Malaysian Sewerage Industry Guidelines Volume II 219 APPENDICES

Hazop Model Requirements

Embed Size (px)

Citation preview

Page 1: Hazop Model Requirements

Malaysian Sewerage Industry Guidelines Volume II 219

APPENDICES

Page 2: Hazop Model Requirements

220 Sewerage Works Procedures (This page is intended to be blank)

Page 3: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 221

Appendices

Appendix A Guide For An EIA Reports

Appendix B Report Format and HAZOP Study and Checklists

Appendix B1 HAZOP Checklist for Sewage Treatment Plant

Appendix B2 HAZOP Checklist for Pump Station

Appendix C Basic Guide of Sewerage Layout Plan Submission in Digital Format

Appendix D Content for Operation and Maintenance Manuals

Appendix E Tabular Amounts of Performance Bond

Appendix F Standard Format for Performance Bond

Appendix G Bank Guarantee for Upgrading of Existing Public Sewerage System

Appendix H Letter of Indemnity for Upgrading Works

Appendix I Typical Project Signboard for Upgrading Works

Page 4: Hazop Model Requirements

222 Sewerage Works Procedures

Appendix A Guide for an EIA Report

WATER SERVICES INDUSTRY ACT 2006

GUIDE FOR DETERMINING THE NEED FOR AN EIA

Developments of certain criteria will require an EIA study that covers its sewerage works

proposals. The EIA must be submitted and approved by the Department of Environment

(DOE) prior to detail sewerage works planning approval. However, regardless of the type and

size of a development, all sewerage works will need to submit a complete Environmental

Criteria Evaluation form.

Development EIA As per the Environmental Quality Order (Prescribed Activities) (Environmental Impact Assessment),

1988, Schedule 7, for a development that covers an area of 50 hectares or greater, the developer must

obtain an EIA approval for the entire project. A section of the assessment must cover the sewerage

aspects of the development, which includes the network system, sewage treatment plants, and/or

sludge treatment facilities. The EIA must address land area requirements for the STP and ensure

sufficient buffer to minimize impact onto its surrounding developments. Buffer requirements as

stipulated in this guideline must be addressed.

Preliminary EIA All STPs constructed by government or its appointed agents, and STPs constructed by developers

which are given permanent status and to be handed over as regional public STPs would require a

separate preliminary EIA approval from DOE.

Environmental Criteria Evaluation The purpose of this criteria checklist is to ensure that the environmental impacts associated with the

plant are minimized when the plant becomes operational. The evaluation includes issues on siting the

plant, water quality and design with environmental considerations.

Procedure for EIA Approval for Development EIAs shall be prepared according to the DOE’s guidelines and requirements covering all aspects of

sewerage works which includes network, sewage treatment plant and/or sludge treatment facilities,

where applicable.

The Commission shall be informed of any submissions to the DOE and a copy must be attached with

other application documents. The same shall be done once the EIA approval is received from the

DOE, highlighting the approval conditions. This is necessary, as EIA approval is part of the

Commission sewerage works approval procedure.

Note: All developments which do not fit the above development criteria are exempted from EIA

requirements.

Page 5: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 223

Appendix B Report Format for HAZOP Study and Checklist

GUIDE TO CARRY OUT HAZOP STUDY AND FORMAT FOR HAZOP REPORT ≥ 20,000 PE.

The methods presented here are not intended to be prescriptive and a certain amount of flexibility will

be required to apply these techniques to different types of projects with different contract strategies.

1.0 HAZOP Study

HAZOP study is a procedural tools designed to identify the safety and operability deficiencies in the

design of a treatment facility.

Once a potential cause has been identified in the HAZOP study, the HAZOP study team will identify

the potential consequences. If the cause is feasible, and the consequences severe enough, a member

of the study team may have to investigate the potential means of eliminating or reducing the problem.

“Fact finding” actions may also be raised if sufficient information is not available at the meeting to

discuss causes and consequences.

2.0 HAZOP Study Team Members

HAZOP Study ideally should have team members of multi-disciplines involved in the design and

operation of the plants. Team members must have a detailed knowledge of the design intentions

and/or intended operation of the plant. The team must contain people with sufficient knowledge and

experience to identify and understand the consequences and importance of deviation or deficiencies

pertaining to design of the plants.

3.0 Format of HAZOP Report

Upon ultimate completion of a HAZOP, i.e. once all actions have been satisfactorily resolved, a

HAZOP report will be produced and the report should consist but not limited to the followings:

1. Executive Summary

2. HAZOP Signoff Sheet

3. Introduction and Objective

4. HAZOP Methodology and Techniques

5. HAZOP Team, Attendance and Meeting Agenda

6. The minutes of the HAZOP Study conducted comprising issues raised and action or

safeguard taken to resolve the issues, significance of issues raised, amended detailed

drawings to suit the HAZOP requirements and signing off of actions by the

responsible party

7. Summary of findings and outcome of the Study

8. Conclusion

Page 6: Hazop Model Requirements

224 Sewerage Works Procedures

Appendix B1 HAZOP Checklist for Sewage Treatment Plant

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

1.0 Overall Layout of Treatment Plant

1.1 General Layout

• Property are fenced and gated and the fence height.

• State where these problems/impacts occur and give

a description of the method employed in

controlling these impacts.

a. Odour Control

b. Noise Level

c. Visual (Landscape)

• Are all tanks and chambers above the safe flood

level and the highest flood level of the nearby

rivers/drain and design to what flood return period.

• Are there any buried pipelines or cables under

buildings within the treatment facility and is it

clearly indicated on the layout drawings.

• The layout of temporary diversion and location of

temporary treatment facilities.

• Where is the location of the screening bins and

what is the basis of sizing the bins area.

• Are lifting devices provided and state what type

and their location and capacity.

1.2 Access Road

• Is the facility located near to a public road to allow

immediate access to the plant/facility? If not, state

where is its access route.

• Are the ingress and egress routes to and from the

plant suitable for desludging tankers?

• Are the entrance and exit gate nearby the public

road

• Road access should be provided adjacent to the

equipment or crane extended to the nearest road.

• If fixed crane beam extends over the road,the

minimum vertical clearance shall be 5.5m.

• Adequate signage provided

• Head clearance for tanker trucks entering the gate

provided and what is the clearance height.\

Page 7: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 225

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

• Sufficient turning radius on the roads to enable

access and maneuverability for tankers and heavy

vehicles.

• Location of sludge desludging area is suitable for

tankers to access and empty the sludge into the

chamber.

1.3 Handrails/Guardrails and Access Ladders

• Have safety handrails or grating been installed at

walkways and around open holes at the plant?

• Toe plates and kick plates shall be fitted along the

outer edges of all walkways or ladders and shall

be part of the structure and not the floor panels.

Toe plates shall extends 100mm above the top

level of the floor panels. Floor panels shall be

sized so that each panel does not weight more

than 50 kg.

• Handrailing provided at all places where there is

potential of falling around al tanks and other

places where falling height is greater than 1.5m.

• Is staircases provided where height is greater than

300 mm. Fixed ladder to access working areas for

purposes of servicing, maintenance or normal

operation works.

1.4 Precaution Against Damp

• All wall mounted equipment is fitted with spacers

to provide minimum gap of 5 mm.

• All holes in equipment is sealed against the

ingress of water

• Any items exposed to weather or water shall be

free of water traps and drain holes shall be

provided where necessary.

• Electrical equipment which is not sealed against

free movement of air shall be protected from

condensation with anti-condensation heaters and

thermostatically controlled.

1.5 Substation / Electricity Meter/ Lamp Post

• Location of electricity meter or the substation

• Is adequate street lighting provided around the

plant and what is the number of lamp post

provided

Page 8: Hazop Model Requirements

226 Sewerage Works Procedures

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

• Are all buildings and major process units at the

treatment facility lighted adequately

1.6 Buffer Zone

• The following buffer zone requirements satisfied?

30 m minimum from fence to nearest

habitable building property line within

residential and commercial development

20 m minimum from the fence of treatment

plant to the nearest property line within

industrial development

10 m minimum from the fence of the

treatment plant to the nearest habitable

building property line if the proposed

treatment plant is fully enclosed.

1.7 Effluent Discharge Point

• Where is the location of effluent discharge point

for the facility and is it clearly indicated on the

layout drawings with relation to existing receiving

water bodies.

1.8 Water Supply

• If tankers and desludging activities take place, is

there provision for stand pipes for cleaning

purposes.

• Where is the location of the stand pipe and

location for toilets for operators to change and

clean themselves after work.

2.0 Screen Chamber (Fine And Coarse Screens)

2.1 Bar Screens

• Dewatering or perforated plate or trough,

provided for ease of maintenance of the screens

2.2 Mechanically Raked Screens

• Automatic conveyor to transfer screenings to

skips.

• Screen motor located above the high water level

and access provided for maintenance.

• Provision of explosion proof floodlights.

• Provision of emergency stop button at a

convenient and visible location

Page 9: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 227

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

• A working platform for ease of operations and

maintenance.

• Provision of hand rail or guard (Refer to item 1.3)

• Location of screening bins must be near the

screen area.

• Bins provided should have adequate capacity and

must be equipped with leachate collection tray

and covers to prevent odour release. Bins should

be provided with rollers.

2.3 General

• Provision of staircase access with sufficient width

(Refer to item 1.3)

• All screen chamber sumps to be fully open at the

top for good ventilation

• Inlet penstock provided to isolate the inlet works

for maintenance purposes.

• All drive units shall be weatherproof

3.0 Pump Sump

• Emergency overflow pipe to by-pass the influent

sewage during power failure (away from

residents) and location of overflow pipe

discharge.

• Provision of crane for maintenance purposes

• Sufficient access to the pump station either from

the top surface or via entry from the screen

chamber

• Is dry well provided with force ventilation and air

outlet shall be located adjacent to pump motors to

assist cooling

• Lighting systems shall be interconnected with

ventilation

• Provision of handrails and MS grating (Refer to

item 1.3)

• If the valve chamber is located in the sump, the

opening of the valve chamber shall be enclosed

with MS grating

• Provision of working space or platform for ease

of operation in both wet well and valve chamber

Page 10: Hazop Model Requirements

228 Sewerage Works Procedures

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

• Dry well adequately lit and it should be weather

proof, vapour proof and explosion proof.

• Miscellaneous Issue

4.0 Grit Chamber

• Provision of working platform along the grit

channel.

• Provision of handrails or guardrail at exposed

sumps or elevated working areas (Refer to item

1.3).

• Provision of grit storage bin or skip with rollers,

perforated tray and covers

• Easy access to the grit removal facility by dump

trucks and sufficient maneuver space (Refer item

1.2).

• To provide a chute to remove the grit into the

skips.

• To provide sufficiently big grit chamber for ease

of maintenance.

• To provide a drain pipe to drain water into the

pump sump to avoid ponding.

• Provide steps into the chamber (pump).

• Misc Issues

5.0 Grease Chamber

• Provision of working platform along the grease

chamber

• Provision of hopper to collect scum and grease

• Provision of handrails or guardrail at exposed

sumps or elevated working areas. (Refer to item

1.3)

• Provision of grease storage tank with rollers and

with drain pipes and valves at the bottom of the

tank for removal of settled solids

• Easy access to the grease removal facility by

dump trucks and sufficient maneuver space.

(Refer to item 1.2)

• Staircases must not be beneath the walkway

(staircase need to be away from walkway)

• Miscellaneous Issue

Page 11: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 229

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

6.0 Blower Room/Control Panel Or Room

• Provision of acoustic enclosures for blowers

including acoustic door

• Provision of exhaust fan with silencer to circulate

air around the blower room.

• Toilet facilities to be isolated from the blower

room due to heat and noise hazards.

• Provision of lifting davit for maintenance of the

blowers.

• Provision of rotating strobe light at the control

room to indicate malfunction of blower or other

equipment.

• Provision of adequate space for blower removal

or installation during maintenance.

• Water storage tank to be located in such a way

that water will not splash on the control panels.

• Control panels in the Blower/Control Panel room

is to be isolated from the blower room

• Allow at least 900 mm access space even when

cabinet doors and the like are open.

• Miscellaneous Issue

7.0 Balancing Tanks

• Sufficient walking or working space along the

tanks

• Provision of handrails or guards if the tanks are

elevated. (Refer to item 1.1 on handrail and guard

rail)

• Miscellaneous Issue

8.0 Primary / Secondary Clarifier

9.0 Biological Treatment System

Page 12: Hazop Model Requirements

230 Sewerage Works Procedures

CHECKLIST

ITEMS TO BE IDENTIFIED IN THE DRAWINGS YES NO COMMENTS

10.0 Sludge Thickener

• Provision of adequate walking or working space

• Provision of potable/clean water for regular

cleaning of the overflow weir

• Provision of force main type of pipe from the

thickener to the sludge holding tank

• Desludging pipe provided to be situated above

ground

• All sludge holding tanks to be on sloped flooring

11.0 Sludge Holding Tank

• Adequate access for desludging tanker. (Refer to

item 1.2 on access road)

• Provision of desludging pipe (if the sludge

holding tank is elevated) appropriately positioned.

• Sufficient walking or working space along the

sludge holding tank. (Refer to item 1.3).

• Provision of handrails or guards if the sludge

holding tank is elevated. (Refer to item 1.1 on

handrail and guard rail)

• Provision of desludging pipe either by force main

or gravity flow

• All sludge holding tanks to have isolating

facilities.

• Each sludge holding tank to have separate feeding

pipes with individual isolating valves.

• The top level of holding tanks to be

approximately 6 inches above ground should the

tank be below ground level.

• Overflow pipe from sludge holding tank to the

aeration tank to be of sufficient diameter to

prevent possibility of the pipe choking.

• Miscellaneous Issues

Page 13: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 231

Appendix B2 HAZOP Checklist for Pump Station

WATER SERVICES INDUSTRY ACT 2006

HAZOP CHECKLIST FOR PUMP STATION

Checklist

Items to be identified in the drawings Yes No

Comments

1. Has safe and suitable access to the wells

been provided?

2. Has a penstock been installed upstream of

the wet well to isolate the pump station

should there be a flood in relation to the

bypass and emergency overflow?

3. Has a double penstock system been

provided for safety reasons?

4. Has ventilation for all hazardous zones of

the pump stations been provided? If not

state how this area will be ventilated?

5. Is a separate ventilation system provided

for the wet wells and dry wells? If not state

how both wells have been ventilated.

6. Are the wet wells and dry wells adequately

lighted?

7. Are guard rails and safety chains around

all pits, wells, and floor openings provided

for safety reasons? State safety provisions

in this area.

8. Are all electrical installations in the pump

stations vapour proof and explosion proof.

9. Are there adequate level controls for start-

stop level of pumps in the pump station?

10. Have corrosion resistant materials been

used for the guardrails, lifting devices and

other well fittings?

Page 14: Hazop Model Requirements

232 Sewerage Works Procedures

Appendix C Basic Guide of Sewerage Layout Plan Submission in Digital Format

1. INTRODUCTION

· Basic guidelines on preparing developments layout plans in digital format using AutoCAD

software or others compatible CAD software where can converted to DXF format.

2. OBJECTIVE

· The objective is to establish feature codes on digital layout plan with proper format in

layering name, element, color and object type by using CAD software. This digital layout

plan will then be use for the Catchment Planning Strategies and Geographical Information

System (GIS) and day to day Operation & Maintenance and billing purposes etc.

3. BASIC REQUIREMENT OF SOFTWARE OR FILES

3.1 Software to prepare digital layout plan.

· AutoCAD (Release 14 or latest version or others CAD software with DXF format

facility)

3.1 Backup or storage media to deliver)

· Diskette 1.44 MB (size 3.5") or Iomega Zip disk 100 MB or Compact Disk (CD)

3.3 Scale unit for layout plan Metric

4. DETAILS OF DIGITAL LAYOUT PLAN

· Lots boundary for layout plans shall be based on Certified Plan (CP) and also shall be comply

to the survey ordinance (can be obtained from Survey Department).

· Benchmark shall be accordance with the Cadastral Map sheet in Cassini coordinate system (in

metre).

· Boundary measurement shall be in metre (Refer Drawing).

Page 15: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 233

Technical requirements of layout plan depend on the type on development (Application

for one proposed element).

5.1 NO LAYERS NAME ELEMENT COLORS TYPE OF OBJECT

1 0 - - -

2 Base map Boundary lines Black Polyline

3 Benchmark Boundary lines Red Polyline

4 Layout Proposed lot lines Black Polyline

5 Road Road reserve Yellow Polyline

6 Water River/water course Blue Polyline

7 Text Text Flexible Text

8 Frame Directional Black Text and others

9 Building line Building line Flexible Polyline

10 Sewer line Sewer line Blue Polyline

11 Manhole Manhole Black Circle

Page 16: Hazop Model Requirements

234 Sewerage Works Procedures

(Application for more than one proposed element.)

5.2 NO LAYERS NAME ELEMENT COLORS TYPE OF OBJECT

1 0 - - -

2 Base map Boundary lines Black Polyline

3 Boundary Boundary lines Rred Polyline

4 Layout Proposed lot lines Flexible Polyline

Residential

Commercial

Industrial

Institutional

Open space

Agricultural

Forest

Topography

Reserve area

5 Road Road reserve Yellow Polyline

6 Water course River/stream/pond Blue Polyline

7 Text Any text use Flexible Text

8 Forest Directional (inclusive of

lines and text)

Black Text

9 Sewer line Sewer line Blue Polyline

10 Manhole Manhole Black Circle

Page 17: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 235

6.1 SUBMISSION

• Two (2) copies in Diskette or Zip disk or CD shall be forwarded during the submission of

design approval stage or after completion of the development(as-built drawing).

68 o 33" 00" 70 o 25" 00"

247 o 04" 00"

90.70m

2470 04” 00”

87.50m

61.3

0m

1570

25”

00”

South (-y)

North (y)

East, (+ve, +ve) West,Nort (-ve, +ve)

West, South (-ve, -ve) East, (+ve, -ve)

West (-x) East (x)

Drawing

Bench mark Boundary line

S = 24268.0

E = 58508.7

x= 58508.7

y = 24268.0

East and South Coordinate system converted to x,

y

(Unit are in meter)

110 5”

30”

75

.68

m

45.94m

40.38m

Page 18: Hazop Model Requirements

236 Sewerage Works Procedures

Appendix D Content for Operation and Maintenance Manuals

Table of content for Operations & Manuals

Process, Operation, Maintenance, Installation and Trouble-Shooting

This sample outline is intended as a guide to be used when developing an O&M manual. Use of this

sample outline will facilitate the development, review and approval of the O&M manual. However,

all aspects of the sample outline may not be relevant for all facilities.

Volume I : Operation Item Description

1 Introduction

1.1 Description and Type of Development

1.2 Description and Status of Existing Treatment Facilities (Upgraded Plants)

1.2 Selection of Site

1.3 Choice of Treatment System

1.4 Effluent Quality

2 Process Description

2.1 General Process Flow

2.2 System Description 2.2.1 Physical Treatment Process 2.2.2 Chemical Treatment Process 2.2.3 Biological Treatment Process

3 Design Calculation

3.1 Basis of Design Information

3.2 Details of Design Calculations

4 Treatment Plant Operation

4.1 Initial Start-up Procedure

4.2 Testing & Commissioning

4.3 Procedure for Operating Plant Constructed in Stages or Phases

4.4 Plant Shut-down Procedure

5 Schedule of Equipment

5.1 Main Mechanical & Electrical Equipment

5.2 Pipes, Valves & Fittings, Instrumentation

6 Unit Process Trouble-shooting & Investigation

6.1 Anticipated Problems & Investigation Works

6.2 Causes of Process Disruption & Non-Compliance of Effluent Quality

6.3 Recommended Corrective Actions

6.4 Description of the appropriate response or adjustment to minimize impact of emergency situations with the potential to affect

the discharge or compliance with the permit

6.5 Periodic Maintenance Procedures for each unit process

6.6 Details on how inspections will be conducted and a schedule for the inspection of collection systems and pump stations, where

applicable

6.7 Inspection checklist

6.8 Record Keeping: 6.8.1 Date of entry, inspection observations, maintenance performed 6.8.2 Process efficiency monitoring results 6.8.3 Operating cost records and recommendations

7 Monitoring Process Efficiency

7.1 Monitoring programme

7.2 Sample equipment used to perform tests, sample locations, collection and handling

7.3 Effluent sampling-lab protocol for in-house testing or reference to off-site laboratory. Sampling and analysis manual

8 Safety & Health

8.1 Security Measures

8.2 Noise Control

8.3 Odour Control

Page 19: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 237

Volume I I: Maintenance Item Description

Catalogues, Technical specification, Performance data, Equipment installation, Equipment trouble-shooting, Periodic

maintenance procedures, Start-up/shutdown for mechanical & electrical equipment, Spare parts inventory, Certificates of warranty, JPP equipment approval letter, etc.

1 Pump 2 Motor

3 Gearbox 4 Penstock 5 Static Screen 6 Mechanical Screen 7 Screw Conveyor/Compactor 8 Screenings Bin 9 Grit Removal System

10 Grease Removal System 11 Scraper Mechanism Primary Sedimentation 12 Aerators 13 Diffusers 14 Mixers 15 Blowers 16 Main Control Panel 17 Scraper Mechanism Secondary Clarifier 18 Thickeners 19 Dewatering Equipment 20 Disinfection Equipment/Apparatus 21 Measuring Instruments/Devices/Sensors 22 Pipes/Valves/Fittings 23 Lifting Devices 23 Electrical Equipment 25 Diesel Generator 26 Fire-Fighting Equipment 27 Sound-Proof Installations 28 Dryer 29 Odour Control Equipment 30 Progamme Logic Controller 31 Manhole Cover/Grating

Volume III : As-Built Drawings

Item Description Process, Hydraulic, PID, Layout, Structure, Mechanical, Electrical, Architecture, Schedule, Standard Drawings, etc.

1 Hydraulic profile & Schematic Flow Diagram

2 Schematic Flow Diagram

3 Process & Instrument Diagram (PID)

4 Site Layout

5 Plant Layout

6 Inlet Works (Primary Screen, Wet Well & Dry Well)

7 Secondary Screen & Grit/Grease Chamber

8 Equalisation Tank & Distribution Chamber

9 Aeration Tank

10 Blower House & Control Room

11 Secondary Clarifier

12 Sludge Holding Tank

13 Sludge Digester

14 Sludge Thickener

15 Sludge Dewatering

16 Sludge Drying Bed & Cake Storage Shed

17 Chlorination Plant & Disinfection Tank

18 Effluent Discharge Chamber

19 Perimeter Fencing & Lighting

20 Schematic Line Diagram for Power Supply

21 Instrument Layout of Control Panel

22 Electrical Line Diagram of all Equipment

23 Schedule of Pumps

24 Schedule of Other Mechanical Equipment

25 Schedule of Pipes, Valves & Fittings

26 Architectural Drawing of Buildings

Page 20: Hazop Model Requirements

238 Sewerage Works Procedures

Item Description

27 Ladder Diagram for Programmable Logic Controller (PLC)

28 Architectural Drawings

29 Locations of Fire-Fighting Equipment

30 Mass Balance Diagram

Notes i. A draft to be submitted for approval 60 days before date of operation of the facility and if manuals found to be inadequate, the

owner is required to make appropriate modifications.

ii. A review of the approved manuals one year after initiation of plant operation and subsequent to the review, the manuals shall be revised to reflect actual treatment plant experience.

Page 21: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 239

Appendix E: Tabular Amounts of Performance Bonds

Population Equivalent

PE

Sewer Reticulation RM

Treatment Plant RM

Pumping Station RM

150 6,200 15,000 7,200

200 7,600 16,200 7,300

250 9,100 17,400 7,500

300 10,600 18,600 7,700

350 12,000 19,800 7,900

400 13,500 21,000 8,100

450 15,000 22,200 8,400

500 16,400 23,700 8,700

550 17,900 25,200 9,000

600 19,400 26,700 9,300

650 19,700 28,200 9,600

700 21,100 29,700 10,000

750 22,500 31,400 10,400

800 22,600 33,100 10,800

850 23,900 34,900 11,200

900 25,200 36,700 11,600

950 25,400 38,600 12,100

1,000 25,600 40,500 12,600

1,100 25,700 42,500 13,100

1,200 26,800 44,500 13,600

1,300 27,900 46,800 14,100

1,400 29,100 49,100 14,700

1,500 30,200 51,600 15,300

1,600 31,400 54,100 15,900

1,700 32,600 56,900 16,500

1,800 33,700 59,700 17,100

1,900 34,900 62,700 17,700

2,000 36,000 65,700 18,300

2,500 37,200 70,700 19,100

3,000 38,300 75,700 20,300

3,500 44,900 80,700 21,500

4,000 55,400 85,700 22,700

4,500 58,900 90,700 24,200

5,000 64,400 96,700 25,700

5,500 70,200 102,700 27,200

6,000 72,000 108,700 28,700

6,500 73,900 114,700 30,200

7,000 75,700 120,700 32,000

7,500 77,500 126,700 33,800

8,000 86,200 132,700 35,600

8,500 90,500 138,700 37,400

9,000 94,900 144,700 39,200

9,500 97,000 150,700 41,000

10,000 101,600 156,700 42,800

11,000 108,800 164,700 45,000

12,000 113,600 172,700 47,200

Page 22: Hazop Model Requirements

240 Sewerage Works Procedures

Population Equivalent

PE

Sewer Reticulation RM

Treatment Plant RM

Pumping Station RM

13,000 118,600 180,700 49,400

14,000 126,300 188,700 51,600

15,000 131,500 196,700 53,800

16,000 136,800 205,700 56,300

17,000 139,400 214,700 58,800

18,000 144,900 223,700 61,300

19,000 150,400 232,700 63,800

20,000 159,100 241,700 66,300

21,000 161,900 251,700 68,600

22,000 164,700 261,700 70,900

23,000 167,500 271,700 73,200

24,000 170,200 281,700 75,500

25,000 173,000 291,700 77,800

26,000 175,800 302,700 79,800

27,000 178,600 313,700 81,800

28,000 181,400 324,700 83,800

29,000 184,200 335,700 85,800

30,000 186,900 346,700 87,800

31,000 189,700 358,700 89,000

32,000 192,500 370,700 90,200

33,000 195,300 382,700 91,400

34,000 198,100 394,700 92,200

35,000 200,900 406,700 93,000

36,000 203,600 419,700 93,800

37,000 206,400 432,700 94,400

38,000 213,100 445,700 95,000

39,000 216,000 458,700 95,600

40,000 222,900 471,700 96,200

41,000 229,900 486,700 96,800

42,000 237,000 501,700 97,400

43,000 244,200 516,700 98,000

44,000 247,200 531,700 98,600

45,000 250,200 546,700 99,200

46,000 257,700 561,700 99,800

47,000 260,800 576,700 100,300

48,000 268,300 591,700 100,800

49,000 271,500 606,700 101,300

50,000 297,500 621,700 101,800

>50,000 6/PE 12/PE 2/PE

Notes: 1. For development below 150 PE, a minimum Bond value as per 150 PE or as fixed by the

Commission shall be imposed for the duration of the Defect Liability Period.

2. Actual PE shall be rounded up to next higher PE as shown in table.

3. For works involving > 50,000 PE, the following values are to be adopted:

sewer reticulation - RM 6/PE, treatment plant - RM12/PE and pumping station - RM2/PE.

Page 23: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 241

Appendix F Standard Format for Performance Bond

THIS AGREEMENT is made on the ______ day of _________________ BETWEEN

________________________________ (hereinafter called the “Guarantor”) of the one Part and Indah

Water Konsortium Sdn. Bhd. (hereinafter called the “Indah Water”) of the other Part.

WHEREAS

A. Indah Water is authorised pursuant to the Water Services Industry Act 2006 to operate and

maintain public sewerage systems and sewer networks.

B. __________________________(the “Developer”) has constructed a sewerage plant, associated

sewerage works and sewer network (altogether known as “sewerage system”) at

___________________________________ (full details of address preferred). Pursuant to the

Water Services Industry Act 2006, the Developer must hand over the sewerage system to Indah

Water to operate and maintain the same whereupon Indah Water shall only accept the sewerage

system or part of the systems, after Indah Water is satisfied that the sewerage system or part of

the systems, as the case may be, meets the requirements set out in the approved plans,

specifications and standards.

C. Subject to para B above and rights of the parties pursuant to Water Services Industry Act 2006,

in consideration of Indah Water maintaining and operating the sewerage system, the Developer

agrees to guarantee the due performance of the sewerage system for a period of twelve (12)

months.

D. At the request of the Developer, The Guarantor agrees to irrevocably and unconditionally

guarantee the due performance of the sewerage system in the manner herein after appearing.

NOW THE GUARANTOR HEREBY AGREES WITH INDAH WATER AS FOLLOWS:

1. Upon the Indah Water’s written demand, the Guarantor shall forthwith pay to the Indah Water

up to and not exceeding the sum of Ringgit Malaysia:______________________ (hereinafter

referred to as “the said Sum”) or such part thereof as specified in such demand notwithstanding

any contestation or protest by the Developer or Guarantor or by any other third party and

without proof or condition. The total amount recoverable against the Guarantor under this

Agreement shall not exceed the said Sum. Such payment or payments shall be made by the

Guarantor within five (5) working days of the issuance of the Indah Water’s written demand.

2. Indah Water reserves the right to make any partial demands if it shall so desire and the total of

all such partial demands so made shall not exceed the said Sum and the liability of the

Guarantor to pay Indah Water the aforesaid shall correspondingly be reduced proportionate to

any payment of partial demands having been made by the Guarantor.

3. The Guarantor shall not be discharged or released from this Guarantee by any arrangement with

the Developer or any arrangement made between the Developer and Indah Water and/or any

third party in whatever manner with or without the consent of the Guarantor or by any

forbearance whether as to payment, time, performance or otherwise.

4. Whenever Indah Water makes a demand on the Guarantor, the Guarantor shall (subject to the

proviso in paragraph 1) forthwith make to Indah Water such payment of the amount so

demanded and any dispute between Indah Water, and the Developer and/or any third party as to

Page 24: Hazop Model Requirements

242 Sewerage Works Procedures

the right of Indah Water to make such a demand shall not in any way relieve the Guarantor from

the obligation to pay upon such demand by Indah Water.

5. This Guarantee given by the Guarantor is a continuing guarantee and shall be irrevocable and

shall remain in force and effect from ____________ to ____________for a period of thirteen

(13) months (hereinafter referred to as ‘ the said Period’).

6. The liability of the Guarantor to make any payment hereunder shall arise upon receipt of a

demand from Indah Water to make such payment. Any demand from Indah Water shall be

submitted in writing not later than ninety (90) days after the Expiry of the said Period.

7. This Guarantee shall not be assigned without the Bank/Guarantor’s prior written consent.

8. Any failure by Indah Water to demand for payment under this Guarantee (in accordance with

the terms herein) within the period as specified in Clause 6 above shall discharge the Guarantor

of all obligations and liabilities under this Guarantee without the need for any notice by the

Guarantor to Indah Water.

9. This Guarantee shall be construed in accordance with the laws of Malaysia, and the Malaysian

Courts shall have jurisdiction to try any matter relating to this Guarantee.

IN WITNESS WHEREOF the parties hereto have hereunto set their hands the day and year first

above written.

Signed for and on behalf of the said )

Guarantor in the presence of )

)

)

………………………………………

(Witness)

Name: ……………….………….. Name: ………………………………………..

Designation: ……………………. Designation: …………………………………

Banker’s Stamp:

Page 25: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 243

Appendix G Bank Guarantee for Upgrading of Existing Public Sewerage System

THIS AGREEMENT is made on the ______ day of _________________ BETWEEN

_________________________ (hereinafter referred to as the “Guarantor”) of the one Part AND Indah

Water Konsortium Sdn.Bhd. (hereinafter referred to as the “Indah Water “) of the other part.

Whereas

A _________________________ (hereinafter referred to as the “Developer/Contractor”) to

carry out upgrading and refurbishment works (“Works’) at the existing sewage treatment

plant located at _________________________________ (“the STP”).

B. In consideration of the aforementioned and at the request of the Contractor, the Guarantor has

agreed to guarantee the due performance of the said Works to its full completion by the

Developer in the manner hereinafter appearing.

NOW THE GUARANTOR HEREBY AGREES WITH THE INDAH WATER AS FOLLOWS:

1. Upon the Indah Water’s written demand, the Guarantor shall forthwith pay to the Indah Water

up to and not exceeding the sum of Ringgit Malaysia:______________________ (hereinafter

referred to as “the said Sum”) or such part thereof as specified in such demand

notwithstanding any contestation or protest by the Developer or Guarantor or by any other

third party and without proof or condition. The total amount recoverable against the

Guarantor under this Agreement shall not exceed the said Sum. Such payment or payments

shall be made by the Guarantor within five (5) working days of the issuance of the Indah

Water’s written demand.

2. The Indah Water reserves the right to make any partial demands if it so desires and the total

of all such partial demands so made shall not exceed the said Sum and the obligation of the

Guarantor to pay the Indah Water shall correspondingly be reduced with each payment of the

partial demands.

3. The Guarantor shall not be discharged or released from this Guarantee by any arrangement

with the Developer or between the Developer and the Commission or any third party in

whatever manner with or without the consent of the Guarantor or by any alteration in the

obligations undertaken by the Developer or by any forbearance whether as to payment, time,

performance or otherwise.

4. The right of the Commission to make demands on the Guarantor under this Agreement shall

be an independent right and shall be without prejudice to any other rights of the Commission

against the Developer under the law.

5. This Guarantee given by the Guarantor is a continuing guarantee and shall be irrevocable and

remain in force and effect from ____________ to ____________for the entire period of

upgrading works (hereinafter known as the Validity Period). Immediately upon the expiry of

the Validity Period, this Guarantee shall, subject to clause 6, cease to be of any force and/or

effect and the obligations or liabilities of the Guarantor hereunder terminated or if the

Contract is deemed abandoned or terminated after the said abandonment or termination of the

said Contract (hereinafter referred to as the ‘Validity Period’), irrespective of whether the

Page 26: Hazop Model Requirements

244 Sewerage Works Procedures

original of this Guarantee is returned to the Guarantor for cancellation. The Guarantor shall

extend the Validity Period for not more than One (1) year from the Validity Period

(hereinafter referred to as “Extended Validity Period) upon the request of the Commission

and the Bank Guarantee shall be deemed extended.

6. On completion of the upgrading works, the Contractor shall request for Final Inspection

before the upgraded plant can officially be handed over to the Commission. Any demand

from the Commission hereunder shall be submitted in writing to the Guarantor before the

handing over date.

7. This Guarantee shall be governed by and construed in accordance with the laws of Malaysia

and the Guarantor hereby agrees to submit to the exclusive jurisdiction of the Courts of

Malaysia over any claim arising out of this Guarantee.

IN WITNESS WHEREOF the parties hereto have hereunto set their hands the day and year first

above written.

Signed for and on behalf of the said )

Guarantor in the presence of )

)

)

………………………………………

(Witness)

Name: ……………….………….. Name: ………………………………………..

Designation: ……………………. Designation: …………………………………

Banker’s Stamp:

Page 27: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 245

Appendix H Letter of Indemnity for Upgrading Works (To be submitted together with WSIA/PDC/6)

Date: __________________

TO : _______________________________________________ (“Commission”)

PROJECT TITLE : _______________________________________________ (“Project”)

_______________________________________________

DEVELOPER : _______________________________________________ (“Developer”)

CONSULTANT : _______________________________________________ (“Consultant”)

PERMIT HOLDER: _______________________________________________ (“Contractor”)

The Developer has applied to National Water Services Commission (herewith referred to as

Commission) to carry out upgrading and refurbishment works (“Works’) at the existing sewage

treatment plant located at _________________________________( “the STP”) which is being

operated and maintained by Service Licensee upon the direction of the Commission. The Developer

has appointed the Contractor to carry out the Works at the STP.

In consideration of the Commission approving the Developer’s application for the Works and Service

Licensee handing over the possession of the STP to the Developer to enable the Works to be carried

out, the following terms shall apply;

1) The Developer hereby IRREVOCABLY AND UNCONDITIONALLY UNDERTAKES that

the Developer shall at all times from the date hereof fully indemnify and hold the

Commission and/or Service Licensee, harmless to the extent and in respect of all actions,

suits, proceedings, demands, claims, liabilities, damages, losses, judgments and all costs

arising out of or resulting from the Works including legal costs on a solicitors and client basis

which may be suffered by, accrued against, be charged to or recoverable from the

Commission and/or Service Licensee, arising out of the Works.

2) The Developer shall accept full responsibility for any breaches by the Developer, its

employees, agents, Contractors, Sub-Contractor, Consultants, and any other persons in the

upkeep, security, safety and health, operation and maintenance of the STP in all its entirety

and associated appurtenances, for the purpose of such Works until specifically released by the

Commission and/or Service Licensee in writing.

3) Upon a written demand from the Commission and/or Services Licensee, the Developer shall

pay the Commission and/or Service Licensee the amount specified in the said demand

notwithstanding any objections or protest by the Developer or any certificate of completion of

Works. Such payment shall be made by the Developer within seven (7) working days of the

issuance of the said written demand and paid in the manner stipulated by the Commission

and/or Service Licensee.

4) The Developer shall comply with the provisions of any laws, regulations, by laws in force and

further any conditions and directions imposed from time to time by the Commission in

relation to the execution of the Works.

Page 28: Hazop Model Requirements

246 Sewerage Works Procedures

5) This Indemnity shall be governed by and construed in accordance with the laws of Malaysia

and the Developer hereby agrees to submit to the exclusive jurisdiction of the Courts of

Malaysia over any claim arising out of this Indemnity.

6) This Indemnity shall continue to be valid and binding on Developer the notwithstanding any

change whether by way of amalgamation, reconstruction or otherwise in the constitution of

the Developer and all successors entitled and assigned thereto.

The Developer understands and is aware of the full import of taking up such indemnities and

is prepared to face and discharge its duties and responsibilities accordingly.

__________________________ __________________________

(Signature & Stamp) (Signature & Stamp)

Developer: Licensed Contractor:

Name: Name:

I/C No. : I/C No.:

Developer License No. : Commission License No.:

___________________________________________________________________________ For Official Use

Date received:

Reference No.:

c.c. Certifying Agency, Indah Water Konsortium

Operations & Maintenance Department, Indah Water Konsortium

Page 29: Hazop Model Requirements

Appendices

Malaysian Sewerage Industry Guidelines Volume II 247

Appendix I Typical Project Signboard for Upgrading Works

Page 30: Hazop Model Requirements

248 Sewerage Works Procedures