8
1. Insert temporary braces to support the beam at its final finished height above the floor. Measure the distance between floor and underside of beam and make a note of it. This will be the OVERALL height of the pressure treated structural post inside your SmartColumn plus the combined thickness of the 2 post mounting brackets. Cut your pressure treated post to the overall height dimension minus the thickness of the 2 post mounting brackets. 2. Use code-approved fasteners and install post mounting brackets (supplied by others) to the beam and floor. Measure the overall height of the post mounting bracket you are using and make a note of it. Post mounting bracket heights will vary depending on the type chosen. Use a plumb bob or level to ensure brackets are aligned and plumb both front-to-back and side-to-side. HB&G SmartColumn – Installation Instructions 4. After cutting column shaft to length, mark the column shaft to drill 2 holes at each end for the screws that will attach the column shaft to the structural post. Measure 1 1 2” along the column shaft from each end of the column and 1” in each direction out from the centerline of the column (your marks should be 2” apart). 3. Take the height-measurement of the structural post you cut in Step-1 and subtract from it TWICE THE OVERALL HEIGHT OF THE POST MOUNTING BRACKET that you noted in Step 2. This will be the maximum height of your SmartColumn shaft. NOTE: If the column shaft is already shorter than twice the overall height of the post mounting bracket, you may may not need to cut the column shaft shorter. For example, if your bracket measures 3 1 2” high, subtract 7” from the overall post height and mark that height that has been reduced by 7” on the column shaft where it will be cut. Use a circular saw with a fine-tooth carbide blade and cut the column shaft to length. CAUTION: DO NOT CUT THE SMARTCOLUMN SHAFT MORE THAN 12” SHORTER THAN THE STRUCTURAL POST.

HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

1. Insert temporary braces to support the beam at its final finished height above the floor. Measure the distance between floor and underside of beam and make a note of it. This will be the OVERALL height of the pressure treated structural post inside your SmartColumn™ plus the combined thickness of the 2 post mounting brackets. Cut your pressure treated post to the overall height dimension minus the thickness of the 2 post mounting brackets.

2. Use code-approved fasteners and install post mounting brackets (supplied by others) to the beam and floor.

Measure the overall height of the post mounting bracket you are using and make a note of it. Post mounting bracket heights will vary depending on the type chosen.

Use a plumb bob or level to ensure brackets are aligned and plumb both front-to-back and side-to-side.

HB&G SmartColumn™ – Installation Instructions

4. After cutting column shaft to length, mark the column shaft to drill 2 holes at each end for the screws that will attach the column shaft to the structural post.

Measure 11⁄2” along the column shaft from each end of the column and 1” in each direction out from the centerline of the column (your marks should be 2” apart).

3. Take the height-measurement of the structural post you cut in Step-1 and subtract from it TWICE THE OVERALL HEIGHT OF THE POST MOUNTING BRACKET that you noted in Step 2. This will be the maximum height of your SmartColumn shaft. NOTE: If the column shaft is already shorter than twice the overall height of the post mounting bracket, you may may not need to cut the column shaft shorter. For example, if your bracket measures 31⁄2” high, subtract 7” from the overall post height and mark that height that has been reduced by 7” on the column shaft where it will be cut. Use a circular saw with a fine-tooth carbide blade and cut the column shaft to length.

CAUTION: DO NOT CUT THE SMARTCOLUMN SHAFT MORE THAN 12” SHORTER THAN THE STRUCTURAL POST.

Page 2: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

5. Using a 3⁄16” diameter twist drill bit, drill holes through the column shaft at your 4 marks.

After drilling the holes, use a countersink bit to countersink the 4 holes to receive flathead screws.

6. Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post should be extending equal amounts out each end of the column shaft. Slide the sawhorses a little further apart so the column shaft drops between them but the ends of the structural post still rest on the sawhorses.

Center the column shaft on the post and double-check to be sure the post is extending an equal distance out each end of the column shaft. Once the column shaft is in position, use 15⁄8” or 2” long, corrosion-resistant, flathead deck screws to fasten the column shaft to the structural post.

7. If you are going to complete the installation of your SmartColumn at this time (sliding the cap and base into final position), then remove the carboard carton and the shrink wrap surrounding it at this time. If the cap and base are not going to be slid into their final position at this time, then it is suggested that you leave the cardboard carton in place to help protect the column during the construction process.

8. Use a jack and wooden post to raise the beam approximately 1⁄2” and remove the temporary bracing. Leave the jack and post in place.

NOTE: As an alternative, attachment method, you may use a pneumatic framing nailer to attach the column shaft to the post. Use corrosion-resistant 2-3/8” fram-ing/siding nails at a suggested air pressure of 100 PSI.

Page 3: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

9. Slide the column into place. The structural post should slide in between the vertical legs of the post mounting brackets.

10. Remove the jack and post and let the beam come to rest on top of the structural post.

Use code-approved connector screws or nails to connect the structural post to the post mounting brackets. YOUR SMARTCOLUMN IS COMPLETE

11. Remove the tape temporarily holding up the cap and base. Slide the base down to the floor and the cap up to the beam. Pre-drill holes and use corrosion-resistant trim screws to secure the cap and base to the column shaft.

Make sure your screw locations will allow you to screw into the fiberglass column shaft. Caulk the small gaps between the cap/base and column shaft and fill the trim screw holes with acrylic caulk. Follow the attached painting instructions.

NOTE: As an alternative, to trim screws, you may also use a 16-guage pneumatic finish nailer set at 80-100 PSI to attach the cap and base to the column shaft.

Page 4: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

A high quality acrylic exterior paint should be used to finish your SmartColumn™ columns. At least one coat of primer and two coats of the final paint should be used. For best results, follow these instructions:

1.The surface of the column shaft is smooth and slightly glossy. First, sand the surface of the column with fine sandpaper to remove the gloss.

2. Make sure all surfaces are clean prior to painting or staining by washing each column thoroughly with soapy water and a soft scrub brush, sponge, or rag. As an alternative, a pressure washer may be used with a house and siding cleaner concentrate to clean the column. Water pressure should be less than 1500 psi.

NOTE: Care must be taken when pressure washing polyurethane caps and bases, as they can be damaged by the pressure washer. Using a lower pressure (750 psi) on polyurethane caps and bases is recommended. After washing the column, rinse thoroughly with a hose or pressure washer to remove any soap residue. Allow the column to dry completely before applying coatings as residual moisture will adversely affect coating adhesion. Stubborn or oily spots may be cleaned with denatured alcohol.

3. For best results, Bondo® polyester filler should be used to fill any minor imperfections in the column, cap or base and should also be used to fill the fastener holes used to secure the cap, base and neck molding. Caulk or exterior acrylic spackle filler may also be used but will not achieve results that are equal to Bondo®. Use a high-quality acrylic caulk and caulk the gaps between the column shaft and the cap, neck molding, and base. Follow the manufacturer’s application instructions.

4. To prime SmartColumn shafts, do the following: If moisture is detected on the column shaft, first wipe the column dry again with a clean rag. Use a high-quality oil-base bonding primer that is recommended by its manufacturer for

use on fiberglass. Zinsser® Cover-Stain® Oil-Base Primer and XIM 400W Primer Sealer Bonder are recommended oil-base primers. Primer may be applied with a brush or sprayed with airless spray equipment. If the primer is sprayed, do NOT thin or dilute the primer. Use the primer at full viscosity. Prime the entire column shaft. NOTE: Waterborne acrylic bonding primers can be used, but additional sanding with 120 grit sandpaper is required to roughen the column shaft. Sherwin-Williams Extreme BondTM Primer and XIM Advanced Technology UMA Bonder are recommended waterborne acrylic primers.

5. Use the proper primer for the cap and base depending on the material that they are made from. Primer may be applied with a brush or sprayed with airless spray equipment. If the primer is sprayed, do NOT thin or dilute the primer. Use the primer at full viscosity. Follow the manufacturer’s coating recommendations and application instructions.

To prime caps & bases: PVC - Use one of the acrylic or oil-base bonding primers mentioned above.

6. For the finish coat, it is important to apply two coats of a high-quality exterior acrylic paint. The finish coats may be applied with a brush or sprayed with airless spray equipment. For the finish coat, do not use a dark color. Dark colors are considered any color that has a Light Reflectance Value (LRV) of 0-54. LRV measures the percentage of light a that paint color reflects and ranges from 0 (black) to 100 (white). All leading paint manufacturers can furnish the LRV values of their paint colors. When applying the finish coating, follow the paint manufacturer’s recommendations and application instructions.

NOTE: Do not use any finishes or solvents containing acetone, lacquer thinner, or MEK.

Failure to follow the recommended installation and finishing instructions will void the warranty.

HB&G SmartColumn™ Painting Instructions

© 2019 HB&G Building Products, Inc

Page 5: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

HB&G SmartColumn™ – Instrucciones de instalación

1. Inserte tirantes temporales para sostener la viga en su altura final final sobre el piso. Mida la distancia entre el piso y la parte inferior de la viga y tome nota de ella. Esta será la altura general de el poste estructural tratado a presión dentro de su SmartColumn™ más el grosor combinado de los soportes de montaje de 2 postes. Corte su poste tratado a presión a la dimensión de altura total menos el grosor de los soportes de montaje de 2 postes.

2. Use sujetadores aprobados por el código e instale soportes de montaje posterior (suministrados por otros) en la viga y el piso.

Mida la altura total del soporte de montaje posterior que está utilizando y tome nota de ello. Las alturas del soporte de montaje posterior variarán según el tipo elegido.

Use una plomada o nivelación para asegurarse de que los soportes estén alineados y la plomada tanto de adelante hacia atrás como de lado a lado.

3. Tome la medida de altura del poste estructural que cortó en el Paso 1 y reste de él DOS VECES LA ALTURA GENERAL DEL SOPORTE DE MONTAJE DE POSTE que anotó en el Paso 2. Esta será la altura máxima de su eje SmartColumn. NOTA: Si el eje de la columna ya es más corto que el doble de la altura total del soporte de montaje posterior, es posible que no necesite cortar el eje de la columna más corto. Por ejemplo, si su soporte mide 31⁄2” de altura, reste 7" de la altura total del poste y marque esa altura que se ha reducido en 7" en el eje de la columna donde se cortará. Use una sierra circular con una hoja de carburo de dientes finos y corte el eje de la columna a la longitud adecuada. Por ejemplo, si su soporte mide 31⁄2” de altura, reste 7" de la altura total del poste y marque esa altura que se ha reducido en 7" en el eje de la columna donde se cortará. Use una sierra circular con una hoja de carburo de dientes finos y corte el eje de la columna a la longitud adecuada. PRECAUCIÓN: NO CORTE EL EJE DE SMARTCOLUMN MÁS DE 12" MÁS CORTO QUE EL POSTE ESTRUCTURAL.

4. Después de cortar el eje de la columna a la longitud, marque el eje de la columna para perforar 2 orificios en cada extremo para los tornillos que sujetarán el eje de la columna al poste estructural.

Mida 11⁄2” a lo largo del eje de la columna desde cada extremo de la columna y 1” en cada dirección desde la línea central de la columna (sus marcas deben estar separadas 2”).

Page 6: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

5. Con una broca helicoidal de 3⁄16" de diámetro, taladre orificios a través del eje de la columna en sus 4 marcas.

Después de taladrar los orificios, use una broca de avellanador para avellanar los 4 orificios para recibir tornillos de cabeza plana.

6. Deslice el poste estructural que cortó a la longitud en el Paso-1 dentro del eje de la columna. Los extremos del poste estructural deben extender cantidades iguales hacia cada extremo del eje de la columna. Deslice los caballetes hasta que el eje de la columna caiga entre ellos, pero los extremos del poste estructural todavía descansen sobre los caballetes.

Centre el eje de la columna en el poste y verifique dos veces para asegurarse de que el poste se esté extendiendo una distancia igual hacia cada extremo del eje de la columna. Una vez que el eje de la columna esté en posición, use tornillos de plataforma de cabeza plana de 15⁄8" o 2" de largo, resistentes a la corrosión, para sujetar el eje de la columna al poste estructural.

NOTA: Como método alternativo de fijación, puede usar una clavadora neumática para unir el eje de la

columna al poste. Use clavos de enmarcado/revestimiento resistentes a la corrosión de 2-3/8" a

una presión de aire sugerida de 100 PSI.

7. Si va a completar la instalación de su SmartColumn en este momento (deslizando la tapa y la base hasta la posición final), retire la caja de cartón y la envoltura de plástico que la rodea en este momento. Si la tapa y la base no se deslizarán a su posición final en este momento, se recomienda dejar la caja de cartón en su lugar para ayudar a proteger la columna durante el proceso de construcción.

8. Use un gato y un poste de madera para elevar la viga aproximadamente 1⁄2” y retire el refuerzo temporal. Deja el gato y colócalo en su lugar.

Page 7: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

9. Deslice la columna en su lugar. El poste estructural debe deslizarse entre las patas verticales de los soportes de montaje del poste.

10. Retire el gato y el poste y deje que la viga se apoye en la parte superior del poste estructural.

Utilice tornillos o clavos de conector aprobados por el código para conectar el poste estructural a los soportes de montaje del poste. SU SMARTCOLUMN ES COMPLETA

NOTA: Como alternativa, para recortar los tornillos, también puede usar una clavadora de acabado neumático de calibre 16 a 80-100 PSI para unir la tapa y la base al eje de la columna.

Asegúrese de que la ubicación de sus tornillos le permita atornillar el eje de la columna de fibra de vidrio. Calafatee los pequeños espacios entre la tapa/base y el eje de la columna y llene los agujeros de los tornillos de ajuste con calafateo acrílico. Siga las instrucciones de pintura adjuntas.

11. Retire la cinta que sujeta temporalmente la tapa y la base. Deslice la base hacia el piso y la tapa hasta la viga. Taladre previamente los agujeros y use tornillos de ajuste resistentes a la corrosión para asegurar la tapa y la base al eje de la columna.

Page 8: HB&G SmartColumn – Installation Instructions...Slide the structural post that you cut to length in Step-1 into the column shaft. The ends of the structural post ... 2” a lo largo

Se debe utilizar una pintura acrílica para exteriores de alta calidad para terminar sus columnas SmartColumn™. Se debe usar al menos una capa de imprimación y dos capas de la pintura final. Para obtener los mejores resultados, siga estas instrucciones:

1. La superficie del eje de la columna es lisa y ligeramente brillante. Primero, lije la superficie de la columna con papel de lija fino para eliminar el brillo.

2. Asegúrese de que todas las superficies estén limpias antes de pintar o teñirlas lavando bien cada columna con agua jabonosa y un cepillo suave, esponja o trapo. Como alternativa, se puede usar una lavadora a presión con un concentrado de limpiadores de casas y revestimientos para limpiar la columna. La presión del agua debe ser inferior a 1500 psi.

NOTA: Se debe tener cuidado al lavar a presión las tapas y las bases de poliuretano, ya que pueden dañarse con la lavadora a presión. Se recomienda usar una presión más baja (750 psi) en las tapas y bases de poliuretano. Después de lavar la columna, enjuague bien con una manguera o una lavadora a presión para eliminar cualquier residuo de jabón. Deje que la columna se seque completamente antes de aplicar los recubrimientos, ya que la humedad residual afectará negativamente la adhesión del recubrimiento. Las manchas rebeldes o aceitosas se pueden limpiar con alcohol desnaturalizado.

3. Para obtener los mejores resultados, el relleno de poliéster Bondo® se debe usar para rellenar cualquier imperfección menor en la columna, la tapa o la base, y también se debe usar para rellenar los orificios de los sujetadores utilizados para asegurar la tapa, la base y la moldura del cuello. También se puede usar masilla o masilla de acrílico para exteriores, pero no se lograrán resultados iguales a los de Bondo®. Use una masilla acrílica de alta calidad y selle los huecos entre el eje de la columna y la tapa, la moldura del cuello y la base. Siga las instrucciones de aplicación del fabricante.

4. Para cebar los ejes SmartColumn, haga lo siguiente: Si se detecta humedad en el eje de la columna, primero seque nuevamente la columna con un trapo limpio. Use un imprimador de unión a base de aceite de alta calidad recomendado por su

fabricante para el uso con fibra de vidrio. El imprimador de base de aceite Cover-Stain® de Zinsser® y el sellador de sellador de imprimación XIM 400W son imprimadores de base de aceite recomendados. El imprimador se puede aplicar con un cepillo o se puede rociar con un equipo de rociado sin aire. Si se rocía la imprimación, NO diluya ni diluya la imprimación. Utilice la imprimación a plena viscosidad. Cebe todo el eje de la columna. NOTA: Se pueden usar imprimaciones adhesivas acrílicas a base de agua, pero se requiere lijado adicional con papel de lija de grano 120 para desbaste el eje de la columna. Sherwin-Williams Extreme BondTM Primer y XIM Advanced Technology UMA Bonder se recomiendan imprimadores acrílicos a base de agua.

5. Use la imprimación adecuada para la tapa y la base, dependiendo del material con el que están hechos. El imprimador se puede aplicar con un cepillo o se puede rociar con un equipo de rociado sin aire. Si se rocía la imprimación, NO adelgace ni diluya la imprimación. Utilice la imprimación a plena viscosidad. Siga las recomendaciones de recubrimiento del fabricante y las instrucciones de aplicación.

Para cebar las tapas y las bases: PVC - use uno de los cebadores de unión acrílicos o con base de aceite mencionados anteriormente.

6. Para la capa de acabado, es importante aplicar dos capas de pintura acrílica para exteriores de alta calidad. Las capas de acabado se pueden aplicar con un cepillo o rociarse con un equipo de rociado sin aire. Para la capa de acabado, no utilice un color oscuro. Los colores oscuros se consideran cualquier color que tenga un valor de reflectancia de luz (LRV) de 0-54. LRV mide el porcentaje de luz a que refleja el color de la pintura y varía de 0 (negro) a 100 (blanco). Todos los principales fabricantes de pintura pueden proporcionar los valores LRV de sus colores de pintura. Al aplicar el revestimiento de acabado, siga las recomendaciones del fabricante de pintura y las instrucciones de aplicación.

NOTA: No utilice ningún acabado o solvente que contenga acetona, diluyente de laca o MEK.

El incumplimiento de las instrucciones de instalación y acabado recomendadas anulará la garantía.

Instrucciones de Pintura HB&G SmartColumn™

© 2019 HB&G Building Products, Inc