    HEDON TOWN COUNCIL

    SNOW CLEARANCE

    APPENDIX TO COMMUNITY

    EMERGENCY PLAN

    1) SCOPEOF ARRANGEMENTS

    The snow clearance activities set out in this plan will be carried out on a bestendeavours basis, subject to resources being available.

    Activities will only be carried out if conditions allow people to work safely.

    2) TRIGGERING SNOW ARRANGEMENTS

    The Parish Community Emergency Team agree to monitor weather forecasts, andground conditions, and will trigger these arrangements when:

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    2/10

    food, prescriptions and other essential items, being without water due to frozen orburst pipes, or being without electric or gas because of utility disruptions. Regular

    checks on the most vulnerable members of the community, assisting those peoplewho have become isolated, promoting good neighbour schemes and clearing

    drives are likely to be actions that would be valued by the

    community

    4B) SUPPORTINGTHE COMMUNITY

    A prolonged heavy snow event is likely to create significant disruption to thecommunity and severely disadvantage its most vulnerable members.

    People may be unable to leave their homes to collect food, prescriptions and

    other essential items, be without water due to frozen or burst pipes, or be

    without electric or gas because of utility disruptions.

    Regular checks on the most vulnerable members of the community, assisting thosepeople who have become isolated, promoting good neighbour schemes and

    clearing drives are likely to be actions that would be valued by the

    community.

    Severe weather co ordinators will consider whether support is required and whether

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    3/10

    6) PRE-IDENTIFIED SNOW CLEARANCE AREAS

    The Parish Council has identified primary areas for footpath salting. Priority will begiven to clearing the primary routes

    Primary

    Footpaths on:-

    St Augustines Gate

    Market Place

    Church Gate

    Stockwell Lane

    Market Hill (outside Doctors Surgeries) Town Centre Car Parks

    Secondary

    The situation will be continually monitored and should conditions be

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    4/10

    Souttergate

    Baxtergate Station Lane

    Sheriff Highway

    Church Lane/Gate

    Thorn Road

    Magdalen Lane

    Preston Road

    The following roads are on the East Riding of Yorkshire Council Secondary Network

    Magdalen Gate

    George Street

    Watson Drive

    St Anthonys Park

    St Nicholas Gate

    Brevere Road

    Inmans Road

    St Marys Drive

    Acklam Road

    D L

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    5/10

    9) CONTRACTOR / FARMER / LAND OWNER

    INFORMATION

    The Town Council has an approved list of contractors available for road clearanceshould it be necessary please see attached

    Checks have been made to ensure that contractors / farmers have

    the appropriate license, training and insurance to carry out these

    activities.

    10) HEALTHAND SAFETY / WELFARE

    ARRANGEMENTS

    The team co-ordinating the winter weather activities should make sure that:

    Before the plan is triggered

    Appropriate risk assessments have been undertaken and applicable methodsof safe working put in place (see Box 14)

    Adequate insurance cover is in place.

    Appropriate resources (e.g. shovel, rock salt, sack-barrow / wheel barrow) canb d il bl

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    6/10

    11) SNOW CLEARANCE ACTIONS

    The aim of the snow clearing actions is to make the situation better and safer whenyou have finished than it was before you started.

    Keep records of snow clearance work carried out using the table at box 13

    Treat light snow falls of 25mm or less

    For falls of snow reaching a depth of between 25mm and 100mm, or more, orlight falls of snow with drifting trigger:

    Contractor / Farmer arrangements Deploy Town / Parish Council resources / clearance teams

    Focus on the primary routes / areas before moving on to the secondary andtertiary routes

    Its easier to move fresh, loose snow rather than hard snow that has packedtogether from people walking on it. So if possible, start removing the snow inthe morning.

    When youre shoveling snow make a path down the middle of the area to be

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    7/10

    Hard packed / snow ice 20-40 g/m2

    Snow cover exceeds 30mm 20-40 g/m2

    For areas away from the salt bin / store, a bucket or even a wheelbarrow, ifone is available, would be useful to transport some salt.

    Salt doesnt work instantly; it needs sufficient time to dissolve into themoisture on the ground. You can use rock salt, ordinary table or dishwashersalt - a tablespoon for each square meter you clear should work. If you dont

    have enough salt, you can also use a grit and salt mix. This is particularlyhelpful on snow that is starting to compress, as it helps to provide better gripunder foot. Sand or ash can also be used for this..

    Avoid using water as it may freeze and make the situation more hazardous.

    Refer to the Health and Safety / Staff Welfare Section of this plan.

    When clearing snow it is possible to make conditions worse if you do notfollow the precautions listed above. If you do act in a safe way and followthese precautions then you will be helping your community in a positive andsafe way and minimise the risk of anyone being injured as a result of youractions.

    Encouraging other to clear snow and ice

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    8/10

    8

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    9/10

    13) Record of Snow Clearance Work

    undertaken by Town / Parish

    Council

    Date / Time Work done Work Carried out by Comments

    9

  • 7/30/2019 Hedon Town Council - Severe Weather Plan

    10/10

    14 RISK ASSESSMENTS

    As attached

    10