Tank Operations Contract
1 1
Hanford’s Double-Shell Tank AY-102 Recovery Project Session 006 - Paper 17416
Carl Hanson,AREVA Federal Services, LLC**
Doug Greenwell,Washington River Protection Solutions
Sebastien Guillot,AREVA Federal Services, LLC
Jordan Follett,Washington River Protection Solutions
**Presenter
Your picture here
March 6, 2017
Tank Operations Contract
2 2
AY-102 Tank Construction/Background
Tank Operations Contract
3 3
Tank AY-102 Overview
Initial Tank Waste
inventory (<3/2016)
• 1 Million Gallons Capacity
• Ø75 feet x 30 feet high, 15 feet
below grade
• Wastes from historic B Plant
operations and strontium/cesium
extraction processes
View of the primary tank only
Tank Operations Contract
4 4
AY-102 Annulus Waste Accumulation
Tank Operations Contract
5 5
Retrieval Transfer System Overview
(Receiver Tank)
Tank Operations Contract
6 6
Project Challenges
• 24 months from design to readiness!
• Numerous risks realized:
o Receiver Tank Selection
o Transfer Structure Shielding
o Infrastructure and Equipment Upgrades
o Availability Retrieval Equipment
o Pump Design Updates
o Ventilation System Capability
o Tank Vapor Issue Evolution
o Overall Project Execution
Tank Operations Contract
7 7
Conceptual Sketch and Aerial Photo of
the Waste Transfer Route
Tank Operations Contract
8 8
Trench Digging through 241-AX Tank
Farm & Road Crossings
Tank Operations Contract
9 9
Tanks AY-102 and AP-102 Equipment Removal
and Pit Refurbishment
AY-02A Pit cover block removal in October 2015
AY-02D Pit before equipment removal and pit rehabilitation in November
2014
AY-02D Pit after rehabilitation in February 2015
AY-02A Pump removal in October 2015 AY-02A Pump packaging and shipping for disposal in January 2016
• Removed 5 obsolete pumps from AY-102 and AP-102
• Rehabilitated and upgraded 7 pits to receive new equipment
Tank Operations Contract
10 10
Equipment Installation
Designed, fabricated, installed and tested 3 new pumps
• Slurry pump and annulus pump in AY-102
• Supernatant pump in AP-102
Annulus pumpAY-02A slurry pump installation in
November 2015
AY-02A pit equipment
installation completed in
November 2015
Tank Operations Contract
11 11
Sluicing Equipment Comparison…
Two-Stage Retrieval
Following first phase of
retrieval, the retrieval system
was reconfigured with four
Extended Reach Sluicers
Tank volume coverage:Standard Sluicer vs ERSS
Standard Sluicer D Standard Sluicer B
Full-scale mockup of the AY-102 primary tank at the Cold Test Facility with a prototype ERSS to train retrieval operators
Tank Operations Contract
12 12
AY-102 Sluicing Operations
Tank Operations Contract
13 13
Primary Tank Leak Behavior
Sluicer 1
Sluicer 2
R54
R57
R67
R51
R63
R80
R69
R61
R52
R39
R88
R91
R89
Tank Operations Contract
14 14
Retrieval Progress
Sluiced for approximately 490 hours
• Standard Sluicers operated for 305 hours
• Extended Reach Sluicers operated for 185
hours
• Recycled 2.7 million gallons of supernate
Removed over 725,000 gallons of waste
• 590,000 gallons of supernate
• 135,000 gallons of sludge
Estimate 18,000 gallons of total waste
remaining
July 2014
January 2017