H-Jet polarimeter H-Jet polarimeter status report status report Yousef Makdisi RSC 07/28/06

H-Jet polarimeter status report

  • Upload
    kasi

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

H-Jet polarimeter status report. Yousef Makdisi RSC 07/28/06. Jet operations in `06. Igor and Dima provided the new code to readout the full waveform and monitoring program. Ron provided the daily PC technical support and monitoring. - PowerPoint PPT Presentation

Citation preview

Page 1: H-Jet polarimeter status report

H-Jet polarimeter status reportH-Jet polarimeter status report

Yousef Makdisi

RSC 07/28/06

Page 2: H-Jet polarimeter status report

Jet operations in `06

• Igor and Dima provided the new code to readout the full waveform and monitoring program.

• Ron provided the daily PC technical support and monitoring.

• Anatoli and Yousef, the daily jet oversight and maintenance (a long haul but only 3 midnight calls)

• T. Wise came to the rescue of the SFT unit.• MCR Operations took full responsibility and saw

to it that data were collected in each fill.

Page 3: H-Jet polarimeter status report

Waveforms(new H-Jet data format this year)

Fit

Half maximum

Baseline = 8

Page 4: H-Jet polarimeter status report

Overall Picture and Cuts

Page 5: H-Jet polarimeter status report

Snap shot of online Monitoring

Page 6: H-Jet polarimeter status report

Strips after the loss of detector 3

Page 7: H-Jet polarimeter status report
Page 8: H-Jet polarimeter status report
Page 9: H-Jet polarimeter status report

Energy Distributions

Page 10: H-Jet polarimeter status report

Click on Info

Page 11: H-Jet polarimeter status report

Data Collected @ 100 GeV

Fills Dates Beam Events7630-7652 3/18-25 B 2.5M7662-7697 3/26-4/4 Y 2.8M7718-7745 4/4-11 B 1.6M4/11 Lost Si detector # 3 7780-7802 4/12-5/2 Y 3.8M7810-7858 5/3-15 B 4.2M7887-7946 5/19-6/1 Y 2.5M6/2 Si detector acted up: reduced the bias from 200 – 175 V.

7949-8002 6/3-5 B 2.0M

Page 12: H-Jet polarimeter status report

Data Collected at 31.2 GeV

Fills Dates BeamEvents

8005-8054 6/9-17 B3.6M

8055-8061 6/18-20 Y2.6M

Page 13: H-Jet polarimeter status report

Data Analysis

• The `05 data is being analyzed by Oleg.• Hiromi will complete the 24 GeV analysis for data taken in

`04. This represents the first look at injection albeit with low statistics.

• The 31.2 GeV data provides a good statistical sample taken in conjunction with the polarimeters. It is closest to calibration at injection. (No one??)

• The 100 GeV `06 is waiting for a good volunteer.• The change in the DAQ to readout the full WFD waveform

(Dima) does not allow the use of the old analysis programs.

• Igor wrote the online analysis and monitoring program which could be used as a first step.

Page 14: H-Jet polarimeter status report

Raw asymmetries

Page 15: H-Jet polarimeter status report

Beam polarization

Page 16: H-Jet polarimeter status report

Comparison with pC-polarimeters

Page 17: H-Jet polarimeter status report

Operational issues

• Nozzle blockage frequency: every 10-12 days. It takes 3 hours to warm up, ½ hour beam down, and two hours to cool down and back online.

• Slower intensity ramp up than before. 3-4 days to reach full intensity, plateau for a few days and then a slow decrease to blockage.

• Midway replaced the nozzle which improved matters somewhat.

• The SFT phase became unstable for a period. Fixed by T. Wise by increasing the gain.

• Lost some precious time due to memory full condition.• Lost one silicon detector, and another acted up.

Page 18: H-Jet polarimeter status report

Operations continued

• Failed to take data with two beams at the same time: a) Requirement that the two beams be separated by 4-6

mm.b) The vertical collimation occluded the silicon acceptance.• Determined no polarization loss with 112 bunch

operation and 1.1011 p/bunch implying the holding field uniformity is adequate.

• Installed a CCD camera to look at light emitted as the beam hits the jet. This serves as another vertical beam emittance device. Our interest is to measure the molecular hydrogen contamination.

• No pump failure this run.

Page 19: H-Jet polarimeter status report

What is next?

• Determine the cause of the silicon failure.• Replace the failed detectors with existing spares.• Start discussion with Hamamatsu to purchase new

detectors.• Purchase spare WFD components.• Will attempt to open up the vertical collimation to

allow simultaneous two-beam measurement.• Wisconsin is building two RF cavities to allow a

polarized deuteron jet beam.• Attempt to improve the jet vacuum to keep it on

the beam line during Au-Au running.