2
Str 3 Str 1 Str 3A Str 1F Str 1G Str 3F Str 3F Str 3F1 Str 1F Str 3D 392(A21) 148(A8) 588(29) 430(22) 289(15) 721(36) 147(7:1) 485(A25) 1627(75:1) 1230(55:1) 337(18)=0(A1) 268(A14) 1428(66:1)=0(1) 88(F8) 1224(55)=0(F1) 11(F2) 1732(82) 1212(54) 1352(62:1) Lake19 THR002-2 THR002-3 THR002-1 Lake19E Lake19 Lake19E THR002-4 FS4 FS2 FS1 MT65 MT64 MT63 MT62 MT27 MT28 MT20 MT61 MT60 MT26 MT22 MT25 MT30 FS3 FLTCA87661 Schedule 6 Sub Basin 322 Schedule 6 Sub Basin 316 32 31 43 44 42 41 40 39 38 37 36 35 34 33 30 59 58 57 56 55 54 53 52 51 50 49 47 46 45 60 THR002A THR001 200 300 280 290 270 260 250 190 210 330 320 310 340 180 350 360 170 370 160 380 390 140 130 400 410 410 200 370 330 340 320 400 180 350 270 210 380 210 350 310 180 280 360 120 NAD 83 BC Albers 0 50 100 150 200 250 Metres 1:5,000 Geographic Centre: (Block Centre) 53° 22' 58"N Lat. / 132° 09' 10"W Long. Tree Crown Modification Length: 602m Width: 20m "Worker Safety Alert" Area pruned prior to falling; increased overhead hazard potential. See back of map for Monumental Tree Harvesting Instructions HARVEST INSTRUCTION MAP (RW) DV4 0R1 Ground Based Grapple Proposed R/W (Cutting Permit) Proposed R/W (Road Permit) Other NP Other 19.6 2.9 3.7 26.2 Existing R/W 1.0 Sub Total 19.6 2.9 3.7 27.2 Proposed R/W (External to Falling Bdy) Total 27.2 NOTE: This table does not include any area(ha) calculation for WTRA, Retention, LUO Reserves or LUO Management Zones Harvest Area Summary (ha) Totals (Block) DV4 017 Legend Riparian Features Type 1 Stream Type 2 Stream Upland Stream Non-Classified Drainage Unknown Fish Sensitive Feature Wet Ground/Swamp Reach Break or Roads Road Station (Hub) Engineered Road Existing Road Recce Road Adjacent Engineered Road FSR Road Old Grade Old Skid Trail De-activated Road Contours (10m interval) Index Contour and Label Intermediate Contour Boundaries Falling Corner Falling Boundary Adjacent Proposed Block Tenure Boundary TAUP/Development Area Management Features Tree Crown Modification Machine Free Zone Sensitive Soils Road Features Culvert (Existing / Proposed) Wood (Existing / Proposed) Replace or Repair (Culvert / Wood) Bridge (Existing / Proposed) Waterbar / X-ditch or or or or Reserves Includes all WTRA & LUO Reserves. For a further break-down of areas please see the SP Map. Other Constraints Park / Conservancy Area Other Features Permanent Sample Plot Dangerous Tree Windthrow Rock Rock Bluff Slide Gully Heli Pad Heli Service Landing Gate Adjacent Retention Adjacent WTRA Greened Up Block Non-Greened Up Block Growth & Yield Plot Buffer Lakes / Wetlands Forested Swamp Type 1 Habitat (Lake/Wetland) Type 2 Habitat (Lake/Wetland) Non-Fish (Lake/Wetland) Unverifed Lake/Wetland/Swamp Road Construction Quarry Harvest Method / Features Stream Crossing Hoe / Backspar Trail Ground Based Grapple Helicopter Other Proposed R/W (CP/RP) Existing R/W LUO Schedules Cedar Stewardship Area Forest Reserve Upland Stream Watershed Sub-Unit Sensitive Watershed Boundary Northern Goshawk Reserve Northern Saw-Whet Owl Reserve Marbled Murrelet Reserve (Class 1 & 2) Other LUO Feature Polygons Cultural Cedar Stand LUO Features Fairy-slipper Devil's club Pacific CrabApple Yew Tree (single) Yew Tree (group) Monumental Cedar(>120cm DBH) Monumental Cedar(<120cm DBH) CMT, Culturally Modified Tree Other Bear Den Species Percent (%) Volume (m³) H 46 7557 S 10 1573 C 38 6181 YC 6 1017 Total 100 16328 Harvest System Hectares Volume (m³) Ground Based 19.6 12215 Grapple 2.9 1807 Other Proposed R/W 3.7 2306 Sub Total 26.2 16328 Proposed R/W (external to Falling Bdy) Total 26.2 16328 Harvest Volume Summary Map Updated: August 8, 2015 Map By: J Fraser THR002 FLTC A87661 CP 017 Mapsheet: 103F.040

HARVEST INSTRUCTION MAP

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Str 3

Str 1

Str 3A

Str 1F

Str 1G

Str 3F

Str 1E

Str 3F

Str 3F1Str 1F

Str 1G1Str 1

Str 1G

Str 3D

392(A21)

148(A8)

588(29)

430(22)

289(15)

721(36)

147(7:1)

485(A25)

1627(75:1)

1230(5

5:1)

337(18)=0(A1)

268(A14)

1428(6

6:1)=0(1

)

88(F8)

1224(5

5)=0(F

1)

11(F2)

1732(82)

1212

(54)

1352(6

2:1)Lake19

THR0

02-2

THR002-3

THR002-1

Lake

19E

Lake19

Lake19E

THR002-4

FS4

FS2

FS1MT65MT64MT63

MT62

MT27MT28

MT20

MT61

MT60

MT26MT22

MT25

MT30

FS3

FLTCA87661

Schedule 6Sub Basin 322

Schedule 6Sub Basin 335

Schedule 6Sub Basin 316

32

31

43

44

42

41

40

39

3837

3635

34

33

3059

58

5756

5554

53

52

51

50

49

4746

45

60

THR003

THR002A

THR001

200

300

280

290

270 260

250

190

210

220

240

330

320

310

230

340

180

350360

170

370

160

380 390

150

140

130

400410410

200

370

330

340

320

400

180

350

270

210

250

380

210

350

310

180

280

250

360

120

NAD 83 BC Albers0 50 100 150 200 250

Metres1:5,000

Geographic Centre:(Block Centre)

53° 22' 58"N Lat. / 132° 09' 10"W Long.

Tree Crown ModificationLength: 602mWidth: 20m

"Worker Safety Alert"Area pruned prior to falling; increasedoverhead hazard potential.

See back of map forMonumental Tree

Harvesting Instructions

HARVEST INSTRUCTION MAP

(RW)

DV40R1

Ground Based Grapple Proposed R/W (Cutting Permit)

Proposed R/W (Road Permit) Other NP Other

19.6 2.9 3.7 26.2Existing R/W 1.0

Sub Total 19.6 2.9 3.7 27.2Proposed R/W (External to Falling Bdy)

Total 27.2NOTE: This table does not include any area(ha) calculation for WTRA, Retention, LUO Reserves or LUO Management Zones

Harvest Area Summary (ha)Totals

(Block)

DV4017

Legend

Riparian FeaturesType 1 Stream Type 2 StreamUpland StreamNon-Classified DrainageUnknown Fish Sensitive FeatureWet Ground/SwampReach Break

or

RoadsRoad Station (Hub)Engineered RoadExisting RoadRecce RoadAdjacent Engineered RoadFSR RoadOld GradeOld Skid TrailDe-activated Road

Contours (10m interval)Index Contour and LabelIntermediate Contour

BoundariesFalling CornerFalling BoundaryAdjacent Proposed BlockTenure BoundaryTAUP/Development Area

Management FeaturesTree Crown ModificationMachine Free ZoneSensitive Soils

Road FeaturesCulvert (Existing / Proposed)Wood (Existing / Proposed)Replace or Repair (Culvert / Wood)Bridge (Existing / Proposed)Waterbar / X-ditch

or

or

or

or

ReservesIncludes all WTRA & LUO Reserves.For a further break-down of areasplease see the SP Map.

Other ConstraintsPark / Conservancy Area

Other FeaturesPermanent Sample PlotDangerous TreeWindthrowRockRock BluffSlideGullyHeli PadHeli Service LandingGateAdjacent RetentionAdjacent WTRAGreened Up BlockNon-Greened Up BlockGrowth & Yield Plot Buffer

Lakes / WetlandsForested SwampType 1 Habitat (Lake/Wetland)Type 2 Habitat (Lake/Wetland)Non-Fish (Lake/Wetland)Unverifed Lake/Wetland/Swamp

Road ConstructionQuarry

Harvest Method / FeaturesStream CrossingHoe / Backspar TrailGround BasedGrappleHelicopterOtherProposed R/W (CP/RP)Existing R/W

LUO SchedulesCedar Stewardship AreaForest ReserveUpland Stream Watershed Sub-UnitSensitive Watershed BoundaryNorthern Goshawk ReserveNorthern Saw-Whet Owl ReserveMarbled Murrelet Reserve (Class 1 & 2)

Other LUO Feature PolygonsCultural Cedar Stand

LUO FeaturesFairy-slipperDevil's clubPacific CrabAppleYew Tree (single)Yew Tree (group)Monumental Cedar(>120cm DBH)Monumental Cedar(<120cm DBH)CMT, Culturally Modified TreeOther Bear Den

Species Percent (%) Volume (m³)H 46 7557S 10 1573C 38 6181

YC 6 1017Total 100 16328

Harvest System Hectares Volume (m³)Ground Based 19.6 12215

Grapple 2.9 1807Other

Proposed R/W 3.7 2306Sub Total 26.2 16328

Proposed R/W (external to Falling Bdy)

Total 26.2 16328

Harvest Volume Summary

Map Updated: August 8, 2015Map By: J Fraser

THR002FLTC A87661 CP 017

Mapsheet: 103F.040

Harvesting Instructions Cut block: THR002

Template Version Date: October 2015

In addition to these site specific instructions, all operations must be carried out in accordance with the Contract and Taan’s CMS.

HARVESTING STRATEGIES AND CONSTRAINTS

If anything is unclear in this plan, or if field marking does not match the map, contact Taan’s Manager or Supervisor Ground Based including back spar trails: Soils are very susceptible to compaction particularly when saturated. The use of ground based equipment will be limited to drier soil conditions and/or using puncheon. Puncheon will be dispersed following the completion of harvest activities to facilitate planting. - Maximum allowable soil disturbance = 5% - Maximum road side soil disturbance = 25% to allow for decking/loading logs. - Utilize sufficient puncheon during ground based operations - Harvesting operations will cease immediately should compaction or rutting occur - Rehabilitate compacted soils and rutted areas once soils are sufficiently drained to allow for the return of machinery - Avoid ground based systems immediately after heavy rainfall events or when wet soil conditions exist - Maintain 7m MFZ on all streams. No tracks to enter MFZ area along stream, including roadside Cable Based: - Ensure adequate deflection during cable yarding to avoid screefing, gouging and excessive soil disturbance - Where use of back spars is prescribed. Use puncheon to avoid soil compaction. Deactivate trails when complete by dispersing puncheon and creating plantable spots along the trail when trail use is complete. - Work around standing stems of yew where possible.

Falling: - Hemlock more than 3m in height is to be cut down to reduce the spread of mistletoe where hemlock is a preferred species except within 7m MFZ areas along streams - Do not fall individual stems of yew unless a safety hazard.

Deactivation: Upon completion of harvesting, ensure the ditches, culverts and road ways are clear of debris and are managing water well. Re-establish sumps at culverts. THR002-1 and THR002-4 will be permanently deactivated. Remove all culverts, clean ditches and maintain drainage patterns (Cross ditches and water bars (herring bones) to keep water off road. Maintain 4X4 access on THR002-1 for planting and future surveys. Rock needs to be installed on cross ditch bottoms Pull all hoe trails and spread puncheon evenly. Decompact soils where compacted

Invasive Plants, Sedimentation and Erosion Control: - Wash equipment before moving from an area of known invasive plants before moving into a new area. - Invasive plant parts removed from machinery should be burned. Where burning is not possible dispose of in landfill area. - Any invasive plant found must be brought to the attention of Taan Forest. - Seed contiguous areas of exposed soil that exceed 0.1 ha within 1 year of completing activity. Where readily available and comparable in cost, preference must be given to grass seed that is:

1. high sod-forming content, except in areas that are planted with tree seedlings; 2. certified by the Canadian Seed Growers Association that the seed; a) meets Common #1 Forage Grade or better standards for varietal purity established by the Association for seed of that kind of species (Seeds Act, Seeds Regulation S. 2(1); and b) is of native origin.

ISSUES OR CONCERNS ACTIONS TO ACCOMMODATE

Safety

Refer to Taan Pre-work document prior to starting Falling and Harvesting activities.

Pruning operations may be completed prior to falling. Overhead hazard potential has increased along pruning boundaries (see map).

Dangerous Trees outside the harvest boundary – Operations will be in accordance with Work Safe BC Regulations. Where possible “No Work Zones” will be established. Danger Trees felled within a Wildlife Tree Retention Areas or Reserve Areas are not to be utilized..

If the Dangerous Tree must be felled, mark an “X” on the stump in the field and mark an “X” on the map for office use.

Recreation & Wildlife

If any raptor nests, heron rookeries or other previously unidentified features are found operations within the immediate vicinity of the feature must be stopped until a plan to manage the feature is developed.

If a bear den tree is found, contact a Taan representative immediately. No action is to be taken on the newly discovered bear den until Taan has reviewed the den.

Species at Risk: Goshawk

Monumental Cedar & Cultural Heritage Features

There are 6 monumentals designated for harvest in this cut block (see map) including 1 that should already be felled along the ROW. A representative of the Cultural Wood Program and Taan must be on site for falling. Alternatively, specific written instructions may be provided by Taan for falling and bucking instructions. When the tree(s) are felled paint the tree with tree number the block name and date felled. Engrave the tree number with saw on butt of log,. Handle all monumentals with care. The 1 tree along the ROW, if necessary may have to be remarked. All monumentals will be hauled to the Skidegate DLS for scaling where they will be temporarily stored.

If a CMT is encountered within the opening, whether alive or dead, standing or fallen, during any phase, logging will cease in the immediate vicinity of the CMT. Notification will be sent to Taan (Manager/Supervisor), Natural Resources (MFLNRO, MSRM (Archeology and Registry Services Branch)) and the Haida Nation. Taan direction must be received prior to operations proceeding.

Yew

Individual stems of yew are to be retained where safe to do so. Fall and yard away from stems, retain non-mech around individual stems. In ground based areas work around yew trees. Do not stack logs on trees. In cable yarding areas minimize roads and make all efforts to lift logs over yew trees, or designate a corridor to minimize yew destruction.

If yew must be felled try to leave high stumps and as many live branches as possible,

If yew is at roadside leave laid out for harvest by CHN, do not pile

Road Maintenance Maintain road access, kilometer signage, and public safety signage along roads. Stop road maintenance activities if siltation occurs.

Mitigate siltation entering streams by maintaining sumps along ditch lines and installing silt barriers (fences, hay bales etc.) along ditches and prior to creeks. Have ditch water flow into forest floor (filtered) before entering streams. Hauling may have to be curtailed when siltation starts in crabapple creek.

Slash Management

A planting density of 1200 sph across the cutblock must be obtained post-harvest. In areas of high slash accumulation pile slash, preferably on larger stumps, or create openings in the slash by moving slash around with the grapple or bucket of machine to create plantable spots.

Along roadside pile slash for disposal by burning. Create tall hay stack shaped piles with minimal dirt. Keep piles away from creeks / drainages and 100 feet from standing timber.

Windthrow Treatments

Pruning to be completed prior to falling or immediately after falling in the identified pruning areas (see map). Prune windthrow prone trees 20m beyond the falling boundary by removing 30% of the crown by spiral pruning and/or topping 10% of the crown where 30% of the crown cannot be removed by spiral pruning. All cut branches must be removed from the crowns to minimize overhead hazards for the next phases of block development. .

Sensitive Soils Use puncheon for all trails and removed/ deactivate trails by dispersing puncheon when complete.

Leave Trees: Retain individual yew stems where possible with non-merchantable trees.

RAINFALL SHUTDOWN CRITERIA Intermediate Zone

Activities must shut down when (whichever occurs first): Total rainfall reaches 75 mm in 24 hours; or Water balance is ≥ 75 mm; or Rainfall since start of the shift is 60mm and continuing.

Activities may start back-up when (whichever occurs first: Total rainfall is equal to or less than 30 mm in 48 hours or the water balance is < 75 mm.

QUARRIES, PITS, AND SPOIL SITES

DO NOT EXCAVATE A PIT, QUARRY OR SPOIL MATERIAL WITHIN THE RIPARIAN MANAGEMENT AREA (30m) OF ANY STREAM.

STREAMS Maintain streams in their natural channels. Do not disturb stable, in-stream large woody debris. Retain non-commercial trees and understory vegetation along riparian areas. Machine Free Zones (MFZs) on riparian areas is a minimum of 7m, including roadside

Creek I.D. CLASS MANAGEMENT STRATEGIES FOR RIPARIAN MANAGEMENT ZONES (RMZ) INCLUDING PROTECTING STREAM

Stream 3D, 3F, 3F1 Upland stream

Maintain 7m MFZ including roadside work and processing. Retain Non merchantable trees and stream side vegetation. Fall and yard away where possible. Cross stream yarding on these streams is permitted provided there is adequate lift to not disturb stream bank and vegetation. Bridging of streams during falling activities is permitted provided that the bank is not disturbed and trees can be lift clear.

1. Logs shall be decked perpendicular to the stream channel, stream flow will be maintained at all times, and any introduced materials will be removed immediately after loading.

2. Do not block or crush culverts with logs yarded to roadside – protect culvert openings and outflows.

3. No machinery is to be left parked within the RMA (30m) of any stream during shutdown periods (i.e., >5 days)

4. No maintenance on machinery or fuel storage is permitted within the RMA (30m) of any stream