    Petrochina(Halfaya)

    HALFAYA PROJECT SURFACE FACILITY

    Additional Tanks for CPF1

    IMCO

    DETAIL DESIGN DOC.NO.: HFY2-E1549-CPF1TA-GEN-PD-0010 REV.: A PAGE 2 OF 4

    Content

    1.0 Purpose3

    2.0 Introduct ion.3

    3.0Scope and Regulation3

    4.0 Methodology3

    5.0 Work Details4

    Attachments:

    TECHNICAL Data & Certi ficates of paints

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    3/9

    Petrochina(Halfaya)

    HALFAYA PROJECT SURFACE FACILITY

    Additional Tanks for CPF1

    IMCO

    DETAIL DESIGN DOC.NO.: HFY2-E1549-CPF1TA-GEN-PD-0010 REV.: A PAGE 3 OF 4

    1.0 Purpose:

    The purpose of this statement is to explain the Surface Preparations and Paintingmethod for internal and external Coating of 30000 m3 Tank in halfaya oil field.

    2.0 Introduct ion:

    This method statement sets out the IMCO procedures to be adopted and followedduring the Sand Blasting & Painting of the 12130 TAG.

    3.0 Scope and Regulation:

    Internal and External Painting for tank and Equipment will be done based on the latestEdition of the Followed SPEC.

    Doc.No.HFY2-E1550-CPF1TB-CP-SPC-0004 Rev.: A

    Doc.No:HFY2-E1550-CPF1TB-CP-SPC-0005 Rev.:1

    4.0 Methodology:

    4.1 Works Authorization Procedure:

    Prior to commencing works the relevant certificate should be obtained in accordancewith PCH Works Authorization Procedure as necessary.

    4.2 Materials :

    All Materials will be delivered to the jobsite in sealed and labeled containers and shall bestored in a location that is protected from the elements, well ventilated and free fromexcessive heat, open flame, or other sources of ignition.

    4.3 Coating System :

    Coating systems and type of paints will be prepared based on the Representations SPCby OWNER.

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    4/9

    Petrochina(Halfaya)

    HALFAYA PROJECT SURFACE FACILITY

    Additional Tanks for CPF1

    IMCO

    DETAIL DESIGN DOC.NO.: HFY2-E1549-CPF1TA-GEN-PD-0010 REV.: A PAGE 4 OF 4

    4.4 Coating f ilm Thickness:

    Coating film Thickness for each layer wil l be done based on tables that presented inSPC-0004 & SPC-0005

    5.0 Work Details:

    5.1 Sequence of Preparation and coating:

    The preparation and first coating of internal and external surface of shell and roof andother attachments that connected to tank will be done before installation and welding.

    5.2 Surface preparations:

    The steel surface will be cleaned by either slag abrasive or abrasives suitable.Preparation grade shall be reach to Sa 2.5

    The profile depth of the abrasive blast cleaned surface shall not be less than 40 orgreater than 75 micrometers.

    5.3 More Painting:

    The intermediate and top coating will be done after the completion of the installation andwelding of tank and Hydrostatic test.

    5.4 Painting / Coating Repair:

    After completion of hydrostatic test and before starting intermediate and top coating anyspots that required repair and maintenance in area of damage, will be done.

    The coating materials used for repair and maintenance shall be the same as the originalmaterials.

    The surface preparation method for repairing will depend upon the size of areas to becoated and the repair coating materials required.

    The order for surface preparation shall be:

    - Dry-blast.

    - Power tool cleaning.- Hand tool cleaning.

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    5/9

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    6/9

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    7/9

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    8/9

  • 8/12/2019 Hfy2 e1549 Cpf1ta Gen Pd 10

    9/9