CEIL/9530/HIRA/GAIL GAS SONIPAT/AKS/20 Page - 1 - of 55
Hazard Identification & Risk Analysis Report
Of GAIL Gas Limited, Sonepat (Haryana)
By
Certification Engineers International Limited
HIRA Study dates: 07.10.2015-08.10.2015
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 2 - of 55
TABLE OF CONTENTS
Sl. No. Topic Page
No. 1 Abbreviation 03 2 Executive Summary 05 3 About CEIL 07 4 Scope 07 5 HIRA Concept &Methodology 07 6 Facility Description 14 7 Documents referred 14 8 Closing Meeting 14 9 Conclusion 15
10 Confidentiality 15 11 Management Plan for intolerable risk 16 12 Activity List of Sonipat 19 13 Annexures :
Annexure 1: HIRA Work Sheets Annexure 2: Attendance Sheet Opening & Closing Meeting Annexure 3: List of Industrial and Commercial Customers Annexure 5: Steel and MDPE Pipe Line Network Of Gail Gas, Sonipat
20
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 3 - of 55
1. ABBREVIATIONS :
ALARP: As Low As Reasonably Practicable ESD: Emergency Shut Down CIPL: Close Interval potential Logging CGD: City Gas Distribution CGS: City Gate Station CP: Cathodic Protection CNG: Compressed Natural Gas DCP: Dry Chemical Powder DCS: Distributed control systems DCVG: Direct Current Voltage Gradient DDMA: District Disaster Management Authority DGFASLI: Directorate General, Factory Advice Service and Labor Institutes DRS: District Regulating Station EMS: Energy Management System ECU: Emergency Control Unit ERDMP: Emergency response to disaster management planning ESA: External Safety Audit FRS: Field Regulating Station GPS: Global Positioning System HAZCHEM: Hazardous Chemicals HAZOP: Hazardous Analysis and Operability/ Hazardous Operations HDD: Horizontal Direct Drilling HIRA: Hazards Identification and Risk Analysis IR: Infra Red IV: Isolation Valve LPG: Liquefied Petroleum Gas MDPE Medium Density Poly Ethylene MoE&F: Ministry of Environment and Forests MoP&NG: Ministry of Petroleum and Natural Gas MoST&H: Ministry of Surface Transport and Highways MRS: Metering Regulating Station MSDS: Material safety data sheet MSIHC: Manufacture, Storage and Import of Hazardous Chemical MV Act: Motor Vehicle Act NDMA: National Disaster Management Authority NFPA: National Fire Protection Association NG: Natural Gas OISD: Oil Industry Safety Directorate OMC: Oil Manufacturing Companies PCV: Pressure Control Valve PESO: Petroleum and Explosive Safety Organization PNGRB: Petroleum and Natural Gas Regulatory Board P/L : Pipeline PNG: Piped Natural Gas
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 4 - of 55
POL: Petroleum, Oil and Liquid PRI: Pressure Regulating Installation PSP: Pipe to Soil Potential PSV: Pressure safety Valve QRA: Quantitative Risk Assessment SIL: Safety Integrity Level SCCDA Stress Corrosion Cracking Direct Assessment SDRF: State Disaster Response Force SV: Sectionalizing Valve/ Strategic Valve TLP: Test Lead Point TPIA: Third Party Inspection Agency TR: Transformer Rectifier TREM: Transport Emergency Management TT: Tank Truck VTS: Vehicle Tracking System
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 5 - of 55
2. EXECUTIVE SUMMARY :
M/s GAIL Gas Limited has awarded FOI No. GGL/70/13-14/5300000455 dated 27.11.14 for carrying out External Safety Audit and HIRA Study of CGD Networks at Dewas, Sonipat, Meerut, Sonipat, Agra and Firozabad under GAIL Gas Ltd. This HIRA Report includes entire steel and MDPE Pipeline network and associated facilities CGS, DRS, MRS, Mother and Daughter stations (CNG Stations) etc. under GAIL Gas, Sonipat region.
Gail Gas Ltd., Sonipat has a spread of approximately 50.8 km of steel pipeline network and approx. 200 KM of MDPE pipe network. GAIL Gas Sonipat has 32 industrial, 7 commercial customers and more than 3500 PNG connections.
CEIL Team comprising of two specialists visited the site during 07-08 October, 2015 at Sonipat, Haryana to examine facilities and hold discussions in order to identify, asses and analyze various hazards pertaining to CGD Network.
Standard methodology of Opening Meeting, HIRA Review session and Closing Meeting was adhered to. GAIL Gas Team consisting of members from Projects, O&M, HSE and E&I took part in the HIRA Study alongwith CEIL Team. The entire CGD operations were discussed in detail and key O&M activities were listed. Further these identified activities were assessed from hazard point of view using a dedicated Hazard Identification Sheet covering the hazard, severity, probability and overall risk. Mitigating measures were discussed amongst the members present and summarized. Points which need to be attended are listed as under:
a) Highlights:
1. No major accident since start of the GAIL Gas. 2. Standard display of HSE Policy, Emergency Telephone numbers at strategic
locations. 3. PPE and Fire Fighting equipment provided as per requirement. 4. Regular meeting held with District authorities. 5. Sensitization of local public through awareness campaign, distribution of safety
leaflets & display of safety banners etc.
b) Points to be attended:
1. Pipeline Coating Health Survey of Steel Pipeline network to be carried out. 2. DCVG Survey to be carried out to monitor corrosion in Steel Pipeline network. 3. Pipeline thickness measurement to be carried out. 4. Moisture content in gas composition to be monitored regularly. 5. First Aid Training to be organized. 6. Electrical O&M Refresher Training to be organized.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 6 - of 55
7. O&M and F&S training to be provided to Compressor and Dispenser operators for safe operation.
8. Odour level tests should be carried out at last mile connectivity to ensure proper odorisation.
9. Designated person for handling Odorisation System to be identified. 10. Training to contractors of other utility companies sharing the same corridor should be
imparted. 11. GIS Mapping of entire CGD Network to be carried out. 12. Effectiveness of patrolling frequency to be periodically reviewed. 13. O-rings of dispensing nozzle to be checked periodically. 14. Customer Waiting Area should be outside the dispensing premises. 15. Periodic calibration of all PSVs to be ensured. 16. Periodic checks of safety interlocks of CNG compressor to be carried out. 17. Air Compressor interlocks to be checked during Preventive Maintenance Schedule. 18. Thickness Test of vessels should be carried out periodically. 19. Preventive Maintenance of the Isolation Valve (IV) needs to be carried out. 20. Periodic calibration of LEL and UV Detectors to be carried out as per Preventive
Maintenance Schedule. 21. If calibration is outsourced, random witness of calibration of said instruments to be
carried out by GAIL Gas personnel. 22. Periodic Hydro test of cascades should be ensured as per Gas Cylinder Rules i.e. once
in three years. 23. During Stationary Cascade maintenance, surprise checks by GAIL Gas personnel
should be carried out. 24. During Stationary Cascade maintenance, Non-sparking tools should be used for such
maintenance. 25. Liaising with relevant civic authorities to be maintained. 26. Line Diagram of the connection piping should be fixed at the entrance of group
housing societies/cluster of houses. 27. For LMC at Industrial and Commercial consumers, Leakage Surveys to be carried out
depending upon the congestion in area (Highly congested areas-once in 3 months, Less congested areas-once in a year).
28. SOP for connections at high rise building to be followed.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 7 - of 55
3. ABOUT CEIL
Incorporated in 1994, Certification Engineers International Limited-a Public Sector Undertaking under MoPNG and wholly owned subsidiary company of Engineers India Limited is a leading Third Party Inspection Agency (TPIA) in area of Oil & Gas projects, Cross country Natural Gas pipe lines etc. CEIL is certified with ISO 9001as well as accredited as TYPE-A Inspection Body as per ISO 17020 by NABCB. CEIL is also an approved TPIA for certification of T4S, ERDMP and IMS for midstream and downstream activities of Oil & Gas sector by PNGRB.
CEIL has significant track record of carrying out of T4S, ERDMP, ESA and IMS Audits of Cross-country NG Pipeline & Compressors, LPG, Multiproduct pipeline, CGD Network, POL Terminals, LPG Bottling plants, LNG Terminals and Process Plants.
4. SCOPE
The scope of this HIRA Study is limited to the steel and MDPE pipeline network of GAIL Gas Limited, Sonipat region. This include facilities like off sites, utilities, products storage and Dispensing, stores, Odorisation Unit, Office Buildings, CGS, CNG stations, DRS, MRS, Domestic and Commercial connections, Pipeline Networks, Gas distribution to various Customers, PNG distribution, Control Rooms, SCADA/Server Rooms.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 8 - of 55
5. HIRA CONCEPT AND METHODOLOGY:
Hazard Identification is a systematic process of examining each work area and work task for the purpose of identifying all the hazards which are ‘inherent’ in the activity/job.
Risk Analysis is a systematic process of appreciating the risks associated with each of these hazards identified so that the nature of risk can be understood. This includes the nature of the damage/harm that may result from the hazard, the severity of that damage/harm and the likelihood of this occurring.
Risk Control details out taking actions to eliminate safety and health risks as far as is reasonably practicable. Where risks cannot be eliminated, then implementation of control measures is required, to minimize risks as far as is reasonably practicable. Hazard: Anything (condition, practice, behavior etc.) that has potential to cause harm, including injury, disease, death, environmental, property and equipment damage. Few examples of various types of hazards are as under:
• Slips and trips • Workplace transport • Moving heavy object • Sharpening tools • Working at height • Manual handling • Noise • Electricity • Confined spaces • Fire
Risk: The likelihood, or possibility, that harms(injury, disease, death, damage) may occur from exposure to a hazard.
KEYWORDS
• Activity : It defines the basic work being carried out. • Concern : It defines the possible hazard that may occur
during carrying out the activity. • Impact explanation : It defines the consequence/loss that may occur
because of the hazard. • Probability Rating : It defines the chances of occurrence of a particular
hazard. • Severity Rating : It defines the extent of damage/loss in case a
hazard occurs.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 9 - of 55
• Overall Risk Rating : It is overall figure of Probability Rating times the Severity Rating.
• Existing Control Measures : It defines those control measures which are already in place/existing to mitigate a particular hazard.
• Additional Control Measures : It defines those control measures which need to be taken over and above existing control measures to mitigate a particular hazard.
• Residual Risk/Impact : It defines the assessment of risk after the implementation of existing control measures and additional control measures, if required.
RISK MATRIX
The Risk Matrix defines various levels of Severity and Probability of Occurrence which are as under. The CEIL and GAIL Gas Team discussed and decided upon various levels as under:
Categorization of Probability of occurrence:
Probability of occurrence
Rating
Once in a year 1
Once in six months 2
Once in three months 3
Once in a month 4
Categorization of Severity:
Severity
Rating
No injury only material loss 1
Minor to moderate injury or health effects OR Minor asset damage
2
Moderate to severe injury or health effects OR Major asset damage
3
Permanently disabling injury or fatality OR complete loss of asset
4
The overall Risk Matrix is as under:
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 10 - of 55
The overall Risk Ranking is as under:
Risk Ranking
Rating
1-3 Acceptable
4-7 Moderate
8-12 High
13-16 Unacceptable
The Residual Risk Ranking is as under:
Risk Ranking
Rating
1-4 Tolerable
5-16 Intolerable
FRE
QU
EN
CY
4 Moderate High Unacceptable Unacceptable
3 Acceptable Moderate High High
2 Acceptable Moderate Moderate High
1 Acceptable Acceptable Acceptable Moderate
1 2 3 4
SEVERITY
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 11 - of 55
Note:
After implementing Existing Control Measures and Additional Control Measures, if the Risk Ranking decreases to less than 4, the Residual Risk will be treated as Tolerable.
Even after implementing Existing Control Measures and Additional Control Measures, the Risk Ranking decreases but remains in the range of 4-16, the Residual Risk will be treated as Intolerable.
However, as ‘Fatality’ is considered as the most serious consequence, hence, if there is an Overall Risk of 4 wherein ‘Fatality’ is involved, such risk will still be treated as ‘Intolerable’.
Intolerable risks have been classified as having potential for single or multiple fatalities. For such risks where the hazard involves loss of human life, remedial action of some kind has to be undertaken. There are four ways of handling any type of risks:
• Terminate • Treat • Tolerate • Transfer
All operational risks fall under these four categories. Suitable mitigating measures are devised and implemented to contain the risks. For the risks which are intolerable, an Incident Management Plan is prepared and activities are carried out in case of an incident, the Incident Management Plan is activated. In no case, an activity related to intolerable risks are stalled merely because they are intolerable as there is a well-defined Incident Management Plan in place.
CEIL Team Leader carried out planning together with GAIL Gas Limited Noida and Sonipat HSE Coordinator in terms of Methodology, Team members, Time Schedule and Special requirements of the contract. Following points were considered.
i. Scope of HIRA Study ii. Special requirements of the contract iii. Type & nature of installation iv. Acceptance criteria v. Deployment Schedule
Prior to start of HIRA Study, an Opening Meeting was held at GAIL Gas Limited office at Sonipat on 7th October 2015which was attended by GAIL Gas officials of Sonipat
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 12 - of 55
office and CEIL team. The OIC gave a presentation regarding facilities at GAIL Gas, Sonipat and briefed various critical operations and maintenance activities. CEIL team also gave a brief presentation regarding modalities of the Study. After completion of HIRA Study, Closing Meeting was held on 8th February 2015, CEIL team gave a presentation listing observations/ remarks.
HIRA Methodology in brief is as under:
• Explanation of HIRA Concept, Purpose, Methodology, Keywords, Risk Matrix to GAIL Gas officials.
• Formation of GAIL Gas Team consisting of members from Projects, O&M, HSE and E&I for taking part in the HIRA Study along with CEIL Team.
• Detailed interaction on entire CGD operations • Listing out key Operation and Maintenance activities. • Identification of possible/potential hazards in these identified activities. • Analysis of these hazards using a dedicated Hazard Identification Sheet covering the
hazard, severity, probability and overall risk. • Decide Control Measures and check if existing control measures are adequate or
additional control measures are required. • Check the residual risk level after considering all control measures. • Summarization of actionable points which need to be attended during Closing
Meeting.
Reference Documents:
i. OHSAS 18001 ii. IS 15656 iii. IS 14489 reaffirmed 2002(Code of Practice on Occupational Health and Safety). iv. OISD Standard-226 (Cross Country NG Pipelines’ and ‘CGD Pipe line network) v. Applicable Statutory Regulations/National/International Standards, Industrial Safe
practices.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 13 - of 55
6. FACILITY DESCRIPTION:
The Sonipat city gas distribution supply natural gas to various industries in and around Sonipat town. Steel pipe network is protected through cathodic protection through impressed current cathodic protection system. There is one CP transformer rectifier (CP T/R units) installed at CGS. The power supply to these CPPSM/TR units is supplied by state electricity board. GAIL GAS LIMITED Sonepat is operating City Gas Distribution network consisting approximately 50 Kilometer of steel and approximately 200 kilometer of Medium Density Poly Ethylene (MDPE) network of various diameters. Piped Natural Gas is supplied to domestic customers, commercial customer and industrial customers in and around the Sonipat City. Apart from this three compressed natural gas stations are in operation and one station is under construction for catering the needs of automobile sector
MDPE pipes of sizes 32mm, 63mm, 125mm & 180mm has been used across network. The impressed current system has been provided for the cathodic protection of the pipeline.
• No. of CP stations: 01 No.
• Distribution pressure or District Regulating Station (DPRS/DRS):
Sr. No. Location No of DRS
01 Sonipat 05
• GAIL Gas Limited Sonipat receives gas from GAIL (India) Limited. • Odorisation: Regular odorisation of gas is being done as per norms. Ethyl Mercaptan is
received in drums and is transferred to the storage tank by the supplier. The empty drums are taken back. Dosing of Mercaptan is automatic in the pipeline. The system is in manual mode hence fixed quantity is being dosed.
• Training
GAIL Gas Limited is organizing regular training programs as follows: i.Public awareness
ii.Critical Safety Campaign iii. Consumer Training: for operators and consumers for safe refueling of CNG iv.Contract Employees Training v.Fire Fighting.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 14 - of 55
7. DOCUMENTS REFERRED
In general, following documents were referred:
i. HSE Policy / Manual ii. List of Equipments / Facilities/Fire Fighting equipment.
iii. P & I Diagrams, Process Flow Diagram (PFD), Electrical Power (Single Line) Diagrams
iv. Design / Operating Technical Data, e.g. Capacity, Pressure, Temperatures etc. v. MSDS of Hazardous Materials stored, handled, produced or transported
vi. Emergency Organogram, Fire & Safety Organization Chart vii. Fire & Safety System
viii. Statutory Clearance(s) ix. Standard Operating Procedures x. Hot Work Permit System.
xi. Monthly inspection report of valves. xii. Monthly checking report of lighting and fittings.
xiii. Maintenance of fire extinguishers monthly report xiv. CP Reports
8. CLOSING MEETING Closing Meeting was held on 8th October, 2015 and presided over by OIC. Observations during HIRA Study were discussed & agreed for compliance.
GAIL Gas, Sonipat employees at Opening Meeting:
Mr. L.K. Maurya Mr. R. Mishra Mr. Chinmaya Tripathi Mr. Narendra Deo Mr. Janak Singh
GAIL Gas, Sonipat employees at Closing Meeting:
Mr. L.K. Maurya Mr. Chinmaya Tripathi Mr. Narendra Deo Mr. Janak Singh
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 15 - of 55
09. CONCLUSION
The HIRA Study for GAIL Gas Limited, Sonipat CGD Network has been carried out covering all key activities as identified during the study. A list of actionable points has been recommended by the CEIL Team for implementation.
CEIL Team: Mr. Ajay Sharma (Team Leader) Mr. R. Thakur (Surveyor)
10. CONFIDENTIALITY
This HIRA Study Report is confidential and an original report will be available only with the entity.
Sign: Sign:
Mr. Ajay Sharma Mr. R. Thakur
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 16 - of 55
11. Management Plan for intolerable Residual Risk
S.No Risk Action required for reducing the risk to
ALARP level 1 Odorisation of gas 1. Checking of dosing unit should be done
periodically. 2. Designated person for handling Odorisation
System to be identified. 3. Sodium Hypochloriteas neutralizer or other
similar chemicals should be available at the odorizing storage system for neutralization in case of leakage.
4. MSDS should be displayed at the unit. 5. Emergency contact number should be
displayed for use in case of emergency. 6. Fire extinguishers should be available at site. 7. PPE should be available 8. Eyewash system should be installed near the
unit. 1 Fire & leakage in Pipe lines 1. Periodic maintenance of the isolation valves
& pits should be done so that the affected section can be isolated easily.
2. Awareness program for the general public should be conducted at regular intervals to spread awareness among the general public.
3. Liaison with local authority should be done so that necessary help can be obtained during any major emergency.
2 Third party damage 1. Awareness program for the general public should be conducted at regular intervals to spread awareness among the general public.
2. Liaison with local authority should be done so that necessary help can be obtained during any major emergency.
3 Corrosion 1. DCVG Survey to be carried out to monitor corrosion in Steel Pipeline network.
2. Instant Pipe to Soil Off Potential measurement for entire pipeline.
3. Pipeline thickness measurement to be carried
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 17 - of 55
out.
Leakage & fire in compressor 1. Leak test should be done periodically 2. Periodic maintenance of the compressor
package should be done. 3. Calibration of measuring instruments & safety
valves should be done periodically 4. Checking of fire detection & alarm &
firefighting systems should be done periodically.
5. O&M procedures should be followed for operation & maintenance of the compressor.
6. F&S training should be imparted to compressor operators to handle the emergency in the incipient stage.
Leakage & fire in dispenser 1.Leak test should be done periodically 2. Periodic maintenance of the dispenser should
be done. 3. Calibration of measuring instruments & safety
valves should be done periodically 4. O&M procedure should be followed for
operation & maintenance of the compressor. 5. F&S training should be imparted to dispenser
operators to handle the emergency in the incipient stage.
6. Awareness training program for CNG customers should be conducted ar regular intervals.
Leakage &Fire in GEG 1. Overloading should be avoided. 2. Leak test should be done on the inlet gas pipe
line. 3. F&S training should be done for the CNG
staff to handle the emergency. Earthing& electrocution 1. Electrical isolation procedure should be
followed during job on the electrical system. 2. Proper tools should be used while working on
the electrical system. 3. Trained personnel should be engaged for any
work on electrical system. 4. PPE should be used.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 18 - of 55
5. Periodic maintenance of the earth pit should be done & records should be maintained.
Vehicle & Passenger movement in the CNG station
1. Safety awareness program for public coming to the CNG station should be conducted at regular intervals. Distribution of safety leaflets to the general public to create safety awareness.
2. Vehicle marshalling should be done in a way that the vehicles should come in a row & exit after filling.
3. It is to be ensured that, no passengers are present while the filling is under progress.
Working at height 1. Working platform or stable ladder should be used for working at height.
2. Personal protective equipment should be used while working at height.
3. Work permit system should be followed. Calibration of measuring
instrument 1. Calibration of the measuring instrument
should be done periodically.
Leakage & fire in customers’ premises.
1. Leakage survey should be done to detect the leakage.
2. Safety awareness campaign should be conducted for the customers.
3. Display of emergency contact number should be done so that the customer can contact in case of any emergency.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page - 19 - of 55
12. GAIL GAS CGD NETWORK ACTIVITY LIST
Location: Sonipat
S. No. SECTION ACTIVITY
1 CGS Odorisation
2 Steel Pipeline Network Gas transmission, Isolation
3 DRS Filtration, Pressure reduction, Isolation
4 MRS Filtration, Pressure reduction, Isolation
5
CNG Station-Mother Compression, Dispensing, Manual handling of Lube Oil Drums, Mobile Cascade filling, Mobile Cascade transport, Power generation through Gas Engine Generator, Air compression, Electrical system, CNG customer vehicle movement, Passenger movement, Working at height, Stationary Cascade.
6 MDPE Pipeline Network Gas distribution, Isolation, Surveillance.
7 Last Mile Connectivity-Commercial & Domestic
Isolation, Pressure reduction, Metering
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 20 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS FORMAT
Name of the Project : Location:
Main Activity : Date:
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-F
atal
ity)
OVERALL RISK =
PROBABILITY x SEVERITY
RISK RANK
(Acceptable/Mod
erate/ High/
Unacceptable)
EXISTING CONTROL MEASURES ADDITIONAL
CONTROL MEASURES
RESIDUAL RISK
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 21 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project : CGD Network Location: Sonipat
Main Section : CGS Date : 07.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moder
ate/ High/ Unacceptabl
e)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Odorisation Spillage
-Air pollution
-Being highly toxic, health gets affected.
1 2 2
Acceptable
1. SOP for handling and disposal is available.
2. Chemical Suit and required PPE available.
3. Safety Shower and Eyewash available.
1. Inspection of dosing unit should be done periodically.
2. Designated person for handling Odorisation System to be identified.
3. Sodium Hypochlorite as neutralizer or other chemicals should be available.
Tolerable
Being highly flammable, fire may occur,
1 4 4 Acceptable
1. Fire extinguishers available. 2. Fire Fighting Training
imparted to concerned
1. Periodic maintenance of the fire extinguisher to be
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 22 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moder
ate/ High/ Unacceptabl
e)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
asset damage, human injury
personnel. 3. ERDMP is in place. 4. MSDS should be displayed
at the unit. 5. Emergency contact number
should be displayed for use in case of emergency
ensured to make the extinguisher available.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 23 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project :CGD Network Location: Sonipat
Main Section : Steel Pipeline Network Date : 07.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-Fa
talit
y
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Gas transmission
Leakage
-Minor asset damage
-Environment gets affected
1 2
2
Acceptable
1. Routine Patrolling is done. 2. Periodic Awareness
campaign for general public is done.
3. ERV Vehicle is available for any emergency.
4. SOP for Steel Pipeline Network in place.
5. O&M team available for leak repair.
1. Maintenance of IV should be done to ensure its operation during leakage.
2. The pit maintenance should be done.
3. Adequate number of markers should be installed at specified intervals for identification of the pipe line underground.
4. Training to contractors of other utility companies sharing the same corridor should be imparted to
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 24 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-Fa
talit
y
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
avoid third party damage.
Fire
-Human injury
-Major asset damage
-Environment affected
1 4
4
Moderate
1. Routine Patrolling is done. 2. Periodic Awareness
campaign for general public is done.
3. ERV Vehicle is available for any emergency.
4. SOP for Steel Pipeline Network in place.
5. O&M team available for leak repair.
1. Maintenance of IV should be to ensure its operation during fire.
2. The pit maintenance should be done.
3.Adequate number of markers should be installed at specified intervals for identification of the pipe line underground.
4.Liaison with local authority should be done to tackle such emergency.
Tolerable
2 Third Party Damage
-Asset damage, gas leakage, fire, human
1 4
4
Moderate
1. Routine surveillance is done.
2. Periodic Meeting with local bodies regarding gas pipeline network is done.
1. GIS Mapping should be carried out.
2. Effectiveness of patrolling frequency to be
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 25 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-Fa
talit
y
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
Injury 3. Periodic Awareness sensitization campaign for general public, JCB owners/operators and shopkeepers nearby pipelines is done.
4. Availability of Route Markers along the pipelines.
5. Emergency Telephone numbers have been displayed at various places in the city.
6. Availability of Warning Tapes above pipeline in place.
7. Odorisation system in place.
8. ERV Vehicle is available for any emergency.
9. SOP for IV operation in place.
10. ERDMP action plan is in place.
periodically reviewed. 3.Training to contractors of
other utility companies sharing the same corridor should be imparted to avoid third party damage.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 26 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-Fa
talit
y
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
Corrosion
Pipeline integrity gets affected, leakage, fire, asset damage, human injury
3 4
12
High
1. ICCP is in place. 2. Regular monitoring of PSP
and TR Units. 3. CIPL and Pearson Surveys
carried out.
1. Coating Health Survey to be carried out.
2. DCVG Survey to be carried out.
3. Pipeline thickness measurement to be carried out.
4. Moisture content in gas composition to be monitored regularly.
Tolerable. Refer
Management Plan
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 27 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project : CGD Network Location: Sonipat
Main Section : MDPE Pipeline Network Date : 07.10.15
S. NO
ACTIVITY
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderat
e/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK HAZARD
IMPACT EXPLANATION
1 Gas transmission
Leakage
-Minor asset damage
-Environment gets affected
1 3
3
Moderate
1. Routine Patrolling is done. 2. Periodic Awareness
campaign for general public is done.
3. ERV Vehicle is available for any emergency.
4. SOP for MDPE Pipeline Network in place.
5. O&M team available for leak repair.
1. Maintenance of IV should be done to ensure its operation during leakage.
2. The pit maintenance should be done.
3. Adequate number of markers should be installed at specified intervals for identification of the pipe line underground.
4. Training to contractors of other utility
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 28 of 55
S. NO
ACTIVITY
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderat
e/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK HAZARD
IMPACT EXPLANATION
companies sharing the same corridor should be imparted to avoid third party damage.
Fire
- Human injury
-Major asset damage
-Environment affected
1 4
4
Moderate
1. Routine Patrolling is done. 2. Periodic Awareness
campaign for general public is done.
3. ERV Vehicle is available for any emergency.
4. SOP for MDPE Pipeline Network in place.
5. O&M team available for leak repair.
1. Maintenance of IV should be to ensure its operation during fire.
2. The pit maintenance should be done.
3. Adequate number of markers should be installed at specified intervals for identification of the pipe line underground.
4. Liaison with local authority should be done to tackle such
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 29 of 55
S. NO
ACTIVITY
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderat
e/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK HAZARD
IMPACT EXPLANATION
emergency.
2 Third Party Damage
-Asset damage
-Gas leakage
-Customers gets affected
-Fire may take place.
4 3 12
High
1. Routine surveillance is done. 2. Periodic Meeting with local
bodies regarding gas pipeline network is done.
3. Periodic Awareness sensitization campaign for general public, JCB owners/operators and shopkeepers nearby pipelines is done.
4. Availability of Route Markers along the pipelines.
5. Emergency Telephone numbers have been displayed at various places in the city.
6. Availability of Warning Tapes above pipeline in place.
7. Odorisation system in place. 8. ERV Vehicle is available for
1. GIS Mapping should be carried out.
2. Effectiveness of patrolling frequency to be periodically reviewed.
3. Training to contractors of other utility companies sharing the same corridor should be imparted to avoid third party damage.
4.Awareness program for general public should be conducted at regular intervals
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 30 of 55
S. NO
ACTIVITY
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderat
e/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK HAZARD
IMPACT EXPLANATION
any emergency. 9. SOP for IV operation in place. 10. ERDMP is in place.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 31 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project :CGD Network Location: Sonipat
Main Section : DRS & MRS Date : 07.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Filtration Choking of filters
Leakage due to failure of gaskets, asset damage
1 2
2
Acceptable
1. Overpressure protection
available at DRS. 2. Pressure Gauge available for
monitoring.
1. Calibration of
Differential pressure gauge should be done.
2. Calibration of PSV should be done
Tolerable
2 Pressure Reduction
High pressure at downstream due to failure of PCV
Consumer gets affected, PSV pup up, gas loss
1 3
3
Acceptable
1. Dual Active Monitor with dual redundancy available.
2. Slam Shut-Off Valve with UPSO and OPSO and PSV available d/s of Active Monitor Regulator.
1. Calibration of PSV should be done.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 32 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
,
4-M
onth
ly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
3 Gas flow Leakage & Fire
Loss of gas, property damage, human injury environment affected.
1 4 3
Moderate
1. Isolation valve provided at inlet && out let for isolation
2. Contact numbers displayed for passing the information.
3.Fire extinguishers available 4. ERDMP is in place.
1. Preventive Maintenance of IV should be done.
2. Training should be imparted for safe operation & maintenance & handling of emergency to the O&M team.
Tolerable
3. Isolation Isolation Valve is passing
Affected part of pipeline cannot be isolated, gas loss.
1 2 2
Acceptable
1. Dual Active Monitor with dual redundancy available.
2. Slam Shut-Off Valve with UPSO and OPSO and PSV available d/s of Active Monitor Regulator.
1. Preventive Maintenance of the IV should be done. Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 33 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project : CGD Network Location: Sonipat
Main Section : CNG Station-Mother Date : 08.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Compression Leakage Gas loss, Human injury 1 3
3
Acceptable
1. Gas Leak Detection & Shutdown System in place.
2. SOP for CNG Package available.
3. Emergency Shutdown system for Individual Arm, Dispenser and compressor available.
1. Implementation of Preventive Maintenance Schedule to be ensured.
2. Safety interlock system should be checked periodically.
3. Periodic maintenance of the compressor package & leakage test should be done.
4. Periodic testing/ calibration of pressure relief valves, PG, PT, TT should be done.
5. O&M & F&S training should be imparted to compressor operators for safe operation.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 34 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
Fire
Human injury and asset damage
1 4
4
Moderate
1. Flame Detection &Shutdown System in place.
2. Fire Suppression System (CO2 Flooding System) in place.
3. SOP for CNG Package available.
1. Preventive Maintenance of CO2 Flooding, fire Detection should be done to ensure its availability.
2. O&M & F&S training should be imparted to compressor operators for safe operation& emergency handling.
Tolerable
2 Dispensing Leakage while dispensing
Gas loss, human injury 3 3
9
High
4. Emergency Shutdown system for Individual Arm, Dispenser and compressor available.
5. Portable LEL Detector available.
6. Periodic maintenance of dispensers being done.
7. Odorisation System in place.
8. SOP for Dispenser operation available.
1. O-rings of dispensing nozzle to be checked periodically.
2. Leakage testing of the tubing & fittings of dispenser should be done.
3. Periodic maintenance of pressure relief valves. PG & other measuring instruments should be done.
4. Safety precautions should be followed during dispensing.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 35 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
9. Dos & Don’ts are displayed near dispensing area.
10. Excess Flow interlock for tripping of dispenser in case of leakage from hose/nozzle.
Fire
Asset damage, loss of sale,
Human injury 1 4
4
Moderate
1. Fire Extinguishers available
2. Regular training to Dispensing Boys.
3. Awareness Training to CNG consumers.
4. SOP for Dispenser operation available.
5. ERDMP is in place.
1. O&M & F&S training should be imparted at regular intervals to dispenser operators for safe operation & emergency handling.
Tolerable
3 Mobile
Cascade filling
Movement of LCV during cascade filling
Asset damage 1 3 3
Acceptable
1. Comprehensive Safety Checklist for LCV is available and being followed.
2. Wheel Chokes are available.
1. Safety Checklist for LCV filling to incorporate Safety briefing.
2. Crash guard to protect the equipment around the LCV
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 36 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
3. SOP for LCV filling in place.
filling point to be provided wherever LCV filling facility is available.
Damage of hose pipe, tube and fittings
1 3 3 Acceptable
1. Wheel Chokes are available.
2. SOP for LCV filling in place.
3. Leak Test is done before filling
1. Awareness training to the LCV drivers should be imparted periodically.
2. Crash guard around the LCV filling point can be provided to protect the equipment.
Tolerable
Leakage from hose pipe, tube and fittings
1 3
3
Acceptable
1. Portable LEL Detector available for leak test.
2. Periodic maintenance of hose and coupling is done.
3. Odorisation System in place.
1. Safety Checklist for LCV filling to incorporate Safety briefing.
2. Periodic calibration of measuring instruments should be done.
3. Periodic leakage survey should be done.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 37 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
4
Power generation through Diesel Generator
Electrocution
Fatal 1 4 4
Moderate
1. PPE and tools for safe electrical operation available.
1. Electrical isolation procedure should be followed.
2. Work instruction should be followed
3.Proper tools should be used 4.Inspection of tools should be
done before using 5.Damaged tools should be
replaced with new one 6.Deployment of trained
personnel 7.PPE should be used during
work
Tolerable
5
Electrical System (Electrical Panel)
Electrocution
Fatal 1 4 4
Moderate
1. PPE and tools for safe electrical operation available.
2. MCCB is in service. 3. Periodic maintenance of
Electrical Panels being
1. Electrical isolation procedure should be followed.
2. PM Schedule for Distribution Panels to be implemented.
3.Deployment of trained
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 38 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
done. 4. Work Permit System in
place. 5. Single line diagram is
displayed in the electrical panel room.
personnel 4. Electrical safety refresher
training should be imparted.
Improper / Discontinu
ed Earthing
-Damage to asset, human
injury
1 4 4
Moderate
1 Earth Pits provided. 2. Periodic monitoring of
Earth Pits Resistance is done.
3. Work Permit System in place.
1. Necessary maintenance to
be carried out to maintain earth resistance within limits.
Tolerable
6 CNG customer vehicle movement
Sudden movement of vehicle
during filling
Asset damage, human injury 1 3 3
Acceptable
1. SOP for dispensing is in place.
2. Breakaway coupling is available
3. Stop the engine and remove vehicle ignition key before filling & all the persons removed from the vehicle.
1. Awareness training for CNG customers should be arranged regularly.
2.Traffic cone should be placed in front of the vehicle during filling & removed after filling.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 39 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
Wrong positioning of CNG customer
vehicle waiting for
filling
Minor human injury, damage
to asset 1 2 2
Acceptable
1. Entry & Exit signage in place.
2. Customer traffic movement monitored by duty supervisor.
3. Crash Guards available around dispensers.
Safety cones & chains should be placed in such a way that the vehicles can enter in a row & exit safely Tolerable
7 Passenger movement
Loitering of passenger
human injury 1 2 2
Acceptable
1. Designated Waiting Area for passengers.
2. Prohibited areas for passenger trespass.
3. Dedicated Drop and Pickup point for passengers.
4. Awareness program being conducted for the passengers to ensure the safety in the CNG station.
1. Customer Waiting Area should be outside the dispensing premises.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 40 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
8 Air
Compression Overpress
ure
Major human injury 1 3 3
Acceptable
1. PSV provided. 2. Start-Stop of compressor
interlock available.
1. Periodic calibration of PSVs to be ensured
2. Compressor interlocks to be checked during Preventive Maintenance Schedule.
3. Thickness test of the vessel should be done.
Tolerable
Trapping between moving
parts
Major human injury 1 3
3
Acceptable
1. Belt Guards provided. 2. Overload interlock in
place. 3. Basic instructions for
safe operation to operators.
1. No loose clothes to be worn by maintenance personnel.
2. PPE should be used during work on air compressor.
Tolerable
10
Calibration of LEL, UV
Detectors
Incorrect/No
calibration
Gas leakage & Fire will go undetected
1 4 4
Moderate
1. Periodic calibration of Gas Leak and Flame Detectors being done.
2. Hand Held LEL Detectors available
- Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 41 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
11
Calibration of Pressure,
Temperature Switches,
Pressure and Temperature Transmitters
Incorrect reading /
No calibration
-Major asset damage,
-Minor human injury
1 4 4
Moderate
1. Periodic calibration of Pressure, Temperature Switches, Pressure and Temperature Transmitters is done.
1. If calibration is outsourced, random witness of calibration of said instruments to be carried out by GAIL Gas personnel.
Tolerable
12 Stationary
Cascade filling and storage
Leakage from
manifold valve,
fittings, cylinder
body
-Major human injury
-Major asset loss
1 3 3
Acceptable 1. Periodic maintenance of
manifold valve and fittings is done.
2. Periodic Hydro test of cascade being done.
1. Preventive Maintenance Schedule for manifold valve, fittings should be adhered to.
2. Periodic Hydro test of cascades should be ensured as per Gas Cylinder Rules i.e. once in three years..
Tolerable
Fire at manifold
valve, fittings
-Fatal
-Major asset loss
1 4 4
Moderate
1.Fire extinguishers are available.
2.Work Permit System is in place.
3. PPEs are in place.
1. Surprise checks by GAIL Gas personnel should be done during such maintenance.
2. Non-sparking tools should be
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 42 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
due to use of normal
tool/in presence of ignition
source
mandatory for such maintenance.
3. Standard O&M procedure should be followed during operation as well as during maintenance.
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 43 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project :CGD Network Location: Sonipat
Main Section : LMC-Domestic & commercial Date : 08.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 LMC-Domestic
Leakage from fittings, valves
-Minor injury
-Minor asset damage
1 1 1
Acceptable
1. Odorisation System in place. 2. Public Awareness Campaign
is done. Safety leaflets should be
distributed for safety awareness.
3. Emergency contact number displayed at Meters.
1. Periodic leakage survey
should be done.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 44 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
2
Fire at fittings, valves, hoses
-Human injury
-Major asset damage
1 3 3
Acceptable
1. Emergency Consumer Help
number is available. 2. Public Awareness Campaign
being done.
1. Awareness regarding dos & don’ts during emergency should be conducted.
Tolerable
3
Working at height during riser installation
-Fall from height
-Fatal
1 4 4
Moderate
1. Full Body Harness available. 2. PPEs are available.
1. SOP for connections at high rise to be followed.
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 45 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
3 LMC-Industrial
Leakage from fittings, valves, flanges
-Minor injury
-Minor asset damage
1 2 2
Acceptable
1. Odorisation System in
place. 2. Preventive Maintenance
Schedule in place. 3 . Safety leaflets should be
distributed for safety awareness.
4. Emergency contact numbers are displayed
1. Periodic leakage survey should be done.
Tolerable
Fire at fittings, valves, flanges
-Major injury
-Major asset damage
1 4 4
Modera
te
1. Emergency Consumer Help
number available. 2.Public Awareness Campaign
is done 3. Fire Fighting equipment
available. 4.Emergency contact number
are displayed.
1. Awareness regarding dos & don’ts during emergency should be conducted.
2. Mock Drills with industrial consumers to be carried out
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 46 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project : CGD Network Location: Sonipat
Main Section : SV and IV Date : 08.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Isolation Passing
Downstream section can not be isolated
3 2 6 Moderate
1. Periodic Maintenance 2. Replacement of valve
3. Periodic operational checking of valve
1. Periodic maintenance & operation test.
Tolerable
Leakage
Environment get effected
Minor Asset Damage
1 2 2
acceptable
1. Periodic Maintenance 2. Replacement of valve 3. Periodic LEL checking 4. Regular cleaning of pit 5. painting of pit &
water proofing wherever necessary
6. Odorising of the gas.
1. Continuous odorisation to be ensured
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 47 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
2 Fire
Environment get effected
Minor Asset Damage
Human Injury
1 4 4
Moderate
1. Periodic Maintenance 2. Replacement of valve 3. Periodic LEL checking 4. Regular cleaning of pit 5. painting of pit &
water proofing wherever necessary
1. Gas Odorisation system to be installed
2. Continuous odorisation to be ensured Tolerable
3 Third Party
Damage
Asset Damage
Gas Leakage and Fire
Human injury
1 4 4
Moderate
1. Heavy cover with lock is in place
2. Routine patrolling 3. Periodic awareness
Campaign, sensitization campaign for general public, JCB owners/operators, customers and shopkeepers nearby pipeline is done.
4. Periodic meeting with local authorities
5. Availability warning boards displaying
1. warning boards displaying emergency numbers etc. should be placed nearer to SVs and IVs
Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 48 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK RANK
(Acceptable/Moderate/
High/ Unacceptab
le)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
emergency numbers etc. along the pipelines nearer to SV and IV
6. SOP in place 7. ERV vehicle available 8. Emergency action plan
in place
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 49 of 55
HAZARD IDENTIFICATION & RISK ANALYSIS
Name of the Project : CGD Network Location: Sonipat
Main Section : Electrical Systems Date : 08.10.15
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
1 Power backup for CP System
Electrical Shocks
Human injury 1 4 4
Moderate
4. Earthing provided and maintained.
5. Rubber Mats provided 6. Electrical Protection devices
such as MCB etc are available
7. SOPs available 8. PPE available
1. Periodic Maintenance to be done
2. Alternate Power Source at caparo tubes.
Tolerable
Acid spillage and fumes
Human injury
Environment impact
1 2 2
Acceptable
1. SOPs available 2. PPE available 3. Proper ventilation
provided
Eyewash to be provided Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 50 of 55
S. NO
ACTIVITY HAZARD IMPACT
EXPLANATION
PRO
BABI
LITY
RA
TIN
G
(1-Y
earl
y, 2
-Hal
fyea
rly,
3-Q
uart
erly
, 4-
Mon
thly
SEV
ERIT
Y RA
TIN
G
(1-N
o in
jury
, 2-M
inor
, 3- M
oder
ate,
4-
Fata
lity
OVERALL RISK=
Probability X
Severity
RISK
RANK (Acceptable/Moderate/ High/
Unacceptable)
EXISTING CONTROL MEASURES
ADDITIONAL CONTROL MEASURES
RESIDUAL RISK
3 TR Unit / CPPSM
Electrical Shocks
Human injury 1 2 2
Acceptable
1. Earthing provided and maintained.
2. Rubber Mats provided 3. Electrical Protection
devices such as MCB etc are available
4. SOPs available 5. PPE available
1. Periodic Maintenance to be done
Tolerable
Corrosion of pipe line
Pipeline Integrity get affected.
Asset Damage
Gas Leakage
Fire
Human injury
1 4 4
Moderate
1. Periodic maintenance of TR Unit
1. Periodic Monitoring to be done Tolerable
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 51 of 55
ANNEXURE 2
Opening & Closing Meeting Attendance Sheet
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 52 of 55
ANNEXURE 3
LIST OF INDUSTRIAL AND COMMERCIAL CUSTOMERS
Sl. No. Category Customer 1
Industrial Customers
TOYO SPRING-II 2 HAPG HOLDINGS 3 NEELKANTH INDUSTRIES 4 PRAVEEN INDUSTRIES 5 TRIVENI POLYMERS 6 SABHARWAL FOODS 7 KAFILA FORGE 8 OSRAM 9 OCEAN GLASS WORKS
10 DLK DESIGN 11 KANODIA TECHNO PLAST 12 PARKAR 13 KANODIA INTER NATIONAL 14 BANKEY BIHARY 15 EVERST HINDUSTAN TOOLS 16 VACKSON CEREMICS 17 VAE VKN
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 53 of 55
18
SUPREME BAKERS 19 BHARAT CHEMICALS 20 KOHINOOR SPECIALITY FOODS 21
HOME MADE BAKERS 22 HPL ELECTRICALS 23 HINDUSTAN TIN 24 MAHAMAYA CASTING 25 ATLAS CYCLE 26 GPA FOODS 27 BIKNARE WALA 28 S.P INFORTECH PVT.LTD 29 T.R.D.P. Happy World 30 PARUTHI ENGG. 31 STAR TRACK 32 ROYAL HARYANA INSULATION
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 54 of 55
33
Commercial Customers
GATE WAY SCHOOL 34 NEW BULBUL RESTAURANT 35 HOTEL DEEWAN 36 REGARDS HOTEL &RESORTS 37 BTW 38 FIMS 39 MILK POINT 40
CNG Stations RAJ CNG STATION
41 AJAY CNG STATION 42 OM CNG STATION
HIRA Report of GAIL Gas Limited, CGD Network, Sonepat
CEIL/9530/15-16/HIRA/GAIL Gas Sonipat/AKS/20 Page 55 of 55
ANNEXURE 4
CGD NETWORK OF GAIL GAS, SONIPAT (STEEL NETWORK)