process weighing
• Hardy delivers productivity solutions to manufacturers and processors
• Hardy developed the first PLC integrated weighing system
• We are a Rockwell Automation Global Encompass Partner
• We were founded as Hardy Scales in 1918
• Hardy is part of Roper Industries, a $2B+ public company
How to Develop Static/Dynamic Check Weighing Solutions using
off-the-shelf components from Rockwell Automation® and Hardy
Process Solutions. Overcome the Black Box, Green Board Problem!
Learn how manufacturers and OEMs in the food and consumer
packaged goods industries are improving product inspection capability
using off-the-shelf components to deliver amazing results. Components
include: PLCs and Human Machine Interface from Rockwell Automation
and high-speed check weighing bundles (instrument/sensor) from Hardy.
Agenda
1. Check Weighing
2. Business Needs
3. Solution & Case Study
Agenda
1. Check Weighing
2. Business Needs
3. Solution & Case Study
1. Many applications. Static and Dynamic.
SLICING BY CHECK WEIGHING
MULTI TRACK CHECK WEIGHING TARE & GROSS WEIGHT FILLING PUSH-OVER CHECK WEIGHING
SORTING BY CHECK WEIGHING
PUSH-UP CHECKWEIGHING
CATEGORIZATION BY CHECKWEIGHING
• Verify package contents
• Check product tolerance
• Classify product
•
• Identify parts
• Overload safety check
1. Many stand-alone check weighing solutions.
7
1. Many production requirements.
Agenda
1. Check Weighing
2. Business Needs
3. Solution & Case Study
2. The Problem
• Expensive “Green Board” Custom Hardware
• Software that is proprietary and/or obsolete
• Maintenance that can be unreliable.
2. What do manufacturers want?
• “Off-The-Shelf” technology. Also called “Open Source”
• Must meet specifications
• Must be reliable
• Above all the must be easy to integrate, use, modify and fix.
Agenda
1. Check Weighing
2. Business Needs
3. Solution & Case Study
3. Hardy & Check Weighing
3. Why are we different.
• Open-Architecture Platforms
– Non-black box solutions
– Direct RA Connectivity
• 3 levels of solutions
– Configured, Flexible, Packaged
• Service-Lite Technologies
– Hardy’s ToolBox makes it easier
An off-the-shelf solution
HI 4050CW
3. Hardy’s Solution – Product Overview
• Easy to Install, Use, Maintain & Change Lower. Cost Effective.
It’s not a black box, it is an off-the-shelf solution. It integrates to
Rockwell and other PLC’s.
• Up to 250 packs per minute
It breaks the traditional analog strain gauge “speed barrier”, without
the cost of MFR (Magnetic Force Restoration or Other similar high
speed/resolution technologies)
• Smart Features
It offers advanced EDGE DETECTION (weight on & weight off) and
operator indication of DATA QUALITY
3. Hardy’s Solution – Bundle Specifications (Controller)
3. Hardy’s Solution – Bundle Specifications (Loadcell)
Load Cell Capacities: 2, 5, 10 kg …up to 100kg
Load Cell Accuracy: Better than +- 0.015% of capacity
3. Hardy’s Solution – Working out the Solution
300g DYNAMIC ROLL TEST
2kg load cell
Vertical Axis in grams
Horizontal Axis 1 grad = 4 msecs
Settling time +- 256 mSec
Low Threshold 40g
High Threshold 280g
Motion Threshold 0.5g Variation Threshold 3g
THE LEDGE
Data Capture Starts
The case study outlines the NEEDS, OPERATIONAL
& FINANCIAL BENEFITS that Hardy’s 4050CW
check weighing bundle delivered to a global
Consumer Packaged Good manufacturer in the
Snack Food industrial market segment.
Customer Needs
• Meet speed spec (<400 msec/weigh)
• Meets resolution spec (<0.25g/weigh)
• Reduce product giveaway
• Uses know, open source technology
• Easy to use, modify & fix
• Retrofit into existing system
3. Hardy’s Solution – Case Study
EXISTING
LINE
LANE
DIVERTER
CHECK
WEIGHERS LANE REJECTOR
& CONSOLIDATOR
EXISTING
LINE
#1 #2 #3
3. Hardy’s Solution – example
MULTI TRACK CHECK WEIGHING
a) Reliability and lower life cycle costs. Accelerated ROI.
b) Reduction in Finished Product Give Away. Accelerated ROI.
3. Hardy’s Solution – Value Delivered
3. Hardy’s Solution – Meeting the Operation Outcomes
ROI - WHAT WAS THE “OPERATIONAL” VALUE ?
a) Reliability and lower life cycle costs. Accelerated ROI.
• Off the shelf components that are readily available and supported ongoing.
• Familiar components/technology that are well known.
• Component cost is considerably less than the current hardware components.
• Less dependence on vendor resources for upgrades, modifications, and troubleshooting.
• Components are robust and not subject to failure due to handling.
• Limited set of cost effective spares can be kept on-site
• Easier swap out of hardware
• Easier upload of software, configuration and calibration parameters dramatically reduces MTTR
(mean time to repair) in the event of a failure.
• Inter component communication via industry standard fieldbus protocols such as EthernetIP
• One HMI can display the production data for multiple rows
• The open platform allows for unlimited data collection and transfer to our MES system.
• Future loop control for weight control, and other controls enhancements are easily added.
• Depending on application: ROI can be reduced from years to months or months to weeks.
3. Hardy’s Solution – Case Study
ROI - WHAT WAS THE “DOLLAR” VALUE ?
b) Reduction in Finished Product Give Away. Accelerated ROI.
Estimated savings per portion = ~0.36% of finished product