Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page1of 68
HCPT INDOOR SITE ACCEPTANCE
PROCEDURE
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
2/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page2of 68
REVIEWS
Rev. Description Author Date
1.0 Rudi Hudoyo 9/05/2007
DOCUMENT HYSTORY
Var. Description Author Date
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
3/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page3of 68
REVIEWS ............................................................................................................................................................................ 2
DOCUMENT HYSTORY.................................................................................................................................................... 2
1.Introduction ....................................................................................................................................................................... 4
2.Purpose .............................................................................................................................................................................. 4
3.Responsibilities.................................................................................................................................................................. 4
4.IBC Component Acceptance ............................................................................................................................................. 4
4.1 Installation Check........................................................................................................................................................ 5
4.1.1.Documentation Check ................................................................................................................................................. 54.1.2.Hardware Inventory..................................................................................................................................................... 5
4.1.2.1 Passive System................................................................................................................................................. 5
4.1.2.1 Active System.................................................................................................................................................. 7
4.2 Visual Inspection............................................................................................................................................................ 7
4.2.1.Physical Condition....................................................................................................................................................... 74.2.2.Antenna, Feeder, Tapper and Splitter Placement........ .......... .......... .......... ......... ............ ......... ........... ......... ........... ...... 7
4.2.3.Antenna, Splitter and Feeder Cable Installation Check .......... ......... ........... .......... .......... .......... .......... .......... .......... ..... 8
4.2.4.Active DAS Check ...................................................................................................................................................... 9
4.3 Measurement ................................................................................................................................................................. 9
4.3.1VSWR Measurements .................................................................................................................................................. 9
4.3.2Distance To Fault Measurements ................................................................................................................................. 10
4.3.3Insertion Loss Measurements ....................................................................................................................................... 10
5.IBC Network Conditional Acceptance .............................................................................................................................. 115.1 IBC Conditional Acceptance Procedure........................................................................................................................ 11
5.2 Walk Test Procedures and Tool Test Configuration............ ......... ........... ......... ............ ......... ........... ......... ........... .......... 12
5.2.1 Walk Test Tool Configuration..................................................................................................................................... 12
5.2.2 Walk Test Routes......................................................................................................................................................... 13
5.2.3 Log File Naming Convention ..................................................................................................................................... 13
5.2.4 Walk Test Procedures for the 2G Network.................................................................................................................. 13
5.2.5 Walk Test Procedures for the 3G Network.................................................................................................................. 13
5.2.6 Criteria for the Indoor Coverage Acceptance .............................................................................................................. 14
6.IBC Network Provisional Acceptance............................................................................................................................... 14
6.1 Indoor Site Provisional Acceptance Procedure.......... ........... ......... ........... ......... ........... .......... .......... .......... .......... ......... 14
6.2 Tests to be performed in the step 6.1.2 .......................................................................................................................... 15
6.3 Walk Test Procedures and Tool Test Configuration........... ......... ........... ......... ............ ......... ........... ......... ........... .......... 17
6.3.1Walk Test Tool Configuration...................................................................................................................................... 17
6.3.2Walk Test Routes.......................................................................................................................................................... 17
6.3.3Log File Naming Convention ...................................................................................................................................... 17
6.3.4Walk Test Procedures for the 2G Network................................................................................................................... 18
6.3.5Walk Test Procedures for the 3G Network................................................................................................................... 19
6.3.6Criteria for the Indoor Coverage Acceptance ............................................................................................................... 20
ANNNEX ............................................................................................................................................................................. 21
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
4/68
1. Introduction
This document describes the Acceptance Process for HCPT Indoor sites (IBC).
2. Purpose
The purpose of this document is to establish the Acceptance Process for an HCPT indoor Site. TheAcceptance Process is divided into 3 major parts.
1. IBC Component Acceptance.2. IBC Network Conditional Acceptance.3. IBC Network Provisional Acceptance.
3. Responsibilities
The Contractor has the responsibility to:
Ensure that the Site is ready for the Acceptance.
Provide tools and test equipments to be used during the Acceptance Tests.
Check all the Submitted Documentation.
Maintain Punch List.
4. IBC Component Acceptance
The purpose of this protocol is to demonstrate that the IBC components are installed according to thecell planning data and the Design Project Accepted.
The corresponding sections have to be filled in during the Acceptance. The test procedure of antennasystem components consists of:
Inventory, Visual Inspection, Distance to Fault and Return Loss measurements.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
5/68
4.1 Installation Check
4.1.1. Documentation Check
Check the documentation of the Accepted Design which gives information on the IBC site:
Description OK NOK
4.1.1.1Cable, Splitter, Tapper, Combiner, Antenna, Remote Unit, Main Hub,Expansion Hub, etc. Specification data from the manufacturers.
4.1.1.2 Technical BTS-Node B room/site drawings/layouts.
4.1.1.3 Installation drawings (Antenna, Splitter, Tapper and Feeder positions).
4.1.1.4 Link budget calculation (Design Binder).
Remark:
4.1.2. Hardware Inventory
Check and compare the installed equipment with the documentations. The quantity of installedequipment should meet the Documentation, if not please give remark.
4.1.2.1 Passive System
Antenna Type Manufacturer NumberQuantitySector 1
QuantitySector 2
QuantitySector 3
Omni ADC 117 133
Directional ADC 29 31
Bi-Directional
Splitter Type Manufacturer NumberQuantitySector 1
QuantitySector 2
QuantitySector 3
2 way Argus 5 10
3 way Argus 24 23
4 way Argus 28 28
Tapper Type Manufacturer NumberQuantitySector 1
QuantitySector 2
QuantitySector 3
7 dB
10 dB
15 dB
Dual Band CombinerType
Manufacturer NumberQuantitySector 1
QuantitySector 2
QuantitySector 3
Multiband 4 in 4 out Pasific Wave 4 4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
6/68
Hybrid 3-dB Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
Feeder Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
1/2 Leoni 14 (111.35 m) 10 (177.08 m)7/8 Leoni 119 (2574.72 m) 132 (3067.23m)
1 Leoni 52 (2833.35 m) 71 (3990.73 m)
1 5/8 Leoni
Jumper Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
0,3 m Leoni 14 191 m Leoni 326 404
5 m Leoni
Connector Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
Connector Leoni 370 426
Other Device Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
4.1.2.2 Active System
Active DAS Device Type Manufacturer Number Quantity Sector 1 Quantity Sector 2 Quantity Sector 3
Main HubExpansion Hub
Remote Unit
Fiber
Cat-5
Cat-5 Extender
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
7/68
4.2 Visual Inspection
4.2.1. Physical Condition
Ensure that there is no scratch or any damage on all the different devices used in the Active andPassive DAS, like Antennas, Splitters, Tappers, Combiners, Hybrids, Main Hubs, Expansion Hubs,RAUs, etc.
Condition for allthe DevicesNbr Description
OK NOK
4.2.1.1Ensure that there is no scratch or any damage on Antennas, Splitters,Tappers, Combiners, Feeders, etc. (refer to Annex 1.1.4, 1.2.4, 1.3.4,
1.4.4, 1.5.4, 1.6.4, 1.7.2, 1.8.3, 2.1.4, 2.3.5, 2.4.4, 2.2.5).Remarks:
4.2.2. Antenna, Feeder, Tapper and Splitter Placement
Ensure that there is no scratch or any damage on all the different devices used in the Active andPassive DAS, like Antennas, Splitters, Tappers, Combiners, Hybrids, Main Hubs, Expansion Hubs,RAUs, etc.
Condition forall the DevicesNbr Description
OK NOK
4.2.2.1
Antenna should be mounted properly to the ceiling or wall and easy tobe maintained. Antenna should be installed in/outside of the ceiling asplanned and make sure that there is no any metal or concrete in frontor surrounding of the Antenna* (refer to Annex 1.1.1).
4.2.2.2The position of the Antenna should have a good position in order tohave good coverage in the building (following the design accepted,refer to Annex 1.1.2).
4.2.2.3 Check the cable layout and compare with as built drawing.
4.2.2.4 The cable/feeder should not across the power line and installedproperly.
4.2.2.5The position of Splitter should easy to reach for measurement andmaintenance purpose.
Remarks:
* If there is not possible to install the antenna outside of ceiling, the vendor should give a specific comment/reason
and calculation that the power links budget still within the specification or should be specified in the as planned
design.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
8/68
4.2.3. Antenna, Splitter and Feeder Cable Installation Check
Check the installation of Antenna, Splitter and Feeder Cable. Give the remark, if any deviation foundfrom the following test:
Condition for allthe DevicesNbr DescriptionOK NOK
4.2.3.1 Check the brackets for the Antennas (refer to Annex 1.1.3).
4.2.3.2Antenna direction and tilting according to the plan approved (refer to Annex1.1.5).
4.2.3.3Each Splitter/Tapper/Combiner/Hybrid should be installed and mountedproperly by a good mounting with brackets (refer to Annex 1.2.3, 1.3.3, 1.4.3,1.5.3).
4.2.3.4Make sure the input and output ports of Splitter/Tapper/Combiner/Hybridconnected to the correct input and output cable (refer to Annex 1.2.5, 1.3.5,1.4.5).
4.2.3.5The connector should tight enough and water proof after the Distance to Faultand VSWR measurements.
4.2.3.6The minimum permissible bending radius of feeder/jumper cable should not beexceeded (refer to Annex 1.6.5).
4.2.3.7Each bottom end of feeder cable that connected to other part of Antennasystem should be marked with eligible label (refer to Annex 1.6.6).
4.2.3.8The maximum length of cable jumper from antenna to feeder is 3 meters asdesign.
4.2.3.9 Feeders, Transmission Cables and Jumpers Properly Secured.Remarks:
4.2.4. Active DAS Check
Check the installation of Active System Devices, as Main Hub, Expansion Hub, Remote Unit, OpticalFeeder, CAT-5, etc. Give the remark, if any deviation found from the following test:
Condition forall the DevicesNbr Description
OK NOK
4.2.4.1 Main Hub functionalities (refer to Annex 2.1).
4.2.4.2 Expansion Hub functionalities (refer to Annex 2.2).
4.2.4.3 Remote Unit functionalities (refer to Annex 2.3).
4.2.4.4 Fiber Optic Cable functionalities (refer to Annex 2.4).
Remarks:
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
9/68
4.3 Measurement
During Acceptance Test, there are 3 measurements required to be conducted which are:
VSWR Measurements.
Distance To Fault Measurements.
Insertion Loss Measurements.
4.3.1 VSWR Measurements
The VSWR of each Antenna must be measured in the entire HCPT DCS/UMTS frequency band:
Frequency Range:
DCS: Full Bandwidth 1710 1880 MHzUplink (RX) 1710 1785 MHzDownlink (TX) 1805 1880 MHz
UMTS: Full Bandwidth 1920 2170 MHzUplink (RX) 1920 1980 MHzDownlink (TX) 2110 2170 MHz
The measurement should be done at bottom end of feeder cable of:
Each individual Antenna.
Every part of feeder cable that connecting Splitter/Tapper/Combiner/Hybrid toSplitter/Tapper/Combiner/Hybrid.
Entire Antenna system.
The worst value must be marked with a marker for both in uplink and downlink band. Record the
measurements value and compare to the VSWR limit value (all the measurements recalled will becollected on a hardware support and attached to this document).
Figure 1. Splitter, Connector, Jumper Cable, Feeder and Antenna typical configuration.
4.3.2 Distance To Fault Measurements
The Distance To Fault (DTF) must be measured for performance verification and failure analysis.DTF displays RF return loss or VSWR data versus distance. The effects of poor connections,damaged cables, or faulty Antennas are quickly identified. Since DTF automatically accounts forattenuation versus distance, the display accurately indicates the return loss or VSWR of theAntenna.
Further information on how the Distance To Fault measurements should be performed described inattachment in Annex 3.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
10/68
4.3.3 Insertion Loss Measurements
Insertion loss must be measured to analyze transmission feed line installation and performancequality.
The transmit and receive Antennas are connected to the radio through coaxial cable and orwaveguide transmission lines (Figure 2).
Insertion loss measures the energy absorbed by the transmission line in the direction of the signalpath in dB/meter or dB/feet. Transmission line losses are dependent on cable type, operatingfrequency and the length of the cable run. Insertion loss of a cable varies with frequency; the higherthe frequency, the greater the loss.
Insertion loss measurements help troubleshoot the network by verifying the cable installation andcable performance. High insertion loss in the feedline or jumpers can contribute to poor system
performance and loss of coverage. Measuring insertion loss using Site Master assures accurate andrepeatable measurements.
Figure 2. Typical Transmission Line System.
Further information on how the Insertion Loss measurements should be performed described inattachment in Annex 4.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
11/68
5. IBC Network Conditional Acceptance
The purpose of this protocol is to demonstrate that the IBC site pass a certain ConditionalAcceptance level.
5.1 IBC Conditional Acceptance Procedure
This procedure to ensure that the IBC installation has been completed and a certain test needs to beperformed to show the minimum number of acceptance level (KPI: Key Performance Index) arefulfilled.
The test is to perform walk tests which cover all the target coverage areas included in the Drawingsas Planned. Only the most important KPI targets to be tested to get a quick result on the IBCnetwork, the more comprehensive tests will be done at Provisional Acceptance Procedure.
Process Step Description Responsible
5.1.1Prepare Data for
Walk Tests
Prepare all the data and the documentation for theSite Walk Tests.
Contractor
5.1.2Define Walk Test
Routes and Schedule
The Contractor will define the Walk Test Scheduleand all Routes necessary for the different tests. Theroutes should cover the predicted distant area whichwill be covered by the indoor Antenna. The routes tobe verified and approved by HCPT
Contractor & HCPT
5.1.3Perform Walk Tests
Perform the Site Walk Tests according to thedefined routes Contractor
5.1.4Analyze Walk Tests
Data
Analyze all the Walk Tests Data and create aDocumentation Report.
Contractor
5.1.5Fix Deficiency
If the data from Walk Test present any problemand/or the coverage KPIs do not reach the criteria,then related failed KPIs have to be fixed and re-testbefore the provisional acceptance process. Any KPInot related to the IBC will be informed to HCPT, andHCPT will take action accordingly
Contractor & HCPT
5.1.6Prepare Walk Test
Report
The Walk Test Report needs to show the coverageKPIs reaching and analysis the problems cause and
also steps to fix the problems, in order to solve thembefore provisional acceptance process. AnotherReport will be submitted after the problems aresolved showing all KPIs have been achieved.
Contractor
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
12/68
5.2 Walk Test Procedures and Tool Test Configuration
5.2.1 Walk Test Tool Configuration
The equipments which will be used during these tests are:
An UMTS/GSM Scanner with a battery for ensure the power supply in the indoor environmentsand connected with two external Omni Antennas (one for GSM and one for UMTS with a totalgain with the cable loss of 0 dBi);
A Software License able to recall measurements in indoor environments (e.g. a TEMS 6.1) for
interacting with test mobile stations, radio scanners;
A Laptop with an optical pen (or pc tablet) to insert the markers for the geographical reference ofthe position during the measurements (this because, generally, in the indoor environments it isnot possible to use a GPS receiver for the geographical positions);
All the walk tests will be stored and shared between the Contractor & HCPT.
5.2.2 Walk Test Routes
The walk test routes, to have a correct evaluation of the walk tests, should be planned before onmap to avoid a multiple collection of the same geographical points.
The Contractor shall propose walk test routes to HCPT for all necessary Walk Tests in all the targetcoverage areas planned in each project. If there areaccessproblems from Building Management ortenants in some areas, they will be indicated in the Acceptance Report.
Every time there is a change of direction it is necessary to insert a mark for the correct mapping ofthe geographical position on the floor map.
The speed of the walk test has to maintain almost the same value to have a correct spread of themeasurements between two marks.
5.2.3 Log File Naming Convention
In order to keep consistency throughout the regions the log files must be named using the followingnaming convention:
Site ID: Self explanatory
Sector no: Self explanatory
Site Name: Self explanatory
5.2.4 Walk Test Procedures for the 2G Network
Depending on the task of the drive test following different test procedures shall be used:
BCCH Scanning Walk Test:During this walk test the scanner is used to verify the coverageonly.
Long Voice Call Test: The long voice call is to verify all targeted coverage areas are able toperform call connection.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
13/68
5.2.5 Walk Test Procedures for the 3G Network
Depending on the task of the drive test following different test procedures shall be used:
Pilot Scanning Walk Tests: For coverage acceptance the Pilot Channel (CPICH) has to bescanned to show the RSCP by an UMTS scanner.
Long Voice Call Test: The long voice call is to verify all targeted coverage areas are able toperform call connection.
5.2.6 Criteria for the Indoor Coverage Acceptance
The acceptance criteria have to reach the values in table below:
KPI
Indicator KPI Level
2G Signal LevelRxLev>=-85 dBm 95%: All of type of buildings
In 95% of target coveragearea
3G Signal LevelRSCP>=-85 dBm 95%: Airport, HCPT or CP buildings, Siemens offices
For Airports, HCPT andSiemens Offices
RSCP>=-85 dBm 90%: Malls, Convention Centers
For Malls, ConventionCentre
RSCP>=-88 dBm 90%: Hotels, Office Buildings, Others
For Hotels, OfficeBuildings, etc.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
14/68
6. IBC Network Provisional Acceptance
The purpose of this protocol is to demonstrate that the IBC site pass a certain ProvisionalAcceptance level.
6.1 Indoor Site Provisional Acceptance Procedure
This procedure to ensure that the IBC installation has been completed and Conditional Acceptancehas been passed. Furthermore all KPIs related to Network Performance Acceptance level (KPI: KeyPerformance Index) are fulfilled.
The test is to perform walk tests which cover all the target coverage areas included in the Drawingsas Planned. All KPI targets related to Network Performance will be tested.
Process Step Description Responsible6.1.1
Prepare Datafor Walk Tests
Prepare all the data and the documentation for the SiteWalk Tests.
Contractor
6.1.2Define WalkTest Routes
and Schedule
The Contractor will define the Walk Test Schedule and allRoutes necessary for the different tests, if no additionalrequest from HCPT the Walk Test Routes fromConditional Acceptance Test will be used. The routes tobe verified and approved by HCPT
Contractor & HCPT
6.1.3Perform Walk
Tests
Perform the Site Walk Tests according to the definedroutes Contractor
6.1.4Analyze Walk
Tests Data
Analyze all the Walk Tests Data and create aDocumentation Report.
Contractor
6.1.5Analyze PMC
Data
The Contractor shall analyze all the BTS/Node-B sectorsinstalled for the Indoor Site the PerformanceMeasurement Counters (PMC) defined in the KPIs criteriaif they have a significant statistical values (the trafficpresents a significant number of users) otherwise for theKPIs value will be considered only the Walk tests results.
Contractor & HCPT
6.1.6Fix Deficiency
If the data from Walk Test present any problem and or thecoverage KPIs do not reach the criteria, then related
failed KPIs have to be fixed and re-test before theprovisional acceptance process. Any KPI not related tothe IBC will be informed to HCPT, and HCPT will takeaction accordingly.
Contractor & HCPT
6.1.6Prepare WalkTest Report
The Walk Test Report needs to show the coverage KPIsreaching and analysis the problems cause and also stepsto fix the problems, in order to solve them beforeprovisional acceptance process. Another Report will besubmitted after the problems are solved showing all KPIshave been achieved.
Contractor
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
15/68
6.2 Tests to be performed in the step 6.1.2
Process Step Description Responsible
6.1.2Define WalkTest Routes
and Schedule
The Contractor will define the Walk Test Schedule and allRoutes necessary for the different tests, if no additionalrequest from HCPT the Walk Test Routes from ConditionalAcceptance Test will be used. The routes to be verified andapproved by HCPT
Contractor & HCPT
6.1.2.1Quality WalkTests
For the Quality Verification the following steps are necessary:
Verification of the 2G planned Quality threshold with anIdle Mode Walk Test using a test Mobile: an RxQualbetter than 4 for the 95% of the coverage area planned ineach indoor project for each floor.
Verification of the 3G planned Quality threshold with aPilot Scanning Walk Test: an Ec/Io better or equal to -8dB for the same area percentage (95% or 90%) of thelevel coverage planned.
In the report the points which satisfy the threshold will beinserted with a green colour and the rest in red colour and willbe realised a statistical study.
Contractor
6.1.2.2AccessibilityWalk Test
For the 2G and 3G sites will be done a Short Call Walk Test(as described in paragraph 6.3.4 and 6.3.5) for each floor, liftand stairs inside the coverage target areas (one file for eachenvironment), with the calculation of Call Setup Success Rate(CSSR), Call Setup Failure Rate (CSFR), Call Drop Rate
(CDR):
CSSR = (CSS/CA) * 100
CSFR = 100 CSSR
CDR = (CD/CSS)
Where:
CSS = Call Setup Success;
CA = Call Attempts;
CD = Call Drop.
Contractor
6.1.2.3CS Idle ModeProcedures
Verify the 2G Cell Selection/Reselection with a Test MobileWalk Test in Idle Mode for each floor, lift and stairs inside
the coverage target areas (one file for each environment). Verify the 3G Cell Selection/Reselection with a Test Mobile
Walk Test in Idle Mode for each floor, lift and stairs insidethe coverage target areas (one file for each environment).
Contractor
6.1.2.4HandoverProcedure
For these tests a Handover Walk Test will be performed for the2G network and the 3G network as described in the paragraph6.3.4 and 6.3.5. It is necessary to recall one file for eachenvironment involved in these tests. In the report will becalculated the Handover Failure Rate (HOFR):
Contractor
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
16/68
Process Step Description Responsible
HOFR = (1 HOS/HOA) * 100Where:
HOS = Hand-Over Success;
HOA = Hand-Over Attempt.
6.1.2.5Video Calls
Walk Test ShortCall
For these tests will be performed a 3G Video Call Walk Test,as described in the paragraph 5.5, for each floor, lift and stairsinside the coverage target areas (recall one file for eachenvironment).
Contractor
6.1.2.6Packet Walk
Test
For these tests will be performed for the 2G and 3G networks aStationary Throughput Test, as described in the paragraph6.3.4 and 6.3.5, for some places inside the coverage target
areas (recall one file for each environment).
Contractor
6.3 Walk Test Procedures and Tool Test Configuration
6.3.1 Walk Test Tool Configuration
The equipments which will be used during these tests are:
An UMTS/GSM Scanner with a battery for ensure the power supply in the indoor environmentsand connected with two external Omni Antennas (one for GSM and one for UMTS with a totalgain with the cable loss of 0 dBi);
A Test Mobile 2G/3G with the capability for tracing the radio interface message flows; A software License able to recall measurements in indoor environments (e.g. a TEMS 6.1) for
interacting with test mobile stations, radio scanners;
A Laptop with an optical pen (or pc tablet) to insert the markers for the geographical reference ofthe position during the measurements (this because, generally, in the indoor environments it isnot possible to use a GPS receiver for the geographical positions);
IMSI Trace collection to analyze with the walk tests log-file the possible problems;
Before starting with walk tests the Laptop clock must be synchronized with the RNC time tosimplify the IMSI analysis if required;
FTP server for the data tests;
All the walk tests will be stored and shared between the Purchaser and the Contractor.
6.3.2 Walk Test Routes
The walk test routes, to have a correct evaluation of the walk tests, should be planned before onmap to avoid a multiple collection of the same geographical points.
The Contractor shall propose walk test routes to the Purchaser for all necessary Walk Tests in all thetarget coverage areas planned in each project. If there are access problems from BuildingManagement or tenants in some areas, they will be indicated in the Acceptance Report.
Every time there is a change of direction it is necessary to insert a mark for the correct mapping ofthe geographical position on the floor map.
The speed of the walk test has to maintain almost the same value to have a correct spread of themeasurements between two marks.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
17/68
6.3.3 Log File Naming Convention
In order to keep consistency throughout the regions the log files must be named using the followingnaming convention:
Site ID: Self explanatory
Sector no: Self explanatory
Site Name: Self explanatory
Type of Call: MOC-CS-Voice
MTC-CS-VoiceMOC-CS-VC {Video Call}MOC-PS-VS {Video Streaming}MOC-PS-FTP
Time Date Stamp: As given by the tool
6.3.4 Walk Test Procedures for the 2G Network
Depending on the task of the drive test following different test procedures shall be used:
BCCH Scanning Walk Tests: During this walk test the scanner is used to verify the coverage only.
Long Call Walk Tests: During this walk test a call is started at the beginning of the test and is onlyrestarted when the call drops. If the call does not drop during the test, the walk test only consists ofone long call. This test procedure might be used e.g. for coverage quality evaluation or handoverperformance evaluation. It will not be used for evaluating a drop call rate. Generally, the calls will beMOC calls to an automatic answering machine. In case the customer require MMC, the 2
ndmobile
will be in stationary position with a good coverage condition and outside from the test-area.
Handover Walk Tests: During this walk tests will be performed measurements in connected modein continuous call starting outside the building with a Macro Serving Cell and going inside for all thepublic entrances and the opposite direction. Other type of tests will be performed in the lifts or inother places where an Intra-Site Handover could happen in both the directions in case the siteconfiguration presents more than one sectors. Generally, the calls will be MOC calls to an automaticanswering machine. In case the customer require MMC, the 2
ndmobile will be in stationary position
with a good coverage condition and outside from the test-area.
Short Call Walk Tests: During this walk test several calls with the same duration and idle time inbetween are conducted. The duration of the call shall be 90 seconds and the idle time between twocalls shall be 10 seconds. This test procedure might be used e.g. for benchmark Walk Tests or dropcall rate performance evaluation. Generally, the calls will be MOC calls to an automatic answeringmachine. In case the customer require MMC, the 2
ndmobile will be in stationary position with a good
coverage condition and outside from the test-area.
Stationary Throughput Tests: To evaluate the data capabilities of the GPRS network a stationarythroughput tests in antenna visibility condition shall be performed at several points throughout theindoor network (in general a number of at least 4 points for floor will be performed during this test).The mobile used for this walk test shall be a class four mobile. These points and the test performed
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
18/68
at each point shall be picked by the Purchaser and mutually agreed with the Contractor. Thestationery throughput test shall include, but not limited to, FTP Download/Upload, WWW Browsing
and Email access. In case of FTP tests the file used will be at least of 2 MBytes.
Mobile FTP Throughput Tests: To evaluate the data capabilities of the GPRS network FTP,downloads and uploads of a 2 MBytes file shall be performed (the file size is due to take in accountthe Link Adaptation). The mobile used for this drive test shall be a class four mobile.
6.3.5 Walk Test Procedures for the 3G Network
Depending on the task of the drive test following different test procedures shall be used:
Pilot Scanning Walk Tests:For coverage/quality acceptance the Pilot Channel (CPICH) has to bescanned to show the RSCP and the Ec/Io by an UMTS scanner.
12.2Kbps Voice Long Call Walk Tests: During this Walk Test a voice call is started at thebeginning of the test and is only restarted when the call drops. If the call does not drop during thetest, the Walk Test only consists of one long call. This test procedure might be used e.g. forhandover performance evaluation. It will not be used for evaluating a drop call rate. Generally, thecalls will be MOC calls to an automatic answering machine. In case the customer require MMC, the2
ndmobile will be in stationary position with a good coverage condition and outside from the test-
area.
12.2Kbps Short Call Walk Tests:During this Walk Test several voice calls with the same durationand idle time in between are conducted. The duration of the call shall be 90 seconds and the idletime between two calls shall be 10 seconds. This test procedure might be used e.g. for benchmarkWalk Tests or drop call rate performance evaluation. Generally, the calls will be MOC calls to anautomatic answering machine. In case the customer require MMC, the 2
nd mobile will be in
stationary position with a good coverage condition and outside from the test-area.
Video Call Walk Tests:During this Walk Test several video calls with the same duration and idletime in between are conducted. The duration of the call shall be 90 seconds and the idle timebetween two calls shall be 10 seconds. This test procedure might be used e.g. for benchmark WalkTests or video-call drop rate performance evaluation. Generally, the video-calls are MMC calls, the2
ndmobile will be in stationary position with a good coverage condition and outside from the test-
area.
Handover Walk Tests: During this walk tests will be performed measurements in connected modein continuous call starting outside the building with a Macro Serving Cell and going inside for all thepublic entrances and the opposite direction. Other type of tests will be performed in the lifts or inother places where a Softer Handover could happen in both the directions.
Stationary Throughput Tests: To evaluate the data capabilities of the 3G network stationarythroughput tests shall be performed at several points in antenna visibility condition (downloads anduploads of a 5 MBytes file shall be performed; the file size is due to take in account the Bit RateAdaptation). These points shall be picked by the Purchaser and mutually agreed with the Contractor.The stationery throughput test shall include, but not limited to, FTP Download/Upload, WWWBrowsing and Email access.
Mobile FTP Throughput Tests: To evaluate the data capabilities of the UMTS network FTP,downloads and uploads of a 5 MBytes file shall be performed (the file size is due to take in accountthe Bit Rate Adaptation). The mobile used for this drive test shall be a class four mobile.
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
19/68
6.3.6 Criteria for the Indoor Coverage Acceptance
The acceptance criteria have to reach the values in table below:
KPI
Indicator KPI Level
2G Signal Level RxLev>=-85 dBm in 95% of target coverage area
2G Voice Quality RXQUAL 0 to 3 in 95% of target coverage area
3G Signal Level RSCP>=-85 dBm 95% For Airports, HCPT and Siemens Offices
RSCP>=-85 dBm 90% For Malls, Convention Centre
RSCP>=-88 dBm 90% For Hotels, Office Buildings, etc.
3G Quality Ec/Io>= -8 dB In the percentage of Coverage Area (90-95 %)
Handover Success Rate >=97 %
Access failure Rate < 1%2G Drop Call < 1.5 %
3G Drop Call < 2 %
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
20/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 20 of 68
ANNNEX
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
21/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 21 of 68
1.Passive Component Check list
1.1 Antennas
1.1.1Antenna
Installation
1.1.2Antenna
Inst.Position
1.1.3AntennaBrackets
1.1.4AntennaIntegrity
1.1.5 AntennaDirectionNr, Floor
AntennaNumber
AntennaType
OK NOK OK NOK OK NOK OK NOK OK NOK
1 3rd
FL A-L3-1 Omni
2 Sector 1 A-L3-2 Omni
3 A-L3-3 Omni
4 A-L3-4 Omni
5 A-L3-5 Omni
6 A-L3-6 Omni
7 A-L3-7 Dir
8 A-L3-8 Omni9 A-L3-9 Dir
10 A-L3-10 Omni
11 A-L3-11 Omni
12 A-L3-12 Omni
13 A-L3-13 Omni
14 A-L3-14 Omni
15 A-L3-15 Omni
16 A-L3-16 Omni
17 A-L3-17 Omni
18 A-L3-18 Omni
19 A-L3-19 Omni
20 A-L3-20 Omni
21 A-L3-21 Omni
22 A-L3-22 Dir
23 3rd
FL A-L3-23 Omni
24 Sector 2 A-L3-24 Omni
25 A-L3-25 Omni
26 A-L3-26 Omni
27 A-L3-27 Omni
28 A-L3-28 Omni
29 A-L3-29 Omni
30 A-L3-30 Dir
31 A-L3-31 Omni
32 A-L3-32 Omni33 A-L3-33 Omni
34 A-L3-34 Omni
35 A-L3-35 Omni
36 A-L3-36 Omni
37 A-L3-37 Omni
38 A-L3-38 Omni
39 A-L3-39 Omni
40 A-L3-40 Omni
41 A-L3-41 Omni
42 A-L3-42 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
22/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 22 of 68
43 A-L3-43 Omni
44 A-L3-44 Dir
45 2nd
FL A-L2-1 Omni46 Sector 1 A-L2-2 Omni
47 A-L2-3 Omni
48 A-L2-4 Omni
49 A-L2-5 Omni
50 A-L2-6 Omni
51 A-L2-7 Omni
52 A-L2-8 Omni
53 A-L2-9 Omni
54 A-L2-10 Dir
55 A-L2-11 Omni
56 A-L2-12 Omni
57 A-L2-13 Omni
58 A-L2-14 Omni59 A-L2-15 Omni
60 A-L2-16 Omni
61 A-L2-17 Omni
62 A-L2-18 Omni
63 A-L2-19 Omni
64 A-L2-20 Omni
65 A-L2-21 Omni
66 A-L2-22 Omni
67 A-L2-23 Dir
68 A-L2-24 Omni
69 2nd
FL A-L2-25 Omni
70 Sector 2 A-L2-26 Omni
71 A-L2-27 Omni
72 A-L2-28 Omni
73 A-L2-29 Omni
74 A-L2-30 Omni
75 A-L2-31 Omni
76 A-L2-32 Omni
77 A-L2-33 Omni
78 A-L2-34 Omni
79 A-L2-35 Omni
80 A-L2-36 Dir
81 A-L2-37 Omni
82 A-L2-38 Omni83 A-L2-39 Omni
84 A-L2-40 Omni
85 A-L2-41 Omni
86 A-L2-42 Omni
87 A-L2-43 Omni
88 A-L2-44 Omni
89 A-L2-45 Omni
90 A-L2-46 Omni
91 A-L2-47 Omni
92 A-L2-48 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
23/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 23 of 68
93 A-L2-49 Omni
94 A-L2-50 Dir
95 1st
FL A-L1-1 Omni96 Sector 1 A-L1-2 Omni
97 A-L1-3 Omni
98 A-L1-4 Omni
99 A-L1-5 Omni
100 A-L1-6 Omni
101 A-L1-7 Omni
102 A-L1-8 Omni
103 A-L1-9 Omni
104 A-L1-10 Dir
105 A-L1-11 Omni
106 A-L1-12 Omni
107 A-L1-13 Omni
108 A-L1-14 Omni109 A-L1-15 Omni
110 A-L1-16 Omni
111 A-L1-17 Omni
112 A-L1-18 Omni
113 A-L1-19 Omni
114 A-L1-20 Omni
115 A-L1-21 Omni
116 A-L1-22 Omni
117 A-L1-23 Omni
118 A-L1-24 Dir
119 A-L1-25 Omni
120 A-L1-26 Omni
121 1st FL A-L1-27 Dir
122 Sector 2 A-L1-28 Omni
123 A-L1-29 Omni
124 A-L1-30 Omni
125 A-L1-31 Omni
126 A-L1-32 Omni
127 A-L1-33 Omni
128 A-L1-34 Omni
129 A-L1-35 Omni
130 A-L1-36 Omni
131 A-L1-37 Omni
132 A-L1-38 Omni133 A-L1-39 Omni
134 A-L1-40 Omni
135 A-L1-41 Omni
136 A-L1-42 Omni
137 A-L1-43 Omni
138 A-L1-44 Omni
139 A-L1-45 Omni
140 A-L1-46 Omni
141 A-L1-47 Omni
142 A-L1-48 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
24/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 24 of 68
143 A-L1-49 Omni
144 A-L1-50 Omni
145 A-L1-51 Omni
146 A-L1-52 Dir
147 Upper A-LUG-1 Omni
148 Ground A-LUG-2 Omni
149 Sector 1 A-LUG-3 Omni
150 A-LUG-4 Omni
151 A-LUG-5 Omni
152 A-LUG-6 Omni
153 A-LUG-7 Omni
154 A-LUG-8 Omni
155 A-LUG-9 Omni
156 A-LUG-10 Dir
157 A-LUG-11 Omni
158 A-LUG-12 Omni159 A-LUG-13 Omni
160 A-LUG-14 Omni
161 A-LUG-15 Omni
162 A-LUG-16 Omni
163 A-LUG-17 Omni
164 A-LUG-18 Omni
165 A-LUG-19 Omni
166 A-LUG-20 Omni
167 A-LUG-21 Omni
168 A-LUG-22 Omni
169 A-LUG-23 Dir
170 A-LUG-24 Omni
171 Upper A-LUG-25 Omni
172 Ground A-LUG-26 Omni
173 Sector 2 A-LUG-27 Omni
174 A-LUG-28 Omni
175 A-LUG-29 Omni
176 A-LUG-30 Omni
177 A-LUG-31 Omni
178 A-LUG-32 Omni
179 A-LUG-33 Omni
180 A-LUG-34 Omni
181 A-LUG-35 Omni
182 A-LUG-36 Dir183 A-LUG-37 Omni
184 A-LUG-38 Omni
185 A-LUG-39 Omni
186 A-LUG-40 Omni
187 A-LUG-41 Omni
188 A-LUG-42 Omni
189 A-LUG-43 Omni
190 A-LUG-44 Omni
191 A-LUG-45 Omni
192 A-LUG-46 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
25/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 25 of 68
193 A-LUG-47 Omni
194 A-LUG-48 Omni
195 A-LUG-49 Dir
196 Ground A-LGF-1 Omni
197 Floor A-LGF-2 Omni
198 Sector 1 A-LGF-3 Omni
199 A-LGF-4 Omni
200 A-LGF-5 Omni
201 A-LGF-6 Omni
202 A-LGF-7 Omni
203 A-LGF-8 Omni
204 A-LGF-9 Omni
205 A-LGF-10 Dir
206 A-LGF-11 Omni
207 A-LGF-12 Omni
208 A-LGF-13 Omni209 A-LGF-14 Omni
210 A-LGF-15 Omni
211 A-LGF-16 Omni
212 A-LGF-17 Omni
213 A-LGF-18 Omni
214 A-LGF-19 Omni
215 A-LGF-20 Omni
216 A-LGF-21 Omni
217 A-LGF-22 Omni
218 A-LGF-23 Omni
219 A-LGF-24 Dir
220 Ground A-LGF-25 Omni
221 Floor A-LGF-26 Omni
222 Sector 2 A-LGF-27 Omni
223 A-LGF-28 Omni
224 A-LGF-29 Omni
225 A-LGF-30 Omni
226 A-LGF-31 Omni
227 A-LGF-32 Omni
228 A-LGF-33 Omni
229 A-LGF-34 Omni
230 A-LGF-35 Omni
231 A-LGF-36 Dir
232 A-LGF-37 Omni233 A-LGF-38 Omni
234 A-LGF-39 Omni
235 A-LGF-40 Omni
236 A-LGF-41 Dir
237 A-LGF-42 Omni
238 A-LGF-43 Omni
239 A-LGF-44 Omni
240 A-LGF-45 Omni
241 A-LGF-46 Omni
242 A-LGF-47 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
26/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 26 of 68
243 A-LGF-48 Omni
244 A-LGF-49 Omni
245 A-LGF-50 Omni
246 A-LGF-51 Omni247 A-LGF-52 Omni
248 A-LGF-53 Dir
249 Lower A-LLG-12 Dir
250 Ground A-LLG-13 Dir
251 Sector 1 A-LLG-14 Dir
252 A-LLG-15 Dir
253 A-LLG-16 Dir
254 A-LLG-17 Omni
255 A-LLG-18 Omni
256 A-LLG-19 Dir
257 A-LLG-20 Omni
258 A-LLG-21 Omni259 A-LLG-22 Omni
260 A-LLG-23 Dir
261 A-LLG-24 Dir
262 A-LLG-25 Dir
263 A-LLG-26 Dir
264 A-LLG-27 Dir
265 A-LLG-28 Dir
266 A-LLG-29 Dir
267 A-LLG-30 Dir
268 A-LLG-31 Dir
269 A-LLG-32 Dir
270 A-LLG-33 Dir
271 A-LLG-34 Dir
272 A-LLG-59 Omni
273 A-LLG-60 Omni
274 Lower A-LLG-1 Dir
275 Ground A-LLG-2 Omni
276 Sector 2 A-LLG-3 Dir
277 A-LLG-4 Omni
278 A-LLG-5 Dir
279 A-LLG-6 Dir
280 A-LLG-7 Dir
281 A-LLG-8 Dir
282 A-LLG-9 Dir283 A-LLG-10 Dir
284 A-LLG-11 Dir
285 A-LLG-35 Dir
286 A-LLG-36 Omni
287 A-LLG-37 Dir
288 A-LLG-38 Dir
289 A-LLG-39 Omni
290 A-LLG-40 Dir
291 A-LLG-41 Omni
292 A-LLG-42 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
27/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 27 of 68
293 A-LLG-43 Omni
294 A-LLG-44 Dir
295 A-LLG-45 Omni
296 A-LLG-46 Dir297 A-LLG-47 Dir
298 A-LLG-48 Dir
299 A-LLG-49 Dir
300 A-LLG-50 Dir
301 A-LLG-51 Dir
302 A-LLG-52 Omni
303 A-LLG-53 Omni
304 A-LLG-54 Omni
305 A-LLG-55 Omni
306 A-LLG-56 Omni
307 A-LLG-57 Omni
308 A-LLG-58 Omni
309 A-LLG-61 Omni310 A-LLG-62 Omni
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
28/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 28 of 68
1.2 Splitters
1.2.1
SplitterInstallation
1.2.2
Splitter Inst.Position
1.2.3
SplitterBrackets
1.2.4
SplitterIntegrity
1.2.5
ConnectionVerificationsNr, Floor SplitterNumber SplitterType
OK NOK OK NOK OK NOK OK NOK OK NOK
1 3rd
FL S2-L3-1 2 Way
Sect.1
2 3rd
FL S3-L3-1 3 Way
3 Sect.1 S3-L3-2 3 Way
4 S3-L3-5 3 Way
5 S3-L3-6 3 Way
6 S3-L3-7 3 Way
7 3rd
FL S4-L3-5 4 Way
8 Sect.1 S4-L3-6 4 Way9 S4-L3-7 4 Way
10 3rd
FL S3-L3-3 3 Way
11 Sect.2 S3-L3-4 3 Way
12 S3-L3-8 3 Way
13 S3-L3-9 3 Way
14 3rd
FL S4-L3-1 4 Way
15 Sect.2 S4-L3-2 4 Way
16 S4-L3-3 4 Way
17 S4-L3-4 4 Way
18 2nd
FL S3-L2-1 3 Way
19 Sect.1 S3-L2-2 3 Way
20 S3-L2-6 3 Way
21 S3-L2-7 3 Way
22 S3-L2-8 3 Way
23 2nd
FL S4-L2-1 4 Way
24 Sect.1 S4-L2-2 4 Way
25 S4-L2-3 4 Way
26 S4-L2-10 4 Way
27 2nd
FL S3-L2-3 3 Way
28 Sect.2 S3-L2-4 3 Way29 S3-L2-5 3 Way
30 2nd
FL S4-L2-4 4 Way
31 Sect.2 S4-L2-5 4 Way
32 S4-L2-6 4 Way
33 S4-L2-7 4 Way
34 S4-L2-8 4 Way
35 S4-L2-9 4 Way
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
29/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 29 of 68
36 1stFL S3-L1-1 3 Way
37 Sect.1 S3-L1-2 3 Way
38 S3-L1-3 3 Way
39 1stFL S4-L1-1 4 Way
40 Sect.1 S4-L1-2 4 Way
41 S4-L1-3 4 Way
42 S4-L1-4 4 Way
43 S4-L1-5 4 Way
44 S4-L1-6 4 Way
45 1stFL S3-L1-4 3 Way
46 Sect.2 S3-L1-5 3 Way
47 S3-L1-6 3 Way
48 1stFL S4-L1-7 4 Way
49 Sect.2 S4-L1-8 4 Way50 S4-L1-9 4 Way
51 S4-L1-10 4 Way
52 S4-L1-11 4 Way
53 UG S3-LUG-4 3 Way
54 Sect. 1 S3-LUG-5 3 Way
55 S3-LUG-6 3 Way
56 S3-LUG-7 3 Way
57 S3-LUG-8 3 Way
58 UG S4-LUG-7 4 Way
59 Sect. 1 S4-LUG-8 4 Way
60 S4-LUG-9 4 Way
61 S4-LUG-3 4 Way
62 UG S3-LUG-1 3 Way
63 Sect. 2 S3-LUG-2 3 Way
64 S3-LUG-3 3 Way
65 S3-LUG-9 4 Way
66 UG S4-LUG-1 4 Way
67 Sect. 2 S4-LUG-2 4 Way
68 S4-LUG-4 4 Way
69 S4-LUG-5 4 Way70 S4-LUG-6 4 Way
71 GF S2-LGF-5 2 Way
72 Sect. 1 S2-LGF-6 2 Way
73 S2-LGF-7 2 Way
74 GF S3-LGF-3 3 Way
75 Sect. 1 S3-LGF-4 3 Way
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
30/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 30 of 68
76 GF S4-LGF-7 4 Way
77 Sect. 1 S4-LGF-8 4 Way
78 S4-LGF-9 4 Way
79 S4-LGF-10 4 Way80 S4-LGF-11 4 Way
81 GF S2-LGF-1 2 Way
82 Sect. 2 S2-LGF-2 2 Way
83 S2-LGF-3 2 Way
84 S2-LGF-4 2 Way
85 GF S3-LGF-1 3 Way
86 Sect. 2 S3-LGF-2 3 Way
87 GF S4-LGF-1 4 Way
88 Sect. 2 S4-LGF-2 4 Way
89 S4-LGF-3 4 Way90 S4-LGF-4 4 Way
91 S4-LGF-5 4 Way
92 S4-LGF-6 4 Way
93 LG S2-LLG-7 2 Way
Sect. 1
94 LG S3-LLG-2 3 Way
95 Sect. 1 S3-LLG-10 3 Way
96 S3-LLG-11 3 Way
97 LG S4-LLG-1 4 Way
98 Sect. 1 S4-LLG-2 4 Way
99 S4-LLG-3 4 Way
100 S4-LLG-7 4 Way
101 S4-LLG-8 4 Way
101 S4-LLG-9 4 Way
102 LG S2-LLG-1 2 Way
103 Sect. 2 S2-LLG-2 2 Way
104 S2-LLG-3 2 Way
105 S2-LLG-4 2 Way
106 S2-LLG-5 2 Way
107 S2-LLG-6 2 Way
108 LG S3-LLG-1 3 Way
109 Sect. 2 S3-LLG-3 3 Way
110 S3-LLG-4 3 Way
111 S3-LLG-5 3 Way
112 S3-LLG-6 3 Way
113 S3-LLG-7 3 Way
114 S3-LLG-8 3 Way
115 S3-LLG-9 3 Way
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
31/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 31 of 68
116 LG S4-LLG-4 4 Way
117 Sect. 2 S4-LLG-5 4 Way
118 S4-LLG-6 4 Way
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
32/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 32 of 68
1.3 Tappers
1.3.1Tapper
Installation
1.3.2Tapper Inst.
Position
1.3.3Tapper
Brackets
1.3.4Tapper
Integrity
1.3.5Connection
VerificationsNr, Floor
Tapper
Number
Tapper
TypeOK NOK OK NOK OK NOK OK NOK OK NOK
1
2
3
4
5
1.4 Multiband Combiners
1.4.1Combiner
Installation
1.4.2Combiner
Inst.Position
1.4.3CombinerBrackets
1.4.4CombinerIntegrity
1.4.5ConnectionVerificationsNr, Floor
MCMNumber
MCMType
OK NOK OK NOK OK NOK OK NOK OK NOK
1 MCM 14 In
4 Out
2 MCM 24 In
4 Out
3 MCM 34 In 4Out
4 MCM 44 In
4 Out
5 MCM 54 In 4Out
6 MCM 64 In 4
Out7 MCM 7
4 In 4Out
8 MCM 84 In 4Out
1.5 Hybrid Coupler
1.5.1Hybrid
Installation
1.5.2Hybrid Inst.
Position
1.5.3Hybrid
Brackets
1.5.4Hybrid
Integrity
1.5.5ConnectionVerifications
Nr, FloorSplitterNumber
SplitterType
OK NOK OK NOK OK NOK OK NOK OK NOK
1
23
4
5
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
33/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 33 of 68
1.6 Feeders
1.6.1
FeederInstallation
1.6.2Feeder
Inst.Position
1.6.3Feeder
PropertySecured
1.6.4
FeederIntegrity
1.6.5Feeder
BendingRadius
1.6.6
Feeder LabelNr. Floor FeederNumber Type
OK NOK OK NOK OK NOK OK NOK OK NOK OK NOK
1 3rd
FL 1 1/2
Sect.1
2 3rd
FL 1 7/8
3 Sect.1 2 7/8
4 3 7/8
5 4 7/8
6 5 7/8
7 6 7/8
8 7 7/8
9 8 7/810 9 7/8
11 10 7/8
12 11 7/8
13 12 7/8
14 13 7/8
15 14 7/8
16 15 7/8
17 16 7/8
18 17 7/8
19 18 7/8
20 19 7/8
21 20 7/8
22 21 7/8
23 3rd
FL 1 1 1/4
24 Sect.1 2 1 1/4
25 3 1 1/4
26 4 1 1/4
27 5 1 1/4
28 6 1 1/4
29 3rd
FL 1 1/2
Sect. 2
30 3
rd
FL 1 7/831 Sect. 2 2 7/8
32 3 7/8
33 4 7/8
34 5 7/8
35 6 7/8
36 7 7/8
37 8 7/8
38 9 7/8
39 10 7/8
40 11 7/8
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
34/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 34 of 68
41 12 7/8
42 13 7/8
43 14 7/8
44 15 7/845 16 7/8
46 17 7/8
47 18 7/8
48 19 7/8
49 20 7/8
50 3rd
FL 1 1 1/4
51 Sect. 2 2 1 1/4
52 3 1 1/4
53 4 1 1/4
54 5 1 1/4
55 6 1 1/4
56 7 1 1/4
57 2nd
FL 1 1/2
58 Sect.1 2 1/2
59 2nd
FL 1 7/8
60 Sect.1 2 7/8
61 3 7/8
62 4 7/8
63 5 7/8
64 6 7/8
65 7 7/866 8 7/8
67 9 7/8
68 10 7/8
69 11 7/8
70 12 7/8
71 13 7/8
72 14 7/8
73 15 7/8
74 16 7/8
75 17 7/8
76 18 7/8
77 19 7/8
78 20 7/879 21 7/8
80 2nd
FL 1 1 1/4
81 Sect.1 2 1 1/4
82 3 1 1/4
83 4 1 1/4
84 5 1 1/4
85 6 1 1/4
86 7 1 1/4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
35/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 35 of 68
87 2nd
FL 1 1/2
88 Sect. 2 2 1/2
89 2nd
FL 1 7/890 Sect. 2 2 7/8
91 3 7/8
92 4 7/8
93 5 7/8
94 6 7/8
95 7 7/8
96 8 7/8
97 9 7/8
98 10 7/8
99 11 7/8
100 12 7/8
101 13 7/8
102 14 7/8103 15 7/8
104 16 7/8
105 17 7/8
106 2nd
FL 1 1 1/4
107 Sect. 2 2 1 1/4
108 3 1 1/4
109 4 1 1/4
110 5 1 1/4
111 6 1 1/4
112 7 1 1/4
113 8 1 1/4
114 9 1 1/4
115 10 1 1/4
116 11 1 1/4
117 12 1 1/4
118 13 1 1/4
119 14 1 1/4
120 1stFL 1 1/2
121 Sect.1 2 1/2
122 3 1/2
123 4 1/2
124 1stFL 1 7/8
125 Sect.1 2 7/8
126 3 7/8
127 4 7/8
128 5 7/8
129 6 7/8
130 7 7/8
131 8 7/8
132 9 7/8
133 10 7/8
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
36/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 36 of 68
134 11 7/8
135 12 7/8
136 13 7/8
137 14 7/8138 15 7/8
139 16 7/8
140 17 7/8
141 18 7/8
142 19 7/8
143 20 7/8
144 21 7/8
145 1stFL 1 1 1/4
146 Sect.1 2 1 1/4
147 3 1 1/4
148 4 1 1/4
149 5 1 1/4150 6 1 1/4
151 7 1 1/4
152 8 1 1/4
153 1stFL 1 1/2
154 Sect.2 2 1/2
155 1stFL 1 7/8
156 Sect.2 2 7/8
157 3 7/8
158 4 7/8
159 5 7/8
160 6 7/8
161 7 7/8
162 8 7/8
163 9 7/8
164 10 7/8
165 11 7/8
166 12 7/8
167 13 7/8
168 14 7/8
169 15 7/8
170 16 7/8
171 17 7/8
172 18 7/8
173 1stFL 1 1 1/4
174 Sect. 2 2 1 1/4
175 3 1 1/4
176 4 1 1/4
177 5 1 1/4
178 6 1 1/4
179 7 1 1/4
180 8 1 1/4
181 9 1 1/4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
37/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 37 of 68
182 10 1 1/4
183 11 1 1/4
184 12 1 1/4
185 13 1 1/4
186 UG 1 1/2
187 Sect. 1 2 1/2
188 UG 1 7/8
189 Sect. 1 2 7/8
190 3 7/8
191 4 7/8
192 5 7/8
193 6 7/8
194 7 7/8
195 8 7/8196 9 7/8
197 10 7/8
198 11 7/8
199 12 7/8
200 13 7/8
201 14 7/8
202 15 7/8
203 16 7/8
204 17 7/8
205 18 7/8
206 19 7/8
207 20 7/8
208 21 7/8
209 22 7/8
210 UG 1 1 1/4
211 Sect. 1 2 1 1/4
212 3 1 1/4
213 4 1 1/4
214 5 1 1/4
215 6 1 1/4
216 7 1 1/4
217 UG 1 1/2
218 Sect. 2 2 1/2
219 UG 1 7/8
220 Sect. 2 2 7/8
221 3 7/8
222 4 7/8
223 5 7/8
224 6 7/8
225 7 7/8
226 8 7/8
227 9 7/8
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
38/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 38 of 68
228 10 7/8
229 11 7/8
230 12 7/8
231 13 7/8232 14 7/8
233 15 7/8
234 16 7/8
235 UG 1 1 1/4
236 Sect. 2 2 1 1/4
237 3 1 1/4
238 4 1 1/4
239 5 1 1/4
240 6 1 1/4
241 7 1 1/4
242 8 1 1/4
243 9 1 1/4244 10 1 1/4
245 11 1 1/4
246 12 1 1/4
247 13 1 1/4
248 14 1 1/4
249 GF 1 1/2
250 Sect. 1 2 1/2
251 GF 1 7/8
252 Sect. 1 2 7/8
253 3 7/8
254 4 7/8
255 5 7/8
256 6 7/8
257 7 7/8
258 8 7/8
259 9 7/8
260 10 7/8
261 11 7/8
262 12 7/8
263 13 7/8
264 14 7/8
265 15 7/8266 16 7/8
267 17 7/8
268 18 7/8
269 19 7/8
270 20 7/8
271 21 7/8
272 GF 1 1 1/4
273 Sect. 1 2 1 1/4
274 3 1 1/4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
39/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 39 of 68
275 4 1 1/4
276 5 1 1/4
277 6 1 1/4
278 7 1 1/4
279 GF 1 1/2
Sect. 2
280 GF 1 7/8
281 Sect. 2 2 7/8
282 3 7/8
283 4 7/8
284 5 7/8
285 6 7/8
286 7 7/8
287 8 7/8
288 9 7/8289 10 7/8
290 11 7/8
291 12 7/8
292 13 7/8
293 14 7/8
294 15 7/8
295 16 7/8
296 17 7/8
297 18 7/8
298 19 7/8
299 20 7/8
300 21 7/8
301 22 7/8
302 23 7/8
303 24 7/8
304 25 7/8
305 26 7/8
306 27 7/8
307 GF 1 1 1/4
308 Sect. 2 2 1 1/4
309 3 1 1/4
310 4 1 1/4
311 5 1 1/4
312 6 1 1/4313 7 1 1/4
314 8 1 1/4
315 9 1 1/4
316 10 1 1/4
317 11 1 1/4
318 LG 1 1/2
319 Sect. 1 2 1/2
320 3 1/2
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
40/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 40 of 68
321 LG 1 7/8
322 Sect. 1 2 7/8
323 3 7/8324 4 7/8
325 5 7/8
326 6 7/8
327 7 7/8
328 8 7/8
329 9 7/8
330 10 7/8
331 11 7/8
332 12 7/8
333 13 7/8
334 LG 1 1 1/4
335 Sect. 1 2 1 1/4336 3 1 1/4
337 4 1 1/4
338 5 1 1/4
339 6 1 1/4
340 7 1 1/4
341 8 1 1/4
342 9 1 1/4
343 10 1 1/4
344 11 1 1/4
345 12 1 1/4
346 13 1 1/4
347 14 1 1/4
348 15 1 1/4
349 16 1 1/4
350 LG 1 1/2
351 Sect.2 2 1/2
352 LG 1 7/8
353 Sect.2 2 7/8
354 3 7/8
355 4 7/8
356 5 7/8
357 6 7/8
358 7 7/8359 8 7/8
360 9 7/8
361 10 7/8
362 11 7/8
363 12 7/8
364 13 7/8
365 14 7/8
366 15 7/8
367 16 7/8
368 17 7/8
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
41/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 41 of 68
369 18 7/8
370 19 7/8
371 20 7/8
372 21 7/8373 22 7/8
374 23 7/8
375 24 7/8
376 25 7/8
377 26 7/8
378 27 7/8
379 28 7/8
380 29 7/8
381 30 7/8
382 31 7/8
383 32 7/8
384 33 7/8
383 LG 1 1 1/4
386 Sect.2 2 1 1/4
387 3 1 1/4
388 4 1 1/4
389 5 1 1/4
390 6 1 1/4
391 7 1 1/4
392 8 1 1/4
393 9 1 1/4
394 10 1 1/4
395 11 1 1/4
396 12 1 1/4
397 12 1 1/4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
42/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 42 of 68
1.7 Jumpers
1.7.1Jumper
Installation
1.7.2Jumper
Integrity
1.7.3Connections
VerificationNr, Floor
Jumper
Number
Jumper
TypeOK NOK OK NOK OK NOK
1 3rd
FL 1 0,3 m
2 Sect.1 2 0,3 m
3 3 0,3 m
4 3rd
FL 1 1 m
5 Sect.1 2 1 m
6 3 1 m
7 4 1 m
8 5 1 m
9 6 1 m
10 7 1 m
11 8 1 m
12 9 1 m
13 10 1 m
14 11 1 m
15 12 1 m
16 13 1 m
17 14 1 m
18 15 1 m
19 16 1 m
20 17 1 m
21 18 1 m
22 19 1 m
23 20 1 m24 21 1 m
25 22 1 m
26 23 1 m
27 24 1 m
28 25 1 m
29 26 1 m
30 27 1 m
31 28 1 m
32 29 1 m
33 30 1 m
34 31 1 m
35 32 1 m
36 33 1 m37 34 1 m
38 35 1 m
39 36 1 m
40 37 1 m
41 38 1 m
42 39 1 m
43 40 1 m
44 41 1 m
45 42 1 m
46 43 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
43/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 43 of 68
47 44 1 m
48 45 1 m
49 46 1 m
50 47 1 m51 48 1 m
52 49 1 m
53 50 1 m
54 51 1 m
55 52 1 m
56 53 1 m
57 54 1 m
58 55 1 m
59 56 1 m
60 3rd
FL 1 0,3 m
61 Sect. 2 2 0,3 m
62 3rd
FL 1 1 m
63 Sect. 2 2 1 m
64 3 1 m
65 4 1 m
66 5 1 m
67 6 1 m
68 7 1 m
69 8 1 m
70 9 1 m
71 10 1 m
72 11 1 m
73 12 1 m
74 13 1 m
75 14 1 m
76 15 1 m
77 16 1 m
78 17 1 m
79 18 1 m
80 19 1 m
81 20 1 m
82 21 1 m
83 22 1 m
84 23 1 m
85 24 1 m
86 25 1 m87 26 1 m
88 27 1 m
89 28 1 m
90 29 1 m
91 30 1 m
92 31 1 m
93 32 1 m
94 33 1 m
95 34 1 m
96 35 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
44/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 44 of 68
97 36 1 m
98 37 1 m
99 38 1 m
100 39 1 m101 40 1 m
102 41 1 m
103 42 1 m
104 43 1 m
105 44 1 m
106 45 1 m
107 46 1 m
108 47 1 m
109 48 1 m
110 49 1 m
111 50 1 m
112 51 1 m
113 52 1 m114 53 1 m
115 54 1 m
116 2nd
FL 1 0,3 m
117 Sect.1 2 0,3 m
118 2nd
FL 1 1 m
119 Sect.1 2 1 m
120 3 1 m
121 4 1 m
122 5 1 m
123 6 1 m
124 7 1 m
125 8 1 m
126 9 1 m
127 10 1 m
128 11 1 m
129 12 1 m
130 13 1 m
131 14 1 m
132 15 1 m
133 16 1 m
134 17 1 m
135 18 1 m136 19 1 m
137 20 1 m
138 21 1 m
139 22 1 m
140 23 1 m
141 24 1 m
142 25 1 m
143 26 1 m
144 27 1 m
145 28 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
45/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 45 of 68
146 29 1 m
147 30 1 m
148 31 1 m
149 32 1 m150 33 1 m
151 34 1 m
152 35 1 m
153 36 1 m154 37 1 m
155 38 1 m156 39 1 m
157 40 1 m158 41 1 m
159 42 1 m
160 43 1 m161 44 1 m
162 45 1 m
163 46 1 m164 47 1 m
165 48 1 m
166 49 1 m
167 50 1 m168 51 1 m169 52 1 m170 53 1 m171 54 1 m
172 55 1 m173 56 1 m
174 57 1 m175 58 1 m
176 2ndFL 1 0,3 m177 Sect. 2 2 0,3 m
178 2nd
FL 1 1 m
179 Sect. 2 2 1 m
180 3 1 m
181 4 1 m
182 5 1 m183 6 1 m
184 7 1 m
185 8 1 m
186 9 1 m
187 10 1 m188 11 1 m
189 12 1 m190 13 1 m191 14 1 m
192 15 1 m193 16 1 m
194 17 1 m195 18 1 m196 19 1 m197 20 1 m198 21 1 m
199 22 1 m200 23 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
46/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 46 of 68
201 24 1 m202 25 1 m203 26 1 m204 27 1 m205 28 1 m206 29 1 m207 30 1 m208 31 1 m209 32 1 m210 33 1 m211 34 1 m
212 35 1 m213 36 1 m214 37 1 m
215 38 1 m
216 39 1 m
217 40 1 m
218 41 1 m
219 42 1 m
220 43 1 m
221 44 1 m
222 45 1 m
223 46 1 m224 47 1 m225 48 1 m226 49 1 m227 50 1 m228 51 1 m229 52 1 m230 53 1 m231 54 1 m232 55 1 m233 56 1 m234 57 1 m235 58 1 m236 59 1 m237 60 1 m238 61 1 m
239 62 1 m
240 63 1 m
241 64 1 m
242 1stFL 1 0,3 m
243 Sect.1 2 0,3 m
244 1stFL 1 1 m245 Sect.1 2 1 m246 3 1 m
247 4 1 m248 5 1 m249 6 1 m250 7 1 m251 8 1 m
252 9 1 m253 10 1 m
254 11 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
47/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 47 of 68
255 12 1 m256 13 1 m257 14 1 m258 15 1 m259 16 1 m260 17 1 m261 18 1 m262 19 1 m263 20 1 m264 21 1 m265 22 1 m
266 23 1 m267 24 1 m268 25 1 m
269 26 1 m
270 27 1 m
271 28 1 m
272 29 1 m
273 30 1 m
274 31 1 m
275 32 1 m
276 33 1 m
277 34 1 m278 35 1 m279 36 1 m280 37 1 m281 38 1 m282 39 1 m283 40 1 m284 41 1 m285 42 1 m286 43 1 m287 44 1 m288 45 1 m289 46 1 m290 47 1 m291 48 1 m292 49 1 m
293 50 1 m
294 51 1 m
295 52 1 m
296 53 1 m
297 54 1 m
298 55 1 m
299 56 1 m
300 1stFL 1 0,3 m301 Sect. 2 2 0,3 m
302 1stFL 1 1 m
303 Sect. 2 2 1 m304 3 1 m305 4 1 m306 5 1 m307 6 1 m308 7 1 m309 8 1 m310 9 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
48/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 48 of 68
311 10 1 m312 11 1 m313 12 1 m314 13 1 m315 14 1 m316 15 1 m317 16 1 m318 17 1 m319 18 1 m320 19 1 m321 20 1 m
322 21 1 m323 22 1 m324 23 1 m
325 24 1 m
326 25 1 m
327 26 1 m
328 27 1 m
329 28 1 m
330 29 1 m
331 30 1 m
332 31 1 m
333 32 1 m334 33 1 m335 34 1 m336 35 1 m337 36 1 m338 37 1 m339 38 1 m340 39 1 m341 40 1 m342 41 1 m343 42 1 m344 43 1 m345 44 1 m346 45 1 m347 46 1 m348 47 1 m
349 48 1 m
350 49 1 m
351 50 1 m
352 51 1 m
353 52 1 m
354 53 1 m
355 54 1 m
356 55 1 m
357 56 1 m358 57 1 m359 58 1 m360 59 1 m361 60 1 m362 61 1 m363 62 1 m364 63 1 m365 64 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
49/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 49 of 68
366 UG 1 0.3 m
367 Sect. 1 2 0.3 m
368 UG 1 1 m369 Sect. 1 2 1 m
370 3 1 m371 4 1 m
372 5 1 m
373 6 1 m374 7 1 m
375 8 1 m
376 9 1 m
377 10 1 m
378 11 1 m
379 12 1 m
380 13 1 m381 14 1 m
382 15 1 m383 16 1 m
384 17 1 m
385 18 1 m386 19 1 m
387 20 1 m388 21 1 m
389 22 1 m
390 23 1 m391 24 1 m
392 25 1 m393 26 1 m
394 27 1 m
395 28 1 m
396 29 1 m
397 30 1 m
398 31 1 m
399 32 1 m
400 33 1 m
401 34 1 m
402 35 1 m403 36 1 m
404 37 1 m405 38 1 m
406 39 1 m
407 40 1 m408 41 1 m
409 42 1 m410 43 1 m
411 44 1 m
412 45 1 m
413 46 1 m
414 47 1 m415 48 1 m
416 49 1 m
417 50 1 m
418 51 1 m
419 52 1 m420 53 1 m
421 54 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
50/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 50 of 68
422 55 1 m
423 56 1 m
424 57 1 m
425 58 1 m
426 UG 1 0.3 m
427 Sect. 2 2 0.3 m
428 UG 1 1 m429 Sect. 2 2 1 m
430 3 1 m
431 4 1 m
432 5 1 m
433 6 1 m
434 7 1 m
435 8 1 m436 9 1 m
437 10 1 m438 11 1 m
439 12 1 m
440 13 1 m441 14 1 m
442 15 1 m443 16 1 m
444 17 1 m
445 18 1 m446 19 1 m
447 20 1 m448 21 1 m
449 22 1 m
450 23 1 m
451 24 1 m
452 25 1 m
453 26 1 m
454 27 1 m
455 28 1 m
456 29 1 m
457 30 1 m458 31 1 m
459 32 1 m460 33 1 m
461 34 1 m
462 35 1 m463 36 1 m
464 37 1 m465 38 1 m
466 39 1 m
467 40 1 m
468 41 1 m
469 42 1 m470 43 1 m
471 44 1 m
472 45 1 m
473 46 1 m
474 47 1 m475 48 1 m
476 49 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
51/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 51 of 68
477 50 1 m
478 51 1 m
479 52 1 m
480 53 1 m
481 54 1 m
482 55 1 m
483 56 1 m
484 57 1 m
485 58 1 m
486 59 1 m
487 60 1 m
488 61 1 m
489 GF 1 0.3 m
490 Sect. 1 2 0.3 m
491 3 0.3 m492 4 0.3 m
493 GF 1 1 m
494 Sect. 1 2 1 m495 3 1 m
496 4 1 m
497 5 1 m
498 6 1 m
499 7 1 m500 8 1 m
501 9 1 m502 10 1 m
503 11 1 m
504 12 1 m
505 13 1 m
506 14 1 m507 15 1 m
508 16 1 m
509 17 1 m510 18 1 m
511 19 1 m512 20 1 m
513 21 1 m
514 22 1 m
515 23 1 m
516 24 1 m517 25 1 m
518 26 1 m519 27 1 m
520 28 1 m
521 29 1 m522 30 1 m
523 31 1 m524 32 1 m
525 33 1 m
526 34 1 m
527 35 1 m
528 36 1 m
529 37 1 m
530 38 1 m
531 39 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
52/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 52 of 68
532 40 1 m
533 41 1 m
534 42 1 m
535 43 1 m
536 44 1 m
537 45 1 m
538 46 1 m
539 47 1 m
540 48 1 m
541 49 1 m
542 50 1 m
543 51 1 m544 52 1 m
545 53 1 m
546 54 1 m
547 55 1 m
548 56 1 m
549 GF 1 0.3 m
550 Sect. 2 2 0.3 m
551 3 0.3 m
552 4 0.3 m
553 GF 1 1 m
554 Sect. 2 2 1 m
555 3 1 m556 4 1 m
557 5 1 m558 6 1 m
559 7 1 m
560 8 1 m
561 9 1 m
562 10 1 m
563 11 1 m
564 12 1 m
565 13 1 m
566 14 1 m
567 15 1 m568 16 1 m
569 17 1 m570 18 1 m
571 19 1 m
572 20 1 m573 21 1 m
574 22 1 m575 23 1 m
576 24 1 m
577 25 1 m
578 26 1 m
579 27 1 m580 28 1 m
581 29 1 m
582 30 1 m
583 31 1 m
584 32 1 m585 33 1 m
586 34 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
53/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 53 of 68
587 35 1 m
588 36 1 m
589 37 1 m
590 38 1 m
591 39 1 m
592 40 1 m
593 41 1 m
594 42 1 m
595 43 1 m
596 44 1 m
597 45 1 m
598 46 1 m599 47 1 m
600 48 1 m
601 49 1 m
602 50 1 m
603 51 1 m
604 52 1 m
605 53 1 m
606 54 1 m
607 55 1 m
608 56 1 m
609 57 1 m
610 58 1 m
611 59 1 m
612 60 1 m
613 61 1 m
614 62 1 m
615 63 1 m
616 64 1 m
617 65 1 m
618 66 1 m
619 67 1 m
620 68 1 m
621 69 1 m
622 70 1 m
623 71 1 m
624 72 1 m
625 LG 1 0.3 m
Sect. 1
626 LG 1 1 m
627 Sect. 1 2 1 m
628 3 1 m
629 4 1 m630 5 1 m
631 6 1 m
632 7 1 m
633 8 1 m
634 9 1 m
635 10 1 m
636 11 1 m
637 12 1 m
638 13 1 m
639 14 1 m
640 15 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
54/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 54 of 68
641 16 1 m
642 17 1 m
643 18 1 m
644 19 1 m
645 20 1 m
646 21 1 m
647 22 1 m
648 23 1 m
649 24 1 m
650 25 1 m
651 26 1 m
652 27 1 m653 28 1 m
654 29 1 m
655 30 1 m
656 31 1 m
657 32 1 m
658 33 1 m
659 34 1 m
660 35 1 m
661 36 1 m
662 37 1 m
663 38 1 m
664 39 1 m
665 40 1 m
666 LG 1 0.3 m
667 Sect. 2 2 0.3 m
668 3 0.3 m
669 4 0.3 m
670 5 0.3 m
671 6 0.3 m
672 7 0.3 m
673 LG 1 1 m
674 Sect. 2 2 1 m
675 3 1 m
676 4 1 m
677 5 1 m
678 6 1 m
679 7 1 m
680 8 1 m
681 9 1 m
682 10 1 m
683 11 1 m
684 12 1 m
685 13 1 m686 14 1 m
687 15 1 m
688 16 1 m
689 17 1 m
690 18 1 m
691 19 1 m
692 20 1 m
693 21 1 m
694 22 1 m
695 23 1 m
696 24 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
55/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 55 of 68
697 LG 25 1 m
698 Sect. 2 26 1 m
699 27 1 m
700 28 1 m
701 29 1 m
702 30 1 m
703 31 1 m
704 32 1 m
705 33 1 m
706 34 1 m
707 35 1 m
708 36 1 m709 37 1 m
710 38 1 m
711 39 1 m
712 40 1 m
713 41 1 m
714 42 1 m
715 43 1 m
716 44 1 m
717 45 1 m
718 46 1 m
719 47 1 m
720 48 1 m
721 49 1 m
722 50 1 m
723 51 1 m
724 52 1 m
725 53 1 m
726 54 1 m
727 55 1 m
728 56 1 m
729 57 1 m
730 58 1 m
731 59 1 m
732 60 1 m
733 61 1 m
734 62 1 m
735 63 1 m
736 64 1 m
737 65 1 m
738 66 1 m
739 67 1 m
740 68 1 m
741 69 1 m
742 70 1 m
743 71 1 m744 72 1 m
745 73 1 m
746 74 1 m
747 75 1 m
748 76 1 m
749 77 1 m
750 78 1 m
751 79 1 m
752 80 1 m
753 81 1 m
754 82 1 m
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
56/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 56 of 68
755 LG 83 1 m
756 Sect. 2 84 1 m
757 85 1 m
758 86 1 m
759 87 1 m
760 88 1 m
1.8 Other Devices
1.8.1Device
Installation
1.8.2Device Inst.
Position
1.8.3Device
IntegrityNr, Floor
DeviceNumber
DeviceType
OK NOK OK NOK OK NOK
1
23
4
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
57/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 57 of 68
2. Active Component Check list
2.1 Main Hub
2.1.1Front Panel LED
Check
2.1.2Fiber PortLED Check
2.1.3Alarm Check
2.1.4Device
IntegrityMain Hub Number
VoltageOutput(Vdc)
BatteryCurrentRating
OK NOK OK NOK OK NOK OK NOK
Main Hub 1
Main Hub 2
Main Hub 3
2.2 Expansion Hub
2.2.1Unit StatusLED Check
2.2.2
DL/ULStatus LED
Check
2.2.3
Port to RAUStatus LED
Check
2.2.4
AlarmCheck
2.2.5
Deviceintegrity
ExpansionHub
NumberVoltageOutput(Vdc)
BatteryCurrentRating
OK NOK OK NOK OK NOK OK NOK OK NOK
Exp. Hub 1
Exp. Hub 2
Exp. Hub 3
Exp. Hub 4
Exp. Hub 5
Exp. Hub 6
2.3 Remote Unit
2.3.1Unit StatusLED Check
2.3.2DL/UL
Status LEDCheck
2.3.3Port to RAUStatus LED
Check
2.3.4AlarmCheck
2.3.5Device
IntegrityRemote
UnitNumber Floor
OutputPower
OK NOK OK NOK OK NOK OK NOK OK NOK
RAU 1
RAU 2
RAU 3
RAU 4
RAU 5
RAU 6
RAU 7
RAU 8
RAU 9
RAU 10
RAU 11
RAU 12
RAU 13
RAU 14
RAU 15
RAU 16
RAU 17
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
58/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 58 of 68
RAU 18
RAU 19
RAU 20
RAU 21RAU 22
RAU 23
RAU 24
RAU 25
RAU 26
RAU 27
RAU 28
RAU 29
RAU 30
RAU 31
RAU 32
RAU 33
RAU 34RAU 35
RAU 36
RAU 37
RAU 38
RAU 39
RAU 40
RAU 41
RAU 42
RAU 43
RAU 44
RAU 45
RAU 46
RAU 47
RAU 48
2.4 Fiber Cable
Fiber Number Floor2.4.1
OpticalLoss
2.4.2Status LED Check
2.4.3DL/UL Status LED
Check
2.4.4Device
Integrity
OK NOK OK NOK OK NOK
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
59/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 59 of 68
Punch list
Site ID
Site Name
ItemNo.
Description Major Date to becleared
ResponsibleGroup*
DateCleared**
Supervisor
* CME, Implementation** Date when deficiency cleared
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
60/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 60 of 68
VSWR and DTF Measurement Result DCS BAND
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
61/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 61 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
62/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 62 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
63/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 63 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
64/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 64 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
65/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 65 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
66/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 66 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
67/68
Created by: Rudi Hudoyo HCPT Indoor Site Acceptance Procedure Ver 1.0
Department: RND 7 May 2007 Page 67 of 68
VSWR(
8/12/2019 HCPT IBC Master EastPoint-Kapas Krampung Mall
68/68
396 MCM-S3-L2-3 1 1/4 85 1,074 1777,9 1,070 1877,4 1,062 81,28
397 MCM-S3-L3-8 1 1/4 95 1,073 1781,5 1,103 1874,1 1,041 92,73
398 MCM-S3-L1-4 1 1/4 95 1,064 1777,2 1,081 1872,1 1,042 96,28