Page | 1 Smith & Redmond AU 2012 Deciding how to BIM in a CLOUD November 11, 2012 AU 2012 Deciding how to BIM in CLOUDS Handouts AU 2012 Mandalay Hotel, Las Vegas Deciding how to BIM in a Cloud Class BO1861 Thursday, Nov 29, 2012, 8-9:30am 90 minutes Class Description Over a hundred owners, architects, engineers, contractors, and software developers engaged in a more than 2-year academic study to identify and prioritize Building Information Modeling (BIM) approaches to cloud-based computing. At DIT 2008 to 2009; Eco-Build 2010 This knowledge was then applied to support a BIM project, oriented to Autodesk® Revit®, for a large organization that budgeted for a 3-month project. At Eco-Build 2011 Our BIM cloud approach was completed under budget in just 3 days! The lessons learned from BIM and Revit modeling in a rapid-fire environment are specified and compared as a decision process map to traditional and non-cloud processes and results Using practice guidelines from the National Building Information Modeling Standards 2.0 Example templates are available to attendees along with this “how to” guide. See the Additional Class Materials for the Visio file. Learning Objectives: Deciding to BIM in a Cloud (Slide 3) 1. Appreciating the world wide BIM community a short personal history of Alan’s research, Kimon, Alan, Bob and others work on a bimXML standard for a National BIM Standard 2.0; 2. Locating Key tools and perspectives (NBIMS Standards) you can actually apply to leverage smart solutions to big problems: Package the NBIMS 2.0 sandwich between two slices of “common sense” maps; 3. Pilot testing a project using a BIMStorm Cloud strategy using Revit and other applications to evaluate the costs and impacts of renovating a specific building and thus test Alan’s working research hypothesis;

Handouts - Autodeskaucache.autodesk.com/au2012/sessionsFiles/1861/4276/handout_1861... · Essentials and is a frequent So Calif. Revit User ... Check with your Information Technology

Embed Size (px)

Citation preview

P a g e | 1

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

AU 2012 Deciding how to BIM in CLOUDS

Handouts

• AU 2012 – Mandalay Hotel, Las Vegas

Deciding how to BIM in a Cloud

Class BO1861 – Thursday,

Nov 29, 2012, 8-9:30am – 90 minutes

• Class Description

– Over a hundred owners, architects, engineers, contractors, and software developers engaged in

a more than 2-year academic study to identify and prioritize Building Information Modeling

(BIM) approaches to cloud-based computing. At DIT – 2008 to 2009; Eco-Build 2010

– This knowledge was then applied to support a BIM project, oriented to Autodesk® Revit®, for a

large organization that budgeted for a 3-month project. At Eco-Build 2011

– Our BIM cloud approach was completed under budget in just 3 days!

– The lessons learned from BIM and Revit modeling in a rapid-fire environment are specified and

compared as a decision process map

• to traditional and non-cloud processes and results

• Using practice guidelines from the National Building Information Modeling Standards

2.0

• Example templates are available to attendees along with this “how to” guide. See the

Additional Class Materials for the Visio file.

• Learning Objectives: Deciding to BIM in a Cloud (Slide 3)

1. Appreciating the world wide BIM community – a short personal history of Alan’s research,

Kimon, Alan, Bob and others work on a bimXML standard for a National BIM Standard 2.0;

2. Locating Key tools and perspectives (NBIMS Standards) you can actually apply to leverage smart

solutions to big problems: Package the NBIMS 2.0 sandwich between two slices of “common

sense” maps;

3. Pilot testing a project using a BIMStorm Cloud strategy – using Revit and other applications to

evaluate the costs and impacts of renovating a specific building and thus test Alan’s working

research hypothesis;

P a g e | 2

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

4. Knowing how to apply Autodesk’s vast network into your strategy;

5. Pulling it all together for a specific future project: Designing a working Process Map for doing

BIM in a CLOUD; Caveats and Look ahead at a few metatrends.

• Introduction – Who we are (Slide 4)

Bob Smith, Ph.D.

– Professor Emeritus, CSU (25 years – decision support systems; strategic planning at Fed, State,

and Local levels);

– Currently Chair of Green Energy Committee, City of Huntington Beach, CA, Environmental

Board;

– Director of Resiliency Engineering at Tall Tree Labs; SG Consortium

– Lead on the NIBS’s NBIMS 2.0 Implementation Committee – LoD and Information Architecture;

C-FIRE Council.

[email protected]

• Alan Redmond, MRICS, MCIOB

– RICS – Royal Institute of Chartered Surveyors; Chartered Institute of Building

– Council on Finance, Insurance, Real Estate (C-FIRE), National Institute of Building Sciences

– MARS City – NASA and NIBS;

– STEM Integration and Resilience Engineering demonstrations;

[email protected] .

• Towards Full Disclosure (Slide 5)

1. Focus on BIM Cloud Diagrams, Maps & Layers for geospatial context and professional conflict

resolution early in the process:

1. Using an explicit Information Architecture in 3D for a project; AND

2. Professional and standards development organizations;

3. Geo-spatial topics around Floor Plans for 1st Responders, Energy Auditors,

Commissioning Agents; Insurance Rate Policy Designers;

4. Bob is NOT a Revit user- has read James Vandezande’s Revit Architecture 2013

Essentials and is a frequent So Calif. Revit User Group attendee.

P a g e | 3

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

2. What we are NOT addressing: (See other AU Classes)

1. technical security topics;

2. Legal litigation topics;

3. Community goal alignments and mediation;

4. Ideal standards development for CLOUD BIM;

5. perceptual details of design graphics and the evolution of BIM ideas over the past

decade.

• Learning Objective 1: The world wide BIM Community (Slide 6)

1. A short personal history and context

– You and your team want to pilot test doing BIM on a Cloud for a real or hypothetical

Client;

2. Alan’s surveys in Ireland indicated several years ago that a market exists for a collaborative

BIM Server on a cloud. His subsequent search led him to the US and the National Institute of

Building Science. Deke Smith, Executive Director. Building SMART Alliance (bSa)

recommended BIMStorm 2010 and the NBIMS 1.0. See next slide

3. Plans were also underway to publish a NBIMS 2.0 with 3 major topics (Bob heavily involved

with Best Practices guidelines and working towards International Standards Organization

formats);

– Best Practice Guidance

– Information Exchange Standards

– Reference Standards

4. Use these Best Practice Guidance to help your team SCOPE the problems, define your roles

and relationships, and formalize a process. Perhaps your firm has already done this? If not,

the web version makes It easy to custom design your own BIM Guides and Project Execution

Guides. Just need to add Cloud Decision front end

5. BUT the NBIMS 2.0 Guidance largely ignores Cloud topics and related key project

boundaries and hurdles;

• How Bob and Alan got “here” with BIM* Templates (Slide 7)

• from ~1988 thinking about extending CAD files to knowledge bases for 2014-2016 city

sustainability design (Post Sandy….)

P a g e | 4

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• 2008-2010 Dublin Institute of Technology’s Grant from CITA….and the goal of Irish Superiority in

Construction Productivity; 2009: 100+ surveyed or interviewed about viability of cloud

computing with BIM using a population (sample) mixture of randomly selected respondents in

Ireland (50 consumers – contractors – architects etc.) and non-random 40 vendors from

countries, such as USA, UK, Ireland and Australia.

• Dec. - 2010 Eco-Build: Alan connects with Deke Smith, Kimon Onuma- and the California

Community College FUSION database;

• March, 2011: Alan’s Delphi work at the interfaces of FUSION, GIS, and ONUMA SYSTEMS, plus

significant further integration by others, results in opening up the full system;

• Dec.- 2011 Eco-Build: Apply research to a specific building during BIMStorm to validate working

Hypothesis on bimXML and SlimBIM data architecture;

• Jan. -2012 NBIMS 2.0 Ballot Submittal for a bim XML – Cloud & XML issues confound the formal

processes;

• Jun.- 2012 Framing the Implementation issues and framing the Lessons Learned for the new

NBIMS 3.0 Team;

• Aug. - 2012 Adapting Owners Performance Requirements Tools to Calif. Office of Planning and

Research Strategic Growth Framework;

• Ongoing- 2012 Co-Designing a Smart City Building Management system for California

• Ongoing- 2013 MARS CITY explorations around NASA and NIBS;

• Oct.- 2012 – Summer of 2013 AIA 2030 and Smart Building Management Certification – AIA

2013, Denver, Colorado.

* BIM and BIMStorm Templates

• What Alan’s survey of over 100 experts showed: (Slide 8)

A Cloud BIM Server is feasible, but:

1. Design and Operational topics

1. Need SlimBIM (as Software As A Service - SaaS)

2. Supply Chain mobilization and marketing

3. Earlier design decisions leverages the W Curve

4. Legal contracts around Intellectual Property Rights and data ownership

2. Major Drivers to understand

1. Needs for unlimited access to extensive Big Data

2. Significantly improved efficiency and reduced costs

P a g e | 5

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

3. Interoperability within and between the major vendors and the increasingly

large number of 3rd party specialized software vendors (See the Software

Ecosystem on Slide # 29)

3. Technology Shift

1. Only innovators will use Cloud BIM in the near future

2. Cloud security solutions will lead to rapid adoption

3. Cloud BIM clauses must be inserted into legal contracts; Federal and State

trends in this direction in the US and UK, Singapore appear positive

4. Anticipate both a Business Pull and a Technology Push

4. Standard Business Practices and Processes

1. Only companies with a need to collaborate with different companies will be

interested; Companies using one vendor (i.e. Intergraph) will not likely be

interested

2. Basic information exchange must be assured

3. Different Professions and Disciplines will require different kinds of data

exchanges

4. Storage and Documentation issues must be resolved after Proof of Concept

• What Alan developed – a Cloud BIM Architecture (Slide 9)

P a g e | 6

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• See Slide 9

• Objective 2: Locating Key tools & perspectives in advance of your project launch (Slide 10)

1. Locating Key tools and Perspectives – a perspective on where Cloud collaboration fits in is

mostly likely needed by BIM Managers. In our discussions at professional meetings the

awareness of available standards, guidance, and tools is minimal. Here are a few

recommendations:

1. NBIMS Standards you can actually apply to leverage smart solutions to big

problems; bSa/ NIBS membership for individual is $75 a year and too low, IMHO.

Additional funds for specific projects may be proposed and accepted by the bSa and

NIBS Board.

1. The National Institute of Building Sciences - http://www.nibs.org/

1. Their Whole Building Design Guide - http://www.wbdg.org/

2. Building Smart Alliance (bSa) -

http://www.buildingsmartalliance.org/

P a g e | 7

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

3. The National BIM Standard http://www.nationalbimstandard.org/

4. International Building Smart Alliance

http://www.buildingsmart.com/

5. Construction Operations Building Information Exchange (COBie)

http://www.wbdg.org/resources/cobie.php?r=buildingcomm

2. Need to re-package the NBIMS 2.0 sandwich between two slices of “common sense”

process maps which include Finance and Real Estate sectors, plus better COBie

integration with early planning and later performance and maintenance topics;

1. Committee on Finance, Insurance and Real Estate (C-FIRE)

http://www.nibs.org/?page=cfire

3. BIM Forum - http://bimforum.org/ Contractor – Engineering orientation on Applied

BIM – see the BIM Level of Detail topics especially; ~ $125 year to join.

4. Fiatech - www.fiatech.org Owner – Public Private Partnership group with a

coherent Road Map to achieving increased performance in the Construction Sector;

very active committee structure. Pay to Play:

5. BIM Score – an advisory company with powerful metrics worth paying for if you are

a sufficiently large and complex construction firm or a very savvy owner -

http://www.bimscore.com/

2. Ask your company’s CIO and Operations Manager about customizing a company-specific

BIM Manual like AECOM, HOK, DRM, the VA, GSA, major universities, and many other

organizations. Remember that the National BIM Standard 2.0 is web enabled and designed

for an organization to easily customize the sections of text that fit their needs. See the

Introduction chapter at www.NationalBIMStandard.org – use the Guest sign in OR simply

join bSa. It will eventually take you to http://bim.psu.edu/Project/resources/default.aspx

where you register for the Project Execution Plan templates and collateral materials. We

recommend considering these guides as general purpose and deserve careful reading and

study sessions. Ask questions about their assumptions of linearity and engineering

orientation. Check with your Information Technology department after scanning Kristine

Fallon’s chapter in the Practice section of the National BIM Standard 2.0.

• Key STEPS (Skude 11)

1. and their meaning for taking action in positive steps with and without a formal

roadmap.

P a g e | 8

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

2. The Penn State Templates from John Messner, Ph.D., (available by following the

NBIMS 2.0 links to http://bim.psu.edu/Project/resources/default.aspx ) assume a

linear progression. Their assumptions may work after the initial designs have been

hammered out and evaluated in a BIMStorm post action assessment.

3. Deciding on a course of action Map -Strategic, Tactical, Operational distinction; Types of

Decisions; Describing a prescriptive vs. descriptive decision; No slides or the Templates

4. Using Revit BIM and Building Information Modeling Information Exchange Standards; Show URL

to www.NationalBIMStandard.org and sign in as a GUEST (or better yet, become a member);

5. Cloud computing and Collaborative Building Modeling using the “Ecosystem” approach; Kimon’s

Ecosystem slide #23 illustrates some of the many kinds of tools available).

6. Physical Buildings and Digital Building Modeling Distinctions and current practices, future

“catalogs”; See Jeff’s 1 or 2 slides

7. Roles of adaptive tracking and fast learning of errors, Early Train Wrecks in a BIMStorm;

1. Conscious design of a “BIG Little Design Room” for Cloud BIM production;

• NIBS Now (Dropped from the PPT) We expect a new organizational chart to be developed

shortly. Note the three major groupings – Security and Disaster; Facility Performance; and

Information Resources & Technology. Our primary focus is on the yellow section – bSa and its

international umbrella organization – bSi (Building Smart International). The NIBS was

established by US Congress in the 1970s as a Public Private Partnership dedicated to

industrializing the fragmented and poorly organized Architectural – Engineering – Construction

– Owners and Operators sectors using information technologies to eliminate the nearly $1.6

billion a day of wasted time and effort entering and reentering data at each and every stage of

the life cycle of a building. By taking a life cycle – cradle to cradle – view of the processes, and

achieving early integration of a design as a Building Information Model, and being able to use

and re-use that digital model, very significant improvement in quality and reduced costs will be

expected. Since the 1970’s, commercial and industrial buildings have become significantly more

complicated and require sophisticated building automation control systems that can link into

the emerging Smart Grid technologies while balancing risks of cyber warfare.

P a g e | 9

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

NIBS Now (See X for Next Version)

National Institute of Building Sciences

Security & Disaster Preparedness

Programs

Facility Performance and Sustainability

Programs

Information Resources & Technologies

Programs

Building Seismic Safety Council (BSSC)

Multihazard Mitigation Council

(MMC)

Multihazard Risk Assessment / HAZUS

Total Building Commissioning

National Clearinghouse for

Educational Facilities (NCEF)

buildingSMARTInternational

(BSI)

National Mechanical Insulation Committee

(NMIC)

Building Enclosure Technology and

Environment Council (BETEC)

High Performance Buildings Council

(HPBC)

Facility Maintenance and Operations

Committee (FMOC)

buildingSMARTalliance

(bSa)

Whole Building Design Guide (WBDG)

Courtesy of Deke Smith, buildingSMART alliance

Slide dropped from the PPT

National BIM Standard version 2.0 and Table of Contents (Slide 12)

NBIMS 2.0 – How to BIM according to the NBIMS Standard 2.0

Slide 12

This document was released after considerable debate during the late Summer of 2012. Both Alan and

Bob with a dozen + others, worked on the unsuccessful ballot in late 2011 for bimXML without having

met. The major bimXML contention was the opinion of some IFC experts that XML and bimXML in

P a g e | 10

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

particular were not ready for the market. The bimXML ballot was removed and resubmitted as a “Blue

Sky Proposal” for the following cycle. Meanwhile the approved ballots were integrated to the extent

possible. The sections that received attention are the Project Execution Planning (PxP) chapters that

should have integrated cleanly with the Strategy and Minimum BIM chapters.

• BIM Best Practice Guidelines – your team should read carefully Chapters 5.6 then Chapters 5.3 & 5.4

for the purpose of customizing your company specific BIM Strategy and Practice Manual in a way that

enables Cloud BIM and rapid modification of strategies and tactics that prove cumbersome and

unworkable. As you can see, the depth of some topics is excellent, but others may be less effective for

your team’s use.

• DRAFT -the AECom team (Slide 14) introduced PxP V 2.0 – Managers of the AECom made a very

comprehensive two hour presentation last September at USC’s Practical BIM workshop. They explained,

section by section, how their management team had worked thru John Messner’s PxP guidelines and

adopted what worked into their corporate manual.

• Are you using the most current NBIMS Practice Guides? However, AECom did not select the most

recent version. It should not be difficult to so organize a topic map with Oxygen XML or other XML topic

editing tool to merge versions and adapt improvements as reported from field testing this “living policy

and guideline document”.

• Big Picture Slide 15

Big Picture (IFC Pathway)

• Slide 15

Remember that this Project Execution Plan needs to be customized to your corporate requirements and

aligned with the unique requirements of a BIMStorm and Cloud Computing for early collaboration among

P a g e | 11

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

the entire set of disciplines (Owners, Commissioning Agents, Architects, Building Maintenance staff, MEP

engineers, financial consultants, etc.). Pay particular attention to the 4 graphics in the 3rd column – the Gantt

chart, the Swim Lane Chart, the Spreadsheets, and the summary Infrastructure for CLOUD BIM

implementation (if desired).

This Project Execution Plan includes over 2 dozen common BIM use cases. They are listed in Slide 20, below.

However, we urge adopters to carefully think about these use cases in BIM Cloud contexts. They provide a

great starting agenda for a comprehensive but not necessarily creative project.

• Are you locating & applying the available Use Case TEMPLATES coherently? Part 1 of 2 from

NBIMS 2.0 – discussed above.

• NBIMS 2.0 Templates for Cloud BIM’s 8 Strategic Issues (Slide 17) – Alan has talked with John

Messinger while developing the template to address his PhD dissertation requirements and to

evaluate the efficacy of both the BIMStorm’s data access and bimXML size/speed factors

• Locating tools and perspectives:

BIM Forum .ORG – “Levels of Detail” is an important effort to clarify boundaries between disciplines. As

more firms move to Cloud computing, cross discipline teams that are problem focused will get design

conflicts identified and removed early into the DIGITAL or VIRTUAL model, and then focus upon

execution at the PHYSICAL level.

• Locating tools & perspectives –

www.Fiatech.org committees working within the Road Map framework will have a strong competitive

advantage. Membership should be sought. Is this in your firm’s budget yet?

• Fiatech’s 2010 Standards Landscape – This provides a good overview of how a BIM Manager of a

BIMStorm project might want to organize an agenda.

• Objective 3: Piloting a Project in a BIMStorm Cloud – an easy way to

test if Cloud BIM is for you and your organization! (Slide 20)

1. What is a BIMStorm?: Essentially, a 1-3 day Charrette in a Cloud with 5 to 500 participants working with

a BIM Server from anywhere on the globe to design and develop a virtual facility or campus of facilities

in 2D, 3D, 4D, and 5D by massive collaboration around a central theme. An entire ecosystem of 3rd party

and mainstream IFC and XML based applications makes exchange of team information using BIM Mail

almost effortless. These events are usually free, have extensive pre-Charrette training, and persist after

the exercise is completed, making BIMs and reports available to study and share.

2. How long have BIMStorms been available? Over 5 years.

3. What are the advantages and disadvantages of a BIMStorm Pilot? –

P a g e | 12

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

1. Advantages: Huge opportunity for individuals unfamiliar with architecture, engineering,

construction to quickly learn how to develop a BIM from a spreadsheet; convert that into a floor

plan in 2D; then convert that into a 3D model in Google Earth; to shape and reshape the size and

location of a Campus site, a building, a floor, a space on that floor, equipment and sensors in

that space; to use standard defaults to quickly estimate costs; LEED ratings; energy efficiency;

etc. The cost to participate is zero: just add time and attention.

2. Disadvantages: Will require paying close attention to getting a design right; learning how to

communicate and share with others; to realize you have made some bad mistakes and need to

start all over again will try some people’s patience; getting the needed gestalt for working in a

cloud context may be too frustrating for those with low tolerance for ambiguity.

• Additional Decision Options: (Slide 21)We did not officially do a Rational

Multi-Attribute Decision Analysis; you could attend Greg Hale’s class and work

thru his 7 choices;

• Onuma Systems + Fusion + GIS (we use this)

• CSG Revit Model Hosting

• BIM 9

• Advance 2000

• ASite

• Autodesk 360 (Buzzsaw rebranded)

• GTeam

• Why we selected OS to work with our Revit BIM – Slide 22

– Cloud BIM pioneer;

– Cost (Free for Alan; $45 a month for Bob);

– Convenience;

– Functionality;

– Pilot worked;

– Training and Video;

– Revit 12 Plug-in consultant (Amber H.);

P a g e | 13

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

– BIMStorms are an excellent opportunity to test ideas and get feedback from a wide range of

professionals from different disciplines and interests.

Slide 23 – BIM Server of Splendid Types of Software: Note the bimXML, IFC, Web Services Distinctions?

• Your Revit workstation can exchange information with many other software applications

because of - Autodesk’s long time commitment to industry wide “interoperability” as

developed in the bSa’s National BIM Standard 1.0 as Industry Foundation Class (IFC – the

basic data structure model), Information Delivery Manual (IDM for “flowcharts” and swim

lanes showing the logical sequence of operations and logical decisions), the Data

Definitions for clear and unambiguous terms, and MVD to pull all the content into format.

A bSa sub-committee has been working on improving the IFC by using a modified

structure called bimXML or SlimBIM. In addition, this diagram highlights (look at the

bottom of the slide – Web Services – which makes it easy to Mash Up data from many

other applications and data sources in real time. Slide 23

• Revit & BIMStorm Cloud Workflow Basics in Six Steps: 1-team members 3 and 15 initiate

some basic elements; 2 – using Excel, GE, Revit to set up Step 3- a list of buildings, floors,

rooms, space layouts so that 4 – a 2D visualization of structures and performance

concerns can be key topics of conversations between members 3,4,5,9 and 15 using

Onuma to process and route data about cost, energy, size, configuration changes

P a g e | 14

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

(Scenarios) to reach 5 – a 4D or 5D visualization suitable for even more considerations of

changes and consequences. Slide 24

• In the beginning there was a Demographic data estimate from some Market Intelligence

Investment service. – possibly based on Calif. Gov. Brown’s OPR & SGC: and translated into Space

Needs which runs from Space Planning to Concept Resolution to Detailed Design. The Office of

Planning and Research (OPR) and the State’s Strategic Growth Council – have commissioned

Calthorpe Associates to develop an open source Land Use-Transportation- Population – Resource

Requirement scenarios that can be operated to test various scenarios at a multi county, single

county, or a city level consistent with State law and City General Plans. It is expected that these

planning scenarios will soon be integrated with BIMStorms and CityGML as indicated in the prior

slide 23.

Strategic Roadmaps from NBIMS 2.0 (Slide 25) is the TEMPLATE in MS Visio available for download from the

Class BO1861 Site to customize for your team or organization. This is the top level view, with each block having

its own drill down set of detailed steps and check points. We strongly recommend considering the collaboration

tasks needed prior to and in parallel with Block 1, below. See Slides 54 and 55, below.

• Determine if NBIMS 2.0 Templates for Cloud BIM’s 8 Strategic Issues works as anticipated

in Research Methods Chapter. Slide 30 shows the high level modified Template available from Penn

State via the National BIM Standard.org website. Currently the templates are available as a MS VISIO

2010 file. Allan used these MS VISIO files to select and program his steps to test the PhD dissertation

assumptions about the feasibility of developing and sharing small and accurate bimXML (SlimBIM)

files in the Cloud. (again, slide 25)

• The Client – CCC’s Site at Miracosta College Oceanside (MCO) Slide 26

P a g e | 15

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

– Campus is on FUSION – ONUMA BIM Server: Slide 31 shows FACILITY BUILDING 4200 in

the context of the California Community College’s Facility Utilization Space Inventory

Option Net (FUSION) System. There are several different FUSION websites - The most

relevant website is http://www.onuma.com/products/FusionOnuma.php . However,

internal contacts are available from http://cccfusion.org/

– 71 million square feet of community colleges statewide – 2.75 million students – 112

California locations;

– One of 5,200 buildings in the California Community College (CCC) Facility Condition

Assessment program;

– Survey in November 2010 indicated graphically on a facility condition map that the MCO

Facility Building 4200 had a Facility Condition Index (FCI) of greater than 10% and thus

should be demolished.

• Demolish Building 4002? (Slide 27)

• Creating a BIM of “Facility 4200” Retrofit and 3D – 4D – 5D models (Slide 28)

• Revit 2012 model developed at a low level of detail

• Project created in OS + FUSION + GIS Cloud

– Problem to solve: use this Cloud platform to report retrofit costs vs. demolition costs to

Client (Fred Harris, VP, CCC);

• Use appropriate 3rd party tools to develop 3D to 5D models with cost and

performance data: Google Earth, DDS, Vasari EA, Synchro, Costos, Palisades Risk

Management

• Step 1 – Access FUSION+GIS+ONUMA System view of campus (Slide 29) – Give user name and

password to the system; Select a Studio (FUSION Studio) and note the Campus; add a new project;

Duplicate the selected building to your new project; Activate Google Earth to observe the site.

• Step 2 – Understand the buildings Facility Condition Index (FCI) of greater than 10%. (Slide 30) Reports

indicate that this building should be considered for demolition. Alan believes it can be renovated at

lower costs than previously estimated. He builds the case.

• Step 3 – Correct FUSION errors -Configuring the Excel square dimensions into existing

Facilities building footprint (FUSION+GIS+ONUMA) (Slide 31) – Not all FUSION buildings are

accurately represented; some buildings are missing room locations and length-width

dimensions in square feet.

P a g e | 16

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• Step 4 – Keep working on getting the missing files -Download Floor Plan JPEG from FUSION to

Project (Slide 32) After some effort, Alan is able to locate the floor plan jpeg file and can now

move forward to developing improved 3D visualization of Building 4002.

• Step 5 – Access DDS for improved 3D modelling and views of Developed Building (Slide 33)

Alan accesses and loads a DDS view

• Step 6 – Bring in Vasari Energy Analysis per Roadmap (Slide 34) Alan decides to use Vasari

Energy Analysis application and obtains the needed data as estimates; Alan extends the data

needed.

• Step 7 – Bring in Synchro 4D Program (Slide 35) From Synchro 4D program Alan is able to

obtain and analyse required data needed to now perform detailed Cost Analysis.

• Step 8 – Bring in COSTOS for 5D BIM analysis and modelling (Slide 36) As shown in the next

two slides, Alan synthesizes much data from having carefully structured the Building Settings

Form in the OS.

• Step 9 – Scrutenize the Cost Data and Simulate Options-Figure 9.18 Facility Building cost

estimate produced by CostOS 4 (Slide 37) Almost finished, Alan applies his extensive costing

framework experience with CostOS to construct the Report shown here.

• Step 10 - Run Palisade Risk Analysis and record results – Monte Carlo Simulation (Slide 38) To

further refine his work, Alan performs Risk Analysis simulations and reports results as

appropriate.

• Step 11 - Verify File Size Differences (127 x) (Slide 39) – a primary concern in CLOUD

computing is the size of files needing to be accessed. With slow applications working with huge

multi-MB files, hours are wasted while different simulations are attempted. This 127 x factor

was believed to be significant. Further comparative work needs to be done in other contexts

and on other Cloud applications. Do you know your Revit file size profile and your expected

wait times?

• STEP 12 -Wrap Up the BIMStorm in a Cloud Experiment – synthesize findings of what bimXML

and IFC allows – Ideal interoperability flows between Cloud Apps and BIM Server (Slide 40) –

This slide is the “Poster Child” Slide for BIM marketing slides, but is seldom questioned. Alan

has questioned and applied the identified 3rd party applications using IFC and bimXML to import

and export data needed to reach a cost feasibility decision in 3 days. This was NOT a strict time

accounting by the minute effort but rather a start-to-finish count of days. Alan had been

informed that this was a 3 month effort, so 3 days rather than 90 days is appreciated.

P a g e | 17

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• Behind the scenes described above are a number of potentially frustrating decisions

when you are exchanging information between Revit and OS.

• This section goes into more depth explaining what you as a Revit user should be aware

of when considering a BIMStorm pilot. See Greg’s presentation for advice using other

Cloud strategies.

• Revit Guides to BIMStorm Cloud Projects

• Revit Export & Round Trip Options for typical building (Slide 41) See the OS

Help screens for connectivity between OS and Revit.

• Onuma Revit 2011/2012 (Setup Slide 42) you first need to install the Plug Ins. I

asked Amber this week about Revit Architecture 2013 but she has been very busy with

double BIMStorm projects. Hopefully her answer will arrive before the AU event. If not,

simply check the FAQ and Comments section on the Connectivity page

• Follow the Red Path (Slide 43) the red lines show the sequence of tasks you

need to take.

• Import bimXML into Revit 2012 (Slide 43) provides additional information.

• Collaboration Options between Revit Software Developers, BSA committees

(Slide 44) – there exist a number of opportunities within bSa and outside of bSa

for Revit developers and Cloud BIM service providers to lift the entire industry’s

productivity. This slide shows one approach. Many Blogs exist to help your

productivity efforts.

• Again, if you have insights on how to improve the industry by adding a new standard or

two, do not be shy in putting your ideas into a Ballot form. The Project Committee

structure for NBIMS 3.0 is starting, and the January meeting in Washington DC should

produce specifics. Stay tuned by signing up for NBIMS 3.0 information

• Objective 4: Where Autodesk’s vast network can fit (Slide 46)

– Disclaimer by Bob and Alan goes about here…

– Where Autodesk’s vast network fits into your strategy:

– Autodesk on the Cloud;

– Autodesk REVIT user groups (i.e. SCRUG);

P a g e | 18

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

– Autodesk University;

• BIM and CLOUD search yields

• Part of this will be anticipating other content at the AU 2012 Sessions

• BIM – CLOUD Issues for Revit BIM Managers and Teams Slide 52

• Brian Mackey (The Revit Geek) on AEC Magazine article by Carl Bass, Autodesk CEO (Slide 48)

– http://bdmackeyconsulting.com/revit_2014/

– In a recent post from AEC Magazine covering a speech from Autodesk CEO Carl Bass, they

mention all sorts of things including

• Autodesk 360 (formerly cloud services),

• Autodesk 123D capturing service, and the new suites.

• But what I found interesting is the fact that Autodesk might get away from the yearly

release model and replace it with updates throughout the year.

– “Death of releases?

• It seems that Autodesk’s yearly product dump may also be up for review. Mr. Bass sees

decreasing reasons for a major ‘R’ release when updates can be easily streamed

throughout the year.

• So there may not be a 2014 release, which raises all sorts of questions about the

traditional ‘obit’ and staying on the upgrade cycle — the moving target that is a yearly

release becomes a wave of in-year updates.

• The company’s decision to concentrate more on its breadth of applications and

increased reach with mobile products also puts an end to the traditional list of new

features and enhancements.

• The push is now on omnipresence of data, workflow and the computational and

optimization benefits of cloud. I hope Autodesk’s new found popularity on mobile

devices is not going to make it take its eyes off the core professional business; mobile

revenue pales into insignificance to that of any one of Autodesk’s design products

alone.”

• Objective 5:Pulling it all together – for a future Revit- Cloud Project (Slide 49)

1. Question early assumptions- our focus on BIM Standards specifics:

2. Role of Standards in BIM & CLOUD performance: Don’t reinvent square wheels

P a g e | 19

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

3. Standards and templates can be used to leverage smart solutions to big problems: NBIMS 2.0

4. Examples of how to leverage specific standards to specific problems: BIM Cloud Templates

• Our Focus – Standards that Support Your Thinking =NIBS 3.0 Hopes Explained (Slide 50)

– The Terms and Definitions chapter was not published as developed…

– Integration between high level strategy and operational IT departments can be

improved by consideration of CLOUD platforms, Web Services – XML – IFC

architectures…

– Greater outreach at events such as AU 2012 and local Revit User Groups is needed;

– Sloppy and incomplete categories (Level of Detail – LoD) can be improved with

conversations with liaisons to standards groups such as OMG, OGC, OASIS, BIM Forum,

and Fiatech.

• NEEDED: Simultaneous Planning for Sequential Analysis for Decision Making: Towards a

“Linear” Process Map (Slide 51)

• Describe your project and your Work Station loaded with software (GE, etc., and

Chrome or Firefox Browser)

• Your Revit *.dwg files at a Low LEVEL of DETAIL

• Navigate to NIBS 2.0 and get access to Project Execution Planning documentation and

templates (MS Visio- for now)

• Navigate to OS, Log In, Open FUSION Studio

• Select MiraCosta Campus, Building 4200

• Create a New Project using your name-CloudBIM

• Navigate to relevant building (Facility 4200)

• Review Building Settings and related data

• Install Revit 2012 Plug-in and related 3rd party applications

• Google Earth and geo positioning and geo referencing

• Energy Analysis –Vasari

• Three D Views – DDS

• Schedule – Timing- Synchro

P a g e | 20

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• FM – Cost – COSTOS

• Risk Assessments = Palisade Risk Analysis

• Use OS Reporting system

• Suggested “Rules of BIM Cloud Project Success” (Slide 52)

• The Object Management Group (OMG) has a group working on Business Rules

and Semantic Vocabulary that can be used to improve the standards and the way

that lawyers frame construction projects

• Does your team know what “BIM” means?

• A BIM is a digital representation of physical and functional characteristics of a

facility. It provides services & knowledge required in subsequent steps in the

Cradle to Cradle life cycle; A BIM “PxP Manual” typically reflects your firm’s

interpretation of NBIMS 2.0 Best Practice & Exchange Standards.

• Can you use “the Cloud” to align BIM Execution Plans & Models with knowable realities

and wicked problems?

• A Cloud environment as envisioned by Autodesk and as available from a few

vendors, allows intense conversations and the capture of collaborative decisions

by anyone anywhere if they hold valid subscriptions. The example we use is

ONUMA SYSTEM’s BIMStorms.

• Do you have “standardized” process maps & quality tests?

• We provide process map Templates that you can customize that we modified

from the NBIMS 2.0 standard. You need to consider what testing your client

needs.

• Have you worked thru the most problematic strategic issues?

• In your first BIMStorm project, just getting started is the main problem.

• Are your process maps designed to be easy to re-use next time? Why do you believe it?

• Cloud strategic thinking and rapid collaboration is more UNSTRUCTURED (Slide 53)

– Process Maps of formalized linear processes will not likely fit;

– Creative designs and counter-designs will create useful fictions or frictions, depending;

– Ad hoc processes need to be modeled, and as tasks become clear, then formalized;

P a g e | 21

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

– Overly bureaucratic early design stages will be brittle and likely dysfunctional;

– Next: Examples of two kinds of Process Maps:

• Workflow Modeling Types: Linear – Sequential OR Non-Linear Communication (Bureaucratic or

Professional) (Slide 54)

• Ad Hoc workflow (or a loose BIMStorm) Slide 65

– NO Sequence, just flows of Information (Look at the Arrow Heads)

• Help add content to NBIMS 3.0 – Start with issues in 2.0 Watch the Video (Slide 56)

– http://www.nationalbimstandard.org/introduction.php

• ISO Standards and VIRTUAL models Vs. PHYSICAL buildings – (Slide 57)

– This is an important slide because it frames the two modes (Digital or Physical) in terms

of Process, Product, and Results. Why is a Virtual Building important to many different

disciplines? How does a virtual building facilitate the execution of a Physical building

project?

– with a process (template) and a product (catalog) room; where tested software modules

can be used and reused and reused yet again – with perhaps slight modification-

combine to form a REUSABLE BIM Virtual Building of Components that all work together

as an integrated (and testable) form. AutoCodes and Automatic Code Check apps are

being tested now at Fiatech and certain cities in the US and abroad. The Lawrence

Berkley National Lab’s FLEXLAB is open for business… http://eetd.lbl.gov/research-

development/area/flexlab

• An attempt to define a High Performance Building and Frame an Owner Performance

Requirements BIM at NIBS has been funded by the Department of Homeland Security Office of

Policy. The Beta version is complete, and work has started on the next phase. Bob is on the Beta

test team and is interested in how many reusable BIM elements are possible.

http://www.oprtool.org/

• At some point in the near future it is conceivable that Fiatech’s AutoCodes project and

Replicable Building project will merge and California’s Title 24 – Energy Efficiency and Green

Building codes will map onto ResNet and ComNet HERS ratings. Any lease or sale of a

commercial or residential building over _xxx sq foot in size will need an energy

score/sustainability score. Eventually, Owners Project Requirements and Owners Performance

Requirements will be fully aligned. The Insurance Commissioners (with ceres) and Real Estate

P a g e | 22

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

Industry sectors might find that buyers and sellers will demand such utility cost knowledge in

advance of purchasing.

• GSA and Federal BIM Mandates Slide 71 For federal projects, the General Services

Administration has published and supported research on building performance with BIM 3D –

4D. International construction firms are noting how the UK and Singapore, among other

nations, are mandating BIM standards.

• The GSA, however, has mandated the use of BIM for spatial program validation to be

submitted prior to final concept presentation on all its projects starting from 2007.

• This allows the GSA design teams to validate spatial program requirements such

as required spaces, areas, efficiency ratios, and so on more accurately and

quickly than traditional 2D approaches.

• As it owns over 300 million square feet of space, this concept design stage

validation helps the GSA to better manage it over the long term.

• The GSA has provided more details about how to create this Spatial Program Validation

BIM for its projects in a special Guide that is available on its website.

• This is one of a series of guides that the GSA has made available for different

aspects of its 3D-4D-BIM program such as laser scanning, energy performance,

circulation, facility management, and so on.

• Thinking ahead about needed BIM Retrofit Markets (Slide 59)

– Performance metrics- be clear about building performance, NOT process or hardware – Ontolog

BSP Wiki and Toby Considine’s points about oBIX;

– General – owners performance requirements now much easier to capture with 3D visualizations

once we are on a Cloud;

– OPR Tool for initial assessment of owner – investor values ( and regulatory dynamics)

– NIBS’s Council on Finance – Insurance – Real Estate (C-FIRE) Risk of Climate Change’s Sea Level

and Hurricane Sandy (Oct. 2012 – NYC’s Mayor Bloomberg)

• Reality Check on Learning Objectives (Slide 60)

• Session Feedback Slide 74 – Please remember to provide feedback on this session.

• END of PRESENTATION Thank you for participating

– Questions?

P a g e | 23

Smith & Redmond AU – 2012 – Deciding how to BIM in a CLOUD November 11, 2012

• Bob – [email protected]

• Alan - [email protected]

– The Long View of Sustainability – Resilience – Bryn Davidson developed this log – log

chart to demonstrate how time can be represented in BIM reports. The life cycle of a

building can be compared to the life time of the owner or tenant of a building, a sewer

system, or a transportation system. Check out his website

http://dynamiccities.squarespace.com/ .

The Long View of Sustainability - Resiliency

10/8/2012 AU 2012 - Deciding to BIM in a CLOUD 77