DESCRIPTION
G.Alexeev for Dubna group ITEP , April 28 , 2010 Muon System Status Report from Dubna. Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 - PowerPoint PPT Presentation
Citation preview
G.Alexeev for Dubna group ITEP, April 28, 2010
Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work position at COMPASS, expected start of long strips r/o studies – May-June 2010 * Range System prototype (degree of readiness) : - steel absorber /structure ~ 95% (Fe plates 100% ready -> to be welded) - MDT detectors ~ 50 % (all parts 100% ready, 10% of MDTs assembled) - strip boards, cables ~ few % (to be produced by summer 2010) - f/e electronics ~ few % (design 100% ready, mass production required) ( see report of A.Piskun)
Software : * Acceptance studies for DY and J/ muon pairs (see report of V.Rodionov)
Full Scale prototype mechanically assembled and stored in COMPASS area (park position)
It is now being equipped with HV,LV, gas lines, strip boards, f/e electronics and tested before the start of COMPASS run
F S prototype position
COMPASS MF2
Full Scale prototype position in COMPASS area.
The prototype should be fixedat this point inMay 2010
Wiring of MDT detectors
Wiring machine for MDT detectors
Assembled MDTs (in black envelops) and profiles prepared for wiring
VME crate 6U VME crate 6U
STRIP R/O digital
RW-TDC QTC–16QTC–16
ASum-96
AAlexander.NagaytWIRE R/O analog & digital
[email protected] ander.Nagaytsev
@cern.ch
ADB-32 (A-32)
A2DB-32
analog
digital
COMPASS CATCH
DAQ VME crate 9U
MWDB units
to DAQ crate
Hot link cables
Range System Prototype Read Out Scheme
Polar angle distribution of DY photons.
Geometrical acceptance study of muon system in case of: full PANDA setup (material)
Pythia as event generator (40K DY events) + PandaRoot.Option: with/without magnetic field in Solenoid/Dipole.
Plans for 2010:
* FS prototype : - finish full assembly (HV, LV, cabling, gas lines, f/e electronics etc) - start running (r/o test with long 2-4 m strips) in summer 2010 - study of wave impedance for strip r/o
* RS prototype : - finish production (300 MDTs, absorber structure, strip boards, cables etc) - produce and test f/e electronics (292 boards of different types) - move to CERN - assemble (at COMPASS) and test with cosmic (debugging) - start running in late autumn 2010 at PS (subject to available resources)
* Software development in PANDAroot :
- finish acceptance studies for muons (DY, J/ , D-mesons) with high statistics - track finding algorithms for muons in Range System (together with Torino/INFN group) - pattern recognition algorithms – muons vs hadrons (together with Torino/INFN group)
Backup slides
G10 fiberglass strip board (1cm wide strips) at CERN/COMPASS
Strip R/O from RS Prototype
MDTs strip (1cm) board
Fe absorber plate A-32 preamp. card
RS prototype absorber plates manufactured in Dubna
RS prototype absorber structure/frame
RS prototype assembly process (start)
RS prototype assembly process (close to finish)
RS prototype assembly finished ( 60mm plates – black, 30mm plates – blue )