Process HAZOP work-sheet No. Guide- word Element Deviation Possible causes Conse- quences Safeguards Comments Actions required Action allocated to Design intent: Material: Source: Activity: Destination: Part considered: HAZOP team: Meeting date: Drawing no.: Rev no.: Date: Study title: Page: of – Source: IEC 61882

Hazop Work Sheet

Embed Size (px)

DESCRIPTION

Hazop Standard Worksheet Format

Citation preview

  • RiskAssessment

    M. Rausand

    Introduction

    Literature

    Types ofHAZOP

    HAZOP teamand meetings

    Process HAZOP

    HAZOPprocedure

    ProcedureHAZOP

    Reporting andreview

    Conclusions

    Process HAZOP work-sheet

    No. Guide-word Element Deviation

    Possiblecauses

    Conse-quences Safeguards Comments

    Actionsrequired

    Actionallocated to

    Design intent: Material:Source:

    Activity:Destination:

    Part considered:

    HAZOP team: Meeting date:

    Drawing no.: Rev no.: Date:

    Study title: Page: of

    Source: IEC 61882