Herriman City Municipal Water. PowerPoint Presentation March 10, 2011. System Maintenance. Service of Booster Pumps & Wells Fire Hydrant Flushing Valve Exercising Tank Cleaning. Service Of Booster Pumps & Wells. Shut Down Power/Lockout- Tagout Disassemble Pump Clean All Parts - PowerPoint PPT Presentation
Citation preview
Herriman City Municipal Water
PowerPoint PresentationMarch 10, 2011
System Maintenance Service of Booster
Pumps & Wells
Fire Hydrant Flushing
Valve Exercising
Tank Cleaning
Service Of Booster Pumps & Wells
• Shut Down Power/Lockout-Tagout
• Disassemble Pump
• Clean All Parts
• Replace All Bearings, Packings & Seals
• Repair Or Replace Other Parts As Needed
• Reassemble Pump
• Realign Pump
• Lubricate With Ultra Sound Equipment
• Test & Bring Back On Line
Pump Shaft Alignment Ultra Sound Equipment
Fire Hydrant Flushing &
Valve Exercising
• Annually We Flush & Inspect All Fire Hydrants & Dead Ends With The Assistance Of Unified Fire
• Fully Close & Reopen Each Valve In Our Water System
Tank Cleaning
• Clean, Inspect & Video Every 3-5 Years
Why?•This Provides Us With Visual
Conditions Of The Inside Of Our Tanks
•This Allows Us To Clean The Tanks Without Taking Them Off-Line.
• All Our Water Tanks Were Cleaned In November 2010
Projects
•Well 1 Booster Station
•Chlorine & Fluoride Analyzer
•5600 W Culinary & Secondary Water Lines
•Early Stages of Implementation Of Secondary Water System
•Mountain View Corridor Betterments
Well 1
Booster
Pump
Station
Completed
Chlorine & Fluoride Analyzer
• Installed At Well 1, HP Tanks & The RoseCrest Booster Pump Station
•Provides Trending Of Fluoride & Chlorine Levels
•Connected To The SCADA System Which Allows Off Site Tracking & Control Of Chemical Levels.
•Analyzers Provide Additional Safety To The Water System & Our Residents
Silver Spur Construction Won Bid Project Will Begin March 16, 2011
This Project Has A Completion Time Of 90 Days
Secondary Water System
Secondary Water Rate Study-Bowen Collins
Project Will Go Out To Bid Early Summer
Purple Shaded Area Will Be First Area To Receive Secondary Water
Mountain View Corridor March 2011
There Is A 32” Culinary & 10” Secondary HDPE Pipe
The Betterments Are Approximately 50%
Completed Trench is 32’
? ? ? ? ?Questions