20
Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Embed Size (px)

Citation preview

Page 1: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Health and Safety Executive

North & West Yorks

WWT

David Stewart

HM Principal Inspector, Construction Group, Leeds

Page 2: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Topics

Control of Asbestos Regulations 2012

RIDDOR

Fee for Intervention

Refurb’ Campaign – Feb/March 2012

Work plan 2012/13

Page 3: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Control of Asbestos Regulations 2012

• EU Directive on exposure to asbestos (Directive 2009/148/EC)

• 6th April 2012– What has stayed the same– What has changed

• Notification

• April 2015 – health surveillance

• Enforcement expectation

Page 4: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

RIDDOR

• 6th April

• The trigger point has increased from over three days to over seven days incapacitation (not counting the day on which the accident happened).

• The deadline by which the over-seven-day injury must be reported has also increased to 15 days from the day of the day of the accident.

Page 5: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Fee For Intervention

• Material breach –when, in the opinion of the HSE Inspector, there has been a contravention of health and safety law that requires them to notify the duty holder, in writing, of that opinion.

• £124 per hour *

• October 2012 ?

Page 6: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Refurbishment campaign

Inspection initiative 20th Feb to 16th March

-Refurb’ & small sites

No of sites visited – 132 (3237)

No of Contractors seen – 175 (4080)

No of notices issued – 27 (581)

FFI dry run

Issues

-WAH, Fire Safety, Good Order, asbestos survey

Page 7: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 8: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 9: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 10: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 11: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 12: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 13: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 14: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 15: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 16: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 17: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 18: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 19: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds
Page 20: Health and Safety Executive North & West Yorks WWT David Stewart HM Principal Inspector, Construction Group, Leeds

Work plan 2012/13

• Priority Areas– Asbestos– Small sites– Refurbishment– Major Projects – Timber Frame buildings– Temporary Demountable Structures