Hampshire Streetworks Quarterly Co-ordination Meeting Wednesday 9 th October 2019 1000 1200 Ashburton Hall, EII Court NEW ROAD AND STREETWORKS ACT 1991 / TRAFFIC MANAGEMENT ACT 2004

Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Hampshire Streetworks Quarterly Co-ordination

Meeting

Wednesday 9th October 2019

1000 – 1200

Ashburton Hall, EII Court

NEW ROAD AND STREETWORKS ACT 1991 / TRAFFIC MANAGEMENT ACT 2004

Page 2: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Agenda• Upcoming Major Works

• Area West

• Area East

• Area South

• Area North

• Area Central

• Cross Border

• Colas acting on behalf Portsmouth City Council PFI

• Performance Data

• Any Other Business

• Lane Rental

• Permit Scheme Performance

• Resourcing Sites

• TTROs for PROWs

• We're Hiring

• Christmas Restriction

• Next Meeting

Page 3: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Upcoming Major Works

• Area West

• Area East

• Area South

• Area North

• Area Central

• Cross Border

Page 4: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area West

Page 5: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Holmsley BridgeHCC

• Bridge replacement and new alignment

• Estimated 8 weeks closure of A35 in Autumn 2020, with other TM set-ups after

• Wide diversion route around New Forest

• Works on Traffic Sensitive roads to be restricted

• No SU new apparatus works should be allowed over A35 and C10 (consulatation with Coordinator to be carried out)

Page 6: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Hut Hill Cycle Lane, Chandler’s FordHCC

• 25/10/19 - March 2020

• Construction of cycle lane on Winchester Road between Asda Roundabout and Chilworth Roundabout

• TM: 24hr TTLs

Page 7: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Fernhill Lane, New Milton

• 23/10/19, for approx. 10 days

• TM: Road Closure in both directions

• Sewer Connection

• Collaborative working opportunity

• Works on TS Streets in New Milton will be restricted

Page 8: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Lyndhurst Rd, BrockenhurstHCC

• 4/11/19 – 13/12/19 and 6/1/20 –3/4/20

• Footway works between BalmerLawn Road and Brookley Road

• TM: 2-Way TTLs, off peak between 0930 – 1600

• No weekend working

Page 9: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Romsey Drainage – Middlebridge St HCC

• 15/11/19 – Feb 2020

• Drainage maintenance and improvement works

• TM: 2-Way TTLs, off peak

• From Mainstone Junction to 240m north west along the A27. From Mainstone Junction to 175m north east along the Mainstone

• Diversionary works underway

Page 10: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Romsey Drainage, Duttons RdHCC

• Dates TBC

• Proposed drainage scheme

• Involve 6 week closure between Greatbridge Road and Station Road

• Preference is Summer Holidays 2020

• Highly disruptive as main route into town from North and to rail station

• Politically sensitive

Page 11: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Romsey Drainage, Greatbridge RdHCC

• 3/2/20 for approx. 3 weeks

• Drainage improvement works

• TM: 24hr TTLs, with all day manual control

• Includes weekend closures of Budds Lane

Page 12: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Lepe

• 1/10/19 – 20/1/20

• TM: Road Closure on Lepe Road between Hampton Lane and Exbury Road

• Mains Renewal

• 4/11/19 – 20/1/19

• TM: Road Closue on Road Through Exbury between Summer Lane and Lepe Road

• Mains Renewal

Page 13: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

SSEN Upgrade, Crampmoor

• Ongoing SSEN works

• TM: 24hr TTLs on Winchester Road, manual control in peak times

• Next phases TBC, but includes closure of Green Lane (est. Winter 19/20) and Highwood Lane (est. Summer 20)

Page 14: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

SSEN Upgrade, Andover

• Proposed network upgrade from Anton Mill Road to substation behind the Hospital

• Full route TBC. A3057 Western Avenue then either Charlton Road or A343 Redon Way - Trial hole investigations underway

• Lane closure on Western Avenue. TM set-up for Charlton Rd or Redon Way TBC

• Completion requested by April 2020, start date TBC but likely November

Page 15: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Footway Works, FordingbridgeHCC

• Resurfacing and civils proposed for February half term 2020

• TM: 24hr closure of Salisbury Rbt at junction of Bridge Street

Page 16: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Eling HillHCC

• 4/11/19 - 8/11/19

• Carriageway works

• TM: 24 closure

• Diversion on TS streets

• 11/11/19 - 15/11/19

• Lexbury Road

• Carriageway works

• TM: Closure, diversion in the estate

Page 17: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

TVBC Future Works

Page 18: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area East

Page 19: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Butts Bridge, Alton278

• Expected end date 14/11/19

• The replacement of the brick arch railwaybridge with a new steel structure

• Replacement of the existing doubleroundabout junction between the A339, ButtsRoad and Winchester Road with a new singlelarge roundabout with widened approaches onthe A339, and improved foot/cycleway links.

• Provision of a new roundabout junction toserve the Selborne Road site on the A339,providing access to Winchester Road via anew link road.

Page 20: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Budds Ln, BordonHCC

• 29/04/19 - 01/10/19

• Improvement works to footway and carriageway resurfacing

• Drainage works for new school

• TM: Road Closures and TTLs

Page 21: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Butts Bride, AltonBudds Lane

Page 22: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Emsworth Common Rd, HavantHCC

• 23/09/19 – 27/10/19

• TM: 24hr Road Closure

• Drainage Improvement Works

• Diversion through Westbourne

Page 23: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Havant Rd & Warblington Rd, EmsworthSSEN

• 13/06/19 – 18/10/19

• TM: Road Closue on Warblington Road and Multi-way TTLs on Havant Road

• Repair oil filled cable leak

Page 24: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Havant Rd / Selangor Ave, Emsworth278

• 15/07/19 – 30/10/19

• TM: Two-way TTLs, manual control from 0630 – 1830

• New signal junction and pedestrian crossing, with widening of A259

Page 25: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

College Rd / Purbrook Way, Waterlooville278

• Approx. 16 week closure proposed from Jan – May 2020

• Next to South Downs College

• Upcoming meeting arranged for these works

Page 26: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area South

Page 27: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

North Whiteley Development 278

• Botley Road, Curbridge

• 16/09/19 – 08/11/19

• TM: Two-way TTLs

• Creation of new Northern Access

• Works up to mid 2020

• Cycleway / footway scheme to be added to Northern Access Junction

Page 28: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Eclipse Busway Phase IIHCC

• Rowner Road, Gosport

• Dates TBC

• TM: TBC

Page 29: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bull Ln, Waltham ChaseLicence

• 14/10/19 for approx. 3 months

• TM: Road closure of Bull Lane and Little Bull Lane

• New Development at Hunters Green

• Construction of a new sewer

Page 30: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A32 Hoad’s Hill, WickhamS278

• Dates TBC

• Re-surfacing night works

• TM: Road closure

• Approx. 10 nights

Page 31: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Marine Parade West, Lee on the Solent

• Dates TBC

• TM: Multi-way Lights (24hr)

• Gas Mains Upgrade

Page 32: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Redlands Ln, FarehamHCC and SGN

• SGN – Mains Upgrade Project from Upper Saint Michaels Grove to Mill Rd

• Feb 2020 - approx. 6 weeks, involving 4wks of 24/7 road closures severely impacts BRT bus route

• Summer 20 - OPRES resurfacing of Redlands Lane under 2/3 week closure

Page 33: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A27 Southampton RdHCC

• 29/07/19 – 28/10/19

• TM: Lane Closures

• Various minor repair works along the carriageway and footway of the A27 between Segensworth Roundabout and Titchfield Gyratory. Footway closure alongside Titchfield Primary School for replacement of path surface

Page 34: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Quay Street Roundabout278

• Summer 2020

• S278 remedial c/way surfacing works

• Overnight works will be a requirement

Page 35: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Fareham

• 22/07/19 – 31/10/19

• Lay new HV cable

• TM: TTLs and Road Closures

• Roads Affected:• Wallisdean Avenue

• Highfield Avenue

• Fairfield Avenue

• St. Anne’s Grove

• St. Michael’s Grove

Page 36: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Stubbington Bypass, Lee-on-the-SolentHCC

• Reconstruction

• TBC 18/11/19 start

Page 37: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Haslar Development

• Works in progress for approx. 9 months

• Road closure on Clayhall Road between Haslar Road and Anglesey Road for 9 months from the 1st November 2019 to the end of June 2020

• Road closure on the Avenue road between Green Road and Privet Road to run concurrently from July 1st July 2020 for 4 months until the end of October 2020

• Cross connection to make at Privet Road to make at the junction of Oval Gardens – yet to be confirmed

Page 38: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A32 Fareham RdHCC

• A32 Fareham Road junction with Wych Lane

• Widening of A32

• Night works

Page 39: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A27 Delme, FarehamHCC

• 21/10/19 – 22/11/19

• TM: Multi-way signals and night-time Lane closures

• Traffic upgrade signals

Page 40: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Parkway, WhiteleyHCC

• 27/09/19 – 30/11/21

• TM: Lane Closure

• Major junction upgrade works at M27 J9 and Parkway south roundabout in Whiteley

Page 41: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area North

Page 42: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Hartley Wintney

• 24/06/19 – Dec '19

• Mains Upgrade

• Works left at A30 j/w Hares Lane

• Connection left at Belgrave Mews

Page 43: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Winchester St, Basingstoke

• Dates TBC

• Mains Upgrade Project

• Discussions still ongoing

Page 44: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Chapel Hill, Basingstoke

• 4/11/19 – 2/12/19 (TBC)

• TM: Some Carriageway Incursion

• Mains upgrade

• Likely to cause disruption due to close proximity of train station

• Liaison with NR and B&D BC for specialist material and permission to work on NR land

Page 45: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Newnham Rd, Hook

• 29/07/19 – February 2020

• New Water Main

• TM: Road Closure

• Affected Roads:• Ridge Lane • Crown Lane• Tylney Lane• Newnham Lane

Page 46: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A340 Ringway West, BasingstokeHCC

• 20/05/19 – 30/11/20

• TM: Lane Closure

• Carriageway widening on all approach arms and circulatory carriageway

• Signalisation of roundabout and installation of toucan crossing

Page 47: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Buckskin Flood Alleviation SchemeHCC

• Dates TBC

• TM: Road Closures

• Installation of new drainage infrastructure

Page 48: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Crookham Rd / Glen Rd, Fleet

• November 2019 (TBC)

• Closure of Glen Road, for storage compound at junction with Crookham Road

• TM: Two-way rolling TTLs down Crookham Road, with side road closure

• Manual control in peak hours

• Mains upgrade project

Page 49: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Fernhill Rd / Lane, Hawley

• 24hr closure of Fernhill Lane

• TTLs at junction of Fernhill Road with Woodlands Walk 28/10/19 –8/11/19

• TTLs along Woodlands Walk 30/10/19 – 19/11/19

• TTLs at junction of Fernhill Lane to near Riverside Yard (11/11/19 –26/11/19

Page 50: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Titchners Farm, London Rd, Hook

• 13/1/20 – 31/3/20

• TM: TTLs

• Upgrade to sewer to accommodate new housing development

Page 51: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area Central

Page 52: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Jewry St, Winchester

• Footway remedials

• Dates 11-22 November

• TM: Some carriageway incursion

• Contact: Duncan Fowler SSE

Page 53: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

High St, WinchesterHCC

• Footway resurfacing

• TM: footway closures in place, possible night closures for carriageway repairs

• Currently ongoing due to finish end of November 2019

• HCC Contact – Gary Shotter

Page 54: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bishopstoke

• Works are now in progress – 40%

of present submitted build phases

completed

• Fibre cabling

• Due to finish March 2020

• TM: Various TM throughout

scheme including TTLs, no road

closures

• Contact: Scott Vander

Page 55: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Hiltingbury Rd VM Chandlers Ford

• Various location around this area -mostly residential areas. Works on Hiltingbury Road, Ashdown Road, Nichol Road etc.

• Due to finish in January 2020.

• TM – Mostly non positive TM but occasional use of TTLs

• Contact: Scott Vander

Page 56: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Stoneham Ln, Housing DevelopmentS278

• New Roundabouts Concorde Club and Lakelands / Old Stoneham Lane Footway construction. New access into the housing site and signalised junction

• The surfacing quality is being investigated

• Minor footway works still remaining

• Due to finish December 2019

• Contact: Abayomi Kasinro

Page 57: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Chestnut AvenueS278

• Follows on from Stoneham Lane project

• Works due to start early 2020

• New signalisation works at junction with Nightingale Avenue

• TM: Under discussion

• Contact: Abayomi Kasinro

Page 58: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bar End Road, WinchesterS278

• Due to start in March 2020

• Due to be completed end of 2020

• TM will be TTLs and closure for surfacing phase

• New Leisure Centre development

• Blanchard Wells – Chris Hill

Page 59: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Woodhouse Lane, Hedge EndHCC

• Woodhouse Lane to be widened and 3 new highway structure to be installed.

• TM: Road closures and TTLs

• Currently at this time trial holes are being undertaken

• Investigations are ongoing

• HCC contact Chris Campos

Page 60: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Windover Roundabout/ J8

• Carriageway widening of Windover Roundabout and all arms off the roundabout

• TM: Lane closures and proposed full closures

• Due to start March 2020

• HCC contact Mark Webster

Page 61: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bishopstoke RoadHCC

• Upgrade to existing footway

• Change Pelican crossing to a Toucan crossing

• Starting 16 October

• Due to finish November 2020

• TM: TTLs

• Contact – Steve Swain

Page 62: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bournemouth Road – New Villiage Hotel

• HCC 278 team – New footway, associated drainage and access.

• Works due to commence in Feb/March 2020

• TM will be TTLs

• Contact: Farncombe Construction

Page 63: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Bournemouth RoadLicensed Works

• Due to start in 2020

• New foul and surface water sewer installation

• Coincide with HCC 278 Works

• TM: TTLs and lane closures at times.

• Due to finish summer 2020

• Contractor: Farncombe Construction

Page 64: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Cross Border

Page 65: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

A3, A27 Southampton RoadPCC

• 7/10/19 – 1/11/19

• TM: Lane Closure

• Widening and resurfacing of the existing footway/cycleway on the north side of A27 Southampton Road for extents of service road. Scheme also requires changes to lamp column positions, traffic signal heads and street furniture.

Page 66: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

• Authority: SCC

• Start: Nov / Dec 2019

• Duration: 12 Months

• Discussion is underway

Portswood Scheme

Page 67: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Southampton City West - Overview

Page 68: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Redbridge Roundabout

• May 2019 – Spring 2020

• An upgrade to the Redbridge roundabout. This will include a dedicated left-turn lane for traffic leaving the M271 to access Southampton docks and city centre.

Page 69: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

M27 Romsey Road Bridge, Nursling

• April 2018 – January 2020

• Demolishment and replacement of the bridge

• HCC / SCC have proposed January Dates

• Two-Way TTLs still in place

Page 70: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Smart Motorways

• M27 Junction 4 – 11

• Now – 2021

• Periodic overnight closures

• Narrow lanes – 50mph

• https://highwaysengland.co.uk/projects/m27-junctions-4-to-11-smart-motorway/

Page 71: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Colas acting on behalf Portsmouth City Council PFI

1. Current & Planned Works

2. Cleansing and Grass Cutting Closures

3. Resurfacing, Structures & Signals

4. Special Events

5. Seasonal directional

6. Sample inspection performance Q2

7. Contact details

Page 72: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

1. Current & Planned Works

Road Name OwnerStart Date/

DurationEnd Date Comments

King street, (former Southsea

community centre)PMC 29/04/2019 29/10/2021

Road closure / construction of 5 story

building (Ongoing)

Museum Road Wates 24/06/2019 24/11/2020

Removal of coach/parking bays

(Ongoing)

Dundas Lane (Admiral Lord Nelson )

PCC 22/07/2019 22/12/2019

Modify access to school, night works

till 03.09.19 (Ongoing)

Old Star Place Adam Bidhendy 14/05/2018 01/11/2019Premier Inn Build – Advance warning

sent (Ongoing)

King Street PMC 02/10/2019 30/11/2019 Movement of plant

Lonsdale Ave CKH/SGN 07/10/2019 20/10/2019 Gas Mains Replacement

Kings Road and Flint Street A-Plant Lux 14/10/2019 15/10/2019

Manhole replacement (multi-way

signals) Night

Garfield Road, Portsmouth Cappagh Browne 18/10/2019 19/10/2019 Parking suspension only

Landport Street Cappagh Browne 21/10/2019 18/11/2019 Replacing of water main

Page 73: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Road Name OwnerStart Date/ Duration

End Date Comments

Stanhope Road - Commercial Road/Edinburgh Road

City Lifting

27/10/2019

03/11/2019

17/11/2019

28/10/2019

04/11/2019

18/11/2019

Revoke TRO 17, Sat 04:00 till Sunday 05:00

Alec Rose Lane Kier

27/10/2019

03/11/2019

17/11/2019

27/10/2019

03/11/2019

17/11/2019

Road Closure- Crane location in Highway

Elmwood Road Openreach 31/10/2019 02/11/2019 New service , extra night in case

Specks Lane Cobra Traffic Management 31/10/2019 01/11/2019 Telecoms maintenance

Eastern Road Colas Ltd 04/11/2019 06/11/2019 Deflectograph survey works- Night

Western Road Colas Ltd 06/11/2019 08/11/2019 Deflectograph survey works- Night

M275 NB and SB Colas Ltd 08/11/2019 10/11/2019 Deflectograph survey works- Night

Dorking Crescent DN Associates 12/11/2018 12/06/2020 Temp one way system

Page 74: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

2. Cleansing / Grass Cutting Closures Road Name Owner Start Date End Date

Day or Night Works

Comments

J and J

(Southampton Road, M275 / M27)

Colas Ltd 7/10/19 11/10/19 Nights SRW REF ; 83397 22:00 to 05:30

M275 SB and NB

Cleanse +

Southwick Rd

TRO 11/19

Colas Ltd 14/10/2019 18/10/19 NightsNB Full Flyover, NB + SB Lane

closure SRW 83378

Southampton

RoadColas Ltd

20/10/2019

10/11/2019

01/12/2019

15/12/2019

20/10/2019

10/11/2019

01/12/2019

15/12/2019

Day Grass cutting (lane closures)

Holbrook road Colas Ltd 31/10/2019 02/11/2019 Nights Road Closure

Eastern Road

CleanseColas Ltd 02/12/2019 04/12/2019 Nights SRW REF ; 83417 22:00 to 05:30

Western Road Colas Ltd 4/12/19 6/12/19 NightsCleanse (lane closure) SRW Ref

83417

M275 SB and NB

Cleanse +

Southwick Rd

TRO 11/19

Colas Ltd09/12/2019 13/12/2019 Nights

NB Full Flyover, NB + SB Lane

closure SRW 83378

Page 75: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

3. Resurfacing, Structures & Signals Road Name Owner Start Date End Date Detail

Twyford Avenue Colas Ltd 09/09/2019 31/07/2020 LCR Carriageway Resurfacing

Stamshaw Road Colas Ltd 09/09/2019 31/07/2020 LCR Carriageway Resurfacing

Havant Road (part) Colas Ltd Mon 14/10/19 Fri 01/11/19 LCR Carriageway Resurfacing

Tangier Road (part) Colas Ltd Mon 28/10/19 Fri 08/11/19 LCR Carriageway Resurfacing

Spur Road Colas Ltd Thu 07/11/19 Tue 19/11/19 LCR Carriageway Resurfacing

Devonshire square (part) Colas Ltd Thu 14/11/19 Fri 22/11/19 LCR Carriageway Resurfacing

Holbrook Road/ Garnier street 2019-1001 Mon 14/10/19 Fri 01/11/19 LCR Electrical – Traffic Signals

Havant Road / Lower Drayton Lane Colas Ltd Mon 04/11/19 Fri 22/11/19 LCR Electrical – Traffic Signals

Allaway Avenue /Woofferton Road Colas Ltd Mon 18/11/19 Fri 06/12/19 LCR Electrical – Traffic Signals

Page 76: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Road Name Owner Start Date End Date Detail

Prince George Street Colas Ltd Tue 07/01/20 Tue 14/01/20 LCR Footway Resurfacing

London Road - Unclassified Colas Ltd Mon 13/01/20 Tue 11/02/20 LCR Footway Resurfacing

Elm Grove Colas Ltd Mon 30/03/20 Wed 06/05/20 LCR Resurfacing 14.1

Programme TTRO Order

Kings Road Colas Ltd Mon 06/04/20 Wed 22/04/20 LCR Resurfacing 14.1

Programme TTRO Order

Victoria Road north Colas Ltd Mon 20/04/20 Fri 29/05/20 LCR Resurfacing 14.1

Programme TTRO Order

Milton road (St Marys Rd RAB -

Velder Avenue)

Colas Ltd Mon 01/06/20 Mon 15/06/20 LCR Resurfacing 14.1

Programme TTRO Order

Havant Road Colas Ltd TBC TBC LCR Resurfacing 14.1

Programme TTRO Order

Hayling Avenue Colas Ltd Mon 01/06/20 Tue 07/07/20 LCR Resurfacing 14.1

Programme TTRO Order

St Marys Road RAB Colas Ltd Wed 10/06/20 Fri 19/06/20 LCR Resurfacing 14.1

Programme TTRO Order

Havant Road / Court Lane Colas Ltd Mon 06/01/20 Fri 24/01/20 LCR Electrical – Traffic Signals

M275 Slip Road / Ferry Port Colas Ltd Mon 03/02/20 Fri 20/03/20 LCR Electrical – Traffic Signals

Holbrook Road/Somers Road North Colas Ltd Sun 23/02/20 Tue 21/04/20 LCR Electrical – Traffic Signals

Stamshaw Road/Angerstein Road Colas Ltd Mon 02/03/20 Fri 20/03/20 LCR Electrical – Traffic Signals

Eastern Road / Copsey path

underpass

Colas Ltd Mon 06/04/20 Wed 13/05/20 LCR Electrical – Traffic Signals

Fratton Road/Bridge Centre Colas Ltd Mon 20/04/20 Mon 11/05/20 LCR Electrical – Traffic Signals

St Marys Road/Shakespeare Road Colas Ltd Mon 11/05/20 Mon 01/06/20 LCR Electrical – Traffic Signals

Rudmore RAB - 4 subways Colas Ltd Mon 11/05/20 Fri 10/07/20 LCR Electrical – Traffic Signals

Winter Road/Devonshire Avenue Colas Ltd Mon 01/06/20 Fri 26/06/20 LCR Electrical – Traffic Signals

Eastney Road/Bransbury

Road/Devonshire Avenue

Colas Ltd Mon 29/06/20 Fri 17/07/20 LCR Electrical – Traffic Signals

3. Resurfacing, Structures & Signals 2020

Page 77: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

4. Special EventsName Date Location

Walk for freedom Sat 19/10/19 - Sat 19/10/19 Portsmouth Guildhall Square

Great South Run Sat 19/10/19- Sun 20/10/19 Clarence esplanade – Pier Road – Pembroke

Road - High Street – St Georges Road – B2154

– Main Road – Victoria Road – Gloucester Road

– Cross Street - Queen Street – Anglesea Road

- A2030 – A288 – Kings terrace – Clarence

parade – Eastern Parade – Eastney Esplanade

King George Fireworks Wed 06/11/19- Wed 06/11/19 King George Playing Field

Remembrance Sunday service Sun 10/11/19- Sun 10/11/19 N/A

Commercial Road Christmas lights switch on Thu 21/11/19- Thu 21/11/19 Commercial Rd and Cascades shopping centre

Cosham Christmas lights switch on Thu 28/11/190 Thu 28/11/19 High Street

Victorian Christmas festival Fri 29/11/190 Sun 01/12/19 Portsmouth Historic Dockyard

Festival of Lights Thu 05/12/190 Thu 05/12/19 Fratton Road

Lake of Lights Sun 15/12/190 Sun 15/12/19 Canoe Lake

Page 78: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

5. Seasonal directional

All highlighted routes starting on 7th December through to 5th January will have restrictions / directions imposed.

Ideally works to be completed before or postponed to after the dates detailed above.

Page 79: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

6. Portsmouth Q2 Performance

For Inspection and site visit enquiries contact [email protected]

Page 80: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

7. Contact details Noticing, FPNs, S74, S81’s etcColas LtdWalton RoadFarlingtonPortsmouthHantsPO6 1TAGeneral Tel 02392 310 900

[email protected]

Network Coordinator (primary contact)

[email protected]

Noticing Admin & licensing

[email protected]

Network Utility Inspector

[email protected]

TM auditor / TSCO

Parking [email protected]

TTRO / TRN applications

[email protected]

Page 81: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Performance

Page 82: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel
Page 83: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Any Other Business

Page 84: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Lane Rental

• HCC planning to introduce a scheme in 2021

• Early engagement with DfT

• We'll be keeping everyone updated as things progress

Page 85: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Street Manager

• HCC testing in sandbox from Nov

• We will be using Confirm through the API

• Potential lag in permit processing – please don't send 'clusters of permits' as the lag may cause permits to be loaded out of sequence

Page 86: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Permit Scheme Performance

• Some headline figures so far (data for SU works only, at the moment)

• 70% of works are completed in one phase

• 175 instances of collab working

• ¼ of all works have improved info for residents / motorists

• ¼ of all works done outside of peak times / extended working hours

Page 87: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Resourcing Sites

• Critical sites need to be resourced appropriately

• Failure to do so will draw criticisms and complaints

• Continued failure to resource sites, may result in permits being revoked

Page 88: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

TTROs for PROWs

• https://www.hants.gov.uk/landplanningandenvironment/rightsofway/temporaryclosures

Page 89: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Area Co-

Ordinator East

Page 90: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Christmas Restrictions In

Hampshire

9/12/19 – 10/1/20

Some A & B Class and Traffic Sensitive Roads

Page 91: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel
Page 92: Hampshire Streetworks Quarterly Co-ordination Meeting · Butts Bridge, Alton 278 •Expected end date 14/11/19 •The replacement of the brick arch railway bridge with a new steel

Next Meeting

15/01/20

0930 arrival

1000 – 1200

Ashburton Hall, Podium Level, Winchester