Upload
ryan-sloan
View
218
Download
0
Embed Size (px)
Citation preview
8/6/2019 Heritage at Wake Senior
1/35
Check all that apply:
Federal Low Income Housing Tax Credit
State Low Income Housing Tax Credit
Tax Exempt Bonds
Rental Production Program (RPP) Loan
Requested RPP Loan Amount:RPP Loan Product Requested:
Print Preview - Final Application
Tax Credits, RPP Loans, and/or Tax Exempt Bond Loans
Resources Requested
Page 1 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
2/35
Is project in Qualified Census Tract & Difficult to Develop area:
Project Name and Location
Project Name: Heritage at Wake Forest Senior Apartments
Address: Rogers Road
City: Wake Forest County: Wake Zip: 27588
Census Tract: 542.01 Block Group: 1 Block 1024
No
Political Jurisdiction: Town of Wake Forest
Jurisdiction CEO Name: First: Last:Vivian Jones Title: Mayor
Jurisdiction Address: 401 Elm Avenue
Jurisdiction City: Wake Forest Zip: 27587
Jurisdiction Phone: (704)554-6190
Site Latitude: 35.9520
Site Longitude: -78.5187
Page 2 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
3/35
Is this project a follow-on (Phase II, etc) to a previously-awarded tax credit development project?
If yes, list names of previous phase(s):If yes, list names of previous phase(s):
Will the project be receiving federal rental assistance?
If yes, provide the subsidy source:If yes, provide the subsidy source: and number of units:and number of units:
Target Population: Elderly (55)
Indicate below any additional targeting for special populations proposed for this project:
Square Footage Information
Project Description
Project Type:* New Construction Rehab Adaptive Reuse
No
No
Mobility impaired handicapped: 5% of units comply with QAP Section IV(F)(3) (in addition to other federal and staterequirements)
Persons with disabilities or homeless populations: the greater of 5 units or 10% of the total units
Remarks: A total of 5 one-bedroom and 7 two-bedroom units will be constructed for occupancy priority forseniors with disabilities. An agreement with the Raleigh Housing Authority (attached) outlines theprocess by which disabled seniors with housing support will be referred to Heritage. A separateagreement with Resources for Seniors, Inc. of Raleigh, as the lead agency, (also attached) details
the services to be provided to all residents of Heritage, and in particular to disabled residents, andthe estimated cost of those services. One of the one-bedroom and two of the two-bedroom units(included in the total of twelve units referenced above) will also be designed for seniors with hearingand sight disabilities.
Proposed number of residential buildings: 17 Maximum number of stories in buildings: 1
Types of Units:* Townhouse Duplex Garden Apartment Detached Single-Family
Project Includes:Separate community building -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area): 4,0004,000
Community space within residential bulding(s) -- Sq. Ft. (Floor Area):Sq. Ft. (Floor Area):
Elevators -- Number of Elevators:Number of Elevators:
Gross Floor Square Footage: 101,500
Total Net Sq. Ft. (All Heated Areas): 101,500
Page 3 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
4/35
Applicant Information
Applicant Name: First Centrum, LLC
Address: 21400 Ridgetop Circle, Suite 250
City: State: VA Zip:Sterling 20166
Contact: First: Last: Title:Weshinskey Mark President
Telephone: (703)406-3471
Alt Phone:
Fax: (703)406-3474
Email Address: [email protected]
Page 4 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
5/35
Total Site Acreage: Total Buildable Acreage:
If buildable acreage is less than total acreage, please explain:
Identify utilities and services currently available (and with adequate capacity) for this site:
Storm Sewer Water Sanitary Sewer Electric
Is the demolition of any buildings required or planned?
If yes, please describe:
Are existing buildings on the site currently occupied?
If yes:(a) Briefly describe the situation:
(b) Will tenant displacement be temporary?
(c) Will tenant displacement be permanent?
Is the site in a distressed neighborhood?
If yes, does a community revitalization plan exist?
Is the site directly accessed by an existing, paved, publicly maintained road?
If no, please explain:
Is any portion of the site located inside the 100 year floodplain?
If yes:(a) Describe placement of project buildings in relation to this area:
Site Description
13.62 13.62
No
No
No
No
An affiliate of the Seller, the Ammons Development Company, has entered into a contract with thePurchaser to construct a 26 foot wide road within a 60 foot wide public right-of-way. The road willextend 250 feet from existing Rogers Road, which is the main entrance into Heritage, to the site,and 150 feet into the site. Ammons Development will also construct sanitary sewer and water mainsto the site.
The installation of public improvements by the Seller is a condition of the Purchase and Sale
Agreement. Ammons has the obligation to finish these improvements prior to land closing.
Electric will be brought to the site from Rogers Road by Wake Electric Corporation.
No
Page 5 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
6/35
(b) Describe flood mitigation if the project is in the East Region and will have improvements within the 100 year floodplain:
Page 6 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
7/35
Does the owner have fee simple ownership of the property (site/buildings)?
If yes provide:
Purchase Date: Purchase Price:
If no:
Site Control
No
(a) Does the owner/principal or ownership entity have vaild option/contract to purchase the property? Yes
(b) Does an identity of interest (direct or indirect) exist between the owner/principal or ownership entity with the option/contract for
purchase of the property and the seller of the property?If yes, specify the relationship:
No
(c) Enter the current expiration date of the option/contract to purchase: 12/31/2003
(D) Enter Purchase Price: 1,009,600
Page 7 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
8/35
Present zoning classification of the site:
Is mutifamily use permitted?
Are variances, special or conditional use permits or any other item requiring a public hearing needed to develop this proposal?
If yes, have the hearings been completed and permits been obtained?
If yes, specify permit or variance required and date obtained. If no, describe permits/variances required and schedule for obtainingthem:
Is a public hearing of any kind required in the future for you to fully develop this property?
If yes, describe the nature of the hearing and when you expect the hearing will be held:
Are there any existing conditions of historical significance located on the project site that will require State Historic Preservation office review?
If yes, describe below:
Are there any existing conditions of environmental significance located on the project site?
If yes, describe below:
Zoning
MF (Multi-Family)
Yes
Yes
Yes
A Special Use Permit is required to develop this property. The Special Use Permit was approved bythe Town Council in June 2003.
Yes
Please see above response.
No
No
Page 8 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
9/35
8/6/2019 Heritage at Wake Senior
10/35
[email protected] 54-1791190
Org: Third Centrum of Virginia, Inc.
First Name: Mark Last Name: Weshinskey Function: Corp Principal
Address: 21400 Ridgetop Circle, Suite 250
City: Sterling State: VA Zip: 20166
Phone: (703)406-3471 Fax: (703)406-3474
EMail: [email protected] Nonprofit: No TaxID 54-2022195
Page 10 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
11/35
List each applicable unit mix combination in a separate row below. Click [Add] to create another row. Click "X" (at the left of each row) todelete a row.
Low Income Units
Market Rate Units
Statistics
Notes
Unit Mix
Type # BRs Net Sq.Ft.Total
# Units#Units
MonthlyRent
UtilityAllowance
MandatoryServ. Fees
**TotalHousing Exp.
Gdn Apt 1 616 2 0 531 137 668
Gdn Apt 1 616 18 0 649 137 786
Gdn Apt 2 802 10 0 658 144 802
Gdn Apt 2 802 90 0 795 144 939
Utilites included in rents: Water/Sewer Electric Gas Other Trash Removal
Type # BRs Net Sq.Ft.Total
# Units#Units
MonthlyRent
UtilityAllowance
MandatoryServ. Fees
**TotalHousing Exp.
Utilites included in rents: Water/Sewer Electric Gas Other
AllUnits
Units
Gross MonthlyRental Income
Low Income....... 120 0 90874
Market Rate.......
Totals............... 120 0 90874
* Paint-to-Paint Square Footage
** Please refer to the Income Limits and Maximum Housing Expense Table to ensure that Total Monthly Tenant Expenses for low incomeunits are within established thresholds.
Page 11 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
12/35
8/6/2019 Heritage at Wake Senior
13/35
Estimated pricing on sale of Federal Tax Credits: $0.
Remarks concerning project funding sources:(Please be sure to include the name of the funding source(s))
Funding Sources
Source AmountNon-
Amortizing*Rate(%)
Term(Years)
Amort.Period(Years)
AnnualDebt
Service
Bank Loan
RPP LoanLocal Gov. Loan - Specify:
RD Loan
AHP Loan
Other Loan 1 - Specify:
Other Loan 2 - Specify:
Other Loan 3 - Specify:
Tax Exempt Bonds 8,075,000 5.577 30 30 554,877
State Tax Credit(Loan) 0 30 30 0
State Tax Credit(Direct Refund)
Equity: Federal LIHTC 2,188,494
Non-Repayable Grant
Equity: Historic Tax Credits
Deferred Developer Fees 359,738
Owner Investment
Other - Specify:
Total Sources** 10,623,232
* "Non-amortizing" indicates that the loan does not have a fixed annual debt service. For these items, you must fill in 20-year debt servicebelow.
** Total Sources must equal total replacement cost in Project Development Cost (PDC) section.
78
Page 13 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
14/35
8/6/2019 Heritage at Wake Senior
15/35
Comments:
45 Operating Reserve 312,523
46 Other Reserve - Reserve for Subsidy of Disabled Units 150,000
47 Other Reserve (specify)
48 DEVELOPMENT COST (lines 1-47) 9,613,632 8,251,123 0
49 Less Federal Financing
50 Less Disproportionate Standard
51 Less Nonqualified Nonrecourse Financing
52 Less Historic Tax Credit (residential) 0
53 TOTAL ELIGIBLE BASIS 8,251,123 8,251,123 0
54 Times Applicable Fraction 100.00% 100% 100%
55 TOTAL QUALIFIED BASIS 8,251,123 8,251,123 0
56 Tax Credit Rate 3.37% 0.00%
57 FEDERAL TAX CREDITS at Estimated Rate 278,062 278,062 0
57a FEDERAL TAX CREDITS at 8.5% or 3.75% 309,417 309,417 0
58 FEDERAL TAX CREDITS REQUESTED 277,896 277,896
59 STATE TAX CREDITS
60 Land Cost 1,009,600
61 TOTAL REPLACEMENT COST 10,623,232
We have included "Line 39 - Other Basis Expense" items in the calculation of the Developer Fee.
Page 15 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
16/35
Please provide a detailed description of the proposed project:
Construction (check all that apply):
Brick Vinyl Wood HardiPlank Balconies/Patios Sunrooms Front Porches
Front Gables or Dormers Wide Banding or Vertical/Horizontal Siding
Other:
Have you built other tax credit developments that use the same building design as this project?
If yes, please provide name and address:
Site Amenities (check all that apply):
Market Study Information
The Heritage at Wake Forest Senior Apartments will consist of 120 one and two bedroom apartmentunits grouped in single-story buildings with direct entries for residents. The community will alsoinclude a 4,000 square foot resident community center located at the front of the site. There will be atotal of 20 one-bedroom and 100 two-bedroom units in the community.
The subject property consists of 13.62 acres of gently sloping terrain located 250 feet south ofRogers Road, which is the main entrance into the Heritage planned community in Wake Forest.Heritage is an 1,100 acre mixed-use community that includes a variety of residential, commercial,retail and office uses along with an 18 hole golf course and swim and tennis club.
Each residential building will feature an exterior of brick and HardiPlank siding with a 6 in 12 pitchroof. Every unit will feature a covered front entry and rear concrete patio. Each unit will feature anopen kitchen design with oven, range with front controls, frost-free refrigerator, garbage disposaland dishwasher. Sufficient space for a dining area allowing for the use of a four-seat dining roomtable will be provided.
Each unit will have a side-by-side washer and dryer provided. The ceilings of each living room willbe vaulted with ceiling fans provided. The bathrooms will have heat lamps as an independent heatsource.
Pantry closets will be provided in the kitchen and bathroom. A coat closet will be located adjacent tothe entrance. Each unit will have emergency pull cords in the bedrooms and bathrooms, wired to
exterior visual and audible devices. Central air conditioning and heat will be provided by individualheat pumps. Individual electric water heaters will provide hot water to each unit.
Parking will be generous, with one parking space per unit plus 20 additional guest spaces adjacentto the community building.
The professionally decorated community building will feature a variety of facilities including a largecommunity room with bistro kitchen, billiards/games room, crafts room, wellness center, hair salon,laundry room, and exercise room. There will also be two management offices, men's and women'srestrooms and a maintenance office. The community building will be surrounded on three sides by awide covered veranda furnished with comfortable seating for residents.
Common area amenities will include walking trails, a gazebo, raised resident garden area andartificial putting green.
Each building will be wrapped in brick veneer (approximately 40% of the exterior siding) around theentire building. The elevations will feature gables over the individual entries to break up theelevations. Buildings will also be "jogged" back and forth to create visual relief. Shutters will beprovided on all buildings.
The clubhouse will be in the tradional southern style with columns, shutters and a wide veranda.
Yes
Augusta Spring II1730 Sibley RoadAugusta, GA 30909
Charlotte Spring4825 Spring TraceCharlotte, NC
Dunlop Farms1000 Dunlop PlaceColonial Heights, VA
Page 16 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
17/35
Onsite Activities:
Landscaping Plans:
Interior Apartment Amenities (check all that apply):
Flooring: Carpet Vinyl Wood Wood Parquet Ceramic Tile Other
Heating/Cooling: Central Air Gas Heat Heat Pump Electric Pump
Do you plan to submit additional market data (market study, etc.) that you want considered?
If yes, please make sure to include the additional information in your pre-application packet.
Community Bldg - Sq Ft: 4,000 Community Room - Sq Ft: Garages - Number:
Laundry Rm Screened Porch Resident Computer Center Exam Rm Reading Rm/Library
Game/Craft Rm Exercise Rm TV Rm Beauty Salon Vending Rm
Chapel/Prayer Rm Picnic Area Onsite Leasing Office Onsite Mgr Onsite Maint. Person
Irrigated Lawns Security Gate Car Care Area Storage Units Gazebos
Walking Trails Garden Spots Basketball/Tennis Court Playground Ball Field
Pool Fitness Stations Horseshoe Pit Shuffleboard Covered Drive Thru
Optional meals served in the community room, resident trips, dinners, games and dances, wellnessscreening, medication education services program, organization of resident association to directresident activities and establishment of a food panty with shelf-staple items for purchase byresidents. A 20 hour per week Service Coordinator will direct these and many other residentactivities. The coordination of activities is expected to be supplemented by contractual arrangementswith non-profit organizations to provide local networking with free and low-cost service and activitiesproviders.
The site will be professionally landscaped using shrubs and trees around each building. The areaaround the clubhouse will be irrigated. An attractive lighted entry sign with seasonal landscaping willbe located at the main vehicular entrance. All downspouts will be tied into the storm drain system. Astorm water infiltration pond will be located on site and will be surrounded by attractive white vinylfencing. An artifical surfaced putting green will be located adjacent to the community building andthe gazebo.
Range Hood Dishwasher Disposal Refrigerator (frost free) Storage interior/exterior
W/D Hookups Mini-blinds Pantry Ceiling fans Walk-in closets
Side-by-
sidewashersanddryers ineach unit
Yes
Page 17 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
18/35
Briefly describe your site in each of the following categories:
Applicant's Site Evaluation
NEIGHBORHOOD CHARACTERISTICS
Physical condition of buildings and improvements. Trend and direction of real estate developmentrelative to the project. Area economic health (degree of decline or investment).
The physical condition of buildings in the neighborhood is acceptable, with a combination ofcommercial, retail and single-family uses. New construction abounds with new homes, retail andlight commercial.
Suitability of surrounding development. Land use pattern is primarily residential with a balance ofother uses, including non-competing multifamily and single family units, relevant amenities, shoppingand services.Adjacent uses are compatible with the proposed development with a balance of other land usesincluding single family and multi-family residential, community recreation, golf course, swim andtennis club, schools, churches, grocery, pharmacy, medical offices and other retail shopping andservices.
A new neighborhood shopping center located less than mile east of the site will include a HarrisTeeter grocery store, a CVS pharmacy and a variety of in-line retail tenants.
SITE SUITABILITY
Adequacy of street(s) and/or access road(s) serving the proposed project and traffic controls (lights,stop signs, turning lanes). Access to mass transit (if applicable).The site is located 250 feet south of Rogers Road, which serves as the principal vehicular entranceinto the Heritage PUD. The developer of Heritage will extend a public road from Rogers Road intothe subject property prior to settlement.
Amount and character of vacant, undeveloped land. Effect of industrial, large-scale institutional orother incompatible uses: wastewater treatment facilities, high traffic corridors, junkyards, prisons,landfills, large swamps, distribution facilities, frequently used railroad tracks, power transmission linesand towers, factories or similar operations, sources of excessive noise, and sites with environmentalconcerns (such as odors or pollution).The site is located in the Heritage planned community, which consists of 1,065 acres and at build-out will feature 1,400 homes, a 120,000 square foot retail center, business park and three schools.Heritage of Wake Forest opened in 2001. There is new commercial, residential and retaildevelopment within mile of our proposed site. Undeveloped land zoned for all of these uses isavailable with Heritage. Heritage incorporates a championship golf course, swim and tennis club, avariety of retail, office, schools and numerous parks and greenways. A CSX railroad line is locatedto the rear of the site (not part of the site to be acquired). According to CSX, traffic on this lineaverages one train per day in each direction. The site plan shows the residential buildings set wellaway from these tracks. In addition, a buffer of mature pine trees shields the tracks visually, and willbe augmented by evergreen tree plantings as part of this project's landscaping plan.
Degree of on-site negative features and physical barriers that will impede project construction or
adversely affect future tenants; for example: power transmission lines and towers, flood hazards,steep slopes, large boulders, ravines, year-round streams, wetlands, and other similar features. Foradaptive re-use projects- suitability for residential use and difficulties posed by the building(s), suchas limited parking, environmental problems or the need for excessive demolition.None
Similarity of scale and aesthetics/architecture between project and surroundings.
Page 18 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
19/35
For each applicable neighborhood feature, enter distance from project in miles.
Other facilities or services:
Residential and multi-family residential buildings in Heritage are governed by the same architecturalstandards that apply to our project. No vinyl or aluminum siding may be used in Heritage. Thesubject project will consist of brick and Hardiboard siding with shutters and 6/12 pitch roofs. Thisarchitectural look complements the existing residential and commercial product within Heritage.
Concentration of affordable housing (housing credit, project-based rental assistance, public housing).There are no other competitive publicly assisted rental developments within mile of the proposeddevelopment.
Availability of Supportive Services (if applicable):
Grocery Store1.2 Community/Senior Center1
Mall/Strip Center1.2 Hospital2
Outdoor Athletic Fields.5 Pharmacy1
Day Care/After School Basic Health Care1
Schools.5 Medical Offices1
Public Transportation Stop5.5 Bank/Credit Union1.2
Convenience Store.75 Restaurants1.5Basketball/Tennis Courts.5 Professional Services1
Public Parks.5 Movie Theater1.5
Gas Station.75 Video Rental1
Library1.5 Public Safety (Fire/Police)1
Fitness/Nature Trails.5 Post Office1
Public Swimming Pools1.75
A new 120,000 square foot Harris Teeter anchored shopping center with a CVS pharmacy is underconstruction and scheduled to open in the fall of 2003. This facility is located 2,500 feet east of thesubject property on Rogers Road.
Page 19 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
20/35
8/6/2019 Heritage at Wake Senior
21/35
8/6/2019 Heritage at Wake Senior
22/35
Financing Commitments
Does the project have a firm commitment for construction financing? Yes
Does the project have a letter of intent for private permenant financing? Yes
Does the project have a firm commitment for government financing? No
Does the project have a letter of intent from an investor? Yes
Is any portion of the eligible basis of new contruction or rehabilitation financed with federal subsidies other than CDBG funds or fundsfrom the HOME program? Yes
If yes, indicate the type and amount below:
Tax Exempt Financing: $ 8076000
RD 515 Financing: $
Hope VI Financing: $
Other: $
If Other, specify the type of Federal subsidy:
Page 22 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
23/35
Project Operations (Year One)
Projected Operating Costs
Administrative Expenses
Advertising 12,000
Other Administrative Expense (specify):
Office Salaries 17,680Office Supplies 12,000
Office or Model Apartment Rent
Management Fee 40,834
Manager or Superintendent Salaries 38,000
Manager or Superintendent Rent Free Unit
Legal Expenses (Project) 500
Auditing Expenses (Project) 5,500
Bookkeeping Fees/Accounting Services
Telephone and Answering Service 4,000
Bad Debts
Other Administrative Expenses (specify):4,750
SUBTOTAL 135,264
Utilities Expense
Fuel Oil
Electricity (Light and Misc. Power) 12,580
Water 765
Gas
Sewer 643
SUBTOTAL 13,988
Operating and Maintenance Expenses
Janitor and Cleaning Payroll 43,200
Janitor and Cleaning Supplies 2,000
Janitor and Cleaning Contract
Exterminating Payroll/Contract 1,000
Exterminating Supplies
Garbage and Trash Removal 1,950
Security Payroll/Contract
Grounds Payroll
Grounds Supplies
Grounds Contract 12,000
Repairs Payroll
Repairs Material 6,000
Repairs Contract
Elevator Maintenance/Contract
Heating/Cooling Repairs and Maintenance
Swimming Pool Maintenance/Contract
Snow Removal
Decorating Payroll/Contract
Decorating Supplies 6,000
Other (specify):
Miscellaneous Operating & Maintenance Expenses
SUBTOTAL 72,150
Taxes and Insurance
Real Estate Taxes 63,000
Page 23 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
24/35
8/6/2019 Heritage at Wake Senior
25/35
8/6/2019 Heritage at Wake Senior
26/35
Design Features
ITEM DESCRIPTION
Foundation/Slab Components Concrete Slab on Grade
Primary Windows Make: Model:Superseal 1100 Series or Equal Type/Construction: Vinyl Single Hung
Exterior DoorsType: Frames:
Hollow Metal 9 PanelDoor Hollow Metal
Siding
Type: Grade/Thickness:
Hardi Plank BeadedSmooth Siding, 8 1/4"Wide with HardShingle StaggardEdge Panel Siding 1/4-5/16"
Warranty: 50 Year Limited, Transferable Product Warranty
Exterior Trim 7/16" Hardi Trim Planks, Rustic Grain
ShinglesType: Weight:Certainteed
225 lbs. PerSquare
Warranty: 25 Year
Sprinkler System Per Local Code
Cabinets Mid Continent Cabinets or Equal, KCMA Approved-Raised Panel with Brass "U" Shape Pull
Heat PumpSEER: Make:
Combined 11.0 SEERAverage with Other HeatSystems Carrier
Model: 38 AYC
Air Conditioner SEER: Make:
Model:
Other Heat Systems SEER: Make: 1st Company
Model: 24 MBX
Page 26 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
27/35
This is a detailed breakdown of rehabilitation or construction costs you summarized in the Development Costs table (Rehabilitation andConstruction of New Building(s)). The total should match those roll-up values.
Costs - Construction
ITEM LABOR MATERIAL TOTAL
Concrete Footings 45,000 100,000 145,000
Backfill-slab, Crawl 13,000 2,000 15,000
Slab-concrete/Rebar/Gravel 60,000 180,000 240,000
Waterproofing 0 0 0
Masonry Foundation 0 0 0
Brick Veneer 65,000 120,000 185,000
Steel/Structure/Rails 0 0 0
Framing/Lumber/Nails 314,670 408,000 722,670
Trusses 40,000 155,000 195,000
Crane Rental 0 0 0
Windows/Grilles/Screen 6,000 40,000 46,000Exterior Doors 5,000 30,000 35,000
Roofing 32,000 70,000 102,000
Fencing 0 0 0
Vinyl Siding/Trim/Box 65,000 145,000 210,000
Gutters/Shutters 4,000 10,000 14,000
Insulation 7,000 58,000 65,000
Drywall 140,000 200,000 340,000
Interior Doors 3,000 24,500 27,500
Int. & Final/Stair/Trim/Shelves 50,000 60,000 110,000
Cabinets & Tops 15,000 103,500 118,500
Painting 50,400 20,000 70,400
Marble - Tub/Shwr/Tops 0 0 0
Plumbing 210,000 170,000 380,000
Electrical 120,000 140,000 260,000
Heating/Air Conditioning 195,000 185,000 380,000
Floor Covering and Underlayment 30,000 85,000 115,000
Wall Paper 2,500 2,500 5,000
Mailboxes/Special Features/Signage 1,000 8,000 9,000
Gypcrete 0 0 0
Blinds/Shades/Art Work 800 4,000 4,800
Light Fixtures/Fans 15,000 50,000 65,000
Sprinkler System 0 0 0
Security Alarm 5,000 6,500 11,500
Hardwood Floors 0 0 0
Elevator 0 0 0
Ceramic Tiles 0 0 0
Acoustical Ceilings 0 0 0
Page 27 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
28/35
Remarks:
Mirror/Shower Door/Encls. 480 2,400 2,880
Hardware/Bath Access. 1,000 3,000 4,000
Appliances 4,000 100,000 104,000
Playground Equipment 0 0 0
Interior Clean 11,500 500 12,000
Exterior Clean/Dumpster 0 0 0
Other 1 (specify in Remarks) 0 0 0
Other 2 (specify in Remarks) 0 0 0
Total Cost 1,511,350 2,482,900 3,994,250
Page 28 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
29/35
This is a detailed breakdown of the General Requirements cost element you summarized in the Development Costs table (GeneralRequirements). The total should match that roll-up value.
Remarks:
Costs - General
ITEM TOTAL
Supervision 145,000
Job Site Office/Trailer Rental 4,500
Impact Fees 0
Office Supplies 4,000
Security/Watchman 0
Water and Sewer Connection Fees 41,275
Project Signage 1,000
Tools and Equipment 10,000
Gas, Oil, and Maintenance 8,000
Cleanup/Dumpster Rental 24,000
Temporary Water, Electric, and Telephone 26,000Storage/Hauling 1,000
Driveway Access Permit 0
Porta-John Rental/Dumping 2,800
Builders Risk Insurance 0
Re-inspection Fees 0
Extra Plans and Specifications 5,000
Miscellaneous, Casual Labor 22,000
Equipment Rental 10,000
Other 1 (specify in Remarks)
Other 2 (specify in Remarks)
Total Cost 304,575
Builders Risk Insurance to be paid by Owner.
Page 29 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
30/35
This is a detailed breakdown of the Site Improvements cost element you summarized in the Development Costs table (On-siteImprovements). The total should match that roll-up value.
Remarks:
Costs - Improvements
ITEM TOTAL
Subsurface Exploration/Perk Testing/Site Engineering 145,000
Clearing/Grading/Final Grading/Excess and Borrow 168,000
Demolition 0
Earthwork/Excavation/Aerating 170,000
Soil Treatment 24,100
Pile Foundations 0
Caissons 0
Shoring/Bracing 0
Site Drainage 115,000
Site Utilities/Site Lighting 175,000
Paving and Surfacing/Curb and Gutter 185,000Walkways 45,000
Site Signage 2,500
Parking Lot Painting 3,200
Dumpsite Pads/Fencing 9,200
Fencing/Gates 0
Landscaping/Topsoil 130,000
Waterproofing/De-Watering 0
Operation of Construction Equipment/Fuel/Oil 0
Crane Rental 0
Rock and Hardpan Excavation 0
Site Supervision Personnel 0
Other (specify in Remarks) 78,000
Total Cost 1,250,000
Mechanical, electrical, plumbing and structural engineering
Page 30 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
31/35
8/6/2019 Heritage at Wake Senior
32/35
This is a detailed breakdown of the Bond Issuance cost element you summarized in the Development Costs table (Cost of Issuance). Thetotal should match that roll-up value.
Remarks:
Costs - Bond Issuance
ITEM TOTAL
Bond Counsel 35,000
Issuer Counsel
Credit Enhancement/LOC Counsel 60,000
Underwriter Counsel 22,500
Developer's Counsel 30,000
Rating Agency Fee 20,000
Printing 3,000
Trustee Fee 3,500
Trustee Counsel
Other 1 (specify in Remarks) 24,228
Other 2 (specify in Remarks) 80,760Other 3 (specify in Remarks) 500
Total Cost 279,488
Other 1 - NCHFA Allocation FeeOther 2 - Issuer FeeOther 3 - Fiscal Agent expenses
Page 32 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
33/35
MINIMUM REQUIRED SET ASIDES (No Points Awarded):
Minimum Set-Asides
Select one of the following two options:
20% of the qualified units are rent restricted and occupied by households with incomes at or below 50% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 50% of median income)
40% of the qualified units are rent restricted and occupied by households with incomes at or below 60% of the median income (Note:No Tax Credit Eligble Units in the the project can exceed 60% of median income)
If requesting RPP funds:
40% of the qualified unit are occupied by households with incomes at or below 50% of median income.
State Tax Credit and QAP Targeting Points:
High Income county:
At least twenty-five percent (25%) of qualified units will be affordable to households with incomes at or below thirty percent (30%) ofcounty median income.
At least twenty-five percent (25%) of qualified units will be affordable to and occupied by households with incomes at or below thirtypercent (30%) of county median income.
At least fifty percent (50%) of qualified units will be affordable to households with incomes at or below forty percent (40%) of countymedian income.
At least fifty percent (50%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Moderate Income County:
At least twenty-five percent (25%) of qualified units will be affordable to and occupied by households with incomes at or below fortypercent (40%) of county median income.
At least fifty percent (50%) of qualified units will be affordable to households with incomes at or below fifty percent (50%) of county
median income.At least fifty percent (50%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
Low Income County:
At least forty percent (40%) of qualified units will be affordable to households with incomes at or below fifty percent (50%) of countymedian income.
At least forty percent (40%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
Tax Exempt Bonds
Threshold requirement (select one):
At least ten percent (10%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent
(50%) of county median income.
At least five percent (5%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Eligible for mortgage subsidy points (select one):
At least twenty percent (20%) of qualified units will be affordable to and occupied by households with incomes at or below fifty percent(50%) of county median income.
At least ten percent(10%) of qualified units will be affordable to and occupied by households with incomes at or below forty percent(40%) of county median income.
Page 33 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
34/35
Page 34 of 35Print - APP03-0077
1/14/2005https://www.nchfa.org/Rental/RTCApp/(ljapowr55w0yr055fvk4xgvj)/site/PrintApp.aspx?I...
8/6/2019 Heritage at Wake Senior
35/35
PLEASE indicate which of the following exhibits are attached to your application. Others may be required as noted.
Full Application Checklist
A Nonprofit Organization Documentation or For-profit Corporation Documentation
B Current Financial Statements/Principals and Owners
C Ownership Entity Agreement, Development Agreement or any other agreements governing development services
D Management Agent Agreement
E Development and manager multi-family experience & Management Questionnaire (Appendix C)
F Letters from State Housing Agencies or designated monitoring agent verifying Out of State Management Experience
G Completed IRS Form 8821 (Appendix I)
H Permitted zoning letter (including conditional and special use)
I Site plan, floor plans and elevations
J Hazard and structural inspection and termite reports (Renovation projects only)
K Description of any existing conditions of historical significance.
L Description of environmental significance.
M Anticipated budget demonstrating how the project would meet the 10% test by November 14th.
N Evidence of Architect's Errors and Omissions insurance (or equivalent).
O Description of acquisition for existing/occupied projects or for projects with occupied buildings to be demolished.
P Description of proposed Relocation Plan & Relocation Budget, Etc. If any relocation is anticipated, reference Appendix F.
Q Targeting Plan and supporting documentation (Required for projects targeted to Special Populations)
R Local Housing Authority Agreement (Reference Model in Appendix I)
S Appraisal (for land costs greater than $5,000 and for buildings in rehab projects)
T Evidence of Permanent Loan Commitment, other sources of funds, and project-based subsidies.
U Statement regarding terms of Deferred Developer Fee and, if nonprofit, resolution of Board approving fee.
V Inducement Resolution (Tax-Exempt Bond Financed Projects only)
W Documentation to support estimated utility costs.
Page 35 of 35Print - APP03-0077