Outreach ProgramGwalior Smart City Development Corporation Limited
22nd December, 2017
IITTM, Gwalior
“ Comprehensively transform Gwalior through promotion of heritage and cultural assets, to create
new economic opportunities, and reinforce its strengths in Education, Health and Trade ”
Objective – Outreach Program Enhance awareness about the GSCDCL projects amongst implementing partners.
Bring national and international best practices to the city in project implementation.
Foster collaboration between local, national and international partners.
Offer an opportunity for dialogue with project proponents.
2
Gwalior Smart City Development Corporation Limited• Gwalior was selected in Round II of Smart Cities Challenge, securing 9th position.
• GSCDCL was incorporated in 25th October, 2016.
• GSCDCL has the mandate of implementing 71 projects of Rs. ~2250 Cr. over the next 5 years.
• Key Office Bearers:
Support from all 3 levels of Governance
GSCDCL Board
Chairman Executive Director
CEO, GSCDCL
GoIRepresentatives
Independent Directors
• SPV is empowered to make decisions to implement projects. 3
• Heritage and Culture: INR 247 Cr.
• Mobility: INR 239 Cr.
• Urban Transit: INR 187 Cr.
• Housing: INR 348 Cr.
• Solid Waste Management: INR 15 Cr.
• Sustainability: INR 183 Cr.
• Recreation & Social Upgradation: INR 143 Cr.
• Technology: INR 27 Cr.
• Economic Development: INR 102 Cr.
• Infrastructure: INR 627 Cr.
• Intelligent Operations Control Unit: INR 97 Cr.
Project Modules
71 Projects 11 Modules 2250.57 INR Cr.
Area Based Development PAN City Development8 Modules 58 Projects 1916 Cr. 3 Modules 13 Projects 334 Cr.
4
Gwalior Smart City
Upgradation of 3 Parks Solar Panels on Rooftops
IEC Campaign for Citizens One City One App Command and
Control CenterDisaster Management
Center
Creating – Branding Gwalior
Revitalizing MaharajBada
Katora Tal Tank Development
Smart Parking Management Smart Classrooms Rain Water Harvesting
System
Upgradation of 3 Play Grounds
Central Library as Digital Library Smart Street Signage Smart Roads Tourist Facility
CentersStreet Sweeping
MachinesIntra and Inter City
BusesPlace Making on
Raj Path Smart Health Care City Dash Board Incubation Centers for Startups Smart Pole
ITS Traffic Surveillance Heritage Hotel on PPP
Riverfront Development of
Swarnarekha River
Air Quality Monitoring Sensors Public Bike Sharing Gwalior Habitat and
Trade Center
CCTV surveillance Heritage Network Trail
Strengthening of 6 Bridges, Swarnarekha
Water Quality Monitoring Sensors
Hawker's and Vending Zones
Redevelopment of Chattri Mandi
Wi-Fi- Hotspots Pedestrian Only Zone at Bada
GIS Mapping of Properties & Utilities
Multipurpose OFCInfrastructure
Hostels for Working Women
GIS Based Asset Management
Digital Literacy Campaigns
Market Improvement in
Bada Area
Public Facilitation Centers LED Street Lights Development of
Night SheltersCapacity Building
Programmes
Skill development centers
Smart Multilevel Car Parking
Redevelopment of Amkho Bus Stand e- Rickshaw as IPT Residential Care
Homes
Under Implementation
Project Matrix
Under Bidding Process Under Preparation
Funding Abstract
Committed contribution for project development from
all the stakeholders
6
41% Component I: Smart Cities Mission – INR. 976 Cr. GoI Grant – INR 488 Cr. GoMP Grant – INR 488 Cr.
9% Component VI: Others – INR 219 Cr.
24% Component III:Debt – INR 572 Cr.
26% Component II:Convergence - INR 635 Cr.
• INR 1,000 Crores allocated to the Scheme allocated as grant.• Envisaged implementation of projects of:
• PPP Mode: INR 75 Cr.• CSR: 19 Cr.
Area Based Development
22nd December, 2017
IITTM, Gwalior
“ Comprehensively transform Gwalior through promotion of heritage and cultural assets, to create
new economic opportunities, and reinforce its strengths in Education, Health and Trade ”
ABD Projects1. Revitalization of Maharaj Bada
2. Façade restoration and improvement of Bada Buildings
3. Conservation & Reuse – Town Hall, Govt Press Bldg, Gorkhi Complex, Central Library
4. Place making of Rajpath
5. Redevelopment of existing markets and Chhatri Mandi
6. Smart Roads Development
7. Swranarekha Riverfront Development
8. Amkho Bus Stand Redevelopment
9. Gwalior Habitat and Trade Centers
10. Skill Development and Incubation Centers
8
Important Dates:
Project Brief: Pedestrianization Provision of Cobble Street Paving Landscaping of Maharaja Bada precinct Street furniture Signage Public Amenities and Facilities Heritage Walk Rehabilitation of Utility Services Reorganization of Vending Activities Peacemaking- urban installations,
sculptures, water features, etc.
Area Based DevelopmentHeritage ModuleRevitalization of Maharaj Bada
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 06 Month 9
Important Dates:
Estimated Cost: INR 20 Cr.
Implementation Mode: EPC& SC
Scope of Work: Hardscaping and Soft-scaping Installation of Street Furniture Vending/Hawking Units Development Relocation of Utility Services Greening and Plantation Visitor Experience Improvement
Package Segments:
Civil Works Services
Rehabilitation
Horticulture Works Specialized Works
Area Based DevelopmentHeritage ModuleRevitalization of Maharaj Bada
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 06 Month 10
Picture of Bada Area Proposed Illustrative Heritage Square Development
Area Based DevelopmentHeritage ModuleRevitalization of Maharaj Bada
11
Existing Paving in Bada Area Proposed Illustrative Cobble Street Paving
Area Based DevelopmentHeritage ModuleRevitalization of Maharaj Bada
12
Revitalization of Maharaj Bada
Existing Signage Proposed Illustrative Signage
Area Based DevelopmentHeritage Module
13
Important Dates:
Project Brief:
Estimated Cost: INR 30 Cr.
Implementation Mode: EPC
Scope of Work:
7 public historical and 50 private facades Up-liftment and restoration of facades
Repair and restoration works Shopfront Signage Control Façade Illumination
Package Segments: Civil Works Restoration Works
Area Based DevelopmentHeritage ModuleFaçade Restoration & Improvement
Jan’ 18
Tender
Mar’ 18
Initiation
Sept’18
Completion
Implementation Period – 6 Month 14
Existing Façade of Historic Buildings Proposed Illustrative Façade Restoration & Illumination
Area Based DevelopmentHeritage ModuleFaçade Restoration & Improvement
15
Façade Restoration & Improvement
Existing Shopfront in Bada Area Proposed Illustrative Shopfront Façade Management
Area Based DevelopmentHeritage Module
16
Conservation & Reuse - Town Hall
Important Dates:
Area Based DevelopmentHeritage Module
Project Brief:
Dec’ 17
Tender
Jan’ 18
Initiation
Feb’ 18
Completion
Implementation Period – 01 Month
Estimated Cost: INR 0.87 Cr.
Implementation Mode: EPC& SC
Scope of Work:
100 year old French Architecture Reuse as auditorium for performance art
Repair and restoration works Interior refurbishment & A/V upgradation Façade Illumination Operation & Management
Package Segments: Civil Works Interior Works
O&M Services
17
Before Illumination After Illumination
Conservation & Reuse - Town Hall Area Based DevelopmentHeritage Module
18
Existing Illustrative Proposal after Intervention
Conservation & Reuse - Town Hall Area Based DevelopmentHeritage Module
19
Conservation & Reuse - Govt. Press Building
Important Dates:
Project Brief:
Estimated Cost: INR 10.00 Cr.
Implementation Mode: EPC& SC
Scope of Work:
Early 20th c. hybrid Victorian architecture Reuse as Boutique Shopping Arcade
Conservation of historic building Retrofitting works for reuse Adaptive reuse for 30 boutique outlets Operation & Management
Package Segments: Civil Works Retrofitting
Works
Conservation Works O&M Services
Area Based DevelopmentHeritage Module
Feb’ 18
Tender
Apr’ 18
Initiation
Jan’ 19
Completion
Implementation Period – 09 Month 20
Existing Printing Area Proposed Illustrative Reuse as Boutique Shopping Arcade
Area Based DevelopmentHeritage ModuleConservation & Reuse - Govt. Press Building
21
Existing Upper Floor Hall Proposed Illustrative Reuse as Multi-cuisine Restaurant
Area Based DevelopmentHeritage ModuleConservation & Reuse - Govt. Press Building
22
Important Dates:
Project Brief: Early 19th c. oldest palace in Gwalior Optimal reuse of abandoned Bharat Scout
and Guide as 50 bed affordable heritage dormitory
Optimal reuse of existing school and old collectorate as Model School with smart classrooms and ICT enabled campus
Optimal reuse of abandoned spaces in Old Gajra Raje School as Heritage Hotel on PPP mode
Reuse of upper level of existing playground as Urban Park
Reuse of lower level of existing playground as Multi-level Basement Parking (400 Cars) with appropriate entry and exit ramps
Area Based DevelopmentHeritage ModuleAdaptive Reuse - Gorkhi Complex
Feb’ 18
Tender
Apr’ 18
Initiation
Jan’ 19
Completion
Implementation Period – 09 Month 23
Important Dates:
Estimated Cost: INR 40.00 Cr.
Implementation Mode: EPC& SC and PPP
Scope of Work: Conservation of historic building Retrofitting works for reuse Adaptive reuse refurbishment works Construction of Multi-level Basement
Parking Adaptive reuse on PPP Mode Operation & Management
Package Segments: Civil Works Retrofitting Works
Conservation Works Urban Infra. Works O&M Services
Area Based DevelopmentHeritage ModuleAdaptive Reuse - Gorkhi Complex
Feb’ 18
Tender
Apr’ 18
Initiation
Jan’ 19
Completion
Implementation Period – 09 Month 24
Existing Scout & Guide Building Proposed Illustrative Reuse as Affordable Dormitory
Area Based DevelopmentHeritage ModuleAdaptive Reuse - Gorkhi Complex
25
Existing School Campus Proposed Illustrative Upgradation as Model School
Area Based DevelopmentHeritage ModuleAdaptive Reuse - Gorkhi Complex
26
Existing School Playground Proposed Illustrative Urban Park with Multi-level Basement Parking
Area Based DevelopmentHeritage ModuleAdaptive Reuse - Gorkhi Complex
27
Adaptive Reuse - Gorkhi Complex
Existing Abandoned Old Gajra Raje School Proposed Illustrative Development as Heritage Hotel
Area Based DevelopmentHeritage Module
28
Important Dates:
Project Brief: Oldest Library in the region Up-gradation to Digital Library Up-gradation of Existing Library Provision of Book Shop and Cafeteria Provision of Automated Stacking System Provision of Library Management System Provision of Hobby Centre Provision of Knowledge Management
Centre Provision of Senior Citizen, Ladies and
Children Section Networking with other national and
international libraries
Area Based DevelopmentHeritage ModuleUpgradation of Central Library
Jan’ 18
Tender
Mar’ 18
Initiation
Feb’ 19
Completion
Implementation Period – 12 Month 29
Important Dates:
Estimated Cost: INR 7 Cr.
Implementation Mode: EPC& SC
Scope of Work: Conservation works Retrofitting works Interior Refurbishment works Façade Illumination Information Networking Capacity Development
Package Segments:
Civil Works Conservation Works
ICT Works Services Retrofitting
Area Based DevelopmentHeritage ModuleUpgradation of Central Library
Jan’ 18
Tender
Mar’ 18
Initiation
Mar’ 19
Completion
Implementation Period – 12 Month 30
Existing Colonnaded Spaces Proposed Illustrative Development as Reading Area
Area Based DevelopmentHeritage ModuleUpgradation of Central Library
31
Existing Covered Vearandah Proposed Illustrative Reuse as Art Gallery
Area Based DevelopmentHeritage ModuleUpgradation of Central Library
32
Upgradation of Central Library
Proposed Digital and ICT interventions Proposed Reading, Review and Stacking
Area Based DevelopmentHeritage Module
33
Important Dates:
Project Brief:
Estimated Cost: INR 1.00 Cr.
Implementation Mode: EPC& SC
Scope of Work:
Early 20th c. Indo Saracenic architecture Reuse as Tourist Facilitation centre
Repair and restoration works Interior refurbishment Façade Illumination Operation & Management
Package Segments: Civil Works Interior Works
O&M Services
Area Based DevelopmentHeritage ModuleConservation - B&D Registration Off.
Feb’ 18
Tender
Apr’ 18
Initiation
Dec’18
Completion
Implementation Period – 09 Month 34
Conservation - B&D Registration Off.
Existing Illustrative Proposal
Area Based DevelopmentHeritage Module
35
Important Dates:
Project Brief:
Estimated Cost: INR 3 Cr.
Implementation Mode: EPC& SC
Scope of Work:
Connects to important historical palace, buildings, club, chattri, recreational areas and educational institute
One of the major arterial road of the city Smart road proposed in this stretch
Improvement of pedestrian environment Provision of green strips and landscaped
areas with street furniture Organization of retail and vending areas
Area Based DevelopmentHeritage ModulePlace-making of Rajpath
Feb’ 18
Tender
Mar’ 18
Initiation
Dec’ 18
Completion
Implementation Period – 09 Month 36
Important Dates:
Package Segments: Civil Works Landscaping and
Horticulture works
O&M Services
Area Based DevelopmentHeritage ModulePlace-making of Rajpath
Feb’ 18
Tender
Mar’ 18
Initiation
Dec’ 18
Completion
Implementation Period – 09 Month 37
Existing Sidewalks at Rajpath Proposed Illustrative Pedestrian Environment
Area Based DevelopmentHeritage ModulePlace-making of Rajpath
38
Existing Pedestrian Pause Points at Rajpath Proposed Illustrative Place making of Pedestrian Pause points
Area Based DevelopmentHeritage ModulePlace-making of Rajpath
39
Existing Roundabout Intersection Proposed Illustrative Place making of Roundabout
Area Based DevelopmentHeritage ModulePlace-making of Rajpath
40
Important Dates:
Project Brief: Redevelopment/Improvement of Markets:
Subhash and Nazar Bagh Market Daulatganj Huzrat Market
Chattri Mandi Redevelopment on PPP modeEstimated Cost: INR 53 Cr.
Implementation Mode: EPC& SC and PPP
Scope of Work: Densification & reorganization Improvement of pedestrian environment Shop-fronts redesign Utility services rehabilitation
Package Segments: Civil Works O&M Services
Area Based DevelopmentEconomic Dev. ModuleRedevelopment of Existing Markets & Mandi
Mar’ 18
Tender
May’ 18
Initiation
Jul’ 19
Completion
Implementation Period – 14 Month 41
Existing Subhash Market Proposed Illustrative Improvement of Market
Area Based DevelopmentEconomic Dev. ModuleRedevelopment of Existing Markets & Mandi
42
Existing Street Market of Daulatganj Proposed Illustrative Improvement of Market
Area Based DevelopmentEconomic Dev. ModuleRedevelopment of Existing Markets & Mandi
43
Existing Chattri Mandi Proposed Illustrative Redevelopment of Market
Area Based DevelopmentEconomic Dev. ModuleRedevelopment of Existing Markets & Mandi
44
Smart Roads Development
Important Dates:
Project Brief:
Estimated Cost: INR 132 Cr.
Implementation Mode: EPC
Scope of Work:
Model roads reorganizing vehicular, pedestrian and utility requirements
Phase I: Development of 3.5 km. road length Phase II: Balance Roads – 58 km.
Geometric redesign, junction improvement, carriageway improvement
Foot path and cycle lane development Underground ducting for utilities Beautification & landscaping, street furniture
and public utilities
Area Based DevelopmentMobility Module
Jan’ 18
Tender
Mar’ 18
Initiation
Dec’ 18
Completion
Implementation Period – 9 Months (Phase-I) 45
Important Dates:
Project Brief:
Estimated Cost: INR 64 Cr.
Implementation Mode: EPC
Scope of Work:
Strengthening & beautification of 6 Bridges STP at 3 locations Riverfront development from Gurudwara to
Boat Club Walking tracks
Development of 1.5 km river front, 25 Acres Landscape 3 km Promenade 150 capacity Amphitheatre Topiary Garden and River front Park
Swarnrekha Riverfront Development
Existing Condition - Swarnrekha River
Illustrative Proposal
Area Based DevelopmentRecreation & Social Upgradation
Module
Mar’ 18
Tender
Apr’ 18
Initiation
Apr’ 20
Completion
Implementation Period – 24 Month 46
Redevelopment of Amkho Bus Stand
Important Dates:
Project Brief: 50 parking for buses 150 private buses operate regionally Connects to remote areas of the region
Estimated Cost: INR 5 Cr.
Implementation Mode: EPC& SC
Scope of Work: Development of 35 bus bays Development of passenger lounge Development of Bus stand control office Other visitor amenities and facilities
Package Segments: Civil Works O&M Services
Area Based DevelopmentMobility Module
Mar’ 18
Tender
May’ 18
Initiation
Jul’ 19
Completion
Implementation Period – 14 Month
47
Existing Amkho Bus Stand Proposed Illustrative Redevelopment of Bus Stand
Redevelopment of Amkho Bus Stand Area Based DevelopmentMobility Module
48
Gwalior Habitat & Trade Center
Important Dates:
Project Brief:
Estimated Cost: INR 250 Cr.
Implementation Mode: PPP
Scope of Work:
First of its kind facility in Gwalior to hostnational and international level events.
Auditorium - 1000 seater, Convention facility, Event Lawns
Art Gallery Library & Resource Center
Package Segments: Civil & Real Estate
Area Based DevelopmentEconomic Dev. Module
Mar’ 18
Tender
May’ 18
Initiation
May’ 20
Completion
Implementation Period – 24 Month 49
Skill Development & Incubation Centers
Important Dates:
Project Brief:
Estimated Cost: INR 23 Cr.
Implementation Mode: EPC
Scope of Work:
Entrepreneurship cell Skill development centers for Handloom and
Handicraft.
Phase I – Women entrepreneurship Fine Arts college
Development of training, skill upgradation program. Handholding for sales and marketing.
Package Segments: ICT Civil
Area Based DevelopmentEconomic Dev. Module
Jan’ 18
Tender
Feb’ 18
Initiation
End of Mission
Completion
50
PAN City Initiatives
22nd December, 2017
IITTM, Gwalior
“ Comprehensively transform Gwalior through promotion of heritage and cultural assets, to create
new economic opportunities, and reinforce its strengths in Education, Health and Trade ”
Pan City Projects1. Command and Control Center (CCC)
2. Inter and Intra City Buses
3. Smart Parking Management
4. Public Bicycle Sharing cum Cycle Tracks
5. E-rickshaws
6. Smart Poles
7. Solar Panels on Rooftops
8. Smart Class Rooms
9. Smart Healthcare Facility
10. Street Sweeping Machines
11. One City One App52
Command and Control Center (CCC)
Important Dates:
Project Brief:
Estimated Cost: INR 30 Cr
Implementation Mode: EPC
Scope of Work: Visualization of data for City Infrastructure
data: Disaster Management Traffic Management Incident Management Parking System GIS enabled services Smart Pole
Helpdesk and facility management
Nerve center of all IT enabled citizen services
PAN City DevelopmentIntelligent Operations
Control Unit
Jan’ 18
Tender
Feb’ 18
Initiation
May’ 18
Completion
Implementation Period – 03 Month 53
Inter and Intra City Buses
Important Dates:
Project Brief:
Estimated Cost: INR 140 Cr.
Implementation Mode: PPP
Scope of Work:
Inter City Buses on 5 routes Intra City Buses on 6 routes
Procurement of ~50 buses Bus operations and maintenance 100 Bus Stops Upgradation of bus terminals
Package Segments: Bus Operators Bus Suppliers
PAN City DevelopmentUrban Transit Module
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 6 Months 54
Smart Parking Management System
Important Dates:
Project Brief:
Estimated Cost: INR 20 Cr.
Implementation Mode: PPP
Scope of Work: Parking infrastructure Customer service platform Smart phone application Integrated monitoring through CCC
Smart parking solution at 28 parking sites. Combination of on-street, off-street and MLCP. Phase II: two large MLCP
Package Segments: Smart Solutions Civil Works
PAN City DevelopmentUrban Transit Module
Dec’ 17
Tender
Jan’ 18
Initiation
Dec’ 18
Completion
Implementation Period – 12 Month 55
Public Bicycle Sharing cum Cycle Tracks
Important Dates:
Project Brief:
Estimated Cost: INR 10 Cr.
Implementation Mode: EPC / PPP
Scope of Work:
Phase I: 20 Km cycle track along 3 Routes Smart phone enabled user interface
Cycle track development Bicycles for PBS Docking Stations ICT Solution
PAN City DevelopmentUrban Transit Module
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 6 Month 56
E-Rickshaw
Important Dates:
Project Brief:
Estimated Cost: INR 5 Cr.
Implementation Mode: SC / PPP
Scope of Work:
100 E-rickshaws Dedicated routes Parking and charging facilities
Procurement of e-rickshaw Charging stations Operation of e-rickshaw App based booking facility
PAN City DevelopmentUrban Transit Module
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 06 Month 57
Smart Poles
Important Dates:
Project Brief:
Estimated Cost: INR 5 Cr
Implementation Mode: EPC/PPP
Scope of Work:
Surveillance camera for safety and parking violation detection.
Optical Fiber for Better Bandwidth for Wi-Fi User/providing backhaul to Telecom Operator.
Wi-Fi services CCTV camera surveillance Smart bill board
Package Segments: Smart Solutions
PAN City DevelopmentIntelligent Operations
Control Unit
OFC networked Air quality sensors EV charging option
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 06 Month 58
Solar Panels on Roof Tops
Important Dates:
Project Brief:
Estimated Cost: INR 152 Cr.
Implementation Mode: EPC and RESCO
Scope of Work:
Installation of solar panels on rooftops in convergence with Net Metering Policy
Installation of solar energy solutions on: Government buildings Industrial buildings Gwalior fort Street lights
Package Segments: ICT Lighting
PAN City DevelopmentSustainability Module
Sep’ 17
Tender
Oct’ 17
Initiation
Oct’ 20
Completion
Implementation Period – 36 Month 59
Smart Class Rooms
Important Dates:
Project Brief:
Estimated Cost: INR 13 Cr
Implementation Mode: EPC
Salient features: Supply, Installation and commissioning of
hardware/software. Smart attendance system and integration
with mobile apps Online MIS and dashboard and
integration with Central command and control center
Smart Classrooms in all municipal schools 37 schools to be upgraded Foster opportunities for teaching, learning
PAN City DevelopmentRecreation & Social Upgradation
Module
Dec’ 17
Tender
Jan’ 18
Initiation
Jul’ 18
Completion
Implementation Period – 6 Month
60
Smart Healthcare Facility
Important Dates:
Project Brief:
Estimated Cost: INR 26 Cr
Implementation Mode: EPC/PPP
Scope of Work: Health ATMs: e-doctor, basic diagnostics Hospital Management System Online MIS and dashboard Integration with CCC
Emergency response system for vulnerable Smart healthcare ATMs in existing hospitals Enhanced accessibility, affordability, delivery to low
income categories
Package Segments: Smart Solutions
PAN City DevelopmentRecreation & Social Upgradation
Module
Jan’ 18
Tender
Feb’ 18
Initiation
Aug’ 18
Completion
Implementation Period – 6 Month 61
Street Sweeping Machines
Important Dates:
Project Brief:
Estimated Cost: INR 4.5 Cr
Implementation Mode: EPC
Scope of Work: Hire/Procurement of street sweeping machines. Operation and management
Night sweeping of commercial areas for minimal inconvenience/disturbance.
PAN City DevelopmentSolid Waste Management
Module
Jan’ 18
Tender
Feb’ 18
Initiation
End of Mission
Completion
62
One City One App
Important Dates:
Project Brief:
Estimated Cost: INR 5 Cr
Implementation Mode: EPC
Scope of Work: Phase I: three mobile applications -
• Sakhi app• Gwalior Paryatan app• Blood bank app
Phase II: Mobile app aggregator platform: Property tax Water and sewerage charges Electricity bills etc.
One stop solution for mobile access to citizen services.
PAN City DevelopmentIntelligent Operations
Control Unit
Aug’ 17
Tender
Dec’ 17
Initiation
Apr’ 18
Completion
Implementation Period – 05 Month 63
Way Forward
64
Opportunity for urban infrastructure community to participate in upcoming projects
Sustained pipeline of viable projects over the next 1 year.
Win-win proposition for GSCDCL and collaborating partners.
Look forward to your participation in upcoming projects.
Project Tracker at www.mpeproc.com
For queries please reach out at [email protected]
Duration Number of Projects Cost in INR (Cr.)
Next one month 8 ~150
2-3 months 16 ~280
4-6 months 18 ~700