High Steel Open House October 4, 2013 BrIM in Structural Steel Fabrication: Current Uses, Benefits and Potential Courtesy: HNTB

High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

High Steel Open HouseOctober 4, 2013

BrIM in Structural Steel Fabrication:Current Uses, Benefits and Potential

Courtesy: HNTB

Page 2: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

““TraditionalTraditional”” BrIMBrIM in Steel Fabricationin Steel Fabrication

Page 3: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Current Current BrIMBrIM in Steel Fabricationin Steel Fabrication

Page 4: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Current Uses of Current Uses of BrIMBrIM

• Generation of Shop Drawings, Fab Data & CAM Files

• Fabrication Planning

• Fit Verification and Clash Detection

• Data Warehouse for Fabrication Documentation (QC Data)

• Steel Erection Planning

Page 5: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Shop Drawingsand Shop Drawings

Page 6: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

NEW PROJECT

MODELS/DATA OF ALL

COMPONENTS

SHOP DRAWING TO FABRICATION FLOW ‐ WITH FULL UTILIZATION OF BrIM AND CNC EQUIPMENT

APPROVAL AND FABRICATION INFORMATION

SUBMIT INFO (DRAWINGS)

FOR APPROVAL

DRAWING APPROVAL

FABRICATE FROM MODELS

CREATE CAM MODELS FOR

CNC EQUIPMENT

MODELS/DATA GOVERN!

BrIMBrIM and Shop Drawingsand Shop Drawings

Page 7: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Design Interactionand Design Interaction

Traditional Workflow

Analysis and Design

(Data/Models)

Create 2-D Contract

Plans

Enter Data into Software

Create 2-D Shop

Dwgs for Approval

Create CAM Models for Fabrication

Engineer Fabricator

Digital

Digital

DigitalPaper

Paper

Digital Paper

Page 8: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Design Interactionand Design Interaction

• Design Data Transfer - Project Geometry• Roadway - Horizontal, Vertical, Cross slopes• Span• Deck – Thickness, Haunches• Structural Steel – Top of Steel Elevations, Camber Data

Project: NYSDOT Kew Gardens Interchange, Contract 2A

Page 9: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Design Interactionand Design Interaction

• Design Data Transfer – Member Properties• Steel Member Sizes, Shapes• Size Transition Locations• Material Specifications

Project: NYSDOT Kew Gardens Interchange, Contract 2A

Page 10: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Design Interactionand Design Interaction

Analysis and Design

(Data/Models)

Create 2-D Contract Plans ?

Data Dump into

Software

Create 2-D Shop

Dwgs for Approval ?

Create Models for Approval and Fab

Electronic Data Transfer

Create 2-D Contract Plans ?

Create 2-D Shop

Dwgs for Approval ?

Preferred Workflow

Digital

Paper

Digital

Digital

Paper

Engineer Fabricator

Page 11: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Fabricationand Fabrication

Traditional Shop Drawing

Communication Tool!

Info Can Be Zinc Marked

Page 12: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Fabricationand Fabrication

Current Transfer of CAM Data

Transferred Electronically

Page 13: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

CAD Drawings

BOM

CNC Code

CAM ToolpathPart Model

• Parametric 3D models created for girder parts

• One associative part model shared by all disciplines

• Reduces redundant efforts

BrIMBrIM and Fabricationand Fabrication

Page 14: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Fit Verification/Assemblyand Fit Verification/Assembly

Traditional Assembly• Labor Intensive• Time Consuming• Costly

Page 15: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Fit Verification/Assemblyand Fit Verification/Assembly

IN Milton Madison Truss Virtual Assembly

Page 16: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

SET UP 2

SET UP 1

BrIMBrIM and Fit Verification/Assemblyand Fit Verification/Assembly

OH Innerbelt Bridge Virtual Assembly

• Schedule/Size Prohibited Full Assembly• Physical Progressive Laydown Assembly• Fully Connected Virtual Assembly in Position for Bearing to Bearing Check

Page 17: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM and Fit Verification/Assemblyand Fit Verification/Assembly

Physical Assembly avoids issues here, BUTVirtual Assembly can achieve same result

Page 18: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

May 9, 2013

Courtesy: WPMT43

Page 19: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

• Project Timeline• May 09 – Accident Occurred

• May 10 – HSSI Contacted PennDOT to Offer Assistance

• May 23 – NTP from PennDOT

• June 06 – Start of Fabrication (2 weeks after NTP)

• August 09 – Start of Steel Delivery (11 weeks after NTP)

• August 12 – Start of Steel Erection

• August 26 – Completion of Steel Erection (13-1/2 weeks after NTP)

Page 20: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

COOPERATION

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

HOW??365 tons2 Box Gdrs

Page 21: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

• Expedited Shop Drawing/Model Review• Direct Communication—PennDOT, Gannett Fleming, HSSI• Redline Markup of Existing Shop Drawings• Modeling of Box Girders

Page 22: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

• On-Site Review/Approval of Model• Design Change from Existing FPW to Bolted Connection• Investigation/Resolution of Design/Detail Issues• Verification of Design Requirements

Page 23: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

• Fabrication Drawing Approval

Page 24: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

Page 25: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

Page 26: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Case Study Case Study –– PennDOTPennDOT II--81/Rt 2281/Rt 22

95 Calender Days

NTP to Complete Steel Erection

Page 27: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM Benefits in Steel FabricationBenefits in Steel Fabrication

• Optimizes Workflow from Design to Detailing to Fabrication

• Minimizes Errors due to:• Manual Data Transfer• Detailing Misfits

• Provides One Source for Data• Shop Drawings• Fabrication Documentation• QC Records

• Eliminates Redundant or Manual Efforts• Manual Programming and Fabrication Processes• Physical Assemblies for Fit Verification

INSERT MODEL SNAPSHOT

Page 28: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

BrIMBrIM Potential in Steel FabricationPotential in Steel Fabrication

• Transfer of Design Data from Engineer to Fabricator• Industry format needed

• Fabrication Approval Process• Use of Models; Fewer Dwgs

• Project Doc Warehouse• Fabrication Details• Fabrication QC Docs• As-Built Docs• Maintenance / Inspection / Rating Docs

• Virtual Assemblies & Erection Planning

Page 29: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

Where Do We Go From Here???Where Do We Go From Here???

• Be Open to the Possibilities of BrIM

• Consider the Benefits to You• Owner, Engineer, GC

• Promote the Benefits

• Discuss with Owners

• Participate with Industry• AASHTO/NSBA Steel Bridge Collaboration--TG 15 Data

Modeling for Interoperability

Page 30: High Steel Open House - Structural Steel Fabrication for ... · 04/10/2013  · Case Study – – PennDOT PennDOT I-81/Rt 22 • Project Timeline • May 09 – Accident Occurred

QUESTIONS ?