NHSSCOTLAND PROJECT FACT FILE
Health Facility Project Name
Replacement Tain Health Centre
Location
Craighill Terrace Tain Ross-shire IV19 9EU
Population served
Just under 9,000 in Tain and surrounding areas
Type of healthcare facility
Health Centre
Type of construction
New Build
Construction start date (estimated or actual)
Estimated June 2013
Construction completion date
Estimated June 2014
Gross floor area (m2)
1,660
Project, design and construction cost
Total Capex (excluding VAT) £4,045,839 Land Purchase £300,000 Equipment (estimated) £400,000
Cost per m2
£2,437.25 (Capex only excludes VAT)
Total bed numbers
N/A
Departmental information
2 GP Practices
Dental Unit
Community Accommodation
Only significant equipment is dental chairs, X-ray, etc
Client/owner
NHS Highland http://www.nhshighland.scot.nhs.uk/
Project Manager/Key contact(s)
John Bogle [email protected] 01955 880200
Capital procurement route
hub
Project management
The hub project management is being carried out by Sweett Group Contact Robert Dunlop [email protected] NHS Project Manager as above
Architects
Keppie
Contractor
Miller Construction
Services
General Medical Services provided by 2 GP practices General Dental Services provided by salaried dental staff Community Nursing, Midwifery, Health Visiting, Podiatry, Physiotherapy
Key facts
Tain Health Centre is being provided as part of a bundle of 3 health centres with NHS Grampian. It is the first bundled revenue project in Scotland and the first to cover 2 Board areas. The aspiration is to achieve BREEAM Excellent. The site occupies a position that will provide commanding views over the Dornoch Firth. A Care Home is to be built by others adjacent to the health centre and the opportunity is being taken to share services where possible and therefore reduce the costs for both parties. The new facility will replace the current Tain Health Centre which is cramped and no longer fir for purpose, it will also replace the current Tain Dental Clinic which is a converted residential property spread across the first and second floors of an old building with no disabled access.
51.0 m²Community Administration
45
(51.0 m²)
15.0 m²Community Lead
44
(15.0 m²)
9.0 m²Dental Reception
15
(9.0 m²)
19.1 m²Dental Support Office
16
(19.0 m²)
15.2 m²Dental Treatment 1
48
(15.0 m²)
15.2 m²Dental Treatment 2
49a
(15.0 m²)
15.1 m²Dental Treatment 3
49b
(15.0 m²)
18.4 m²Dental Treatment 4
49c
(17.0 m²)
11.8 m²Preventative & X-Ray
50
(12.0 m²)
19.7 m²LDU
51
(16.0 m²)
9.7 m²LDU DSR
61a
(7.0 m²)10.9 m²
Clinical Office54
(11.0 m²)
20.4 m²Dental Store
63b
(16.0 m²)
3.5 m²Compressor
65
(6.0 m²)
5.0 m²Disabled WC
09a
(4.5 m²)
23.8 m²Circ 8
72h
(0.0 m²)
15.3 m²Circ 9
72i
(0.0 m²)
7.1 m²Lift75a
(7.5 m²)
2.7 m²Patient WC
10e
(0.0 m²)
13.8 m²Stair74d
(15.0 m²)
14.0 m²Stair74e
(0.0 m²)
14.4 m²Stair74f
(15.0 m²)
9.0 m²DSR 2
61b
(9.0 m²)
2.9 m²Wheelchair Allowance
06b
(3.0 m²)
2.9 m²Patient WC
10f
(0.0 m²)
0.6 m²Elec69c
(1.5 m²)
0.6 m²HM73h
(0.0 m²)
14.7 m²Void
73
(0.0 m²)
35.4 m²Staff Rest
60a
(35.0 m²)
19.0 m²Female Changing
56
(19.5 m²)
3.3 m²Shower
59b
(3.3 m²)
2.7 m²Staff WC
58f
(2.2 m²)
2.7 m²Staff WC
58e
(2.2 m²)
3.1 m²Shower
59a
(3.3 m²)7.6 m²
Male Changing57
(7.5 m²)
7.5 m²Switch
69a
(7.5 m²)
36.8 m²Multi-Purpose Room
12
(36.0 m²)
2.1 m²Equipment Store
14
(2.0 m²) 3.9 m²Furniture Store
13
(4.0 m²)
0.5 m²HM73g
(0.0 m²)
0.8 m²HM73i
(0.0 m²)
6.1 m²Circ 10
72j
(0.0 m²)
22.3 m²Dental Waiting
04
(22.0 m²)
10.2 m²GP Office
23
(10.0 m²)
41.0 m²Circ 7
72g
(0.0 m²)
2.7 m²Staff WC
58d
(2.2 m²)
23.1 m²GP Waiting
03a
(45.0 m²)
9.6 m²Lobby
01
(0.0 m²)
16.6 m²GP Consulting 1
28
(16.5 m²)15.0 m²
GP Consulting 229a
(15.0 m²)15.0 m²
GP Consulting 429c
(15.0 m²)
14.9 m²GP Consulting 5
29d
(15.0 m²)15.0 m²
GP Consulting 629e
(15.0 m²)15.0 m²
GP Consulting 729f
(15.0 m²)
16.5 m²GP Consulting 8
31
(16.5 m²)15.0 m²
GP Consulting 932a
(15.0 m²)14.8 m²
GP Consulting 1032b
(15.0 m²)
15.1 m²GP Consulting 11
32c
(15.0 m²)
15.1 m²Treatment 1
30b
(15.0 m²)
40.9 m²Fearn Administration
20
(39.5 m²)
15.0 m²Practice Manager
22
(15.0 m²)
28.1 m²Tain Administration
24
(26.5 m²)
14.8 m²Practice Manager
26
(15.0 m²)
12.0 m²GP Office
27
(12.0 m²)
15.0 m²Treatment 3
33
(15.0 m²)
27.0 m²Circ 3
72c
(0.0 m²)
15.0 m²Treatment 2
30a
(15.0 m²) 15.0 m²GP Consulting 12
32d
(15.0 m²)
11.6 m²Clinical Store 1
36a
(11.5 m²)
9.9 m²IT Server
67
(10.0 m²)
4.8 m²Tain Reception
18
(4.5 m²)
4.8 m²Fearn Reception
17
(4.5 m²)
2.0 m²Stationary
38b
(2.0 m²)
2.7 m²Patient WC
10c
(2.5 m²)
2.7 m²Patient WC
10d
(2.5 m²)
9.5 m²Childrens Play
07a
(9.0 m²)
1.4 m²Info Point
08
(1.0 m²)
3.0 m²Stationary
38a
(3.0 m²)
56.8 m²Circ 1
72a
(335.3 m²)
3.4 m²Staff WC
58a
(2.2 m²)
9.9 m²Circ 5
72e
(0.0 m²)
40.0 m²Circ 4
72d
(0.0 m²)
15.3 m²Community Store
04c
(15.0 m²)
27.6 m²Circ 2
72b
(0.0 m²)
9.1 m²DSR 3
61c
(9.0 m²)
6.7 m²Disabled WC
09b
(4.5 m²)
2.7 m²Patient WC
10a
(2.5 m²)
2.8
m²
Wheelc
hair A
llow
ance
06a
(3.0
m²)
2.7 m²Patient WC
10b
(2.5 m²)
15.0 m²GP Consulting 3
29b
(15.0 m²)
Departments
A - Entrance & Reception
B - Fearn GP Practice
C - Tain GP Practice
E - Community Unit
G - Services
H - Staff Facilities
J - Circulation
2.0 m²Pram Space
72k
(0.0 m²)
6.5 m²Lift75b
(7.5 m²)
22.0 m²GP Waiting
03b
(0.0 m²)
5.7 m²Baby Changing
11
(4.5 m²)
13.9 m²Stair74a
(15.0 m²)
14.5 m²Stair74c
(15.0 m²)
7.6 m²Clinical Store 2
36b
(7.5 m²)
2.7 m²Staff WC
58b
(0.0 m²)
0.4 m²HM73b
(0.0 m²)
0.5 m²HM73a
(0.0 m²)
0.7 m²Elec69b
(1.5 m²)
0.6 m²HM73e
(0.0 m²)
44.0 m²Physiotherapy Treatment
43
(44.0 m²)
15.0 m²Clinical Treatment 2
39b
(15.0 m²)
15.0 m²Clinical Treatment 1
39a
(15.0 m²)
17.5 m²Clinical Consulting 3
40c
(15.0 m²)
2.4 m²Staff WC
58c
(2.2 m²)
10.1 m²Clinical Interview 1
41a
(10.0 m²)
10.1 m²Clinical Interview 2
41b
(10.0 m²)
14.9 m²Clinical Consulting 2
40b
(15.0 m²)
14.9 m²Clinical Consulting 1
40a
(15.0 m²)
16.0 m²Podiatry Treatment
42
(16.0 m²)
8.6 m²Community Reception
45a
(8.5 m²)
12.7 m²Stair74b
(0.0 m²) 5.3 m²Community Waiting
05
(5.0 m²)
3.0 m²Tain Interview
18a
(0.0 m²)2.1 m²Fearn Interview
17a
(0.0 m²)
16.7
m²
Wate
r S
erv
ices P
lant R
oom
76 ?
0.5 m²HM73c
(0.0 m²)
0.5 m²HM73d
(0.0 m²)
0.6 m²HM73f
(0.0 m²)
Access tounderstair store
Access tounderstair store
Access tounderstair store
Status
keppie
Project No.
Drawing No.
Drawing
Created ●
Rev
Date ● Scale ●
BELFAST ● EDINBURGH ● GLASGOW ● INVERNESS ● MANCHESTER ● PERTH
Checked ●
@A1
architecture ● interior design ● planning ● landscape ● urban design
●
www.keppiedesign.co.uk
INVERNESS
Copyright, Keppie Design, Ltd ©
Figured dimensions only are to be taken from this drawing.All dimensions are to be checked on site before any work is put inhand. IF IN DOUBT ASK.
CDM:Hazard Elimination & Risk Reduction has been undertaken andrecorded where appropriate, in accordance with the requirementsof "The Construction (Design and Management) Regulations 2007"and the "Industry Guidance for Designers"
Project
Client
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Dochfour Business CentreDochgarrochInvernessIV3 8GYTel: 01463 246 850
1 : 200
PL(20)001
209609
INFORMATION
LASS
14/03/12
Ground Floor Plan / First FloorPlan / Roof Plan
Tain Health Centre
Alba Community Partnerships /NHS Highland
C
1 : 200
First Floor Plan.
Room Schedule by Department
Number Room Name Area
BriefedArea
AreaSum
J - Circulation
01 Lobby 9.5 0.0 9.5
72a Circ 1 57.0 335.5 -278.5
72b Circ 2 27.5 0.0 27.5
72c Circ 3 27.0 0.0 27.0
72d Circ 4 40.0 0.0 40.0
72e Circ 5 10.0 0.0 10.0
72g Circ 7 41.0 0.0 41.0
72h Circ 8 24.0 0.0 24.0
72i Circ 9 15.5 0.0 15.5
72j Circ 10 6.0 0.0 6.0
72k Pram Space 2.0 0.0 2.0
74a Stair 14.0 15.0 -1.0
74b Stair 12.5 0.0 12.5
74c Stair 14.5 15.0 -0.5
74d Stair 14.0 15.0 -1.0
74e Stair 14.0 0.0 14.0
74f Stair 14.5 15.0 -0.5
75a Lift 7.0 7.5 -0.5
75b Lift 6.5 7.5 -1.0
356.0 410.5 -54.0
K - Other
73 Void 14.5 0.0 14.5
14.5 0.0 14.5
Grand total: 121 1482.5 1463.5 2.5
Room Schedule by Department
Number Room Name Area
BriefedArea
AreaSum
G - Services
61a LDU DSR 9.5 7.0 2.5
61b DSR 2 9.0 9.0 -0.0
61c DSR 3 9.0 9.0 0.0
65 Compressor 3.5 6.0 -2.5
67 IT Server 10.0 10.0 -0.0
69a Switch 7.5 7.5 0.0
69b Elec 0.5 1.5 -1.0
69c Elec 0.5 1.5 -1.0
73a HM 0.5 0.0 0.5
73b HM 0.5 0.0 0.5
73c HM 0.5 0.0 0.5
73d HM 0.5 0.0 0.5
73e HM 0.5 0.0 0.5
73f HM 0.5 0.0 0.5
73g HM 0.5 0.0 0.5
73h HM 0.5 0.0 0.5
73i HM 1.0 0.0 1.0
76 Water Services PlantRoom
16.5
71.5 51.5 3.5
H - Staff Facilities
56 Female Changing 19.0 19.5 -0.5
57 Male Changing 7.5 7.5 0.0
58a Staff WC 3.5 2.0 1.0
58b Staff WC 2.5 0.0 2.5
58c Staff WC 2.5 2.0 0.0
58d Staff WC 2.5 2.0 0.5
58e Staff WC 2.5 2.0 0.5
58f Staff WC 2.5 2.0 0.5
59a Shower 3.0 3.5 -0.0
59b Shower 3.5 3.5 -0.0
60a Staff Rest 35.5 35.0 0.5
85.0 79.5 5.5
Room Schedule by Department
Number Room Name Area
BriefedArea
AreaSum
E - Community Unit
04c Community Store 15.5 15.0 0.5
39a Clinical Treatment 1 15.0 15.0 -0.0
39b Clinical Treatment 2 15.0 15.0 -0.0
40a Clinical Consulting 1 15.0 15.0 -0.0
40b Clinical Consulting 2 15.0 15.0 -0.0
40c Clinical Consulting 3 17.5 15.0 2.5
41a Clinical Interview 1 10.0 10.0 0.0
41b Clinical Interview 2 10.0 10.0 0.0
42 Podiatry Treatment 16.0 16.0 -0.0
43 Physiotherapy Treatment 44.0 44.0 0.0
44 Community Lead 15.0 15.0 -0.0
45 Community Administration 51.0 51.0 -0.0
45a Community Reception 8.5 8.5 0.0
247.0 244.5 2.5
F - Dental
16 Dental Support Office 19.0 19.0 0.0
48 Dental Treatment 1 15.0 15.0 0.0
49a Dental Treatment 2 15.0 15.0 0.0
49b Dental Treatment 3 15.0 15.0 0.0
49c Dental Treatment 4 18.5 17.0 1.5
50 Preventative & X-Ray 12.0 12.0 -0.0
51 LDU 19.5 16.0 3.5
54 Clinical Office 11.0 11.0 -0.0
63b Dental Store 20.5 16.0 4.5
146.0 136.0 10.0
Room Schedule by Department
Number Room Name Area
BriefedArea
AreaSum
B - Fearn GP Practice
20 Fearn Administration 41.0 39.5 1.5
22 Practice Manager 15.0 15.0 0.0
23 GP Office 10.0 10.0 0.0
28 GP Consulting 1 16.5 16.5 0.0
29a GP Consulting 2 15.0 15.0 -0.0
29b GP Consulting 3 15.0 15.0 -0.0
29c GP Consulting 4 15.0 15.0 0.0
29d GP Consulting 5 15.0 15.0 -0.0
29e GP Consulting 6 15.0 15.0 -0.0
29f GP Consulting 7 15.0 15.0 -0.0
30a Treatment 2 15.0 15.0 -0.0
30b Treatment 1 15.0 15.0 0.0
36a Clinical Store 1 11.5 11.5 0.0
38a Stationary 3.0 3.0 0.0
217.0 215.5 1.5
C - Tain GP Practice
24 Tain Administration 28.0 26.5 1.5
26 Practice Manager 15.0 15.0 -0.0
27 GP Office 12.0 12.0 -0.0
31 GP Consulting 8 16.5 16.5 0.0
32a GP Consulting 9 15.0 15.0 -0.0
32b GP Consulting 10 15.0 15.0 -0.0
32c GP Consulting 11 15.0 15.0 0.0
32d GP Consulting 12 15.0 15.0 0.0
33 Treatment 3 15.0 15.0 0.0
36b Clinical Store 2 7.5 7.5 0.0
38b Stationary 2.0 2.0 0.0
156.0 154.5 1.5
Room Schedule by Department
Number Room Name Area
BriefedArea
AreaSum
A - Entrance & Reception
03a GP Waiting 23.0 45.0 -22.0
03b GP Waiting 22.0 0.0 22.0
04 Dental Waiting 22.5 22.0 0.5
05 Community Waiting 5.5 5.0 0.5
06a Wheelchair Allowance 3.0 3.0 -0.0
06b Wheelchair Allowance 3.0 3.0 -0.0
07a Childrens Play 9.5 9.0 0.5
08 Info Point 1.5 1.0 0.5
09a Disabled WC 5.0 4.5 0.5
09b Disabled WC 6.5 4.5 2.0
10a Patient WC 2.5 2.5 0.0
10b Patient WC 2.5 2.5 0.0
10c Patient WC 2.5 2.5 0.0
10d Patient WC 2.5 2.5 0.0
10e Patient WC 2.5 0.0 2.5
10f Patient WC 3.0 0.0 3.0
11 Baby Changing 5.5 4.5 1.0
12 Multi-Purpose Room 37.0 36.0 1.0
13 Furniture Store 4.0 4.0 -0.0
14 Equipment Store 2.0 2.0 0.0
15 Dental Reception 9.0 9.0 -0.0
17 Fearn Reception 5.0 4.5 0.5
17a Fearn Interview 2.0 0.0 2.0
18 Tain Reception 5.0 4.5 0.5
18a Tain Interview 3.0 0.0 3.0
189.5 171.5 18.0
Area Schedule (GIA)
Ground Floor GIA 959.5 m²
First Floor GIA 580.8 m²
1540.4 m²
1 : 200
Ground Floor Plan 1 : 200
Roof P lanLASS 19/02/12
A Client amendments to Dental. X-ray developing roomremoved / compressor room reduced / area added tostore
SS LA 06/06/12
B Client amendments to Dental.
SS LA 27/06/12
C Client amendments - stores added understairs.
SS AK 27/06/12
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch Cladding Dark Gray roof tilesWhite render Dark Gray aluminiumfaced curtain wall
Timber Cladding
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch Cladding Dark Gray roof tilesColoured render Dark Gray aluminiumfaced curtain wall
Timber Cladding
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch Cladding Dark Gray roof tiles White render
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch Cladding Dark Gray roof tilesWhite render Stone teature wall Horizontal Larch Cladding
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch CladdingDark Gray roof tiles White renderDark Gray aluminiumfaced curtain wall
Ground Floor
0.0
First Floor
3300.0
Horizontal Larch CladdingDark Gray roof tiles
White render
Ground Floor
0.0
First Floor
3300.0
Wall head
6000.0
3000.0
Ground Floor
0.0
First Floor
3300.0
Wall head
6000.0
2700.0
Status
keppie
Project No.
Drawing No.
Drawing
Created ●
Rev
Date ● Scale ●
BELFAST ● EDINBURGH ● GLASGOW ● INVERNESS ● MANCHESTER ● PERTH
Checked ●
@A1
architecture ● interior design ● planning ● landscape ● urban design
●
www.keppiedesign.co.uk
INVERNESS
Copyright, Keppie Design, Ltd ©
Figured dimensions only are to be taken from this drawing.All dimensions are to be checked on site before any work is put inhand. IF IN DOUBT ASK.
CDM:Hazard Elimination & Risk Reduction has been undertaken andrecorded where appropriate, in accordance with the requirementsof "The Construction (Design and Management) Regulations 2007"and the "Industry Guidance for Designers"
Project
Client
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Drawn: Chk'd: Date:
Revision
Dochfour Business CentreDochgarrochInvernessIV3 8GYTel: 01463 246 850
1 : 200
PL(25)001
209609
PLANNING
LASS
14/03/12
Elevations / Sections /Perspective
Tain Health Centre
Alba Community Partnerships /NHS Highland
-
1 : 200
East Elevation 2
1 : 200
Front Elevation (East Elevation)
1 : 200
North Elevation 1 : 200
South Elevation to Craighill Terrace
1 : 200
West Elevation 1
1 : 200
West Elevation 2
1 : 200
Section thru Community / Dental 1 : 200
Section thru GP wing
External MaterialsWallsWhite wet dash renderPainted smooth renderHorizontal larch claddingStone feature walls at entrance.Brick basecourse
RoofDark grey roof tiles to main buildingSingle ply roof over projection
Windows and DoorsDark grey aluminum faced timber windows or dark grey curtain walling to front entrance
Perspective view of Front Entrance