This document describes the requirements for HSE hazards studies
Citation preview
PURPOSE
Practice 004 402 PR021b
Date Feb 2009
Attachment 2 -- Page 1 of 2HAZARD STUDIES
Content of Hazard Study 1 -- Report
Project No. and Title Hazard Study Leader, Team and Date
Project and Process
Project Definition
Process Description
Incident Review
Materials Hazard Data
Raw Materials
Intermediates
Products And by-products
MSDS
Effluent
Support Materials
Services
Principal Materials Of Construction
Materials Encountered During Construction/Demolition
Chemical Hazard And Chemical Interaction Performa
Inherent HSE, Occupational Hygiene And Environmental Protection
Inventory And Loss Containment
Estimated Quantities For Off-Site Effects
Environmental Aspects
Environmental Statement
Conformance With BHPBIOs Environmental Standards
Waste Minimization
Energy And Resource Conservation
Waste Recycling
Responsibility For Further Environmental Assessments
Health and Toxicology
Occupational Health Statement
Adequacy of Occupational Health Data
Requirement of Design for Hygiene Assessment
Special clothing/changing facilities
Ergonomic Studies
Responsibilities for further Occupational Health Studies
Transport and Siting
Transport Stages
Effect of Loss of Containment on occupied Buildings
Potential Effect from existing projects
Additional Considerations (Future Site Developments, consideration of normally rare events, construction activity)
Consultation with External Authorities
Authorities to be contacted
Responsibility for contact
Change of Site Status
Consent levels and HSE Criteria
HSE criteria
Environmental criteria
Health criteria
Noise criteria
Design Guidelines and Codes
Technical Standards Responsibility
Relevant Guides, Codes and Standards
Organizational Human Factors and Emergency Requirements
Suitability and Availability of staff
New systems of Work and procedures
Control and Manning
Site Emergency Facilities
Control and Protection
Broad control and protection objectives
Proposed control and protection structure
Further Studies
Fire Reviews
Relief and Blowdown Studies
Area Classification Reviews
Hazard Study of Non Process Hazards
Control and Operability Reviews
Pipework Registration reviews
Critical Machines Reviews
Study of Construction Activities
Reviews Required by Regulations
Project Critical Instrumentation Protective Systems (Trips and Alarms)
Major Lifting Equipment
Specialist studies of proposed control and protection systems as may be warranted.
Health, Safety & Environmental