13
Heathrow NAP 2019 2023 Development Plan HCNF WG1 6 June 2017 Quieter Planes

Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

  • Upload
    hakhue

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Heathrow NAP 2019 – 2023 Development PlanHCNF WG1 6 June 2017 – Quieter Planes

Page 2: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

HCNF WG1 Workshop on Development of

Noise Action Plan 2019-2013 – Part 1

Purpose of Today’s Workshop

• Overview of DEFRA requirements for NAP

• Review proposed timeline for NAP development

• Overview the required structure of NAP

• Examine “Quieter Planes” current NAP items in detail

• Brainstorm - Consider new and future actions items or areas of work for

Quieter Planes

Page 3: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Timeline April 2017 to 2019 Launch NAP19

Year Period Task Notes

2017 Apr – May Development Plan for

NAP 2019-2023

May – Dec

Develop draft of new

NAP 2019-2023 with

HSNAG, HCNF and

EHO groups

Draft for

Consultation

Aug - Dec

Pre-consultation –

Airline, NATS, EHO,

Other

2018Feb – Apr

(TBC)

Public Consultation on

draft NAP19

DEFRA to

confirm timing

May – Jun

Post-consultation

amendments to

NAP19

Jul (TBC)

Submission of draft

NAP19 to DEFRA

SOS for approval

Dec (TBC)

Publication and

Launch of NAP 2019-

2023

2019

2023

Implementation of

NAP 2019-2023

Page 4: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

DEFRA Guidance (2013) (2017 update expected soon)

for updating Noise Action Plan (NAP)

See NAP 2013-2018 Annex 2

• Use 2016 strategic noise map (yet to be published, ref annual LHR contours)

• Review progress made on NAP 2013-2018

• Update details of airport, operations, regulation, policy etc.

• Update on-going and proposed new actions

• Present draft to consultative committee(s) (HNCF, HSNAG etc.)

• Consult with the public on NAP, allow public participation, and consider all

comments

• Consider feedback when finalising draft NAP

• Submit draft NAP to DEFRA

• Finalise NAP based on DEFRA review

• Publish NAP

Page 5: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Noise Action Plan Structure

Content required by DEFRA

• Airport description covering noise sources, authority, legal context etc.

• Summary of noise mapping

• Evaluation of impacts – no. people exposed, problems and situation to be

improved

• Record on consultations

• Noise reduction projects – current and in preparation

• 5-year action plan and long term strategy

• Financial information

• Provisions for evaluation implementation and results of the NAP

Page 6: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Timeline 2017

TimeMeeting /

ForumTask Status

26 Apr 2017 NESG Development Plan Outline (This document) Done

10 May 2017 HSNAG Development Plan Outline (This document) Done

24 May 2017 HCNF Development Plan Outline (This document) Done

6 Jun 2017 HCNF – WG1 I. Quieter Planes This week

8 Jun 2017 HCNF – WG2 II. Quieter Procedures This week

20 Jul 2017 EHO Development Plan Outline (This document)

1 Aug 2017 HCNF – WG1 III. Land Use Planning and Mitigation

3 Aug 2017 HCNF – WG2 IV. Operational Restrictions

20 Sep 2017 HCNF Draft NAP 2019-2023 (Actions I. – IV.)

3 Oct 2017 HCNF – WG1 V. Working with Local Communities

25 Nov 2017 HCNF 2nd Draft NAP 2019-2023 (Actions I. – V.)

Other

HAL internal review and other pre-

consultations – Airlines (FLOPC), NATS,

HSNAG, EHO/Councils, Others

Q4 2017 Airline workshop day

Q1 2018 General public consultation on Draft NAP

Q3 2018 Submission to DEFRA for approval

Jan 2019 Implementation of NAP 2019-2023

Other

Page 7: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Proposed Approach for Developing Draft NAP 2019-2013

Actions

Keep 5 sections, as per the Balanced Approach plus Community Engagement

HNCF WG1 WG2 WG1 WG2 WG1

Inputs

- Actions from NAP 2013-2018 and the status

- Actions from Heathrow 2.0 Sustainability Leadership Plan

- Actions expected to be completed 2016-2018 before new NAP19

- On going and new actions

- Development and consideration of new types of actions

Page 8: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:
Page 9: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Existing Actions – various locations

- Noise Action Plan 2013 – 2018 – 44 actions

- Blueprint for Noise Reduction (2016/17) – 10 actions

- Heathrow 2.0 Sustainability Leadership Plan – Objective 4 – Respite for Residents

- 4.1 Aircraft, operations and noise envelope

- 4.2 Policy and Planning

- 4.3 Community engagement and collaboration

- DFT Night Flights Regime

- AIP (Airport Information Package)

- OSI (Operational Safety Instructions)

- Ground Noise Management Plan (in development)

- T4 and T5 Consent conditions

- New single location – NAP 2019 - 2013

Page 10: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Key Actions for WG1 Today

Brainstorm – NAP 2019-2023 Quieter Planes

- What are the key action areas within Quieter Planes?

- Are there new Quieter Planes areas we can investigate and influence?

- Are there research questions we would like to explore and answer?

- Which areas are within 5-year NAP and which might be longer term?

Note

- This is only the first brainstorming session. Ideas can be brought forward at

later sessions and during subsequent consultations.

- Items and action areas better suited under the other areas – Quieter

Procedures, Land-use Planning, Operational Restrictions and Working with

Communities – will be noted and parked for the upcoming WG sessions on

those areas.

Page 11: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Three Types of Actions

Types of Actions Examples Comments

SMART Actions with targets

- Specific

- Measureable

- Attainable

- Relevant

- Timely

Voluntary phase-out of

Ch3 aircraft (less than x

movements/yr) by end

2020

Includes Single action

Regular actions Annual external audit of

x% of NAP action items

Fields of research, actions,

investigation

Consider and evaluate

new arrival and departure

procedures

Not SMART

Others? ….

Page 12: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Quieter Planes – 3 arenas of consideration

What can NAP influence and how?

Aircraft technology

- Long term consideration

(25 yr +)

- Engine and airframe

research

- Functionally silent

aircraft

- Integrated wing-fuselage

design

- Trade-offs with fuel and

emissions

- ICAO certification

- International pressure

- What impact can one

airport make?

Aircraft owned by airlines

- Medium-long term

consideration (5-25

years)

- Fleet modernisation

- Cost of fleet renewal

- Life expectancy of

aircraft

- Extension of service

life

- Are noise fees an

incentive for aircraft

purchase?

Individual aircraft at LHR

- Short-medium term

consideration (0-5 yrs)

- Aircraft deployment

- Home carrier fleets

- Carriers selecting

aircraft to come to LHR

- Time of day

- Flight mission

- Capacity and load

factor

Page 13: Heathrow NAP 2019 2023 Development Plan · PDF file26 Apr 2017 NESG Development Plan Outline (This document) ... Other actions? Ground Noise Fly Quiet and Clean. Title:

Quieter Planes

SMART Actions with targets

Regular actions

Fields of

research, actions,

investigation

Landing Charges

Ch3 and Ch14 targets

A320 retrofits

Aircraft technologyHAL/EASA database

Airline fleet

ICAO certification

Aircraft deployment

Other actions?

Study new

aircraft noise

levels

Other actions?

Other actions? Ground Noise

Fly Quiet and Clean