Harmonisation Working Group HWG Meeting Monday, 17 th January, 2011 NIAUR Offices Belfast

Harmonisation Working Group

Embed Size (px)

DESCRIPTION

Harmonisation Working Group. HWG Meeting Monday, 17 th January, 2011 NIAUR Offices Belfast. HWG Agenda. Feedback from HSG, 20 Dec 2010. ES Project Update. DR1042 V1.0 – Removal of non-visit keypad meter configuration changes. Change Request - PowerPoint PPT Presentation

Citation preview

Page 1: Harmonisation Working Group

Harmonisation Working Group

HWG Meeting Monday, 17th January, 2011

NIAUR Offices Belfast

Page 2: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 2

HWG Agenda

Introduction, Minutes, Agenda 13.00 – 13:10

HSG Feedback 13.10 – 13.15

ES Project Update 13.15 – 13.30

Market Design Work Update (incl. DR1042) 13.30 – 13.50

HWG To-Do List Review 13:50 – 13:55

AOB & Closing 13:55 - 14:00

Page 3: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 3

Feedback from HSG, 20 Dec 2010HWG relevant topics covered by the Harmonisation Steering Group 20th December

Topic Detail Review of HWG minutes

Minutes of HWG from 02nd and 15th December reviewed –minor amendment required to date of the former HWG, otherwise the group had no further comments.

Review of DRs and MCRs from HWG of 15th December

The HSG approved the following MCRs:

- MCR1013 - MCR1030 - MCR1044

The HSG was made aware that: MCR1013 Suppliers will receive data in an alternative report format MCR1030 NIAUR met with Networks and Suppliers and is waiting on their view on costs. NIAUR to get back to HSG in January 2011. (Note: NIAUR have subsequently confirmed a quarterly reading cycle) MCR1044 Flexibility would be introduced into the reading window The following was noted in relation to DRs. DR 1031 Long discussion took place – CER asked for more time to consider implications for Prepayment meters in ROI. As decision is required before Christmas in order to avoid delaying the project and associated costs, the CER agreed to get back to HSG group via email by Wednesday 22nd December . (Note: CER have subsequently approved this DR). DR1042 – Whether a visit or a phone call is still being considered and will need to come back on this. Malcolm Rowley said that NIE had advised that issues pertaining to the collection of accurate meter readings from the customer over the phone meant that the majority of configuration changes would require a site visit.

Forthcoming HSG Wednesday 26th January at CER offices RoI timeline An indicative timetable for implementation of the harmonised schema in the RoI will be provided to the HSG by

ESB Networks at the end of February 2011.

Page 4: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 4

ES Project Update

Page 5: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 5

DR1042 V1.0 – Removal of non-visit keypad meter configuration changes

• Change Request – Suppliers will no longer be able to request a non-visit keypad

meter configuration in NIE– Will improve the accuracy of site configuration and subsequent

billing data – Meter Works Type K01 (Change Keypad Meter Configuration - No Site

Visit Required) will be removed– Referred to HSG at HWG Workshops on 1 and 20 Dec– No change in DR since presented originally

• At today’s Meeting– Approval to MCR and – Approval

DR1042

Page 6: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 6

Market Design Work Update Harmonisation Retail Design Services Summary of all change requests raised since publication of initial Harmonistion Baseline, and how standing as at 24 December, 2010

Classification Status (legacy) Document TypeDocument No.Request Description Current VersionDate Status Updated TotalHarmonisation Approved MCR 178 Treatment of Supplier Unit excess of Generation over Demandv1.0 26/10/2010 1

180 Sending of Additional Messages to EirGrid-TSO v1.0 03/06/2010 11003 Addition of New Value Codes v2.0 26/10/2010 11004 Supplier to use the MCC on 010 New Connection Registration Market Message as agreed by customer at the New Connection Application stagev2.0 26/10/2010 11006 Retain MPRN on change of voltage from LV to HV v2.0 26/10/2010 11009 Removal of Cleansed Address Indicator v2.0 26/10/2010 11010 Hold Change of Supplier requests until Old Supplier fieldwork has been Completed or Cancelv2.0 26/10/2010 11012 Removal of 303R Market Message for Implausible Reads. Only use 303R Market Message to Reject Invalid Metering Read Details on Supplier Provided Reads v2.0 26/10/2010 11013 Removal of Aggregating to Tariff and Meter Configuration Code Levelv3.0 15/12/2010 11014 Change the format of the DUoS and Transactional Supplier Invoices and MPRN level detailsv2.0 21/10/2010 11015 Remove Field Name ''PostCodeMPA'' on Relevant Market Messages and Revert Back to the Original Field Name ''PostCode''v2.0 26/10/2010 11016 Use Market Message for Ungrouped Unmetered MPRNs only. Grouped Unmetered MPRN and associated Unmetered MPRNs to be Processed Manually v2.0 21/10/2010 11018 To Allow Supplier Provided Readings received after 12 months to be validated in the same way as any other readingv2.0 21/10/2010 11022 Removal of EAC/AAC Effective From Dates from Data Aggregation Audit Logsv2.0 21/10/2010 11023 Estimated Readings for Change of Legal Entity v2.0 26/10/2010 11024 Global Aggregation v2.1 26/10/2010 11028 Submission of multiple Customer Service Codes on 010, 013, 016 and 017 MMs v2.0 01/12/2010 11030 Read Single Rate Keypad Meters v3.0 15/12/2010 11031 Change to COS Registration for Keypad v3.0 23/12/2010 11032 Alignment of Meter Configuration Codes v2.0 18/11/2010 11037 WP 18 Procedure where a customer has a Budget Controller (Token Meter) Installedv5.0 18/11/2010 11038 Supplier Advice of Long-Term Vacant Property v2.0 01/12/2010 11040 New Value in 591 message for Unmetered Total Usage Factor v2.0 01/12/2010 11041 Registration Cancellation Timescale v3.0 01/12/2010 11044 Removal of Cooling off Period v2.0 16/12/2010 1

Approved Total 25Issued DR 1042 Removal of non-visit keypad meter configuration changes v1.0 29/11/2010 1Issued Total 1Withdrawn DR 1029 Change of Supplier Appointment Booking v2.0 01/12/2010 1

MCR 1011 Use 507 and 507C Market Message for Designated Disputes in DUoS Billing with 5% Invoice Value Rule Retainedv2.0 26/10/2010 11017 Change Keypad Meter Configuration - Supplier Execution to be Market Message driven (030 & 210) v2.0 18/11/2010 1

Withdrawn Total 3Harmonisation Total 29NI Specific Approved DR 1034 Change of Use to Non-Domestic - No Meter Changes Requiredv2.0 26/10/2010 1

1035 Use of Free Text Field on N131C Market Message v2.0 26/10/2010 11036 Use of Customer Number when searching MPRN website for First Domestic CoSv2.0 26/10/2010 1

Approved Total 3NI Specific Total 3Grand Total 32

Page 7: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 7

Harmonisation Baseline (HBL) Update Planning

• Approach to Updating HBL – All approved MCRs above are in scope for inclusion in a revised

Harmonisation Baseline and are currently available on the RMDS website

– Other than these, only Regulatory or emergency changes will be considered for inclusion

– MCRs 0178, 0180, 1024 and 1040 are planned for implementation in ROI in June 2011

– A cross-jurisdictional team will work on applying all MCRs in scope to the common elements of the existing HBL

– The jurisdiction-specific elements will remain the responsibility of individual jurisdiction-specific teams

• Outlook – Work kicks off with an HRDS planning / scoping meeting on 20th

January– An outline schedule for the HBL work will be presented at the next HWG

Page 8: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 8

HWG Action Items closed since last scheduled meeting Item Status Org. Assigned to AP No. Title TotalClosed Airtricity 013 MCR 1013 - Provide a summary of why NI approach to aggregation preferred 1

025 MCR1013 - Conclude discussion with ES Project 1038 Airtricity to write to NIAUR regarding retained credit in Keypad CoS Process 1046 MCR1038 - Respond to most recent email on proposal from NIE 1048 DR1044 - Write to NIAUR re their issues with this DR 1049 DR1044 - Respond finally to NIE on this DR by 17th December 1

CDA 014 MCR 1013 - Obtain update on proposals for TuoS from SONI. 1CER 050 Confirm date of HWG meeting in Jan 2011 1ES Project 026 DR1029 - resolve requirement for firm appointments and re-present DR 1

027 DR1031 - resolve outstanding issues and represent DR 1028 DR1038 - clarify optionality of new Long Term vacant flag 1029 DR1041 - consider generalising the rule for extension to agreement to cancellation 1030 MCR1017 - withdraw 1035 Raise new DR removing Fieldwork Request for MCC change - Non-Site Visit 1037 MCR1013 - Conclude discussion with Airtricity 1039 DR1029 - consider extending COS Appt. window to 1 hour 1041 MCR1038 - How to manage double lock between Networks staff and Suppliers for long term vacancy 1

GEMSERV 047 DR1031 - Malcolm Rowley to represent Airtricity issues at HSG on 20 Dec 1HRDS 031 HWG Extraordinary Meeting 1

032 HSG Action Items tracking 1033 Multiple CSSN codes on 010/013/016/017 MMs 1

NIE 016 MCR 1017 V2.0 - Check detail for process 1017 DR 1029 - Obtain a more detailed impact assessment 1021 DR 1031 - Set up workshops 1022 DR 1032 - Confirm continued Suppliers' visiblity of prepayment setup on Extranet 1023 DR 1032 - Provide more clarity on usage types/factors 1024 DR 1032 - Clarify position on delayed notification of prepayment meter setup 1

NIEES 034 NIEES Debt Notification issues to be sent to CDA 1040 MCR1030 - Request NIAUR to circulate list of issues raised by NIEES 1043 DR1044 - NIEES to meet with NIAUR on 14 December 2010 to discuss their issues 1

RMDS 001 Outline the current strategy and likely timing for the MPCC/EMMA replacement programme 1044 DR1031 - RMDS to contact EirGrid re draft DR 1043 1045 Follow-on HWG workshop 1

TSO 036 Consider raising new DR for aggregation requirements 1Closed Total 34Open RMDS 051 Confirm special arrangements for TIBCO technical presentation 1Open Total 1Grand Total 35

Page 9: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 9

Next Steps

• Next HWG meeting

23.02.2011 (Dublin)

• Dates for all meetings for 2011 are on the Calendar on the RMDS website

Page 10: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 10

HWG Meeting

• AOB

Page 11: Harmonisation Working Group

17 Jan, 2011 Harmonisation Working Group 11

Thank You

HWG Meeting