    gProcedu

    res

    ,

    SEPTEMBER2010

    1

    ServiceStrategy

    1

    CompanyConfidential

  • 8/10/2019 Heat Trace Testing Procedures1

    2/18

  • 8/10/2019 Heat Trace Testing Procedures1

    3/18

    Overv

    iew

    SEPTEMBER2010

    3

  • 8/10/2019 Heat Trace Testing Procedures1

    4/18

    SystemS

    tart-up

    GeneralConsiderations

    Allp

    artiesinvolvedshouldhavearepresentativepres

    entforstart-up.

    Alls

    tart-upinfoshouldbelog

    gedandsignedoffbyap

    propriateparties.

    Allt

    estequipmentusedfors

    tart-uptestingshouldbe

    ingoodrepairand

    CAL

    IBRATED!

    Hav

    eallappropriatedrawing

    s,specifications,andins

    tructionsheetson-handfor

    ree

    rence.

    Mecha

    nicalInspection

    Insp

    ectallinsulationandweatherproofing.(WetinsulationisBad!)

    ,

    Verifysensorsareinappropriatelocations

    Verifyallcircuitshavebeenproperlygrounded

    Verifyallcircuitsareconnectedinproperpanellocations

    Verifyallcircuitlengthsarew

    ithinmanufacturersspecifiedlimits

    Verifyallpropersafetywarningsareinplace

    Verifyallendseal,splice/tee

    locationsaremarkedon

    lagging

    SEPTEMBER2010

    4

  • 8/10/2019 Heat Trace Testing Procedures1

    5/18

    SystemS

    tart-up

    Electrica

    lTests

    Insulation

    Resistance(Megg

    er)

    Beforetracingpipes

    Afterinstallingterminations

    BeforeInsulatingpipes

    er

    nsuangppes

    BeforeEnergizingSystem

    CircuitVoltage

    Noteambienttempandpipetemp

    StabilizedCurrent(15minutesofoperation)

    SEPTEMBER2010

    5

  • 8/10/2019 Heat Trace Testing Procedures1

    6/18

    Documentation

    SEPTEMBER2010

    6

  • 8/10/2019 Heat Trace Testing Procedures1

    7/18

    MeggerTest

    Whatisit???

    Tests

    InsulationResistance

    BetweenConductiveCore

    Equipment

    InsulationResistanceTester

    andG

    roundingBraid

    Detectsdamagethatcan

    resultincableshortto

    groun

    d

    1000

    VDCMinimum

    2500

    VDCBest

    Digit

    alorAnalogOK

    Failurecouldtripcircuit

    breakerorcausefire

    Whento

    do??

    aery

    perae

    es

    Howtodoit

    Perfo

    rmedatthefactory

    After

    receiptatjobsite

    After

    cableinstall

    term

    inalsinjunctionbox

    One

    leadtogroundbraid

    One

    leadtobusswire

    er

    nsuaon

    AtStart-up

    Periodicallyper

    maintenanceprocedure

    Musthave50MegOhm

    s

    Plus

    at1000VDC

    Recordtestedvalue

    SEPTEMBER2010

    7

  • 8/10/2019 Heat Trace Testing Procedures1

    8/18

    MeggerTest

    Open

    Cover

    Removebraidandleadfromterminalblock

    SEPTEMBER2010

    8

  • 8/10/2019 Heat Trace Testing Procedures1

    9/18

    MeggerTest

    SEPTEMBER2010

    9

    eseaposon

    esu

    om

  • 8/10/2019 Heat Trace Testing Procedures1

    10/18

    C

    oldResistanceTest

    Whatisit???

    Tests

    ResistanceBetween

    Equipment

    Stan

    dardMultiMeter

    Cable

    Busswires

    Quick

    testtoverifycable

    outpu

    t

    Auto

    Rangeto50Kohm

    Digit

    alorAnalogOK

    BatteryOperatedBest

    Whento

    do??

    Perfo

    rmedatthefactory

    Howtodoit

    Take

    onefootsam

    le

    After

    receiptatjobsite

    Prior

    toinstallation

    Conditionforonehoura

    t70

    Deg

    F+/-2degF

    One

    leadtoeachbusswire

    SetonOhms

    Com

    paretoknownvalu

    es

    Record

    SEPTEMBER2010

    10

  • 8/10/2019 Heat Trace Testing Procedures1

    11/18

    C

    oldResistanceTest

    Result=2.2Kohms

    SEPTEMBER2010

    11

    Test

    leadposition

  • 8/10/2019 Heat Trace Testing Procedures1

    12/18

    StabilizedCurrentTest

    Whatisit???

    Tests

    cablecurrentatfull

    volta

    e

    Equipment

    Stan

    dardMultiMeterwith

    clam

    oncurrent

    Insurescablepoweroutput

    iscor

    rectfordesignand

    stable

    attac

    hement

    Auto

    Rangeto100amp

    s

    Digit

    alorAnalogOK

    Whento

    doIt??

    After

    Insulation

    AtStart-up

    Insulation

    Howtodoit

    OpenUPCbox

    ero

    cayper

    maintenanceprocedure

    am

    ponoone

    ussw

    re

    Energizecircuit

    Allow

    circuittorunfor20

    minu

    tesminimum

    Take

    currentreading/

    record

    Divid

    ebycircuitlength

    Multilb

    Voltae

    Watts=C

    urrent*Voltage

    SEPTEMBER2010

    12

    Com

    paretooutputatpipe

    temp

    Open

    PowerJB

  • 8/10/2019 Heat Trace Testing Procedures1

    13/18

    StabilizedCurrentTest

    Clamponbuss

    wire

    R

    eadResult

    Watts=Current*V

    oltage

    SEPTEMBER2010

    13

  • 8/10/2019 Heat Trace Testing Procedures1

    14/18

    StabilizedCurrentTest

    Watts=Current*Voltage

    Com

    arecalculated

    resulttooutut

    chartattem

    SEPTEMBER2010

    14

  • 8/10/2019 Heat Trace Testing Procedures1

    15/18

    End

    ofCircuitVoltageTest

    Whatisit???

    Tests

    VoltageatendofL

    ine

    Equipment

    Stan

    dardMultiMeter

    Applied

    VerifiesBusswiresare

    good

    overentirelengtho

    f

    cable

    Digit

    alorAnalogOK

    BatteryOperatedBest

    Whento

    do??

    Atsta

    rt-up

    Howtodoit

    De-e

    nergizecircuit

    Rem

    oveendcap

    Periodicallyper

    maintenanceprocedure

    One

    testleadtoeachbuss

    wire

    Energizecircuit

    ea

    voage

    Com

    paretodesiredvalue

    Record

    SEPTEMBER2010

    15

  • 8/10/2019 Heat Trace Testing Procedures1

    16/18

    End

    ofCircuitVoltageTest

    Exos

    eBussWires

    SEPTEMBER2010

    16

  • 8/10/2019 Heat Trace Testing Procedures1

    17/18

    End

    ofCircuitVoltageTest

    Testleadposition

    SEPTEMBER2010

    17

  • 8/10/2019 Heat Trace Testing Procedures1

    18/18

    Mainten

    ance

    Genera

    lConsiderations

    work

    .

    Alltestequipmentusedsh

    ouldbeingoodrepairandcalibrated.

    Allin

    spectionandtestresultsshouldbedocumentedoncircuit

    man

    tenanceog.

    Free

    zeProtectionshouldbecheckedpriortoco

    ldweathereachyear

    asa

    minimum.

    Proc

    essLinesshouldbec

    heckedasthe

    roces

    sreuires.

    MechanicalInspections

    Follo

    wsameprocedureassystemstart-up

    Electric

    alInspections

    Follo

    wsameprocedureassystemstart-up

    SEPTEMBER2010

    18