STATUS OF THE HADRONPHYSICS PROJECT Carlo Guaraldo NuPECC 54 th Meeting Groningen, 18-19 November 2005

HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

  • Upload
    vukien

  • View
    212

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

STATUS OF THE HADRONPHYSICS PROJECT

Carlo Guaraldo

NuPECC 54th Meeting

Groningen, 18-19 November 2005

Page 2: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

ContentsContents1. The HadronPhysics Project

2. Activities of the Project

3. Time scale of the Project

4. First Annual Report

5. Scientific achievements

6. Other activities: HadronPhysics and ECT*

7. Second pre-financing

8. Towards the Second Annual Report

9. Mid-term Review

10. Towards FP7

Page 3: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

HadronPhysicsHadronPhysics ProjectProject

• Project Coordinator: Carlo Guaraldo (INFN-LNF, Italy)• Managing Institution: INFN-LNF, Italy• 29 Activities:

- 1 Management Activity- 7 Networking Activities- 9 Transnational Access Activities- 12 Joint Research Activities

• 49 Contractors• 70 Institutions receiving EC funds + 60 Other Involved Institutions• 2000 European scientists• EC budget: 17.4 M€• Duration of the contract: 4 years• Start of the contract 01/01/04

All information is available at: http://www.infn.it/eu/i3hp/wel.html

Page 4: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Activities of the

HadronPhysics Project

Page 5: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Networking ActivitiesNetworking Activities

Activity Number Descriptive Title Acronym Spokesperson

N1 Compressed baryonic matter CBMnet Peter Senger,GSI

N2 Computational (lattice) hadron physics ComHP Gerrit Schierholz,

DESY-Zeuthen

N3 Dimuon physics in heavy-ion collisions at LHC DIMUONnet Ermanno Vercellin,

INFN-TO

N4 Production and decay of mesons and resonances EtaMesonNet Bo Höistad,

UU

N5 Structure and dynamics of hadrons HadronTh Ulf-G. Meissner,

U Bonn

N6Strongly interacting matter in

ultrarelativistic heavy-ion collisions

SIM Joerg Aichelin,CNRS/IN2P3- SUBATECH

N7 Exploring the unknown transverse spin structure of the nucleon TRANSVERSITY Enzo DeSanctis,

INFN-LNF

Page 6: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Transnational Access ActivitiesTransnational Access Activities

Activity Number

Descriptive Title Manager

A1 Access to RI “Laboratori Nazionali di Frascati (LNF)”

Carlo Guaraldo,INFN-LNF

A2 Access to RI “DESY-HERMES” Elke-Caroline Aschenauer,DESY-HERMES

A3 Access to RI “FZJ-COSY” Dieter Grzonka,FZJ-COSY

A4 Access to RI “FZY-NIC/ZAM” Norbert Attig,FZY-NIC/ZAM

A5 Access to RI “GSI” Klaus-Dieter Gross,GSI

A6 Access to RI “MAMI” Thomas Walcher,U Mainz

A7 Access to RI “ZIB” Hinnerk Stueben,ZIB

A8 Access to RI “MAXLAB” Bent Schroeder,MAXLAB

A9 Access to RI “The Svedberg Laboratory (TSL)”

Curt Eckstrom,TSL

Page 7: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint Research Activities (I)Joint Research Activities (I)

Activity Number Descriptive Title Acronym Spokesperson

JRA1 Future data acquisition system FutureDAQ Walter Müller,GSI

JRA2 Fast compact EM calorimeters FastEMCalorimeters

Rainer Novotny,JLU-PIG

JRA3 European tagged photon facilities EuroTagKen Livingston,

U Glasgow

JRA4 High speed gas detectors with integrated electronics Gas Detectors Johannes Wessels,

WWU

JRA5 Generalised parton distributions GPD Ralf Kaiser,U Glasgow

JRA6 High luminosity hypernuclear gamma-spectroscopy HyperGamma Alessandro Feliciello,

INFN-TO

JRA7 High luminosity internal targets for storage rings Internal Targets Herbert Orth,

GSI

Page 8: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint Research Activities (II)Joint Research Activities (II)

Activity Number Descriptive Title Acronym Spokesperson

JRA8 Polarized nucleon targets for Europe Polarized Targets

Werner Meyer,RUB

JRA9Ring imaging Cherenkov

counters for particle indentification

RICH Detectors Silvia Dalla Torre,INFN-TS

JRA10 Silicon drift detectors for X-ray spectroscopy SIDDHARTA Vincenzo Lucherini,

INFN-LNF

JRA11 Novel Radiation Hard CVD -diamond detectors NoRHDia Eleni Berdermann,

GSI

JRA12 Advanced TOF detection systems Advanced TOF Norbert Hermann,

UHEI-PI

Page 9: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Time scale of the

HadronPhysics Project

Page 10: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Time scale of the HadronPhysics Project in 2005Time scale of the HadronPhysics Project in 2005

- 14 February 2005 delivery to Bruxelles of the First Annual Report

-21 April 2005 approval of the first amendments to the contract

-10 June 2005 approval First Annual Report

-13 June 2005 delivery of the Complementary Management Report (CMR)

-31 August 2005 approval of the CMR

-12 September 2005 delivery second pre-financing

-7 November 2005 start road map to prepare the Second Annual Report

Page 11: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

First Annual Report

Page 12: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

First Annual ReportFirst Annual Report

According to the “Guidelines for reporting for Integrating Activities implementedas Integrated Infrastructure Initiatives”, Edition December 2004,the Annual Report is made of 4 parts:

1. ACTIVITY REPORT

2. MANAGEMENT REPORT (FINANCIAL INFORMATION)

3. REPORT ON THE DISTRIBUTION OF THE COMMUNITY FINANCIAL

CONTRIBUTION

4. DETAILED IMPLEMENTATION PLAN FOR THE NEXT 18 MONTHS

Page 13: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Management of the consortium to prepare the Annual Report

B. Financial Report1. Justification of resources deployed2. Form C3. Summary Financial ReportA. Progress Report

Report per contractor

Financial contact person

Spokesperson

Report per Activity

C. Distribution of the EC

financial contribution

D. Detailed implementation

plan for the next 18 months

Progress Report

Implementation plan for the next 18 months

Progress Report

Implementation plan for the next 18 months

Justification of resources deployed

Form C

Justification of resources deployed

Form C

ProjectCoordinator

Management Board

Management Team

Page 14: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

EUROPEAN COMMISSIONRESEARCH DIRECTORATE-GENERAL

Directorate B - Structuring the European Research Area The Director f.f.

Brussels, 21.04.2005B.4 (2005) D/513231

Istituto Nazionale di Fisica NucleareProf. Enzo IAROCCIPresident &Dr. Carlo GUARALDOVia Enrico Fermi 40I-00044 Frascati

Registered with acknowledgement of receipt

Subject: Amendment No 01 to Contract No. RII3-CT-2004-506078– Project “HadronPhysics” Your revised request for amendment dated 14/04/2005

Dear Prof. Iarocci, Dr. Guaraldo,

With reference to the above letter this is to inform you that the Commission agrees to your request to modify the contract as follows:1. Modification of the frequency of submission of the audit certificates2. Modification of the payment modalities3. Addition of one special clause 4. Modification of Annex I

All other provisions of the contract and its annexes remain unchanged.This amendment takes effect as of 01/02/2005.

Your sincerely,

Robert –Jan SMITSDirector f.f.

Page 15: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

2. Modification of the payment modalities

Article 8. 2(d) of the contract is modified as follows:

“Where less than 70% of a pre-financing has been used at the end of a reporting period, and notwithstanding the approval by the Commission of the related reports, subsequent intermediate pre-financing may be paid only on the basis of a complementary periodic management report referred to inArticle II.7.2 b that shall be submitted to the Commission once the abovementioned spending rate has been achieved.”

On the basis of the Article II.7.2 b of the contract, the periodic management report is including:

i) a justification of the resources deployed by each contractor, linking them to activities implemented and justifying their necessity;

ii) the Form C Financial statement set out in Annex VI, provided by each contractor for that period;

iii) a summary financial report consolidating the claimed costs of all the contractors in an aggregate form, based on the information provided in Form C.

Page 16: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Complementary periodic financial reportComplementary periodic financial report

From the First Annual Report:

- Community's pre-financing sent to the coordinator, corresponding to the first reporting period and the first six months of the subsequent reporting period: 6.400.000,00 €

- Threshold to receive the second pre-financing (Article 8.2 (d) modified): 70 % * (6.400.000,00 €) = 4.480.000,00 €

-Requested EC contribution for the first reporting period: 3.519.129,38 €

- Amount justified below the threshold: - 960.870,62 €

Submission of a complementary periodic management report referred to the period 01/01-30/04/2005

Page 17: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Complementary periodic financial reportComplementary periodic financial report

0 10

0

1000000

2000000

3000000

4000000

5000000

60000006400000

P1+(4 months 2005)P1 (2004)Reporting period

EC re

ques

ted

cont

ribut

ion

(eur

o)

Threshold: 4.480.000,00 € 1.781.701,71 €960.870,62 €

3.519.129,38 €

5.300.831.09 €

First pre-financing

Page 18: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

HadronPhysics I3Scientific achievements

Examples from the three blocs of activities

Page 19: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

JRA2

Fast compact EM calorimeters and high power lasers

Page 20: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

JRA2: Fast EM Calorimeters statusR.Novotny , JLU-PIGproposed deliverables:

• development of PbWO4• doped PbF2 as scintillator material• technology for large size CeF3 crystals• large area avalanche photo diods (APD)

• development of PbWO41. increase of light yield 2. technology for mass production

light

yie

ld

absorbance

CMS

PWO-II • PWO-II (BTCP): reduced doping2 times more light

mass production( L = 200mm )

PANDA prototypesordered

• competitive manufacturer: SICCAS

Page 21: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

• PWO-III (BTCP): PWO:La,Mo PWO-II PWO-III

wavelength

inte

nsity

• structure defects (EPR, etc.)

• further improvement by coolingwavelength

abso

rban

ce

• study of radiation hardness @ KVI

light

yie

ld

temperature new record inresolution photon energy / MeV

σ/ E

%

Page 22: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

• development of PbF2:X,Y

in collaboration with SICCAS: series of test crystals on order

• technology of large size CeF3survey on state of the art + postponed crystal production

• technology and response Lu2(1-x)Y2xSiO5 (LYSO)density = 7.4g/cm3 - X0 = 1.14cm - λemission = 420nm - τ =20ns

in collaboration with Photonic Materials190 mm

120 mm

0 200 400 6000

1000

2000

3000

4000

5000

6000

7000

22Na - sourcebackground subtracted

σ/E = 5.1%

σ/E = 6.9%

channel / a.u.

coun

ts

new generation calorimetry

Page 23: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

• large area APDs (LAAPD)contract with Hamamatsu

• development of 10x10mm2 low capacity APDs• promissing tests of radiation hardness @CERN, KVI• survey of manufacturer

(Advanced Photonics, Perkin Elmer, RMD)• development of low noise preamplifier• laboratory and beam tests of PWO subarrays

excellent energy and time response

deposited energy / GeVincident energy / GeV

σ / E

σ t/ n

s

first test of3 x 3 PWO matrixwith APD read-out

Page 24: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

• development and installation of test-facility @ MAMI

tagged photon facility for photons between 10 and 100MeV energy

final commissioning in 2005

access for test set-up

Page 25: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

N1

Compressed barionic matter

Page 26: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Objectives of the N1 activity

• to mobilize Europe–wide interest to secure critical mass of the participants with the aim to constitute a formal collaboration, the Compressed Baryonic Matter collaboration (CBM collaboration);

• to create and maintain close scientific contacts among the participants;

• to generate and exchange expertise for the realization of innovative detection concepts and analysis tools;

• to write a Physics Book for the CBM experiment;

• to foster interest in hadron physics in the public.

Page 27: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

163Sum 9B. SikoraWarsaw University, Poland18

6F. RamiStrasbourg IReS, France17

8W. ZipperSilesia University Katowice, Poland16

7J. GarzonSantiago de la Compostela Univ., Spain15

8F. DohrmannRossendorf FZ, Germany14

7A. KuglerRez CAS, Czech Republic 13

4J. WesselsM�nster University, Germany12

3B. KohlmeyerMarburg University, Germany11

15R. M�nnerMannheim University, Germany10

12Z. MajkaKrakow Jagiellonian University, Poland9

20V. LindenstruthHeidelberg Univ. Kirchhoff Inst., Germany8

8N. HerrmannHeidelberg Univ. Phys. Inst., Germany7

7H. Str�beleFrankfurt University, Germany6

25P. SengerDarmstadt GSI, Germany5

3H. TsertosCyprus University, Nikosia, Cyprus4

5P. FonteCoimbra ISEC/LIP, Portugal3

8J. KeszkemetyBudapest KFKI, Hungary2

8M. PetroviciBucharest IPNE, Romania1

group members

Group leaderParticipating institutes:No

The N1 consortium (Coordinator P. Senger)

Page 28: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

One postdoc position ( 3 years) ……………………...150 k€Travel expenses: 1200 days, 75 € per day …………………………………......90 k€300 travels, 350 € per travel………………... ………..105 k€Workshops (3 x 10 k€ ):…………………………….………..30 k€Sum 375 k€

Budget CBMnet (3 years project)

Page 29: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Submission of a Letter of Intent for the CBM experiment (Jan. 2004)

Submission of a Technical Status Report on the CBM experiment (Jan. 2005)

Constitution of a formal CBM Collaboration (Oct. 2004) including elections of Spokesperson (P. Senger), Chair of the Collaboration Board (M. Petrovici), Technical Coordinator (W.F.J. Müller) and Physics coordinator (V. Friese). The collaboration actually consists of more than 300 persons from 41 institutions.

Organization of Collaboration Meetings:• Feb. 11 – 13, 2004 (80 attendees)• Oct. 6 – 8, 2004 (100 attendees)• March 9 – 12, 2005 (110 attendees)

Organization of Topical Meetings:• CBM software week, May. 10 – 15, 2004• CBM tracking week, Jan. 24 – 28, 2005 • CBM dilepton workshop, May 30 – 31, 2005

Presentations on Hadron Physics with CBM at many international conferences and in many institutes

CBM Network Activities

Page 30: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

CBM Collaboration* : 41 institutions, > 300 MembersCroatia:RBI, ZagrebChina:Wuhan Univ.Cyprus:Nikosia Univ. Czech Republic:CAS, RezTechn. Univ. PragueFrance:IReS Strasbourg

Hungaria:KFKI BudapestEötvös Univ. BudapestKorea:Korea Univ. SeoulPusan National Univ.Norway:Univ. Bergen

Russia:CKBM, St. PetersburgIHEP ProtvinoINR TroitzkITEP MoscowKRI, St. PetersburgKurchatov Inst., MoscowLHE, JINR DubnaLPP, JINR DubnaLIT, JINR DubnaMEPHI MoscowObninsk State Univ.PNPI GatchinaSINP, Moscow State Univ. St. Petersburg Polytec. U.Spain:Santiago de Compostela Univ.Ukraine:Shevshenko Univ. , Kiev

* as of March 2005

Germany: Univ. Heidelberg, Phys. Inst.Univ. HD, Kirchhoff Inst. Univ. FrankfurtUniv. KaiserslauternUniv. Mannheim Univ. MarburgUniv. MünsterFZ RossendorfGSI DarmstadtPoland:Krakow Univ.Warsaw Univ.Silesia Univ. KatowicePortugal:LIP Coimbra

Romania: NIPNE Bucharest

Page 31: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

http://www.gsi.de/documents/DOC-2005-Feb-447-1.pdf

The CBM Technical Status Report January 2005

Page 32: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Meetings

• Kick-off Meeting of the International Theory Working Group on Compressed Baryonic Matter on June 13, 2005 (Goal: CBM physics handbook end of 2006)

• CBM tracking workshop, June 20 – 24, 2005 at GSI

• CBM Collaboration meeting Sept. 6 – 11, 2005, in Piaski (Poland)

• CBM Topical Meetings

• International Workshop on Compressed Baryonic Matter (organized by the Theory Working Group)

Publicity and documentation

• The presentations at the meetings and workshops are available via the Web

• Presentations at international conferences (incl. proceedings)

Planned CBMnet activities in 2005

Page 33: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

A1

LNF-INFN

Page 34: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

A1 A1 -- Transnational Access Activity Transnational Access Activity at INFNat INFN--LNFLNF

10 Sept. 2004 10 Sept. 2004 -- 30 Apr. 200530 Apr. 2005Frascati, 10 June, 2005M.C. D�Amato, C. Guaraldo

Page 35: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Selected projects Selected projects and assigned manand assigned man--daysdays

1st Call (10 Sept. 2004): 13 Projects, 1618 man1st Call (10 Sept. 2004): 13 Projects, 1618 man--days days 2nd Call (4 Mar. 2005): 8 Projects, 1064 man2nd Call (4 Mar. 2005): 8 Projects, 1064 man--daysdays

In total In total 2121 Projects (P) and Projects (P) and 26822682 manman--days (mdays (m--d) d) distributed among the facilities:distributed among the facilities:–– BTF: 4 P, 471 mBTF: 4 P, 471 m--dd–– DAFNEDAFNE--LIGHT: 11 P, 542 mLIGHT: 11 P, 542 m--dd–– HADRON PHYSICS: 6 P, 1669 mHADRON PHYSICS: 6 P, 1669 m--dd

Page 36: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Ongoing Projects during the period Ongoing Projects during the period 10/9/200410/9/2004--30/4/200530/4/2005

Group Leader Project Title Users used usedm-d trips

BTFK. Drozdowicz A Linac-based Neutron Source for Time-Of-Flight (TOF) Measurements 2 62 2J. Ridky AIRFLY 12 145 10V. Biryukov Bent Crystal Extraction 1 30

Total 15 237 12

DAFNE-LIGHT IRA. Kuzmin Effect of Dilution on Infrared Absorbtion in Antiferromagnetic Materials 2 30 2A. Popov Analysis of IR Spectra of Nano Aluminum Nitride 4 51 4

J. Polit Reflectivity spectra analysis of the oriented mono-crystalline ZnCdTe 3 42 3in polarised light

C. Kuntscher Dimensional cross over in Bechgaard-Fabre salts 2 10 2Total 11 133 11

DAFNE-LIGHT XRE. Kotomin Analysis of XR Spectra of Nano Aluminum Nitride 3 84 4J. Chaboy Influence of A1 on the magnetic properties of RFe2 and RCo2 phases 3 31 3

Total 6 115 7

DAFNE-LIGHT IR/XRW. Kwiatek Biological tissue analysed by Xanes and IR

Total 5 47 7(continued)

Page 37: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

(continued)

Group Leader Project Title Users used usedm-d trips

HADRON PHYSICS, KLOEW. Kluge Kloe Physics, Hadronic Cross Section 12 196 14

W. Kluge Kloe Physics, Hadronic Cross Section 1 3

Total 13 199 14

HADRON PHYSICS, SIDDHARTAM. BragadireanuDevelopment of the trigger and control systems for exotic atom 8 316 10

measurements at DAFNE

J. Marton Setup development for exotic atom research at DAFNE 6 109 4

M. BragadireanuRealization of the prototypes for the SIDDHARTA Silicon Drift Detectors 3 33 3

Bias Controller and SIDDHARTA Kaon Trigger Detector

J. Marton Setup development for exotic atom research at DAFNE 1 27

Total 18 485 17

Total ongoing Projects: 16

Total users, man-days and trips in 8 months: 68 1216 68

Page 38: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Used manUsed man--days days compared to the contract mancompared to the contract man--daysdays

10/9/04-31/12/04 1/1/05-30/4/05 Contract m-d

(in 4 months)

BTF 111 126 100

DAFNE-LIGHT 109 186 83

HADRON PHYSICS 240 444 467

MACHINE DEVELOPMENT 17

TOTAL 460 756 667

Page 39: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Other activities:HadronPhysics Project

and ECT*

Page 40: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

ECT* (ECT* (TrentoTrento) )

ECT* (European Centre for Theoretical Studies in Nuclear Physics

and Related Areas) plays an important and unique role in the area of

hadron physics and the physics of matter under extreme conditions,

• through workshops, training programmes, research projects

and as well

• by promoting exchange of scientists and co-operation

between theoreticians and experimentalists.

Page 41: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Organic cooperation between HadronPhysics Organic cooperation between HadronPhysics and ECT* in and ECT* in TrentoTrento

1. Joint HadronPhysics-ECT* Workshops

2. HadronPhysics Committees Meetings

ECT* can become the elected site to host theseperiodical meetings.

3. Joint position ECT*-HadronPhysics at ECT*

Page 42: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint HadronPhysics-ECT* Workshopsin 2005

The HadronPhysics logo has appeared in all announcements ( posters, ECT* website, etc) of these workshop, partially sponsored by the management budget of the project:

11 -16 July Resonances in QCDOrganisers: M.F.M. Lutz, Co-ordinator, (GSI Darmstadt), J. Nieves (Univ. of Granada), U. Thoma (Univ. of Giessen), U. Wiedner (Univ. of Uppsala)

18 - 23 July Effective theories in Nuclear physics and Lattice QCDOrganisers: A. Parreño, Co-ordinator, (Dept. ECM, UB, Barcelona), P.F. Bedaque (Lawrence Berkley Nat. Lab.), E. Pallante (Univ. of Groningen)

Page 43: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint HadronPhysics-ECT* Workshopsin 2005

12-17 September The New Physics of Compact StarsOrganisers: D. Blaschke, Co-ordinator (Univ. of Bielefeld), J. Margueron (IPN, Orsay), J. Trümper (MPE Garching)

26 September-7 October Parton propagation through strongly interacting matterOrganizers: W.K. Brooks (Thomas Jefferson Nat. Accelerator Facility), B.Z. Kopeliovich (Max-Planck Inst., Heidelberg), V. Muccifora (INFN, Frascati) X.N. Wang (LawrenceBerkley Nat. Lab), U. Mosel(Univ. of Giessen)

Page 44: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint HadronPhysics-ECT* Workshopsin 2006

The following workshops are organized by scientists directly involved in the activities of the HadronPhysics project. There are sponsored or by the activities budget for workshops or/and by the management budget.

10 - 14 April Numerical Simulation of Heavy Ion Reactions in the Fermi Energy Domain10 - 14 April, 2006 Organisers: Joerg Aichelin (Université de Nantes)

Pawel Danielewicz (United States) Massimo Di Toro (Istituto Nazionale di Fisica ) Francesca Gulminelli (LPC Caen)Akira Ono (Tohoku University) Herrmann Wolter (LMU MünchenThéorique UniversitéLouis Pasteur)

19 – 24 June Exotic Hadronic Atoms, Deeply Bound Kaonic Nuclear States and AntihydrogenOrganisers: Catalina Curceanu (INFN)

Akaki Rusetsky (Helmholtz-Institut, Universität Bonn) Eberhard Widmann (Stefan Meyer Institut fürsubatomare Physik

Page 45: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint HadronPhysics-ECT* Workshopsin 2006

26 June-1July Heavy Ion Reactions at Ultrarelativistic EnergiesOrganisers: Maria Paola Lombardo (INFN)

Joerg Aichelin (Subatech) Carsten Greiner (ITP Goethe University(

Jochen Wambach (GSI) Peter Levai (RMKI)

3-8 July Observables in Antiproton-Proton Interactions and their Relevance to QCDOrganisers: Helmut Koch (Ruhr-Universität Bochum)

Mauro Anselmino (Dip. di Fisica Teorica)Ulrich Mosel (Institut für Theor. Physik) Dan-Olaf Riska (University of Helsinki)

Page 46: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Joint position ECT*Joint position ECT*--HadronPhysics for a Research HadronPhysics for a Research Associate at ECT*Associate at ECT*

The ECT* (European Center for Theoretical Studies in Nuclear Physics and Related Areas) and the HadronPhysics I3 open a joint position for a Research Associate (assistant professor level) at ECT*. The successful candidate is expected to contribute to the scientific activities of ECT* and carry research in the field of hadronic physics (including Quantum Chromodynamics and hadron structure, matter under extreme conditions and ultrarelativistic heavy ion collisions).

The initial appointment is for 3 years with a possibility of extension depending on scientific policy considerations and availability of resources.Applications, including a curriculum vitae, a list of publications, a statement of researchinterest and a summary of research activities should be made through the ECT* web page (http://www.ect.it, LOGIN page).Applicants should arrange for three letters of reference to be sent directly to theDirector at the following address:

Prof. J.-P. BlaizotECT* Directorstrada delle Tabarelle, 286, 8050 Villazzano (Trento), Italye-mail : [email protected], fax: +39 0461 314747

Deadline for applications and receipt of recommendation letters is January 8, 2006.

The selection will be carried out by a joint committee ECT* - HadronPhysics I3, and we expect decisions to be taken by the end of January.

Page 47: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Second pre-financing

Page 48: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Distribution of the second preDistribution of the second pre--financingfinancing

1. from the Commission to the Coordinator2. from the Coordinator to the contractors3. from the Coordinator to the activities within each contractor4. from the Coordinator to each activity.

According to Article 8.2(d) of the Contract:

“Any payment at the end of the reporting period accompanied by an AUDIT CERTIFICATE shall be considered as FINAL.TOTAL PRE-FINANCING MAY NOT EXCEED 80% OF THE COMMUNITY FINANCIAL CONTRIBUTION or, where final payments ….have been effected, of the difference between the Community financial contribution and those final payments”.

“GOLDEN RULE”

Page 49: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Distribution of the second preDistribution of the second pre--financingfinancingPAYMENT TO THE COORDINATOR

According to the contract, ART. 8-PAYMENT MODALITIES, the Community financial contribution to the project shall be paid to the Coordinator on behalf of the contractors in accordance with the following provisions (Article 8.2 (b)):

- if the EC requested contribution (total accepted expenditures) for the firstreporting period is LESS than the first pre-financing (first 16 months in our case) the Commission SHALL DEDUCT THE DIFFERENCE from the second pre-financing to the Consortium;

- if the EC requested contribution for the first reporting period (first 16 months in our case) is MORE than the first pre-financing, the Commission SHALLADD THE DIFFERENCE, as a COMPLEMENTARY PAYMENT, at the time ofthe payment of the second pre-financing to the Consortium.

All this was illustrated in detail to the 20 project coordinators of I3 and CA by the Head of Financial Department, Bertrand Michaud, in a “Working Seminar on the management and implementation of I3 an CA contracts”, held in Bruxelles on 12 November 2004.

Page 50: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Bertrand Michaud rule for pedestrianBertrand Michaud rule for pedestrian

If the Consortium has spent MORE than the received pre-financing, it will

receive a “BONUS”, equal to the absolute value of the negative difference,

TO BE ADDED to the request for the next 18 months.

Viceversa, if the Consortium has spent LESS than the sum received as pre-

financing, the Consortium will be penalized by SUBTRACTING the amount

NOT spent from the next payment.

Page 51: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Contract RII3-CT-2004-506078–HadronPhysics

1) Distribution of the 2nd pre-financing from EC to the Coordinator

- Maximum EC contribution: 17.400.000,00 €

- Project duration: 48 months

- Number and duration of reporting periods: 4 periods of 12 months

Table 1: Estimated breakdown of the EC contribution per reporting period

Estimated Grant to the Budget

Reporting Periods Month x – Month y Total (€) In which first six months (€)

Reporting Period 1 (P1) M01-M12 5.308.000 Reporting Period 2 (P2) M13-M24 5.395.000 2.697.500Reporting Period 3 (P3) M25-M36 4.930.000 3.861.964Reporting Period 4 (P4) M37-M48 1.767.000 883.500 GRAND TOTAL: 17.400.000

Table 2: 1st and 2nd pre-financing amounts

EC grant for first 18 months (P1+6 months P2)

(€)

Estimated EC grant for next 18 months (P2+ 6 months P3)

(€) 8.005.500,00 9.256.964,00

Page 52: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Calculation of 2nd pre-financing to the consortium

with partial audit certificates for the 1st period

(only GSI audit certificate) 1st Period starts 1st pre-financing

80% of the 1st period budget plus first six months of 2nd period

0,8 x (5.308.000,00 + 2.697.500,00) = 6.400.000,00 € (to be paid by the EC to the co-ordinator)

Available pre-financing for the 1st period: 6.400.000,00 €

1st Period ends Reception of the reports and partially audit certificates (only GSI audit certificate)

Justified and accepted and partially certified amount: 5.297.613,04 € =

= 3.516.870,71 € (annual report) + 1.780.742,33 € (complementary periodic report)

Justified and accepted and certified amount: 902.610,68 €

Certified amount of 902.610,68 € is re-qualified as final payment

Remaining pre-financing available to the consortium: 6.400.000,00 - 5.297.613,04 = 1.102.386,96 €

2nd Period starts 2nd pre-financing

Page 53: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

80% of (the 2nd period budget plus first six months of 3rd period) minus remaining pre-financing

0,8 x (5.395.000,00 + 3.861.964,00) – 1.102.386,96 = 0,8 x 9.256.964,00 – 1.098.514,96 = 6.303.184,24 €

Test (Article 8.2(d)): 80% of the (EC contribution – final payments) ≥ total pre-financing

The total pre-financing is given in this case by the total pre-financing (1st + 2nd pre-financing) minus the part re-qualified as final

payment (audit).

Test:

0,8 x (17.400.000,00 - 902.610,68) = 13.197.911,46 € ≥ (6.400.000,00 + 6.303.184,24 - 902.610,68) = 11.800.573,56 € TRUE

∆1 = 13.197.911,46 - 11.800.573,56= 1.397.337,90 € > 0

In the case that the test is negative (FALSE), the quantity ∆ is subtracted from the 2nd pre-financing.

Pre-financing for the 2nd period: 6.303.184,24 € (to be paid by the EC to the co-ordinator)

At this stage, the total amount of pre-financing already provided to the consortium is:

6.400.000,00 + 6.303.184,24 = 12.703.184,24€ of which 902.610,68 € is re-qualified as payment and 11.800.573,56 € remains as

pre-financing

Page 54: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Distribution of the second preDistribution of the second pre--financingfinancing

DISTRIBUTION TO THE CONTRACTORS

According to Article 8.1

a) “the Consortium shall determine the allocation of each trance of the Community financial contribution between the contractors, in accordance with this contract and any relevant provisions in their Consortium Agreement.”

b) “the payment of the Community financial contribution to the Coordinator DISCHARGE THE COMMISSION from its obligation to make this payment to the contractors.”

Page 55: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Distribution of the 2Distribution of the 2ndnd prepre--financing financing to the contractorsto the contractors

Procedure a)

Application of the “Bertrand Michaud rule” (BM rule) to each contractor.

Page 56: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Procedure a)Procedure a)

Application of the “Bertrand Michaud rule” to each contractor.

2nd pre-financing to be distributed to contractors: 4.844.096,04 €

2nd pre-financing paid to the Coordinator: 6.303.184,26 €

Remaining amount to the Coordinator:

6.303.184,26 - 4.844.096,04 = 1.459.088,22 €

Page 57: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Distribution of the 2Distribution of the 2ndnd prepre--financing financing to the contractorsto the contractors

Procedure b)Class A and Class B contractors.

Class A (n.11 contractors) : remaining 1st pre-financing < 0

BM rule (“bonus)

Class B (n.37 contractors) : remaining 1st pre-financing > 0

80%(P2+1/2P3) (no penalization)

Page 58: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Procedure b)Procedure b)

Class A and Class B contractors.

2nd pre-financing to be distributed to contractors: 6.942.943,14 €

2nd pre-financing paid to the Coordinator: 6.303.184,26 €

Missing amount to the contractors: 639.758,88 €

Page 59: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

SolutionSolution

- Homogenous cut to some or all Contractors.

- Cut to the Coordinator INFN, in practice delayed reimbursement

2nd pre-financing to INFN: 1.441.726,40 €

Effective 2nd pre-financing to INFN: 801.967,52 €

Page 60: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Contractors which Contractors which have not spenthave not spent in the first 16 in the first 16 months of the Project months of the Project

(January 2004(January 2004--April 2005)April 2005)

No Contractor name Contractor short name Total EC request (€)

11Universität Bielefeld

Friedrich-Alexander-Universität Erlangen-

Nürnberg

Universitat de BarcelonaUniversitat de València,

Estudi GeneralThe University of

EdinburghThe University of

Liverpool

UBIE.TP (Germany) 0,00

16 FAU (Germany) 0,0040 UB (Spain) 0,00

42 UVEG (Spain) 0,00

46 UEDIN (U.K.) 0,00

48 U Liverpool (U.K.) 0,00

Page 61: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Towards the

Second Annual Report

Page 62: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Other amendments to the contract

submitted to the Commission

Page 63: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Amendments to the ContractAmendments to the Contract(28 October 2005)(28 October 2005)

1. Termination of a Contractor’s participationContractor LIMBURGS UNIVERSITAIT CENTRUM (LUC) has left the Consortium on 01/01/2005Contractor COMMISSARIAT À L’ENERGIE ATOMIQUE (CEA) has taken over tasks, obligations and benefits of Contractor LUC

2. Addition of a ContractorContractor WUPPERTAL UNIVERSITY (BUW) has entered the Consortium on 01/10/2005

3. Addition or removal of special clauses (n. 13 “Contractors with flat rate overheads of less than 20%”)Contractor UNIVERSITY OF CYPRUS (UCY) has changed its overhead to 0%Contractor LUNDS UNIVERSITET (LU) has changed its overhead to 20%Contractor UPPSALA UNIVERSITET (UU) has changed its overhead to 20%Contractor UNIWERSYTET JAGIELLONSKI (JU) has changed its overhead to 10%Contractor WARSAW UNIVERSITY (UWNPD) has changed its overhead to 10%

4. Addition of the special clause (n. 23 “Entities composed of one or more legal entities”)The contractor Centre National de la Recherche Scientifique (CNRS) represents also the following members: Université Blaise Pascal, École des Mines de Nantes, Université de Nantes, Université Claude Bernard Lyon 1, Université Paris Sud 11.

Page 64: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Amendments to the ContractAmendments to the Contract(15 October 2005)(15 October 2005)

5. Modification of Annex IAccordingly to the amendments.

6. Modification of Contract Preparation Form (CPF)Accordingly to the amendments.

Page 65: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Road map to prepare the Road map to prepare the

Second Annual ReportSecond Annual Report

I) SPOKESPERSONS DUTIES

Part A -Progress ReportPart B -Total human effort (for AC contractors)

- Co-financing (AC contractors)Part D - Gantt chart next 18 months

- Human effort next 18 months- Revision Annex I

Request: 7th November 2005Dead lines: 16th December 2005 (JRA + Networks)

10th January 2006 (Transnational Access)

Part D – Financial plan next 18 monthsRequest: end of JanuaryDead line: 3rd February 2006

Page 66: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Road map to prepare the Road map to prepare the

Second Annual ReportSecond Annual Report

II) FINANCIAL CONTACT PERSONS DUTIES

Part B - Total human effort (for FC, FCF contractors)- Justification of resources deployed in P2 (including the first 4 months)

Request: 19th December 2005Dead line: 20th January 2006

Part D - Form C and audit certificatesRequest:19th December 2005Dead line: 3rd February 2006

Page 67: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Mid-term review

Page 68: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Gerburg Larsen, RTD-B3

Main Aspects related to Activity andManagement Reports

- Mid-term Review -

Seminar for I3 and CA Project Co-ordinators12 November 2004

Research Infrastructures

Page 69: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Mid-term Review – Objectives (1)

For each Contract:to assess the implementation of the Contract, i.e. to obtain an objective appraisal of the overallprogress and performance of the Project againstits stated objectivesto identify problems encountered and suggestcorresponding solutionsto disseminate best practice among the membersof the Consortium

Page 70: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Mid-term Review – Objectives (2)

For the Research Infrastructures Action:to provide an overview on the impact of the RI Action as a whole in relation to its objectivesset out in the “Structuring the EuropeanResearch Area” Programme decision and therespective Work Programmeto identify, where appropriate, strengths and weaknesses in the various fieldsto offer guidance for improvement concerning the impact and the management of the RI Actionand successor activities in FP7

Page 71: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Mid-term Review – Putting into Practise

The Commission may decide to involveindependent experts as reviewers.It is foreseen to combine the Mid-term Reviewwith a Project meeting (annual meeting, generalmeeting).It is foreseen not to request a separate report, butto require specific elements to be added to the (second) annual report.Guidelines and instructions and will be madeavailable in the course of 2005.

Page 72: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

The Mid-term Review of the HadronPhysics ProjectContract RII3-CT-2004-506078

will be held in combination with a meeting of the Project Council, which is composed of one representative per each Institution involved in the Project

at Frascati National Laboratories

from 30th March to 1st April 2006.

Page 73: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Towards FP7

Page 74: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Towards FP7Towards FP7

http://www.cordis.lu/fp7/

Page 75: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Significant datesSignificant dates

FP6HadronPhysics I3

FP7 (*)

Publication date Call 1 17 December 2002 December 2006

Submission of proposal to EC 15 April 2003 April 2007Communication of evaluation 31 July 2003

Start of negotiation with EC 28 September 2003

End of negotiation with EC 31 December 2003 December 2007Start date of the contract 1 January 2004 January 2008

Enter into force of the contract 11 May 2004 May 2008First Pre-financing received 9 June 2004 June 2008Final payment(*) May-June 2008

(*)assumed dates.

Page 76: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

MAY- JUNE 2008

FP6HADRONPHYSICS I3

FINAL PAYMENT

FP7

1st PREFINANCING

Page 77: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Objectives of HadronPhysics I3Objectives of HadronPhysics I3

The main objective of this Integrate Infrastructure Initiative (I3) is to strengthen the European Research Area by promoting access to the leading Hadron Physics RIs in Europe and by improving their performances.

This will be achieved by developing new methods and experimental tools in the JRAs and by Networking Activities, unifying, for the first time, three previously separated communities of researchers: communities who are using leptons, hadrons and high energy heavy ion beams, respectively, for studying hadrons and their properties.

Page 78: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Integration of activitiesIntegration of activities

Fig. 1 Intercorrelations between HadronPhysics I3 activities

Page 79: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

Long term goals: reasons to apply to FP7

Most of the Joint Research Activities are embedded in multi-annual research projects. The hardware and software technologies developed in this I3 represent necessary stages for the next generation of experiments in hadron physics with high luminosity accelerators. In many cases, the opened lines of research are not exhausted, sometimes just started. New developments are continuously rising and needed since relevant research infrastructures like FAIR at Darmstadt and DAFNE2 at Frascati are in advanced phase of design. They will strong characterize the hadron physics field in Europe in next 15 years.

Networking activities follow the same trend. They are related to the organization of experimental and theoretical collaborative work concerning both on going activities and planned experiments at future facilities.

Access to the major Research Infrastructures in Europe has an increased importance due to the improved performance of the accelerators and of the computing centers. This activity has a long term future, independently on the major complexes in construction phase.

Page 80: HADRONPHYSICS PROJECT - NuPECC · Time scale of the HadronPhysics Project in 2005 ... Project Coordinator Management Board ... and notwithstanding the approval by the Commission of

• From all this it comes out a natural request of the scientific

community to apply for a new I3 in hadron physics within the

Seventh Framework Programme of EU.

• A favorable matching between the “old” and the “new”

financing appears possible.