Upload
amar-bhowmik
View
226
Download
0
Embed Size (px)
Citation preview
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 1/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Gulf Lights Project – Sage Accpac ERP System
Scope of Work Document(SWD-V1.0)
Date : 22nd February 2010
Document Ref.: Gulf Lights PID-V1.0
Approvals
Mahesha S ____________________________ _____________Brainwarelabs Project Manager Date
Khalid Hurzuk
______________________________ _____________Gulf Lights Project Manager Date
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 2/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
CHANGE RECORD
Date Author Version Change Reference
22/02/2010
Mahesha S 1.0 Document Initiation
Approved byName Position /
Organisation
Anil Kumar B J Project Director
DISTRIBUTION
Name Location
Library Master Project Library
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 3/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Scope of Work Document
1.0 Objective and the methodology used for the scope document……………….5
2.0 Background……………..……………………………………………………………………….6
3.0 The Objective…………………………………………………………………………………..8
4.0 The workflow of Gulf Lights….……………………………………………………….9
5.0 Solution Overview ………………………………………………………………………….10
6.0 Gulf Lights– Departments and Functions………………………………..…….11
6.1 System Manager.………………………………………………………………….11
6.2 Order Entry.…………………………………………………………………………13
6.3 Purchase Order……………….………………………………………………….14
6.4 Inventory Control………………………………………………………........16
6.5 Accounts Receivable..…………………………………………………………17
6.6 Accounts Payable….…………………………………………………………….20
6.7 General Ledger….…………………………………………………………………23
6.8 Project and Job Costing. …………………………………………………….25
6.9 Fixed Asset Management……………………………………………………..26
6.9 Gulf Lights - Requirement Traceability Matrix…………………..31
7.0 Important workflows and Snap Shots of Sage ACCPAC Modules……48
7.1 Module: System Manager.…………………………………………………….48
7.2 Module: General Ledger……………………………………………………….51
7.3 Module: Accounts Payable……………………………………………………63
7.4 Module: Account Receivable………………………………………………..71
7.5 Module: Inventory Control…………………………………………………….78
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 4/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
7.6 Module: Purchase Orders……………………………………………………….81
7.7 Module: Fixed Asset Management………………………………………….96
7.8 Module: Sales Order and Invoicing………………………………………….99
7.9 Module: Project and Job Costing…………………………………………….107
8.0 Project Implementation Plan………………………..…………………………………….109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 5/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
1.0 Objective and the methodology used for the Scope of Work Document
This document is intended to elucidate the requirements for the ERP software system that
is proposed to be implemented for Gulf Lights Electrical Engineering-Qatar. It addresses in
detail the processes that will be covered by the ERP software with the systems and
procedures that are visualized.
After detailed reading and approval from Gulf Lights, this document will form the basis for
implementing the ERP software. The database setup, Software configuration etc will
begin after approval is received for all the areas covered in this document.
This scope document, after approval will form the basis for the implementation process
and any deviations from the agreed scope has to be again approved by both project
teams.
The scope was derived by interviewing the designated heads of departments. The
following table gives the users interviewed and their respective functions.
Department Representative Details
Finance Mr. Khalid Hurzuk Accounts Receivable, Accounts
Payable, General Ledger,
General Administration, MIS Reports,
User Rights
Operational Mr. Khalid Hurzuk
Mr. Zakeer
Inventory Control, Purchasing, Sales
Project and Job
Costing
Mr. Khalid Hurzuk
Mr. Zakeer
Project and Job Costing
System
Administration
Mr. Khalid Hurzuk,
Mr. Abdul Salam
IT infrastructure – current and
proposed, User Rights, Application
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 6/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
and Database back up requirements
The actual requirements (specifications) as described by the above users of the respective
functions have been discussed under separate sections later in the document.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 7/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
2.0 Background
The Gulf Lights Electrical Engineering - Qatar, Gulf Lights Electrical Engineering W.L.L.
having its commercial registration in Doha, State of Qatar. We are an electrical
engineering and trading company. The company is having 300 employees. The company
represents number of lighting manufacturers of Europe and various part of the world. 80%
of the revenue of the company is generated through the trading activities and the rest is
from engineering contracts.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 8/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
3.0 The Objective
Gulf Lights Electrical Engineering-Qatar (Gulf Lights) decided to implement Sage Accpac
ERP solution, Financial and Project & Job Costing.
The key factors for implementing Sage Accpac system are to ensure the following:
Systematic flow of information across all departments
Avoiding duplication and increasing work efficiency
Consolidation of accounting information
Consolidation of the operational reports centrally for managerialreview.
Allow scaling up the operations and expansions as required
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 9/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
4.0 The Work flow at Gulf Lights
The following is the generic work flow that is mapped to the Sage Accpac ERP solution.
Work flow Diagram of Gulf Lights Electrical Engineering
P h a s e
1
P h a s e
2
AccountsPJCStoresPurchaseSales $ $ $
Vendor Mgmt
Purchase
Receipt
Inventory
Location
Material
issue
Inventory
Location1
AR
Transactions
AP
Transactions
GL Posting
and Financial
Accounting
rejected
Quotation
e
3
Yes
Order
Acceptance
Order Entry
Inventory
Check
Purchase
Requisition
Contract
Project1
Project2
Manpower
Consumption
Inventory
Location2
Shipment
Invoice
Invoice
Generation
Purchase Order Fixed
Asset
Project Job
Costing report
Overheads
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 10/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
5.0 Solution Overview
Deployment Architecture
The Sage Accpac solution would be configured to the Gulf Lights workflow and would bedeployed based on the System Architecture Diagram described below.
ERP Server
SYSTEMARCHITECTUREDIAGRAM
Ethernet
`
Ethernet
`
DesktopsPrinter Printers
Server Department4
Ethernet
`
DesktopsPrinter
Ethernet
`
DesktopsPrinter
Department2Department1
Ethernet
`
DesktopsPrinter
Department3
VP N
Salient Points:
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 11/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
The Sage Accpac application and the MS SQL 2005 database would be loaded on to the
designated server.
The designated user machines would be configured to access the application on SageAccpac
Gulf Lights has purchased 5 (seven) concurrent licenses on MS SQL. These 5 users would
have access to the system based on the role and access rights assigned to them by the
management of Gulf Lights.
6.0 Gulf Lights – Departments and Functions
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 12/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
The various functions carried out in different departments are described in the following
6.1 System Manager Gulf Lights like to start using the SageAccpac system with the data transactions started
from January 2010.
Gulf Lights follows 12 fiscal periods in a fiscal year, fiscal periods start from
1st January to 31st December.
Functional currency of the company is Qatari Riyals “QAR”, and like to follow with 2
decimal values.
Sage Accpac system date format will be DD/MM/YYYY
Gulf Lights, requires Tax components to be created in system to accomplish in purchase
transactions.
Gulf Lights, agreed to follow the standard functionality of Bank Services in sage Accpac.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 13/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
6.2 Sales
Even though Gulf Lights mainly into projects services, trading is also a part of
company’s business. Sales activity starts with Quotation generations.
Order Entry/ Sales Order will be generated either with reference to Quotation or
directly.
Shipment of products will happen with reference to Order Entry.
Authorized user will perform the shipment by generating print of “Delivery Note”
The Invoice generation against the Order Entry will happen with reference to
Shipment Number. In all above documents, user name who made the entry will be printed on the
Accpac standard format.
In addition to the information fields available on Order Entry of Sage Accpac, certain
other fields to be created on the Screen of Order entry as with reference to MS Excel
sheet sent by email sent by Mr. Khalid on 07th Feb2010.
6.3 Purchasing:
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 14/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
As already explained Gulf Lights do purchasing the items mainly for projects services
and also for trading activity.
Purchasing activity starts with Purchase Requisition activity, an internal document,but not necessarily be used in present scenario of Purchasing. As a future
requirement Purchase Requisition function with standard configuration will be
implemented.
Purchase Order, an external/legal document will be generated using the data
information from AP Vendor master, payment terms, IC Items and Location details.
The Purchase workflow defines the approval steps and Budget defined in the GL
Budgets restricts the generation of Purchase Order if the purchasing value is morethan the defined value.
Purchase Order generated not only prints hard copy, also soft copy (PDF doc)will be
sent to vendor by email (Accpac system uses outlook/email server of user)
Purchase Order Receipt, receiving the ordered items will happen with reference to
PO number. The items will be received at the location/warehouse as defined in the
PO or any other location by selecting from location master.
Vendor Invoice entry will happen with reference to PO Receipt Number.
Invoice entry can be made either in PO Receipt screen or separate Invoice entry
screen.
In all above documents, user name who makes the entry will be printed.
The PO formats will be as per Accpac standard format with few changes as given by
hard copies.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 15/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
The procurement team will be able to generate the following reports
• General Ledger Transactions
•
Aged Purchase Orders• Payables Clearing Audit List
• Posting Journals
• Purchase History
•
Purchase Order Action• Purchase Statistics
• Transaction List
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 16/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
6.4 Inventory Control
Gulf Lights is currently having five inventory Control locations and same will be
maintained in the system.
Inventory items, as per the requirement on project wise, trading activity wise will be
procured and stored in the locations defined.
Inventory Items will be issued to project site and helps in calculating project cost and
also generating material usage reports.
Inventory items also can be transferred from location to another location by
authorized user.
Gulf Lights will follow FIFO Account set of Inventory items in Accpac.
Inventory Items are categorized like Transformer, Switch Gear and Light
Fixture/Fittings etc. Detailed Item Category list will be provided during data
collection
Item Code structure will follow the combination of Category and Product Code
segments.
The reports can be generated by users are listed below,
Item Status
Item Valuation
Overstocked Items
Physical Inventory Worksheet
Posting Journals
Reorder Report
Stock Movement Transaction History
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 17/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
6.5 Accounts Receivable
Once the Invoice is generated in Order Entry module, automatically a new
Invoice batch will be created in Accounts Receivable module.
Different Invoices created in OE module, creates separate new AR Invoice Batches in AR
Module.
The AR Invoice batches will be posted by user on confirmation
In Receipt entry screen, payment will be received by customers against due invoices.
In Receipt entry, different types of transactions like prepayment, payment will be done
by receiving the amount in different payment codes like cheque, cash etc.
Each Receipt entry transaction done creates separate batch in Receipt entry and then
after confirmation will be posted.
The posted Receipt entry batch will create separate transaction batch in General Ledger
batch list.
After completing Receipt entry, Receipt form will be printed in the standard Accpac
format.
In the receipt form, user name will be printed.
The customer classification will be done based on the company’s services and
classification data will be given during the data collection stage.
Some of the other functions that can be handled in Accounts Receivable module are
Create summary or detailed invoices using the item price list and calculate
taxes on a summary or line-by-line basis.
Create adjustment batches automatically to write off small account or
transaction balances, and choose whether to charge interest on overdue
balances or individual invoices.
Import transactions from other applications.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 18/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Schedule any number of recurring charge invoices for fast invoicing of monthly
charges, and update recurring charges automatically by amount or percentage.
Clear inactive recurring charges using the Delete Inactive Records form.
Enter recurring charges with details that total to a zero amount.
Check a customer’s credit based on the pending transactions in Accounts
Receivable and Order Entry, the customer’s current posted balanced in
Accounts Receivable, and transactions contained in other integrated
applications.
Automatically carry forward descriptions and comments from one detail line to
the next using quick entry mode in Invoice Entry. Designate a multi-currency rounding account.
Perform data integrity checks on specific functions within the Accounts
Receivable module.
Bill Project and Job Costing Fixed Price projects using a summary or item
invoice
Update Bank Services with deposit and receipt information.
Enter multiple receipt batches on a single deposit slip.
Automatically calculate taxes on miscellaneous receipts and update the Tax
Tracking report.
Mix currencies in a single batch.
Track credit card payments received from your customers.
Easily write off small overpayments by adjusting the receipt in Adjustments.
Choose to automatically apply a receipt to the transactions of open item
customers.
Enter and post a prepayment without specifying the document number to which
the prepayment will be applied.
Handle Advance Credit Claims in Receipt Entry
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 19/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Record a refund by check, cash, or credit card from the Accounts Receivable
module. Issue both credit refunds (for credit notes, pre-payments, unapplied
cash, and receipts) and return refunds (refund issued automatically forreturned goods).
Decide if you want your system to issue a warning or an error when duplicate
check numbers are processed.
Void a check from Refund Entry.
The system will help the users to generate the following reports
Aged Trial Balance
Batch Listing
Batch Status
Customer Transactions
Deposit Slips
General Ledger Transactions
Invoices
Item Sales History
Posting Journals
Customer Receivables
Customer Statistics
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 20/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
6.6 Accounts Payable
Once the invoice entry happens in Purchase Order module, a new AP Invoice batch will
be generated in Accounts Payable module.
After confirmation AP Invoice bath will be posted
Payment will be made to vendors against due invoices in AP Payment entry screen
In Payment entry, different types of transactions like prepayment, payment will be done
by paying the amount in different payment codes like cheque, cash etc.
After completing Payment entry, payment form will be printed in the standard Accpac
format.
In the Payment form, user name will be printed.
Each Payment entry transaction creates separate batches in payment entry and then
after confirmation will be posted.
The posted payment batches will create separate transaction batches in General Ledger
batch list.
The Vendor classification will be done based on the services they provide and the vendor
classification data will be given during data collection stage.
Some of the other functions that can be handled in the Accounts Payable module are
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 21/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Create a new vendor and remit-to location on the fly.
Organize vendor records quickly and easily, and flag inactive records that are
retained for historical reporting.
Automatically prohibit the vendor and remit-to-location from being deleted or
set to inactive if documents exist that has not been posted.
Prohibit the changing of remit-to information when a remit-to location is
specified in Payment Entry.
Change the accounts within an account set even when the account set is in use
by a vendor
Automatically distribute invoices to as many general ledger expense or assetaccounts as you require by defining distribution sets.
Calculate tax for vendor invoices or manually distribute tax.
Change discount percentages or amounts as required and establish standard
payment selection criteria for creating check batches.
Reinstate invoices by reversing posted checks.
Set up and schedule recurring payables for invoices paid on a regular basis and
create reminders. For fixed price projects, capture cost details needed to support summary or
item billing in Accounts Receivable.
Enter summary and item invoices for Project and Job Costing fixed-price
projects.
Automatically carry forward descriptions and comments from one detail line to
the next using quick entry mode in Invoice Entry.
Clear inactive recurring payables using the Delete Inactive Records form.
Designate a multi-currency rounding account.
Force or withhold payment of individual transactions, subject to maximum
payment limits.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 22/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Use a vendor optional field or default payment code to select invoices for
payment.
Generate and print system checks for current payables and last-minutetransactions with or without payment advices.
Keep details of all fully paid transactions and print them when needed.
Prepay invoices that you have not yet received.
Determine how you wish to handle duplicate checks—provide a warning or an
error when duplicate check numbers are encountered.
Specify the method of payment for documents within Payment Entry.
Set up payment codes to define the type of payment such as credit card, cash,
or check.
Automatically calculate taxes on miscellaneous payments and update the Tax
Tracking report.
Limit the maximum payment amount for documents.
Receive a warning when entering a payment in Payment Entry for a document
that is currently on hold.
Void checks during entry of payments or pre-payments.
Print checks
Automatically generate separate checks for each invoice or create summary
checks
Drill down from General Ledger transaction history to Accounts Payable
transactions and then to originating Purchase Orders transactions.
Drill down from the vendor’s transactions and payments in Vendor Activity to
the originating transactions and payments. View payments in date order or check number order in Vendor Activity.
Save the selections you make to view transactions within Vendor Activity (e.g.
Order By) so that they can be used as defaults.
Easily view and enter vendor comments by date.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 23/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
View year-to-date statistics for the vendor and the vendor group.
View your vendor payments by bank range, vendor range, check status,
transaction type, date range,
Year and period range, and check number range.
Print the Batch Listing report from the transaction entry forms.
Indicate vendors subject to 1099/CPRS reporting.
The system will help the users to generate the following reports
Aged Cash Requirements
Aged Payables
Batch Listing
Batch Status
Check Register
General Ledger Transactions
Posting Journals
Vendor Transactions
6.7 General Ledger
Gulf Lights, like to setup Chart of Accounts in such a way tracking the accounts by
country and division will become easy. Hence 3 segments need to be created as below
1. Country
2. Division
3. Account
Account structure would be combinations of above said segments and will be used while
creating a chart of account
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 24/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
The chart of Accounts of Gulf Lights will be created with value addition based one the
excel sheet data sent by Mr. Khalid on 13th Feb 2010.
As explained in AR and AP, transaction batches will be created in GL when thetransaction batches are posted from AR and AP modules, also Journal Entry can be
done directly in GL.
Gulf Lights agrees to follow other General Ledger features as per the standard
functionalities of SageAccpac.
The various functions that can be done in the General Ledger Module are
Processing
Assign different retained earnings accounts to different account segments.
Automatically create budgets using prior-year information or choose from seven
other computation methods.
Auto-reverse entries to eliminate manual accrual tracking and specify the
period for the reversal.
Integrate powerful financial diagnostic and strategic analysis tools through
ACCPAC CFO.
Lock budgets to prevent unauthorized changes.
Maintain separate periods for adjusting and closing entries.
Reverse a posted transaction.
Set up and schedule recurring journal entries for transactions that are
processed on a regular basis
Maintaining Accounts
Flag General Ledger accounts as inactive to stop using them, but retain them in
the system for historical and reporting purposes. Create alphanumeric account numbers as long as 45 characters.
Define your own account groups and assign them to your General Ledger
accounts for quick financial
Statement and report design.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 25/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Performing Inquiries
Drill down from an unposted journal entry to the originating transaction.
Drill down to the originating journal entry and transaction from transaction
history.
Limit the batches shown in the Batch List window to only those from a single
sub ledger.
Reporting
Create analytical reports, spreadsheets, graphs, and charts, and update
budgets automatically through full integration with Microsoft Excel.
Print consolidated statements or divisional statements based on account
number segments.
Produce fast, flexible, customized financial statements through full integration
with Microsoft Excel.
Reduce wasted paper with detailed selection criteria for reports.
Drill down to transactions from financial statements using the Financial
6.8 Project and Job Costing
Gulf Lights presently following a simple project and job costing system but with Sage
Accpac system would like to track the costing of different resources consumed in
different projects.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 26/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
Gulf Lights, when gets a contract from client defines different tasks/projects under a
contract.
In each project, estimation of different sources like materials, manpower, overheads,miscellaneous/bank charges will be defined and after approval releases the task.
Actual usage of Material Qty, overheads and other resources against each project will be
updated as and when occur.
Gulf Lights agrees to implement other PJC features as per standard SageAccpac
functionalities.
6.9 Fixed Asset Management
The core functionality module, Asset Accounting, can be used to process the entireasset accounting transactions, including acquisition, depreciation, adjustment, disposal,
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 27/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
merge and split. The higher functionality module, Asset Maintenance and Asset Leasingcan be used to facilitate the asset maintenance and lease management.
The complete Asset Tracking facility is available.
Highlights
• Integration with GL, AP, AR, IC, PO
• Comprehensive asset transaction processing.
• Asset depreciation for book & tax purpose respectively
• Powerful and flexible depreciation facility.
• Asset maintenance scheduling and expense processing.
• Asset lease tracking and billing processing.
• Complete barcode tracking facility.
• Image can be attached to location and asset register.
• Extensive inquiries and reporting.
Integrated functions
• Uses the fiscal calendar and currency of Common Service module.
• Asset transactions generate General Ledger batches automatically.
• Integrates with PO streamline the asset requisition, acquisition and invoicingprocess.
• Integrates with IC on asset acquisition, disposal and maintenance.
• AP invoice can be created from asset acquisition batch automatically.
• AR invoice can be created from the asset disposal batch automatically.
• AP invoice can be created from asset maintenance batch automatically.
•
AR invoice can be created from asset lease billing entry automatically.
• Drill down from G/L, A/P and A/R to originating asset transaction.
Comprehensive Setup Option
• Options
• Accounts Sets
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 28/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
• Categories
• Cost Centre
• Locations
• Groups
• Depreciation Periods
• Depreciation Methods
• Acquisition Codes
• Classifications
• Budgets
• Templates
• Maintenance Types
Extensive Inquiries and Reporting
• Search asset by category, group, cost centre, location.
• Review complete asset activities history and the original transaction entry.
• Check component assets of master asset.
• Maintain serial no. and bar-coding for each unit of asset.
• Print standard or customized label for each unit of asset.
• Print asset list, asset history and depreciation report for audit or reconciliationwith G/L.
• Print depreciation projection report for the financial planning.
• Print capitalization analysis to compare budget with expenditure.
Asset Accounting
The Asset Accounting module provides the basic functionality for processing assetaccounting transaction, including acquisition, depreciation, adjustment and disposal.Asset merge and split are also available in this module.
Acquisition
• Acquires the WIP or normal asset.
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 29/109
Gulf Lights Electrical Engineering, Qatar
Sage Accpac ERP
Scope of Work Document Gulf Lights Electrical Engineering
• Integrates with PO to manage the asset acquisition process.
• Issues IC item to create WIP or normal asset.
• Acquisition entry books the transaction and defines the asset information.
• A/P invoice batch is automatically created from acquisition batch.
Depreciation
• Separates depreciation for book or tax purpose respectively.
• Runs depreciation for a range of assets for any number of periods.
• Depreciation calculation uses standard or user-defined formula.
• Depreciation can be reversed back to beginning period of the current year.
• Depreciation Projection facilitates the financial planning.
• Fully supports the US MACRS/ARCS rules and Canadian Tax Pooling.
Reports
• Batch Listing
• GL Transaction
• Provisional Revaluation
• Accumulated Depreciation
• Depreciation by Period
• Depreciation Projection
• US Depreciation Worksheet
• Asset History
• Capitalization Analysis
• Asset Listing
• Asset Schedule
• PO Receipt Audit List
• Master Assets and Components
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 30/109
Asset MaintenanceBased on the Asset Accounting module, the Asset Maintenance module can be usedto schedule and manage the asset maintenance activity, and to process maintenanceexpense with the Sage Accpac ERP Account Payable module.
Maintenance Type
• Sets up maintenance type to categorize the maintenance expense.
• Specifies maintenance expense account for maintenance type.
• Defines cost class (parts, labor or miscellaneous) for maintenance type.
• Selects IC item for maintenance type.
Maintenance Order
• Specifies maintenance vendor for each maintenance order.
• Specifies due date for each maintenance order.
• Includes multiple assets in a maintenance order.
• Specifies maintenance type for each asset.
• Defines maintenance budget for each asset.
• Creates PO for maintenance order.
Maintenance Expense Process
• Books actual maintenance expense against maintenance order.
• Posting maintenance batch creates AP invoice batch automatically.
• Posting maintenance batch updates the actual expenditure.
• Posting maintenance batch updates the asset maintenance history.
• Creates IC shipments to issue IC item for asset maintenance.
Reports
• Maintenance Order
• Maintenance Batch Listing
• Maintenance GL Transaction
• Maintenance Order Action Detail
• Maintenance History
Asset Leasing
GULF LIGHTS SWD – VER 1.3 PAGE 30 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 31/109
Based on the Asset Accounting module, the Asset Leasing module can be used tomanage the asset leasing activity, and to process lease billing transaction with theSage Accpac ERP Account Receivable module.
• Lease Rate
• Lease Contract
• Create Billing Batch
• Lease Billing Entry
Reports
• Lease Contract.
• Lease Billing Batch Listing.
• Lease GL Transaction.
• Lease Contract Action Detail.
• Lease Billing History
Asset Tracking
Based on the Asset Accounting module, the Asset Tracking module works with avariety of barcode scanning device to keep track of your assets.
•
Barcode Label• Interface with Barcode Scanner
Asset Audit Report
• Print out the asset audit report to facilitate reconciliation.
GULF LIGHTS SWD – VER 1.3 PAGE 31 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 32/109
Gulf Lights Electrical Engineering - Requirement Traceability Matrix
System Manager
Task
ID
Process Requirement
(sequential)
Module
Ref
Mapped
/ Gap
Where mapped in
ERP?SM1 Database Creating Database in MS-
SQL Server 2005MS-SQLServer -
EnterpriseManager
Mapped Start -> Programs ->MS-SQL Server -> EnterpriseManager
SM2 DatabaseSetup
Configure database inSage ACCPAC
Databasesetup
Mapped Start -> Programs ->SageACCPAC -> Databasesetup
SM3 CompanyProfile
Gulf Lights ElectricalEngineering
CommonServices
Mapped Common Services->Company Profile ->Address
SM4 Fiscal period Number of fiscal periodsis 12 fiscal year startsfrom January toDecember
CommonServices
Mapped Common Services->Common ServicesActivation andGeneral Ledger->Financial Reporter
SM5 FunctionalCurrency
Require functionalCurrency “QAR”
CommonServices
Mapped Common Services->Common ServicesActivation
SM6 MultiCurrency
Multicurrency function isrequired for overseastransactions.
CommonServices
Mapped Common Services->Common Services, MCActivation
SM7 Add user Creating Users Administrative
Services
Mapped Administrative Services ->User
SM8 AssignSecurity touser Groups
Creating Roles andResponsibilities for user
Administrative
Services
Mapped Administrative Services->Security Groups
SM9 UserAuthorizations
Map user with roles andresponsibility
Administrative
Services
Mapped Administrative Services->User Authorizations
SM10 Reminder Creating reminders forpayables and receivables
CommonServices
Mapped Common Services->Scheduling -> Reminder
List
SM11 Scheduling Creating schedules forpayment and other issuespecification to beprovide
CommonServices
Mapped Common Services->Scheduling -> Schedules
SM12 Currencyrate type
Currency rate type- Dailyspot rate
CommonServices
Mapped Common Services->Currency -> CurrencyRate Types
SM13 CurrencyConversionrates
Currency rates to beconverted to QAR fromUSD, EURO etc
CommonServices
Mapped Common Services->Currency -> CurrencyRates
SM14 Bank profiles Option to create profilesof 4 to 5 Banks profiles
BankServices
Mapped Common Services-> BankServices -> Banks
GULF LIGHTS SWD – VER 1.3 PAGE 32 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 33/109
specification to beprovide
->profile
SM15 Banksaccountlinked with
GL account
Each bank requiresseparate GL Account.
BankServices
Mapped Common Services-> BankServices -> Banks->Accounts
SM16 Bank's Checkno.
they would like to printchecks
BankServices
Mapped Common Services-> BankServices -> Banks ->checkStocks
SM17 BankTransactionTypes
Issue payments indeferent Vendorscurrency
BankServices
Mapped Common Services-> BankServices -> Bank Setup ->Transaction Types
SM18 Bank G/LIntegration -Integration
Bank transaction post toGL automatically
BankServices
Mapped Common Services-> BankServices -> Bank Setup ->G/L Integration
SM19 Bank
Transactions-ReconcileStatements
Reconcile banks
transaction on monthlybasis
Bank
Services
Mapped Common Services-> Bank
Services -> BankTransactions -> ReconcileStatements
SM20 Import OFXStatements
Reconcile Banktransaction automaticallyif facility to be providedby bank
BankServices
Mapped Common Services-> BankServices -> BankTransactions -> ImportOFX Statements
SM21 BankTransfers
fund transfer from onebank to other banks
BankServices
Mapped Common Services-> BankServices -> BankTransactions -> BankTransfers
SM22 ReturnCustomerChecks
maintain customer'sreturned checks andchange status of Invoiceas due invoice
BankServices
Mapped Common Services-> BankServices -> BankTransactions -> ReturnCustomer Checks ->Reverse Payments
SM23 BankDepositsStatusReport
Print deposit statusreport
BankServices
Mapped Common Services-> BankServices -> BankTransaction Reports ->Deposits Status
SM24 Withdrawalsstatus
Reports
Print withdrawals StatusReport
BankServices
Mapped Common Services-> BankServices -> Bank
Transaction Reports ->Withdrawals Status
SM25 BankReconciliation StatusReport
Print ReconciliationStatus Report
BankServices
Mapped Common Services-> BankServices -> BankTransaction Reports ->Reconciliation Status
SM26 BankReconciliation
Print Bank Reconciliation BankServices
Mapped Common Services-> BankServices -> BankTransaction Reports ->Bank Reconciliation
SM27 Reconciliatio
n PostingJournal
Print report of
Reconciliation PostingJournal
Bank
Services
Mapped Common Services-> Bank
Services -> BankTransaction Reports ->
GULF LIGHTS SWD – VER 1.3 PAGE 33 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 34/109
Reconciliation PostingJournal
Order Entry (Sales Order)
Task ID Process Requirement
(sequential)
Module Ref Mapped
/ Gap
Where mapped in
ERP?OE1 Customer Local and Foreign Sales Master Mapped Sales Master data-
GULF LIGHTS SWD – VER 1.3 PAGE 34 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 35/109
Master setup Customer master setup Data > Customer
OE2 CustomerMaster setup
Purchase/ Sales tax keyattaching to customer andwith credit limit definition
Sales MasterData
Mapped Sales Master data-> Customer->transactiondefaults
OE3 CustomerMaster setup
Defining Ship To, SalesCommission & SalesContract location
Sales MasterData
Mapped Sales Master data->Ship To, SalesCommission &Sales Contract
OE4 CustomerPrice list
Generating different pricelists based on territory,customer, item, discountpattern etc
Sales MasterData
Mapped Sales Master data->Price Matrix forCustomer Item
OE5 Quotation To generate SalesQuotation
Order Entry Mapped Order Entry ->Quotation
OE6 Order Entry Confirming the Order Entry
based on agreed terms
Order Entry Mapped Order Entry ->
Quotation-ActiveOE7 Check points Check points like Tender
Bond, Performance Bondetc. on Screen
Order Entry GAP Customization
OE8 Pop message Pop message as “PB# expiry date”(when adminlogin to system)
Login GAP Customization
OE9 MaintainShipment
Shipment of materialswith reference to OrderEntry
Order Entry Mapped Order Entry ->Maintain Shipment
OE10 Invoice
generation
After Shipment of
Material for the OrderEntry, Invoice to begenerated.
Order Entry Mapped Order Entry ->
Transfer to Invoice
OE11 Sales AnalysisReport
Analysis of Sales based oncustomer, Items,Territory, Sales person
Order EntryReports
Mapped Order Entry Report-> Sales AnalysisReport
OE12 Sales Historyreport
History of Sales based oncustomer, Items,Territory, Sales person
Order EntryReports
Mapped Order Entry Report-> Sales HistoryReport
OE13 Sales Contract Sales Contract Review andReport
Order EntryReports
Mapped Order Entry Report-> Sales contract
Report
OE14 Order Entriesand Invoices
Viewing of Order Entriesand Invoices for thepurpose of accountconsolidation
Order EntryReports
Mapped Order Entry Report-> Order Entryreport, Invoices
OE15 ShipmentStatus
Shipment status (on hand,shipped, shipment due,
Order EntryReports
Mapped Order Entry Report-> Shipmentitem/status wiseReport
OE16 SalesCommission
Tracking of salescommission
Order EntryReports
Mapped Order Entry Report-> Sales
commission report
GULF LIGHTS SWD – VER 1.3 PAGE 35 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 36/109
Purchasing
Task ID Process Requirement (sequential) Module Ref Mapped/ Gap
Where mappedin ERP?
PO1 Vendor Master Defining Local& ForeignVendors, Credit limit details,Applicable Purchase taxauthorities, class and ratesand linking with respectiveG/L accounts
AccountsPayable
Mapped AP->AP Vendors->VendorInformation
PO2 Contracts Setting up Contract types - Purchase Mapped Purchase Master
GULF LIGHTS SWD – VER 1.3 PAGE 36 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 37/109
Value based/ Cost based/Time based for a vendor forsupplying materials
Master Data Data->Contracts
PO3 Vendor-Item &Evaluation
Attaching a default vendorfor an item and Vendor
evaluation
PurchaseMaster Data
Mapped Purchase master-> Vendor item
PO6 PurchaseRequisition
Internal Document - to begenerated by differentdepartments for materialrequirement
PurchaseOrder
Mapped Purchase Order->PurchaseRequisition
PO8 Purchase Order Legal, External Document tobe sent to Vendor formaterials supply.
PurchaseOrder
Mapped Purchase Order->Purchase orderentry
PO9 Purchase OrderReceipt (GRN)
Receiving the items as perthe PO
Purchaseorder
Mapped Purchase Order ->Purchase Orderreceipt
PO10 Invoice Entry Receipt of Vendor Invoice PurchaseOrder
Mapped Purchase Order->Invoice Entry
PO11 Due PurchaseOrders
Pending PO's PO Reports Mapped Purchase Report->Over due PO
PO12 Over dueVendors
Pending PO's- Vendor andDue date wise
PO Reports Mapped Purchase Report->Over due PO
Inventory Control
TaskID
Process Requirement (sequential) ModuleRef
Mapped/ Gap
Where mapped inERP?
IC1 Item Master Defining the Item description,Item classes
InventoryControl
Mapped Inventory Control->ICItem->Items
IC2 Item UOM’s Item's Unit of measurementsat Purchase side, Stock side&Selling side
InventoryControl
Mapped Inventory Control->ICSetup->Unit of Measure
IC4 Item Costingmethod
Item Costing method-standard, Moving Average,
Average cost, last costmethods
InventoryControl
Mapped Inventory Control->ICItems->Items &
Location details
GULF LIGHTS SWD – VER 1.3 PAGE 37 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 38/109
IC9 Item Storage Item storage locations up tobin level
InventoryControl
Mapped Inventory Control->ICItems-> Locationdetails
IC10 Item pricing Defining the pricing& Costdetails of an Item and linking
to respective G/L accounts
InventoryControl
Mapped Inventory Control->ICItem &Price -> Item
PricingIC11 Item Qty
detailsItem Qty details related to Reorder Point, Economic OrderQuantity, Safety stock
InventoryControl
Mapped Inventory Control->IC Items -> Re-Order Point
IC12 Item type Classifying as buy/make type InventoryControl
Mapped Inventory Control->IC Setup->Category
IC13 Itemadjustment
To adjust the damaged/spoilt Inventory Items withparticular G/L Account
InventoryControl
Mapped Inventory Control->IC Transactions->Adjustments
IC14 InventoryMovement /
Transaction
Shipping Inventory items fromone warehouse location to
another location and alsowithin premises from onestorage location to another
InventoryControl
Mapped Inventory Control->IC Transactions-
>Transfers
IC15 PhysicalCounting
Physical counting of InventoryItem based on selectedperiods
InventoryControl
Mapped Inventory Control->IC Physical Inventory
Accounts Receivable
TaskID
Process Requirement(sequential)
Module Ref Mapped/ Gap
Where mapped in ERP?
AR1 Companyprofilesetup
Company Profile withContact details.
AccountsReceivable
Mapped A/R Setup -> Options->Company
AR2 Processing Setting up for the Processof Recurring Charge,Force listing of allbatches, Edit of imported/ externalbatches. Keeping thecustomer Statistics,Keeping Sales person
AccountsReceivable
Mapped A/R Setup -> Options->Processing
GULF LIGHTS SWD – VER 1.3 PAGE 38 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 39/109
Statistics.
AR3 Transaction Setting up for thetransaction defaults.
AccountsReceivable
Mapped A/R Setup -> Options->Transaction
AR4 Numbering All document no. shouldbe 13 char length with
prefix.
AccountsReceivable
Mapped A/R Setup -> Options->Numbering
AR5 Statements Aging period is to be 1-30,31-60, 61-90, 90+
AccountsReceivable
Mapped A/R Setup -> Options->Statements
AR6 Statements Printing the Zero BalanceStatements
AccountsReceivable
Mapped A/R Setup -> Options->Statements
AR7 AccountSets
Creating account sets forCategorizing customertransactions
AccountsReceivable
Mapped A/R Setup -> Account Sets
AR8 DistributionCodes
Map to GL accountnumber by name
AccountsReceivable
Mapped A/R Setup -> DistributionCodes
AR9 DunningMessages
Set Message to use foreach aging period
AccountsReceivable
Mapped A/R Setup -> DunningMessages
AR10 Salespersons
Creating sale personprofile
AccountsReceivable
Mapped A/R Setup ->Salespersons
AR11 Terms Creating Payment Termsfor customers andcustomer Groups
AccountsReceivable
Mapped A/R Setup ->Terms
AR12 Items Creating Customer Itemlist
AccountsReceivable
Mapped A/R Setup ->Item
AR13 E-mailMessages
Configuring to send emailsto the customers
automatically forRecurring payments.
AccountsReceivable
Mapped A/R Setup ->E-mailMessages
AR14 G/LIntegration
Setting for configurationof posting A/R batches tothe G/L
AccountsReceivable
Mapped A/R Setup ->G/LIntegration
AR15 CustomerGroups
Creating Customer Groups AccountsReceivable
Mapped A/R Customers->Customer Groups
AR16 Customers Creating Customer Profile AccountsReceivable
Mapped A/R Customers ->Customers
AR17 Ship-ToLocations
Creating Finish goodsdelivery locations for each
customer
AccountsReceivable
Mapped A/R Customers ->Ship-ToLocations
AR18 CustomerActivity
Viewing Customersummary and transactiondetails
AccountsReceivable
Mapped A/R Customers ->Customer Activity
AR19 RecurringCharges
Creating RecurringCharges for customers
AccountsReceivable
Mapped A/R Customers ->Recurring Charges
AR20 Create G/LBatch
Creating G/L Batches AccountsReceivable
Mapped A/R Periodic Processing->Create G/L Batch
AR21 CreateInterestBatch
Creating Interest Batch AccountsReceivable
Mapped A/R Periodic Processing->Create Interest Batch
AR22 CreateRecurring
Creating Recurring ChargeBatch
AccountsReceivable
Mapped A/R Periodic Processing->Create Recurring Charge
GULF LIGHTS SWD – VER 1.3 PAGE 39 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 40/109
ChargeBatch
Batch
AR23 CreateWrite-Off Batch
Creating Write-Off Batch AccountsReceivable
Mapped A/R Periodic Processing->Create Write-Off Batch
AR24 ClearHistory&Statistics
History & Statistics to becleared on request
AccountsReceivable
Mapped A/R Periodic Processing->Clear History
AR25 Year End Reset batch no, clearingthe statistics at the yearend
AccountsReceivable
Mapped A/R Periodic Processing->Year End
AR26 DeleteInactiveRecords
deleting Inactive Records AccountsReceivable
Mapped A/R Periodic Processing->Delete Inactive Records
AR27 UpdateRecurring
Charges
to be make modificationin Recurring Charges
AccountsReceivable
Mapped A/R Periodic Processing->Update Recurring
ChargesAR28 Customer
GroupsPrinting Customer Groupslist
AccountsReceivable
Mapped A/R Customer Reports->Customer Groups
AR29 Customers Printing Customers list AccountsReceivable
Mapped A/R Customer Reports->Customers
AR30 Ship-ToLocations
Printing Ship-To Locationslist for ranges of customer
AccountsReceivable
Mapped A/R Customer Reports->Ship-To Locations
AR31 RecurringCharges
Printing Recurring Chargesreport
AccountsReceivable
Mapped A/R Customer Reports->Recurring Charges
AR32 Statements/ Letters /Labels
Printing Statements /Letters / Labels forcustomer
AccountsReceivable
Mapped A/R Customer Reports->Statements / Letters /Labels
AR33 Labels Printing Labels for the listof customer
AccountsReceivable
Mapped A/R Customer Reports->Labels
AR34 Options Printing AR setup Optionsdetails
AccountsReceivable
Mapped A/R Setup Reports->Options
AR35 AccountSets
Printing Account Sets list AccountsReceivable
Mapped A/R Setup Reports->Account Sets
AR36 DistributionCodes
Printing DistributionCodes list
AccountsReceivable
Mapped A/R Setup Reports->Distribution Codes
AR37 Dunning
Messages
Printing Dunning Messages
for customer
Accounts
Receivable
Mapped A/R Setup Reports
->Dunning MessagesAR38 Salesperson
sPrinting Salespersons list Accounts
ReceivableMapped A/R Setup Reports
->Salespersons
AR39 Terms Printing list of Terms AccountsReceivable
Mapped A/R Setup Reports->Terms
AR40 Items Printing list of customer'sItem
AccountsReceivable
Mapped A/R Setup Reports ->Item
AR41 E-mailMessages
Printing E-mail Messages AccountsReceivable
Mapped A/R Setup Reports ->E-mail Messages
AR42 G/LIntegration
Printing Defined G/LIntegration settings
AccountsReceivable
Mapped A/R Setup Reports ->G/LIntegration
AR43 BatchListing
Printing Batch Listingdetails
AccountsReceivable
Mapped A/R Transaction Reports-> Batch Listing
GULF LIGHTS SWD – VER 1.3 PAGE 40 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 41/109
AR44 BatchStatus
Printing Batch Statusreport
AccountsReceivable
Mapped A/R Transaction Reports-> Batch Status
AR45 PostingJournals
Printing Posting Journals AccountsReceivable
Mapped A/R Transaction Reports-> Posting Journals
AR46 Invoices Printing Invoices Accounts
Receivable
Mapped A/R Transaction Reports
-> InvoicesAR47 Receipts Printing Receipts Accounts
ReceivableMapped A/R Transaction Reports
-> Receipts
AR48 G/LTransactions
Printing G/L Transactions AccountsReceivable
Mapped A/R Transaction Reports-> G/L Transactions
AR49 PostingErrors
Printing Posting Errors AccountsReceivable
Mapped A/R Transaction Reports-> Posting Errors
AR50 CustomerTransactions
Printing CustomerTransactions details
AccountsReceivable
Mapped A/R Transaction Reports-> Customer Transactions
AR51 Item SalesHistory
Printing customer ItemSales History
AccountsReceivable
Mapped A/R Transaction Reports-> Item Sales History
AR52 Aged TrialBalance
Printing customers AgedTrial Balances
AccountsReceivable
Mapped A/R Transaction Reports-> Aged Trial Balance
Accounts Payable
TaskID
Process Requirement (sequential) ModuleRef
Mapped /Gap
Where mapped inERP?
AP1 Company Company Profile AccountsPayable
Mapped A/P Setup->Options->Company
AP2 Processing Setting option for Forcelisting of all batches, Editableoption for imported batch.Keeping the default Vendorcomments 15 days
AccountsPayable
Mapped A/P Setup->Options->Processing
AP3 Transaction Default features of transactions to be set.
AccountsPayable
Mapped A/P Setup->Options->Transaction
AP4 Numbering Document no. length to be 13char with prefix.
AccountsPayable
Mapped A/P Setup->Options->Numbering
AP5 Processing Aging period is to be 1-30, 31-
60, 61-90,90+
Accounts
Payable
Mapped A/P Setup->Options-
>Processing
GULF LIGHTS SWD – VER 1.3 PAGE 41 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 42/109
AP6 AccountSets
Creating few account sets forCategorizing Vendortransactions
AccountsPayable
Mapped A/P Setup->AccountSets
AP7 DistributionCodes
Map to GL account number byname.
AccountsPayable
Mapped A/P Setup->Distribution Codes
AP8 DistributionSets
Creating distribution set forstandard groups of distributions to general ledgeraccounts
AccountsPayable
Mapped A/P Setup->Distribution Sets
AP9 PaymentCodes
Creating Payment code AccountsPayable
Mapped A/P Setup->Payment Code
AP10 Terms Creating Payment Terms forVendor and Vendors Group
AccountsPayable
Mapped A/P Setup->Terms
AP11 E-mailMessages
Configuring to send emailmessages to the Vendorsabout purchasing
AccountsPayable
Mapped A/P Setup->E-mailMessages
AP12 G/LIntegration
Setting up to post AP to G/L AccountsPayable
Mapped A/P Setup->G/LIntegration
AP13 VendorGroups
Creating Vendor Groups AccountsPayable
Mapped A/P Vendors ->Vendor Groups
AP14 Vendors Creating Vendor Profile AccountsPayable
Mapped A/P Vendors ->Vendors
AP15 Remit-ToLocations
Creating Remit-To Locationsfor vendor payments
AccountsPayable
Mapped A/P Vendors ->Remit-To Locations
AP16 VendorActivity
Viewing Vendor summary andtransaction details
AccountsPayable
Mapped A/P Vendors ->Vendor Activity
AP17 RecurringPayables Creating Recurring Payablesfor few Vendors. AccountsPayable Mapped A/P Vendors ->Recurring Payables
AP18 Create G/LBatch
Creating G/L Batch AccountsPayable
Mapped A/P PeriodicProcessing -> CreateG/L Batch
AP19 CreateRecurringPayableBatch
Creating Create RecurringPayable Batch
AccountsPayable
Mapped A/P PeriodicProcessing -> CreateRecurring PayableBatch
AP20 ClearHistory&
Statistics
to be Cleared History &Statistics on request
AccountsPayable
Mapped A/P PeriodicProcessing -> Clear
HistoryAP21 Year End reset batch no, clear activity
statisticsAccountsPayable
Mapped A/P PeriodicProcessing -> YearEnd
AP22 DeleteInactiveRecords
Deleting Inactive Records AccountsPayable
Mapped A/P PeriodicProcessing ->Delete InactiveRecords
AP23 VendorGroups
Printing Vendor Groups list AccountsPayable
Mapped A/P VendorReports -> VendorGroups
AP24 Vendors Printing Vendors list AccountsPayable
Mapped A/P VendorReports -> Vendors
GULF LIGHTS SWD – VER 1.3 PAGE 42 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 43/109
AP25 Remit-ToLocations
Printing Remit-To Locationslist for each Vendor
AccountsPayable
Mapped A/P VendorReports -> Remit-To Locations
AP26 RecurringPayables
Printing Recurring Payablesreport
AccountsPayable
Mapped A/P VendorReports ->
Recurring PayablesAP27 Letters /
LabelsPrinting Letters / Labels forVendor
AccountsPayable
Mapped A/P VendorReports ->Letters / Labels
AP28 Setup Printing AP setup Optionsdetails
AccountsPayable
Mapped A/P Setup Reports-> Options
AP29 AccountSets
Printing Account Sets list AccountsPayable
Mapped A/P Setup Reports-> Account Sets
AP30 DistributionCodes
Printing Distribution Codeslist
AccountsPayable
Mapped A/P Setup Reports-> DistributionCodes
AP31 DistributionSets
Printing Distribution Sets AccountsPayable
Mapped A/P Setup Reports-> Distribution Sets
AP32 PaymentCodes
Printing Payment Codes list AccountsPayable
Mapped A/P Setup Reports-> Payment Codes
AP33 Terms Printing list of Terms AccountsPayable
Mapped A/P Setup Reports-> Terms
AP34 E-mailMessages
Printing E-mail Messages AccountsPayable
Mapped A/P Setup Reports-> E-mail Messages
AP35 G/LIntegration
Printing Defined G/LIntegration settings
AccountsPayable
Mapped A/P Setup Reports-> G/L Integration
AP36 PaymentSelectionCodes
Printing Payment SelectionCodes AccountsPayable Mapped A/P Setup Reports-> PaymentSelection Codes
AP37 BatchListing
Printing Batch Listing details AccountsPayable
Mapped A/P TransactionReports ->BatchListing
AP38 Batch Status Printing Batch Status report AccountsPayable
Mapped A/P TransactionReports ->BatchStatus
AP39 PostingJournals
Printing Posting Journals AccountsPayable
Mapped A/P TransactionReports ->Posting
JournalsAP40 Check
RegisterPrinting Check Register Accounts
PayableMapped A/P Transaction
Reports ->CheckRegister
AP41 G/LTransactions
Printing G/L Transactions AccountsPayable
Mapped A/P TransactionReports ->G/LTransactions
AP42 PostingErrors
Printing Posting Errors AccountsPayable
Mapped A/P TransactionReports ->PostingErrors
AP43 Vendor
Transactions
Printing Vendor Transactions
details
Accounts
Payable
Mapped A/P Transaction
Reports ->VendorTransactions
GULF LIGHTS SWD – VER 1.3 PAGE 43 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 44/109
AP44 AgedPayables
Printing Aged Payables AccountsPayable
Mapped A/P TransactionReports ->AgedPayables
AP45 Aged CashRequiremen
ts
Printing Aged CashRequirements
AccountsPayable
Mapped A/P TransactionReports ->Aged
Cash Requirements
General Ledger
Task
ID
Process Requirement
(sequential)
Module
Ref
Mapped
/ Gap
Where mapped in
ERP?GL1 Company
ProfileCompany Profile withAccount Dept. headContact person name andContact to be provide
GeneralLedger
Mapped G/L Setup -> Options-> Company
GL2 Account setup Use account groupssystem, applying GLsecurities and one defaultcontrol account required
GeneralLedger
Mapped G/L Setup -> Options-> Account
GL3 Posting setup up to 5 Nos. budgets to bemaintained, posting of
previous year data notrequired, allow forprovisional Posting
GeneralLedger
Mapped G/L Setup -> Options-> Posting
GL4 Segmentssetup
set 6 segment of GLAccount and segmentlength to be5+4+3+3+2+2(#####-####-###-###-##-##)
GeneralLedger
Mapped G/L Setup -> Options->Segments
GL5 Source Codes To identify the type of transaction details inGeneral Ledger.
GeneralLedger
Mapped G/L Setup -> SourceCodes
GL6 Source JournalProfiles
To print the type of Transaction details
GeneralLedger
Mapped G/L Setup ->SourceJournal Profiles
GL7 Segment Codes set the each segmentName and descriptions
GeneralLedger
Mapped G/L Setup ->Segment Codes
GL8 AccountStructures
Defining the format of theaccount numbers whichare assigned to theaccount structure code.
GeneralLedger
Mapped G/L Setup ->Account Structures
GL9 RecurringEntries
Journal entries fortransactions that recur onspecific schedule.
GeneralLedger
Mapped G/L Setup ->Recurring Entries
GL10 CreateAllocation
The expenses of branchesshould be allocated in
GeneralLedger
Mapped G/L PeriodicProcessing -> Create
GULF LIGHTS SWD – VER 1.3 PAGE 44 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 45/109
Batch percentages among them. Allocation Batch
GL11 ConsolidatePosted Trans.
General Ledgerconsolidates a group of transactions,
GeneralLedger
Mapped G/L PeriodicProcessing ->Consolidate PostedTrans.
GL12 Create NewYear
Creating a new fiscal yearand closing the currentyear
GeneralLedger
Mapped G/L PeriodicProcessing -> CreateNew Year
GL13 Period EndMaintenance
Maintain the end of fiscalyear to be delete inactiveaccount, Reset batch nos.
GeneralLedger
Mapped G/L PeriodicProcessing ->PeriodEnd Maintenance
GL14 CreateRecurringEntries Batch
Creating a journal entrybatch of recurring entrieson reminder
GeneralLedger
Mapped G/L PeriodicProcessing ->CreateRecurring EntriesBatch
GL15 Clear History Clear all information for
printed posting journals.
General
Ledger
Mapped G/L Periodic
Processing ->ClearHistory
GL16 Chart of Accounts
To view the Chart of accounts
GeneralLedger
Mapped G/L Accounts->Chart of Accounts
GL17 Accounts Creating new accounts GeneralLedger
Mapped G/L Accounts->Accounts
GL18 Account HistoryInquiry
To view the individualAccount history
GeneralLedger
Mapped G/L Accounts->Account HistoryInquiry
GL19 BudgetMaintenance
Enter and display budgetdata for each G/L
account.
GeneralLedger
Mapped G/L Accounts->Budget
Maintenance
GL20 TransactionHistory
Displays all transactionsposted to an account in aparticular year and fiscalperiod
GeneralLedger
Mapped G/L Accounts->Transaction History
GL21 Fiscal SetComparison
Display accountinformation for two fiscalsets, to compare the netchanges or periodbalances
GeneralLedger
Mapped G/L Accounts->Fiscal SetComparison
GL22 Create Accounts Automatic creating a
chat of accounts with setof specific criteria
General
Ledger
Mapped G/L Accounts
->Create Accounts
GL23 Chart of Accounts
Printing the chart of accounts
GeneralLedger
Mapped G/L Reports -> Chartof Accounts
GL24 Trial Balance Printing the TrialBalance, Work Sheet,Provisional work sheetetc
GeneralLedger
Mapped G/L Reports -> TrialBalance
GL25 TransactionsListing
Printing list of transaction details of allaccounts in the selected
range, for the specifiedfiscal periods.
GeneralLedger
Mapped G/L Reports ->Transactions Listing
GULF LIGHTS SWD – VER 1.3 PAGE 45 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 46/109
GL26 Source Journals Printing the Sourcejournals list the detailsof posted transactions
GeneralLedger
Mapped G/L Reports ->Source Journals
GL27 Batch Status Printing the batch statusreports in range of
Batches
GeneralLedger
Mapped G/L Reports ->BatchStatus
GL28 Posting Journals Creating audit trailreport of all un cleareddetails that have beenposted.
GeneralLedger
Mapped G/L Reports->Posting Journals
GL29 RecurringEntries
Printing the RecurringEntries in the selectedrange.
GeneralLedger
Mapped G/L Reports->Recurring Entries
GL30 AccountStructures
Printing the accountstructure code list
GeneralLedger
Mapped G/L Reports->Account Structures
GL31 Segment Codes Printing the Segment
Codes list
General
Ledger
Mapped G/L Reports
->Segment CodesGL32 Source Codes Printing the Source
Codes listGeneralLedger
Mapped G/L Reports ->SourceCodes
GL33 Print FinancialStatements
Printing report of GL usesMicrosoft Excel togenerate FinancialStatements report
GeneralLedger
Mapped Financial Reporter->Print FinancialStatements
GL34 StatementDesigner
Creating FinancialStatements report usingMicrosoft Excel sheet
GeneralLedger
Mapped Financial Reporter->StatementDesigner
GULF LIGHTS SWD – VER 1.3 PAGE 46 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 47/109
Project and Job Costing
TaskID
Process Requirement(sequential)
ModuleRef
Mapped/ Gap
Where mapped inERP?
PJC1 Contracts Contracts of client PJC Mapped PJC transaction->contractmaintenance
PJC2 Projects Tasks, Projects PJC Mapped PJC Setup ->Projects
PJC3 Resources Manpower, Material,Equipment, Overheadsdefinition
PJC Mapped PJC Setup->Employees,Equipment, Overheadexpenses,Subcontractors
PJC4 Material usage Material consumption PJC Mapped PJC Transactions->Material Usage
GULF LIGHTS SWD – VER 1.3 PAGE 47 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 48/109
7.0 Important workflows and Snap Shots of Sage ACCPAC Modules
7.1 Module: System Manager
After installing the software, Company profile will be created with all the details asshown in the screen below
GULF LIGHTS SWD – VER 1.3 PAGE 48 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 49/109
Fiscal periods, Country code, Multicurrency option and Functional currency will bedefined as below,
1. Fiscal Calendar
GULF LIGHTS SWD – VER 1.3 PAGE 49 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 50/109
2. Tax Services –Tax Classes
GULF LIGHTS SWD – VER 1.3 PAGE 50 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 51/109
7.2 Module: General Ledger
a. G/L Work Flow
GULF LIGHTS SWD – VER 1.3 PAGE 51 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 52/109
b. Processing Transactions in General Ledger
GULF LIGHTS SWD – VER 1.3 PAGE 52 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 53/109
Snap shots of General Ledger module
1. G/L Setup – Options - Company
GULF LIGHTS SWD – VER 1.3 PAGE 53 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 54/109
2. G/L Setup – Options – Account
3. G/L Setup – Options – Posting
GULF LIGHTS SWD – VER 1.3 PAGE 54 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 55/109
4. G/L Setup – Options – Segments
GULF LIGHTS SWD – VER 1.3 PAGE 55 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 56/109
5. G/L Setup – G/L Account Structures
6. G/L Setup – G/L Recurring Entries
GULF LIGHTS SWD – VER 1.3 PAGE 56 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 57/109
7. G/L Periodic Processing – G/L Period End Maintenance
8. G/L Periodic Processing- G/L Clear History
GULF LIGHTS SWD – VER 1.3 PAGE 57 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 58/109
9. G/L Accounts – Chart Of Accounts
GULF LIGHTS SWD – VER 1.3 PAGE 58 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 59/109
10. G/L Accounts – Accounts – Detail
GULF LIGHTS SWD – VER 1.3 PAGE 59 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 60/109
11. G/L Accounts – G/L Account History Inquiry
12. G/L Accounts – G/L Budget Maintenance
GULF LIGHTS SWD – VER 1.3 PAGE 60 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 61/109
13. G/L Accounts – G/L Fiscal Set Comparison
GULF LIGHTS SWD – VER 1.3 PAGE 61 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 62/109
14. G/L Accounts – G/L Print Financial Statements
Sage Accpac has a distinct functionality to create user defined balance sheet in withMS excel integration inside the Accpac.Then while generating Financial Statement just browse for the file designed and
generate the statement.
GULF LIGHTS SWD – VER 1.3 PAGE 62 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 63/109
7.3 Module: Accounts Payable
a. Accounts Payable work Flow
GULF LIGHTS SWD – VER 1.3 PAGE 63 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 64/109
b. Overview of Accounts Payable Processing
1. Account Payable- Setup Option Transaction
GULF LIGHTS SWD – VER 1.3 PAGE 64 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 65/109
2. AP-Vendor Group-Group tabLinking the Vendor to General Ledger A/c at Vendor Class level.
GULF LIGHTS SWD – VER 1.3 PAGE 65 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 66/109
GULF LIGHTS SWD – VER 1.3 PAGE 66 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 67/109
3. A/P Transactions – A/P Invoice Batch List – A/P Invoice Entry - Document
GULF LIGHTS SWD – VER 1.3 PAGE 67 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 68/109
4. A/P Transactions – A/P Invoice Batch List – A/P Invoice Entry – Totals
5. A/P Transactions – A/P Payment Batch List
GULF LIGHTS SWD – VER 1.3 PAGE 68 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 69/109
6. A/P Transactions – A/P Payment Entry
8. A/P Transactions – A/P Payment Entry – Payment Information
GULF LIGHTS SWD – VER 1.3 PAGE 69 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 70/109
9. A/P Transactions – A/P Adjustment Entry – Document
GULF LIGHTS SWD – VER 1.3 PAGE 70 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 71/109
7.4 Module: Account Receivable
a. Accounts Receivables Work Flow
GULF LIGHTS SWD – VER 1.3 PAGE 71 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 72/109
b. Over view of Accounts Receivable Processing
GULF LIGHTS SWD – VER 1.3 PAGE 72 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 73/109
GULF LIGHTS SWD – VER 1.3 PAGE 73 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 74/109
1. Account Receivable- Setup function- Processing feature
GULF LIGHTS SWD – VER 1.3 PAGE 74 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 75/109
2 Account Receivable- Terms
GULF LIGHTS SWD – VER 1.3 PAGE 75 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 76/109
3. Accounts Receivable-Customer Group, Capturing the GL a/c at Customer group level
4. Accounts Receivable- Invoice Entry
5. Accounts Receivables- Receipt Batch list
GULF LIGHTS SWD – VER 1.3 PAGE 76 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 77/109
6. Account Receivable- Receipt Enquiry
7.5 Module: Inventory Control
GULF LIGHTS SWD – VER 1.3 PAGE 77 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 78/109
a Inventory Control Work Flow
Overview of Inventory Control Processing
GULF LIGHTS SWD – VER 1.3 PAGE 78 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 79/109
1. A Fee item will be created as below
GULF LIGHTS SWD – VER 1.3 PAGE 79 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 80/109
2. Different Fees will be combined to generate Invoice would be as below,
GULF LIGHTS SWD – VER 1.3 PAGE 80 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 81/109
7.6 Module: Purchase Orders
a. Purchase Order Work Flow
b. Overview of Purchase Orders Processing
GULF LIGHTS SWD – VER 1.3 PAGE 81 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 82/109
GULF LIGHTS SWD – VER 1.3 PAGE 82 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 83/109
1. PO Transaction – Requisition Entry - Requisition
GULF LIGHTS SWD – VER 1.3 PAGE 83 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 84/109
2. PO Transaction – Purchase Order - Order
GULF LIGHTS SWD – VER 1.3 PAGE 84 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 85/109
3. PO Transaction – Purchase Order –Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 85 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 86/109
4. PO Transaction – Purchase Order – Total
GULF LIGHTS SWD – VER 1.3 PAGE 86 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 87/109
5. PO Transaction – Purchase Order – Details Items/Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 87 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 88/109
6. PO Transaction – Receipt Entry - Receipt
GULF LIGHTS SWD – VER 1.3 PAGE 88 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 89/109
7. PO Transaction – Receipt Entry – Detail Items/Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 89 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 90/109
8. PO Transaction – Receipt Entry – Taxes
9. PO Transaction – Receipt Entry – Totals
GULF LIGHTS SWD – VER 1.3 PAGE 90 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 91/109
10. PO Transaction – Invoice Entry – Invoice
GULF LIGHTS SWD – VER 1.3 PAGE 91 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 92/109
11. PO Transaction –Invoice Entry – Detail Items/Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 92 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 93/109
12. PO Transaction – Invoice Entry – Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 93 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 94/109
13. PO Transaction – Invoice Entry – Totals
GULF LIGHTS SWD – VER 1.3 PAGE 94 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 95/109
14. PO Transaction – Return Entry– Return
GULF LIGHTS SWD – VER 1.3 PAGE 95 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 96/109
15. PO Transaction – Return Entry– Detail Items/ Taxes
16. PO Transaction – Return Entry– Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 96 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 97/109
7.7 Module: Fixed Asset Management
1. Asset Management screen
2. Asset depreciation expense can be allocated across multiple GL accounts by fixedpercentage.
GULF LIGHTS SWD – VER 1.3 PAGE 97 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 98/109
3. All asset transactions create G/L transaction automatically
4. Depreciation calculation can use standard or user-defined formula
GULF LIGHTS SWD – VER 1.3 PAGE 98 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 99/109
7.8 Module: Sales Order and Invoicing
a. Order Entry Work Flow
GULF LIGHTS SWD – VER 1.3 PAGE 99 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 100/109
b. Overview of Order Entry Processing
1. O/E Transactions – Quotation and Order Entry – Order
GULF LIGHTS SWD – VER 1.3 PAGE 100 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 101/109
GULF LIGHTS SWD – VER 1.3 PAGE 101 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 102/109
2. O/E Transactions – Order Entry – Customer
GULF LIGHTS SWD – VER 1.3 PAGE 102 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 103/109
3. O/E Transactions – Order Entry – Taxes
GULF LIGHTS SWD – VER 1.3 PAGE 103 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 104/109
4. O/E Transactions – Order Entry – Totals
5. O/E Transactions – Invoice Entry – Invoices
GULF LIGHTS SWD – VER 1.3 PAGE 104 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 105/109
GULF LIGHTS SWD – VER 1.3 PAGE 105 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 106/109
6. O/E Transactions – Invoice Generation – Customer
7. O/E Transactions – Invoice Entry – Totals
GULF LIGHTS SWD – VER 1.3 PAGE 106 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 107/109
7.9 Module: Project and Job Costing
1. Tasks/Projects masters
2. Employee (Manpower) master
GULF LIGHTS SWD – VER 1.3 PAGE 107 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 108/109
3. Over head expenses master
4. Contract Maintenance, Different tasks/projects in a contract of a given client
GULF LIGHTS SWD – VER 1.3 PAGE 108 OF 109
8/3/2019 Gulf Lights SWD V1.0
http://slidepdf.com/reader/full/gulf-lights-swd-v10 109/109
8.0 Project Plan
Month Feb-10 Mar-10 Apr-10 May-10
Task Week # 1 2 3 4 5 6 7 8 910
11
12
13
14
Project Contract Sign Off Ramp up
Kick Off
System Study
Interview with usersInterview with users
DocumentationDocumentation
Gap AnalysisGap Analysis
Scope FinalizationScope Finalization
Mile Stone#1 ReviewMile Stone#1 Review MeetingMeeting 1
Installation andInstallation and ConfigurationConfiguration
Installation of software onInstallation of software on serverserver
Installation of work stationsInstallation of work stations
Module ConfigurationModule Configuration
Masters set upMasters set up
Loading Opening BalancesLoading Opening Balances
Data and formats collectionData and formats collection
Data migrationData migration
Mile Stone#2 ReviewMile Stone#2 Review
MeetingMeeting 2 CustomizationCustomization
MIS ReportsMIS Reports
Forms and DocumentsForms and Documents
Mile Stone#3 ReviewMile Stone#3 Review MeetingMeeting 3
Change Management andChange Management and Go-liveGo-live
Pilot runPilot run