SR 1142 WEYERHAEUSER ROAD
SR 1142 W
EYE
RH
AEUSE
R ROAD
20' BST
CR
EE
KT
UC
KA
HO
E38
39
39
40
40
40
40
40
40
40
41
41
41
41
41
42
42
42
42
42
42
42
43
43
43
43
43
43
43
43
43
43
43
43
44
44
44
44
44
44
44
44
44
44
44
44
44
44
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
45
4545
45
45
45
45
45
45
45
45
45
45
45
45
45
46
46
46
46
46
46
46
46
46
46
46
46 4
6
46
46
46
46
46
46
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
47
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
48
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
49
50
50
50
50
50
50
50
50
50
50 50
50
50
50
50
5050
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
51
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
52
53
53
53
53
53
53
53
53
53
53
53
53
53
53
54
54
54
54
54
54
54
55
GREU, TL-3
GREU, TL-3
IIITYPE
IIITYPE
IIITYPE
IIITYPE
-L- POT STA 16+30.50BEGIN APPROACH SLAB
-L- POT STA 16+42.50BEGIN BRIDGE
-L- POT STA 18+12.50END BRIDGE
-L- POT STA 18+24.50END APPROACH SLAB
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
-L-
NAD 83/ NA 2011 DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
10
20
30
40
50
60
0
10
20
30
40
50
60
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
-L-
RELATIONSHIP TO PAVEMENTSKETCH OF BRIDGE IN
NOT TO SCALE
04
03
TAPER
8:1
8:1 TAPER
01
00
01
02
025
025
-L-
30.8
4'
16.8
4'
14'
11'
11'
ELEV. = 51.23-L- STA 20+75.59, 138.52' LTRR SPIKE SET IN 24" HARDWOODBM#1
MATERIAL TO BE REMOVED
HORIZONTAL SSD (215') - V=35 MPH 2: DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE (480.47')
NOTES: 1: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS.
TU
CK
AH
OE
CR
EE
K
WETLAND & STREAM IMPACTSW2
FILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF
W1
FILL IN WETLANDS = 0.00 Ac / 0 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF W4
FILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = 0.00 Ac / 0.00 SF
W3
S SSURFACE WATER
DENOTES IMPACTS IN
TS TSIMPACTS IN SURFACE WATER
DENOTES TEMPORARY
TEMPORARY STREAM IMPACTS = 28 LFPERMANENT STREAM IMPACTS = 88 LFFILL IN WETLANDS = 0.00 Ac / 0.00 SFHAND CLEARING IN WETLANDS = <0.00 Ac / 0.00 SF
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
4B-5994
R/W SHEET NO.8/17/99
9/7/2018
...\
17
BP.2.R.7
7_hyd_pr
m_psh4.d
gn
HN
TB
-L- POT STA 21+50.00END PROJECT B-5994
-L- STA 22+50.00PROJECT B-5994END CONSTRUCTION-L- POC STA 14+00.00
BEGIN PROJECT B-5994BEGIN CONSTRUCTION
15
20
-L- P
CC Sta. 13
+28.21
-L-
PC Sta. 18
+30.6
7
-L-
PT
Sta. 20+73.0
6
-L- PT Sta. 16+28.17
C
C
C
F
F
C
C
C
F
C
F
F
C
F
C
-BL1-
-BL2-
-BL3-
BM1
1
21
CHORD
CHORD
CHORDCHORD
15" RCP-IV
REMOVE EXIST. BRIDGE
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 1
SPECIAL LAT. 'V' DITCH
SEE DETAIL 3
SPECIAL LAT. 'V' DITCH
SEE DETAIL 2
4' BASE DITCH
SPECIAL LAT.
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
D
FROM -L- STA. 18+05 TO STA. 19+50 LTFROM -L- STA. 14+00 TO STA. 16+50 RTFROM -L- STA. 14+00 TO STA. 15+50 LT
Min. D= 1.5 Ft.
DETAIL 1
Ground
Natural
Slope
Fill3:1 3:
1
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
3:1D
FROM -L- STA. 20+00 TO STA. 22+50 RT
Min. D= 1.0 Ft.
DETAIL 3
Ground
Natural
Flatter4:
1 or
Slope
Fill
2:1
B
D
( Not to Scale)
SPECIAL LATERAL BASE DITCH
FROM -L- STA. 15+50 TO STA. 16+40 LT
Slope
Fill
DETAIL 2
Ground
Natural
Geotextile
2:1
Type of Liner= Class 'I' Rip-Rap
B= 4.0 Ft.
Min. D= 1.0 Ft.
LIMIT (TYP.)EXCAVATION
LIMIT (TYP.)EXCAVATION
STA. 16+17.5 (LT)BEGIN SBG -L-
STA. 16+30.5 (LT)END SBG -L-
24"
15"
PI = 14+90.00
EL = 52.27'
(-)0.3000% (+)0.3000%
VC = 160'K = 267
PI = 19+05.00
EL = 53.51'
(+)0.3000% (-)0.6796%
VC = 160'K = 163
V = 80 MPH+/-
V= 61 MPH
ELEV. = 52.54-L- STA 14+00.00BEGIN GRADE
ELEV. = 51.85-L- STA 21+50.00END GRADE
SURVEY 06-13-17
WS EL.= 41.4'
El = 49.46
PI = 14+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 49.26
PI = 14+00.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 48.46
PI = 16+00.00 (RT)El = 45.96
PI = 16+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
El = 50.10
PI = 20+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 46.73
PI = 19+50.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 46.01
PI = 18+05.00
LAT. 'V' DITCH (LT)
END SPECIAL
(-) 3.0000%
(-) 2.5000%
(-) 0.5000% (-) 5.0000%
(+) 0.5000%
El = 49.60
PI = 22+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
(-) 0.2000%
El = 42.51
PI = 16+40.00
LAT. BASE DITCH (LT)
END 4' SPECIAL
El = 44.76
PI = 15+50.00
LAT. BASE DITCH (LT)
BEGIN 4' SPECIAL
LAT. 'V' DITCH (LT)
END SPECIAL
-L- STA 18
+13.7
5E
ND
BRID
GE
-L- STA 16
+41.25
BE
GIN
BRID
GE
REMOVE
REMOVE
REMOVE
TB2GI FG
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2000
= 10
= 49.9
= 4466
= 100
= 53.1
= 2030
= 10+
= 50.0
= 06-13-17
= 41.4
SHEET 3 OF 7PERMIT DRAWING
WOODED
FALLOW
FALLOW
WOODED
WOODED
FALLOW
FALLOW
FALLOW
WOODED
WOODED
T
T
B
24" CMP
18" RCP
15" RCP
FINISHED FLOOR IS NATURAL GROUND
FINISHED FLOOR ELEVATION=50.47'EXISTING R/W
EXISTING R/W
GUY
GUY
TU
CK
AH
OE
CR
EE
K
EXISTING R/W
EXISTING R/W
DAVY HUSSEY, HEIRS
DAVY HUSSEY, HEIRSERIC PROPPER
20' BST SR 1142 WEYERHAEUSER ROAD
SR 1142 W
EYE
RH
AEUSE
R ROAD
20' BST
CR
EE
KT
UC
KA
HO
E
GREU, TL-3
GREU, TL-3
IIITYPE
IIITYPE
IIITYPE
IIITYPE
-L- POT STA 16+30.50BEGIN APPROACH SLAB
-L- POT STA 16+42.50BEGIN BRIDGE
-L- POT STA 18+12.50END BRIDGE
-L- POT STA 18+24.50END APPROACH SLAB
NC License No: C-1554
Raleigh, North Carolina 27609
343 E. Six Forks Road, Suite 200
HNTB NORTH CAROLINA, P.C.
-L-
NAD 83/ NA 2011 DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
10
20
30
40
50
60
0
10
20
30
40
50
60
11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00
-L-
RELATIONSHIP TO PAVEMENTSKETCH OF BRIDGE IN
NOT TO SCALE
04
03
TAPER
8:1
8:1 TAPER
01
00
01
02
025
025
-L-
30.8
4'
16.8
4'
14'
11'
11'
ELEV. = 51.23-L- STA 20+75.59, 138.52' LTRR SPIKE SET IN 24" HARDWOODBM#1
MATERIAL TO BE REMOVED
HORIZONTAL SSD (215') - V=35 MPH 2: DESIGN EXCEPTION REQUIRED FOR HORIZONTAL CURVE (480.47')
NOTES: 1: ALL DRIVEWAY RADII ARE 10' UNLESS OTHERWISE NOTED ON THE PLANS.
TU
CK
AH
OE
CR
EE
K
BUFFER IMPACTSLEGEND
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
B2
ZONE 2 BUFFER IMPACTS = 261 SFZONE 1 BUFFER IMPACTS = 563 SF
ZONE 2 BUFFER IMPACTS = 351 SFZONE 1 BUFFER IMPACTS = 830 SF
B4
ZONE 2 BUFFER IMPACTS = 351 SFZONE 1 BUFFER IMPACTS = 518 SF
B3
ZONE 2 BUFFER IMPACTS = 227 SFZONE 1 BUFFER IMPACTS = 535 SF
B1
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
4B-5994
R/W SHEET NO.8/17/99
9/7/2018
...\
17
BP.2.R.7
7_hyd_buff_psh4.d
gn
HN
TB
-L- POC STA 14+00.00BEGIN PROJECT B-5994BEGIN CONSTRUCTION -L- POT STA 21+50.00
END PROJECT B-5994
-L- STA 22+50.00PROJECT B-5994END CONSTRUCTION
15
20
-L- P
CC Sta. 13
+28.21
-L-
PC Sta. 18
+30.6
7
-L-
PT
Sta. 20+73.0
6
-L- PT Sta. 16+28.17
C
C
C
F
F
C
C
C
F
C
F
F
C
F
C
-BL1-
-BL2-
-BL3-
BM1
1
21
CHORD
CHORD
CHORDCHORD
REMOVE
15" RCP-IV
REMOVE EXIST. BRIDGE
REMOVE
REMOVE
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
D
FROM -L- STA. 18+05 TO STA. 19+50 LTFROM -L- STA. 14+00 TO STA. 16+50 RTFROM -L- STA. 14+00 TO STA. 15+50 LT
Min. D= 1.5 Ft.
DETAIL 1
Ground
Natural
Slope
Fill3:1 3:
1
( Not to Scale)
SPECIAL LATERAL 'V' DITCH
3:1D
FROM -L- STA. 20+00 TO STA. 22+50 RT
Min. D= 1.0 Ft.
DETAIL 3
Ground
Natural
Flatter4:
1 or
Slope
Fill
2:1
B
D
( Not to Scale)
SPECIAL LATERAL BASE DITCH
FROM -L- STA. 15+50 TO STA. 16+40 LT
Slope
Fill
DETAIL 2
Ground
Natural
Geotextile
2:1
Type of Liner= Class 'I' Rip-Rap
B= 4.0 Ft.
Min. D= 1.0 Ft.
TB2GI FG
LIMIT (TYP.)EXCAVATION
LIMIT (TYP.)EXCAVATION
STA. 16+17.5 (LT)BEGIN SBG -L-
STA. 16+30.5 (LT)END SBG -L-
24"
15"
PI = 14+90.00
EL = 52.27'
(-)0.3000% (+)0.3000%
VC = 160'K = 267
PI = 19+05.00
EL = 53.51'
(+)0.3000% (-)0.6796%
VC = 160'K = 163
V = 80 MPH+/-
V= 61 MPH
ELEV. = 52.54-L- STA 14+00.00BEGIN GRADE
ELEV. = 51.85-L- STA 21+50.00END GRADE
SURVEY 06-13-17
WS EL.= 41.4'
El = 49.46
PI = 14+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 49.26
PI = 14+00.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 48.46
PI = 16+00.00 (RT)El = 45.96
PI = 16+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
El = 50.10
PI = 20+00.00
LAT. 'V' DITCH (RT)
BEGIN SPECIAL
El = 46.73
PI = 19+50.00
LAT. 'V' DITCH (LT)
BEGIN SPECIAL
El = 46.01
PI = 18+05.00
LAT. 'V' DITCH (LT)
END SPECIAL
(-) 3.0000%
(-) 2.5000%
(-) 0.5000% (-) 5.0000%
(+) 0.5000%
El = 49.60
PI = 22+50.00
LAT. 'V' DITCH (RT)
END SPECIAL
(-) 0.2000%
El = 42.51
PI = 16+40.00
LAT. BASE DITCH (LT)
END 4' SPECIAL
El = 44.76
PI = 15+50.00
LAT. BASE DITCH (LT)
BEGIN 4' SPECIAL
LAT. 'V' DITCH (LT)
END SPECIAL
-L- STA 18
+13.7
5E
ND
BRID
GE
-L- STA 16
+41.25
BE
GIN
BRID
GE
DESIGN DISCHARGE
DESIGN FREQUENCY
BASE DISCHARGE
CFS
YRS
YRS
BASE FREQUENCY
OVERTOPPING ELEVATION
OVERTOPPING FREQUENCY
OVERTOPPING DISCHARGE CFS
CFS
YRS
FT
FT
FT
DESIGN HW ELEVATION
BASE HW ELEVATION
BRIDGE HYDRAULIC DATA
DATE OF SURVEY
W.S. ELEVATION
AT DATE OF SURVEY FT
= 2000
= 10
= 49.9
= 4466
= 100
= 53.1
= 2030
= 10+
= 50.0
= 06-13-17
= 41.4
SHEET 4 OF 7PERMIT DRAWING
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 15+42 TO 16+60 24" CORED SLAB BRIDGE 0.02 < 0.01 88 28
TOTALS*: 0.02 < 0.01 88 28 0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2016 09 09 SHEET 5 OF 7
Permanent SW impacts: 1033 SF
Temporary SW impacts: 229 SF
WETLAND AND SURFACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
JONES COUNTY
B-5994
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
9/7/2018
ROAD
CROSSING BRIDGE
PARALLEL
IMPACT
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
TOTAL
(ft2)
ZONE 1
(ft2)
ZONE 2
(ft2)
1 24" CORED SLAB BRIDGE -L- 16+48 TO 18+13 X 2446.0 1190.0 3636.0
TOTAL: 2446.0 1190.0 3636.0 0.0 0.0 0.0 0.0 0.0
Rev. SEP 2016
SHEET 6 OF 7
B-5994
DATE: 9/7/2018
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
JONES COUNTY BRIDGE NO. 32
IMPACT
RIPARAIN BUFFER IMPACTS SUMMARY
TYPE
SITE NO. STRUCTURE SIZE / TYPE
STATION
(FROM/TO)
ALLOWABLE MITIGABLE
BUFFER
REPLACEMENT
Rev. May 2006
ZONE 1
(ft2)
ZONE 2
(ft2)
1 -L- 16+48 TO 18+13 0 0
TOTAL: 0 0
WETLANDS IN
BUFFERS
SITE NO.
STATION
(FROM/TO)
WETLANDS IN BUFFER IMPACTS SUMMARY
SHEET 7 OF 7
B-5994
DATE: 9/7/2018
N.C. DEPT. OF TRANSPORTATION
DIVISION OF HIGHWAYS
JONES COUNTY BRIDGE NO. 32
Rev. Jan 2009