55
1 GULF LABORATORIES CO. WLL GULF GEOTECHNICAL SERVICES & MATERIAL TESTING LLC Prequalification Gulf Laboratories Co. W.L.L Gulf Geotechnical Services & Material Testing LLC P.O. Box 4024, Doha, Qatar PO Box 515, PC 132 Al Khoudh, Oman Tel : +974 44607034 / 44607036 Tel : +968 24542255 / 24542552 Fax : +974 44607628 Fax: +968 24545441 e-mail : [email protected] e-mail : [email protected] Website : www.gulflaboratories.com

GULF LABORATORIES CO. WLL GULF GEOTECHNICAL · PDF fileDrilling Engineer : ... Electrical Resistivity Survey ... Oman Saraya Bandar Jissah Ritz Carlton Hotel at SBJ 46,272

  • Upload
    vukhue

  • View
    232

  • Download
    1

Embed Size (px)

Citation preview

1

GULF LABORATORIES CO. WLL

GULF GEOTECHNICAL SERVICES & MATERIAL TESTING LLC

Prequalification

Gulf Laboratories Co. W.L.L Gulf Geot echnical Services & Material Testing LLC

P.O. Box 4024, Doha, Qatar PO Box 515, PC 132 Al Kh oudh, Oman Tel : +974 44607034 / 44607036 Tel : +968 2454225 5 / 24542552

Fax : +974 44607628 Fax: +968 24545441

e-mail : [email protected] e-mail : [email protected]

Website : www.gulflaboratories.com

Prequalification Document

2

Contents Page No.

COMPANY DETAILS .................................... ................................................................... 3

PERSONNEL ................................................................................................................... 4

EQUIPMENT AND RESOURCES .................................................................................... 5

SERVICES ....................................................................................................................... 8

APPENDICES

APPENDIX A CERTIFICATATIONS & ACCREDITATIONS

APPENDIX B ORGANIZATION CHART

APPENDIX C COMPANY EXPERIENCE

APPENDIX D FIELD & LABORATORY TESTING

Prequalification Document

3

Company Details

QATAR

Name of Company : Gulf Laboratories Co. W.L.L

Head Office Address : P.O. Box 4024, Doha, Qatar

Commercial Reg. # : 14419

Nature of Business : GroundInvestigations and Materials and Environmental Testing

Established : Mid-1970’s

Owners : Mannai Corporation – Doha

Employees : 185

Office/Laboratory Location : Jct of Street # 2 and Al Kassarat Street

Salwa Industrial Area

Workshop Location : Street 41, Salwa Industrial Area

MMAA Approval Certificate Nos.

Geotechnical / Soil Investigation : No. SI012

Material Testing Laboratory : No. 061

SULTANATE OF OMAN

Name of Company : Gulf Geotechnical Services & Material Testing LLC

Head Office Address : PO Box 515, PC 132 Al Khoudh, Sultanate of Oman

Commercial Reg. # : 1041094

Nature of Business : Geotechnical Investigations and Materials Testing

Established : 2008

Owners : Mannai Corporation & Gulf Laboratories Co. WLL

Employees : 12

Office Location : 273 Al Tameer St., South Mawaaleh

Laboratory Location : Plot 602, Way 4731, Off Al Tameer St., South Mawaaleh

We are certified to ISO 9001:2008 and OHSAS18001:20 07 and are ISO17025:2005 accredited.

Prequalification 2011

4

Personnel

General Manager : Andrew Slate, BSc, CGeol, EurGeol

Deputy General Manager : Dr. Richard Ellis, PhD

Drilling & Geotechn. Manager : K.P.Abdul Majeed, BSc, MSc

Geotechnical Operations Manager (Oman) : Wael Mohd Saleh, BSc, MSc

Laboratory Operations Manager : Thomas Varghese, BSc

Senior Geotechnical Staff : M.N. Sananth, BSc, MSc

Chief Chemist : K.M. Arunan, BSc, MSc, FRSC

Senior Geologists : Abdul Rahman, BSc, MSc

Durga Bashyal, BSc, MSc

Bal Dhoj Karki, BSc, MSc

Elizabeth Raji John, MSc, BSc

Sunil Shrestha, BSc., MSc

Geologists / Engineers Sujin Jayadevan, BSc, MSc

Abdul Jawad, BSc, MSc

Vineeth Nair, BSc, MSc

Subhesh Thottiyil, BSc, MSc

Gulzar Ansari, BSc, MSc

Nabil Chakkittayil, BSc., MSc

Suhail Mohammed, BSc., MSc

Chemists : 8 nos.

Laboratory Staff : 80 nos.

QA/QC Engineers : Francis Mercado, Allan Nabong

Drilling Supervisors : K. Kunamani, Orlando Boledo

Drilling Engineer : Subrajith Nayak

Drillers & Drilling Assistants : 46 nos.

Other Support Staff : 35 nos.

Prequalification 2011

5

Equipment and Resources

Drilling Rigs – 6 no. Dual Purpose Truck Mounted Hands England HE-35, Hands England HE-36

Boyles BBS 25, Dando Geotech

2 no. Pilcon Traveller T30 Rigs

Drilling Rigs – 11 no. Dual Purpose Crawler Mounted 2 no. Beretta T44 Rigs, 9 Hanjin P4000SD Rigs

Drilling Rigs – Cable Percussion Pilcon Wayfarer Light Cable Percussion Rig

Other Plant & Test Equipment Pagani 200T Cone Penetration Rig with Piezocone

Jack-up Drilling Barge “Nautilus” (12m x 6m)

Air Compressors – 250 to 750cfm, Water Bowsers and Water Tanker

Pressuremeter test equipment,

Drilling parameter measurement systems

Ground Penetrating Radar with DGPS

Pile Integrity Testing Equipment

Soil Resistivity Testing Equipment

Thermal Resistivity Testing Equipment

Submersible Pumps, V-Notch Weir Tanks, Pressure Transducer and Dataloggers

Prequalification 2011

6

Soil and aggregate testing laboratory

Automatic soil compactor

CBR machine

Slake Durability test machine

Water permeability of concrete testing unit

Sieve set

Electronic balances

Drying Ovens

Asphalt testing laboratory

Ignition Oven for Binder content

Automatic Marshal Compactor

Marshal Testing machine

Cement testing laboratory

Blaine Air permeability apparatus

Mortar Mixer

Jolting apparatus

Curing Cabinet

Chemical laboratory

BOD Incubators

Muffle Furnaces

Microwave Digester

HACH spectrometers

Ultra Pure water system

Distillation Apparatuses for Ammonia, TKN and Cyanide

Rotary Evaporator for Oil & Grease test

Prequalification 2011

7

Environmental testing laboratory

Gas Chromatograph Mass Spectrometer (GCMS)

ICP OES

TOC Analyser

Noise monitoring unit

Microbiological and drinking water testing laborato ry

Bacteria culture Incubator

Microscope

Colony counter

Geotechnical testing laboratory

Automatic Consolidated Oedometer with data processing system

Digital Shear Testing – Fully Automatic with data processing system

Triaxial system with electric load cell and electronic axial strain transducers

On-site Materials Testing Laboratories

Nuclear gauges for In-situ density testing

Concrete & Asphalt core drilling

Plate bearing test equipments

In-situ CBR testing equipments

Prequalification 2011

8

Services GROUND INVESTIGATION

Onshore Soil Investigations, Nearshore Soil Investigations

Contaminated Land and Environmental Investigations

Exploratory Borehole Drilling and Sampling

Trial Pitting

In-Situ Testing

Static “Dutch” Cone Penetration Testing

Dynamic Cone Penetration Testing

Probehole Surveys

Geophysical Investigations

Soil Resistivity Testing

WATER RESOURCES AND WATER MANAGEMENT Water Well Drilling

Soakaway Borehole Drilling

Well Casing Installation

Pumping Tests and Permeability Testing

Earthing and Cathodic Protection Boreholes

LABORATORY / MATERIALS TESTING Soil and rock mechanics laboratory testing

Groundwater, seawater & wastewater analysis

Concrete testing

Aggregate testing

Asphalt testing

Chemical testing

Environmental testing

GEOLOGICAL INVESTIGATIONS / MINERAL RESOURCES Geological mapping

Walk-over surveys

Exploratory core drilling

GROUND ENGINEERING AND GROUND IMPROVEMENT Pressure grouting

Gravity filling of cavities and voids

Anchor drilling

Micropiling

OTHER SERVICES Pile Integrity Testing

Underground Service Detection

Ground Penetrating Radar

Electromagnetic Surveys

Electrical Resistivity Survey

Thermal Resistivity Testing

Prequalification 2011

9

APPENDIX A

CERTIFICATIONS &

ACCREDITATIONS

Prequalification 2011

10

Prequalification 2011

11

Prequalification 2011

12

Prequalification 2011

13

Prequalification 2011

14

Prequalification 2011

15

APPENDIX B

ORGANIZATION CHART

16

Prequalification 2011

17

Andrew Slate

General Manager

Thomas Varghese

Laboratory Operations

Manager

Chemist

Chemical Lab

Assistants

Lab Technicians

Asst. Lab

Technicians

Chemical &

Environmental Lab.

Soil & Aggregate Lab

Wael. M.Saleh

Geotechnical Operations

Manager (Oman)

Sunil Shrestha

Nabeel Chakkattayil

Engineers / Geologists

Moataz Elsayed

Group QHSE

Manager

Executive Committee

Mannai Corporation

GULF GEOTECHNICAL SERVICES &

MATERIAL TESTING LLC ORGANIZATION CHART

Orlando Boledo

Drilling Supervisor

Drilling Crews

Workshop facilities

Mannai Corporation

Accounts, Credit Management,

Legal Dept, Purchasing

Khamis Al Aufi

PRO

Field technicians

Prequalification 2011

APPENDIX C

RESUME OF COMPANY EXPERIENCE

Prequalification 2011

19

Major Completed Projects Geotechnical Investigations & Drilling Projects

2010

Location Client Project Value (US$)

Oman Gharafi International Cargo Facilities at Muscat and Salalah International

Airports 24,929

Oman Technibuild Micropile drilling 25,402

Oman National Contracting Co. Thermal Resistvity testing, Sohar 5,148

Oman Gulf Mining Core drilling services in ibri and Waqba 24,700

Oman Al Musdaq Modern Trade Maine Geotechnical Invetigation at Ras Al Hadd 15,600

Oman Cowi & Partners Salalah Airport Interchange 31,462

Oman Al Fairouz / APM Mining Diamond core drilling services – South Batinah 388,700

Oman Saraya Bandar Jissah Ritz Carlton Hotel at SBJ 46,272

Qatar SINOHYDRO CORPORATION LUSAIL DEVELOPMEMNT – CANTILEVER 12,978

Qatar CHINA HARBOUR ENGINEERING

CO.

DREDGING & RECLAMATION WORKS AT AL RUWAIS

PORT 175,342

Qatar KEO INTERNATIONAL

CONSULTANTS

SHOOTING RANGE & TRAINING COMPLEX AT

LEHSANIYAH 14,540

Qatar AL JABER & PARTNERS QATAR FOUNDATION – EARTHING BOREHOLES 17,872

Qatar AMERICAN INTERNATIONAL

CONTRACTORS

AL UDEID AIR BASE – SOF09 – GROUND

INVESTIGATION 16,100

Qatar ARAB ENGINEERING BUREAU NORTH GATE MALL DEVELOPMENT AT SHAMAL

ROAD 40,367

Qatar TECHNIP FRANCE PLATEAU MAINTANANCE PROJECT 2,046

Qatar AL JABER TRASNPORT PEARL GTL PROJECT 19,569

Qatar SCHLUMBERGER PROPOSED WORK AT DEVELOPMENT AT ABU

HAMOUR 6,027

Qatar ARAB ENGINEERING BUREAU OFFICERS & RETAIL BUILDING 17,093

Qatar ARAB ENGINEERING BUREAU MIXED USE DEVELOPMENT AL KHALEEJ STREET, BIN

MAHMOOD 15,784

Qatar MARBU

CONSTRUCTION & UPGRADE OF EMERGENCY

APPROACH ROADS TO ARABD. FNGLCS & JDS IN

DHUKAN FIELD

16,862

Qatar HASSAD FOOD WATER WELL & PUMPING TETST WORKS IN

SHAHANIYA FARM 19,726

Qatar JAN DE NUL NDPP- CP06 10,348

Qatar LARSEN & TOUBRO DOHA SOUTH SEWARAGE TREATMENT WORKS PH-II

EXPANSION 25,359

Qatar TECHNICAL RESOURCES ARAB MUSEUM OF MODERN ARTS 6,986

Qatar HYDER CONSULTING ME ASPIRE ZONE 37,288

Qatar PRIVATE ENGINEERING OFFICE DOHA CENTRAL GRAND PARK 36,319

Qatar SINOHYDRO CORPORATION CP1

PROJECT DRILLING DIAMETER BOREHOLES 27,381

Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATEMENT PLANT -

BAGGING PLANT 7,077

Qatar PRIVATE ENGINEERING OFFICE LAND AT SOUK WAKEF, DOHA 14,151

Qatar A I C I UDEID AIR BASE 7,816

Qatar HYDER ENVIRONMENT ASSESMENT AT WAKRA PETROL

STATION 13,028

Prequalification 2011

20

Qatar QATAR GAS OPERATING QATAR GAS FACILITY RLIC 23,260

Qatar QATAR KENTZ FAHAHIL STRIPPIN PLANT DOKHAN 3,836

Qatar BURHAN INTERNATIONAL DEVELOPMENT OF ROADS IN BANIHAJER ZONE 213,680

Qatar CDC-TAKENAKA JV NDIA - CP35 4,881

Qatar QATAR KENTZ PEARL GTL SITE- RLIC 4,795

Qatar SCHLUMBERGER SHALLOW GROUND WATER MONITORING IN DOHA 868,651

Qatar C T J V 6,425

Qatar ENERGY TECHNICAL SERVICES WORKSHOP AT QRSFA - DHUKAN 3,051

Qatar C T J V QCS PROJECT RASLAFFAN 9,356

Qatar EXXONMOBIL RESEARCH SABKHA CORE DRILLING 43,986

Qatar REDCO CONSTRUCTION -

ALMANA DOHA SHOWCASE STADIUM 2022 AT ABU HAMOUR 15,726

Qatar HX STEEL INTERNATIONAL DRILLING BOREHOLES GDI- DUKHAN FIELD 3,425

Qatar HE SHEIKH FAHAD BIN

ABDULLAH ABDUL AZIZ AL THANI DRILLING WATER WELL 2,466

Qatar SINOHYDRO CORPORATION CP1

PROJECT

GROUND WATER MONITORING WELLS AT SWI

LUSAIL 9,634

Qatar

CONSOLIDATED CONTRACTORS

INTLS CO / TEYSEER

CONTRACTING COMPANY

QGX II PROJECT RASLAFFAN 9,836

Qatar ELECTRO THAWRAT DRILLING EARTHING BOREHOLES , DIE SUBSTATION 8,548

Qatar AL QAHTANI ENGINEERING DRILLING SOAKWAY BOREHOLE 4,110

Qatar QATAR KENTZ PEARL GTL SITE- RLIC 5,342

Qatar ARCHIRODON CONSTRUCTION

OEVRSEAS CO.SA DRILLING BOREHOLES EARTHING- RLIC 5,342

Qatar G H D DRILLING & INSTALLATION GROUND WATER

MONITORING WELLS 60,685

Qatar

CONSOLIDATED CONTRACTORS

INTLS CO / TEYSEER

CONTRACTING COMPANY

QGX II PROJECT RASLAFFAN 7,260

Qatar SHEIKH NASAR BIN JASSIM AL

THANI CLEANING WATER WELL AT WADI WASIAH 4,658

Qatar HE SHEIKH FAHAD BIN

ABDULLAH ABDUL AZIZ AL THANI DRILLING WATER WELL 24,658

Qatar DOPET HALUL PROJECT 15,110

Qatar METALEX TRADING &

CONTRACTING DRILLING EARTHING BOREHOLE AT DOHA IND AREA 2,466

Qatar GULF CONTRACTING DOHA WEST SEWAGE TREATMENT WORKS

EXTENTION :3 8,219

Qatar H.E SHEIKH ABDULLA BIN JASIM

AL THANI AL THANI WATER WELL 2,301

Qatar QATAR KENTZ PEARL GTL SITE- RLIC 6,986

Qatar SAOUD ABDULLA HAMAD AL

HAZAB CLEANING WATER WELL AT MUAITHER 1,370

Qatar ARAB ENGINEERING BUREAU MIC Housing Project Phase#2 20,400

Qatar QDVC LUSAIL CAR PARK PROJECT 1,644

Qatar NEW LINE GROUP DRILLING EARTHING BOREHOLE AT DOHA 1,507

Qatar STFA MARINE CONSTRUCTION EPIC OF CONTAINER TERMINAL AT MESAIEED BERTH

#7 27,507

Qatar ENERGY TECHNICAL SERVICES EPIC OF MOSQUES 14,556

Qatar STFA MARINE CONSTRUCTION EPIC OF CONTAINER TERMINAL AT MESAIEED BERTH

#7 35,637

Prequalification 2011

21

Qatar GEMS INTERNATIONAL NDPP - HIRE OF GEOLOGIST / ENGINEER 10,959

Qatar SINOHYDRO CORPORATION CP1

PROJECT CP5- GOLF 1 SUBSTATION LUSAIL, DOHA 10,993

Qatar HYDER CONSULTING ME ASPIRE ZONE HYDRO GEOLOGICAL INVESTIGATION -

PHASE II 100,388

Qatar HX STEEL INTERNATIONAL PROPOSED DEVELOPMENT AT RAS LAFFAN –

GEOTECHNICAL INVESTIGATION 4,581

Qatar ARUP QATAR NATIONAL MUSEUM – GEOPHYSICAL INV 12,678

Qatar CONSOLIDATED GULF CO. WLL HV CONTROL CENTRE BUILDING , DUKHAN 15,651

Qatar PREMIUM CONSTRUCTION CONSTRUCTION & REPAIR OF STREET LIGHT SYSTEM 15,753

Qatar ARUP MV2 SITE LUSAIL SIMSIMA ROUTE 10,116

Qatar ALPHA GULF PROPOSED 2B+G+2 BUILDING IN NUAIJAH DOHA 3,562

Qatar INDUSTRIAL SERVICES GROUP PROPOSED G+5 BUILDING AT MUMTAZA DOHA 3,562

Qatar A R U P MEEZA MV3 GROUND INVESTIGATION 5,718

Qatar QATAR INDUSTRIAL

LABOROTORIES

DRILLING GEOTECHNICAL BOREHOLES – AL KHOR

HIGWAY 71,233

Qatar SINOHYDRO CORPORATION CP1

PROJECT CP-5 UTILITY TUNNELS & INTERCHANGE 115,104

Qatar BURHAN INTERNATIONAL DEVELOPMENT OF ROADS IN BANIHAJER ZONE –

GEOTECHNICAL INVESTIGATION 31,697

Qatar T C J V PLATEAU MAINTANANCE PROJECT – GEOTECHNICAL

INVESTIGATION 151,339

Qatar GEMS INTERNATIONAL NDPP - ADDITIONAL GEOTECHNICAL INVESTIGATION

–Variation Order -7 1,161,961

Qatar REDCO INTERNATIONAL G+2 STORING BUILDING AT WUKAIR 6,437

Qatar GEMS INTERNATIONAL RENTAL OF JACK UP, BARGE & DRILLING OF MARINE

BOREHOLES 963,878

Qatar HALCROW QEC TRUCK MARSHALLING AREA & PEOPLE MOVER 82,572

Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATEMENT PLANT 13,026

Qatar CONSOLIDATED CONTRACTORS

INTLS CO / TEYSEER

CONTRACTING COMPANY

QGX PROJECT RASLAFFAN 3,288

Qatar BLACK CAT ENGINEERING &

CONSTRUCTION

EPIC FOR PRODUCED WATER TREATMENT &

INJECTION PHASE-2 62,672

Qatar AMERICAN INTERNATIONAL

CONTRACTORS SITE INVESTIGATION ATALUDEID AIR BASE 15,477

Qatar KLG ORGANIC QATAR W.L.L CHLORINATED PARAFFIN WAXES (CPW) PROJECT 8,487

Qatar RENCO QATAR NDIA - CP35 103,151

Qatar MANSOOR ISSA AL HAKI 2B+G+6 GUILDING AT BINMAHMOOD 4,397

Prequalification 2011

22

2009

Location Client Project Value (US$)

Oman Zoom Steel Iron Ore Exploration project, Ibra 343,400

Oman Saraya Bandar Jissah Saraya Bandar Jissah Resort 287,000

Oman Five Oceans Sohar Special Economic Zone 23,120

Oman Al Rimal Mining Limestone Quarry, NW of Salalah 272,600

Qatar CDC-Takenaka JV NDIA - Passenger Rail System – Geotechnical investigation

works 1,019,393

Qatar STFA Marine Construction EPIC for Container Terminal Berth 7 at Mesaieed Port –

CPT soundings 240,959

Qatar Adil Jaidah & Associates B+G+2 Office Building at C-ring Road 5,145

Qatar Coastal Consulting Engineering Submarine Cable at Corniche, Doha 15,019

Qatar Hyatt Plaza Drilling Soakaway boreholes 5,616

Qatar GHD Global Doha Park Project - Soil Testing & Drilling Boreholes to

Groundwater level. 9,641

Qatar CDC-Takenaka JV NDIA – Geotechnical investigation works 12,042

Qatar JGC / KBR – Qatar Shell

Pearl GTL PROJECT PI-008 – Proposed Location of

Operational Waste Storage Cell – Geotechnical

Investigation – Trial Pits

22,873

Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for

vertical anodes 10,885

Qatar Pillar Microwave Transmission Site – Muaither – Earthing

Borehole 1,370

Qatar Dohaland Heart of Doha, Geotechnical Investigation Works 681,018

Qatar Rent-a-Port Lusail Development – Marine Geotechnical Investigation 66,608

Qatar CCIC& Teyseer JV NDIA, CP-27 Geotechnical Investigation for utility tunnel 20,548

Qatar KBAS Contracting Barwa Industrial Area & Development of Mohd. Bin Jassim

St. 7,808

Qatar Sinohydro Corporation Lusail Stormwater Pumping Station SW1 – geotechnical

investigation 47,102

Qatar Mannai Trading Co. Proposed Development at RLIC for MCL – Geotechnical

Investigation 19,963

Qatar Hyder Consulting Lusail Pumping Station – Geotechnical Investigation 9,197

Qatar Halcrow Yolles NDIA – Airport Operations FAacilities Package No. 2 –

geotechnical investigation 33,075

Qatar Qatar Kentz Pearl GTL, RLIC – Earthing borehole drilling 5,342

Qatar Consolidated Gulf Co. WLL Mesaieed Tank Farm Area – geotechnical investigation 6,997

Qatar Tracer Qatar Improvement to Roads and Cark park at HGH – Earthing

boreholes 23,518

Qatar Danway Qatar Drilling Earthing Boreholes in Dukhan 16,767

Qatar Gulf Contracting Co. WLL Earthing Boreholes 5,764

Qatar Danway Qatar Drilling Earthing Boreholes in Umm Bab 2,541

Qatar Atkins / Mumtalkat Plot ECQ-D-11 Energy City, Lusail 21,085

Qatar Arab Engineering Bureau Ras Al Nassa Development (Marine Works), Doha 53,301

Qatar Zenon Trading & Contracting Co. Soakaway borehole drilling 6,329

Qatar KEO International NDIA – Subsurface Exploration and Geotechnical

Exploration 47,278

Qatar DOPET Design Inputs for Raft Foundation 1,233

Prequalification 2011

23

Qatar Al Jaber Energy Services Common Sulphur Plant Qatargas II – Cathodic Protection

boreholes 10,247

Qatar Redco Construction Almana Construction of B+G+3 office Building at Al Wakrah 2,027

Qatar Qatar Primary Material Co Geotechnical Investigation 16,362

Qatar Hyder Consulting Qatar Foundation, Education City, Additional Geotechnical

Investigation – infiltration tests 14,438

Qatar Gulf Contracting CO. WLL DOHA WEST SEWAGE TREATMENT WORKS - DRILLING

EARTHING BOREHOLES 43,836

Qatar WSP Environmental Aerospace City, Al Khor- Geotechnical Investigation 162,995

Qatar GEMS New Doha Port project – Supplementary site investigation 2,169,160

Qatar Aswan Trading Drilling Water Wells in Al Khor Farm 24,616

Qatar CCIC& Teyseer JV Qatargas 3 & 4 Onshore projects – Drilling Boreholes for

vertical anodes 7,123

Qatar Middle East Engineering

&Corrosion Control WLL MEEC - QP Tank Farms 21,945

Qatar STFA Marine-Construction

Company Gabbro Berth - Piezcone testing 35,644

Qatar Qatar National Museum QNM - Additional SI - Pumping tests 53,682

Qatar Cedgec Central Control Room for QAPCO 8,811

Qatar Nasser- Al Hajiri Pearl GTL Project - Earthing boreholes 33,288

Qatar Mohamed Mohanna Ali Dosari Cleaning & Deepening Water Well At Al-Khuraib 1,370

Qatar Shannon Engineering HKT & MKT Office Building Najma 0

Qatar CCIC & Teyseer Contracting Borehole at RLIC 10,890

Qatar Al Jaber & Partners Education City - North Side Utility Tunnels 35,616

Qatar JGC KBR Pearl GTL Project off Plot Waste Cell 22,885

Qatar Dornier Consulting Drilling of Additional GW Monitoring Wells 100,000

Qatar Diplomatic Contracting Company New Industrial Area - Soakaways 4,049

Qatar KEO International NDIA -CP63 - Additional SI works 29,147

2008

Location Client Project Value (US$)

Qatar MR. ABDULLA ABDULARAHMAN

HYDER

APARTMENT (B+G+2) - GEOTECHNICAL INVESTIGATION

WORKS 1,507

Qatar QATAR DEVELOPMENT CO. KINDER GARTEN SCHOOLS AT ISHGAWA - GEOTECHNICAL

INVESTIGATION 4,205

Qatar SOGREAH PUMPING TEST & WATER ANALYSIS 66,740

Qatar FIVES SOLIOS QATALUM PROJECT - FUME TREATMENT PLANT - SOIL

INVESTIGATION 33,808

Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS - SITE

INVESTIGATION 21,034

Qatar GEMS NDPP PROJECT 401,562

Qatar CRC MARKIYAH MALL - DRILLING EARTHING BOREHOLE 8,440

Qatar CH2MHILL DRILLING & INSTALLATION GROUND WATER WELL AT

MESAIEED 13,432

Qatar FLUOR GROUND WATER MONITORING WELL IN CONDENSATE 1

& 2 AREA 64,029

Qatar MINISTRY OF MUNICIAPL

AFFAIRS & AGRICULTURE DRILLING 3 NOS. WATER WELL AT SABKHAT DUKHAN 7,397

Qatar HYUNDAI ENG'G & CONST. CO.

LTD

RAS LAFFAN "C" IWPP PROJECT (RAPO) - THERMAL

RESISTIVITY TEST 2,534

Prequalification 2011

24

Qatar CCIC& TEYSEER RASGAS ONSHORE/ONPLOT EXPANSION - DRILLING OF

GROUND WATER MONITORING WELLS 20,274

Qatar HYUNDAI ENGINEERING &

CONSTRUCTION CO. LTD

RAS LAFFAN "C" IWPP PROJECT- SOIL INVESTIGATION

WORKS 285,686

Qatar FOSTER WHEELER QATAR PETROCHEMICAL COMPLEX PROJECT -

ENVIRONMENTAL BASE LINE SURVEY 153,374

Qatar NIPPON KOEI QUOTATION FOR PROVISION AND TRANPORTATION OF

CORE BOXES 3,562

Qatar JGC-KBR / QATAR SHELL

PEARL GTL PORJECT - SHELL CONTRACT PI-012 TPME,

PROJECT NO. 9216T - GEOTECHNICAL INVESTIGATION

WORKS

45,400

Qatar FLUOR MIDEAST LTD WEST SIDE FLUOR CAMP - DRILLING OF GROUND WATER

MONITORING WELLS 26,837

Qatar QATAR DEVELOPMENT CO. RIVERA GARDENS - DUHAIL - GEOTECHNICAL

INVESTIGATION WORKS 4,205

Qatar MAFCO B+G+10 BUILDINGS AT FAREEQUE ABDUL AZEEZ -

GEOTECHNICAL INVESTIGATION 20,466

Qatar RAKO CONTRACTING GEOTECHNICAL INVESTIGATION AT WAKRA 4,103

Qatar FERNAS CONSTRUCTION CO. EPIC FOR FUEL GAS SUPPLY TO QNCC - IV AND GCC -I

PLANTS AT UMM -BAB AREA 3,699

Qatar BEHZAD TRANSPORT DRILLING EARTHING BOREHOLES AT ADARMA 1,575

Qatar DOPET DOHA PETROLEUM CONSTRUCTION CO. (DOPET) - QP SITE 15,870

Qatar AL HUDA ENGINEERING WORKS EARTHING BOREHOLES FOR PLAZA II & III 1,912

Qatar KEPPLER SEGHERS DOHA NORTH SEWERAGE TREATMENT PALNT SITE 1 & 2 27,005

Qatar SALAM PETROLEUM SERVICES GEOTECHNICAL INVESTIGATION KHATIYAH MAIN IN

DUKHAN FIELDS 7,047

Qatar MADAR BUILDING MATERIAL GEOTECHINCAL INVESITGATION WORKS 7,064

Qatar AL WAZEERI TRADING

TRANSPORT & CONTG AL WAZEERI TRADING TRANSPORT 2,071

Qatar MAFCO CONTRACTING G + 3 BUILDING AT AL SAAD AREA - GEO TECHNICAL

INVESTIGATION WORKS 15,110

Qatar FERNAS CONSTRUCTION CO. PLANTS AT UMMBAB AREA - GEOTECHNICAL

INVESTIGATION WORKS 21,381

Qatar BEZHAD TRANSPRT DRILLING ONE BORE HOLE 1,575

Qatar AL SRAIYA STRABAG NEW IZGHAWA LINK ROAD - GEOTECHNICAL

INVESTIGATION WORKS 13,329

Qatar AMMICO CONTRACTING CO. WLL DRILLING & INSTALLATION OF GROUNDWATER

OBSERVATION WELL 4,384

Qatar KEO INTERNATIONAL GEOTECHNICAL INVESTIGATION 133,479

Qatar DAEWOO ENGINEERING CONSTRUCTION CO. RAS LAFFAN YARD RLIC -

GEOTECHNICAL INVESTICATION 171,486

Qatar STFA MARINE CONSTRUCTION GABRO BERTH EXPANSION AT MESAIEED 94,863

Qatar QATAR KENTZ DRILLING EARTHING BOREHOLES 4,110

Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 121,014

Qatar MSK CONTRACTING GEOTECHNICAL 5,479

Qatar MSK CONTRACTING DRIILING GROUND WATER WELL 3,562

Qatar DOPET DRILLING EARTHING BOREHOLES 9,189

Qatar ABYAAR REAL ESTATE

DEVELOPMENT GEOTECHNICAL INVESTIGATION WORKS 84,614

Qatar AL JABER & PARTNERS DRILLING EARTHING BOREHOLES 43,315

Qatar ENERGY TECHNICAL SERVICES GEOTECHNICAL INVESTIGATION WORKS 8,000

Qatar QATAR PRIMARY MATERIALS SITE IVESTIGATION 63,233

Qatar REDCO GROUP PRECAST CONCRETE FACTORY - GEOTECHNICAL

INVESTIGATION 5,425

Qatar QATAR KENTZ PEARL GTL SITE - RLIC - DRILLING EARTHING BORE HOLE 18,493

Prequalification 2011

25

Qatar CCIC& TEYSEER PACKAGE CP 27 - NDIA - GEOTECHNICAL INVESTIGATION 25,478

Qatar HYDER CONSULTING ME THE SPORTS CITY PROJECTS - BOREHOLE DRILLING,

PUMPING TEST 76,660

Qatar QATAR PRIMARY MATERIALS CEMENT SILOS, GABBRO BERTH, MESAIEED -

GEOTECHNICAL INVESTIGATION 40,849

Qatar HILL INTERNATIONAL GRAND HYATT RESORT PORJECT - PHASE II -

GEOTECHNICAL INVESTIGATION 43,281

Qatar AL JABER GROUP ABUDHABI TOWER - GROUND INVESTIGATION 695,348

Qatar BEITY PROPOSED G + 8 BUILDING AT OLD GHANEM - SITE

INVESTIGATION WORKS 5,452

Qatar COWI A/S BARWA AL KHOR DEVELOPMENT - GEOTECHNICAL

INVESTIGATIONS 194,926

Qatar CONSTRUCTION ENTERPRISES

COMPANY

CONSTRUCTION OF AL KHOR PORT CHANNEL -

GEOTECHNICAL INVESTIGATION 5,660

Qatar EL SEIF ENGINEERING CONTG DRILLING BOREHOLE 3,642

Qatar AL RIYADH TRADING & CONT. CO. EARTHING BOREHOLES AT AL WAAB 1,904

Qatar QATAR KENTZ SOIL RESISTIVITY TEST 1,301

Qatar STS LUSAILPROJECT 43,712

Qatar DORNIER CONSULTING DRILLING INSTALLATION OF GROUNDWATER MONITOR

WELLS AT DUKHAN 107,945

Qatar TADMUR CONTRACTING &

TRADING EST

GEOTECHNICAL INVESTIGATION WORKS - FAHAHIL

STRIPPING PLANT IN DUKHAN 7,136

Qatar QDVC WEST BAY PARK SITE - SOIL INVESTIGATION 149,588

Qatar HYDER CONSULTING ME PACKAGE 1 - WAKRAH MAIN ROAD - GEOTECHNICAL

INVESTIGATION 101,582

Qatar HYDER CONSULTING ME PACKAGE 2 - MAJOR ROADS IN AL KHOR & AL HUWAILAH -

GEOTECHNICAL INVESTIGATION 113,318

Qatar HYDER CONSULTING ME PACKAGE 3 : ROADS & INFRASTRUCTURE - AIN KHALID 120,273

Qatar HYDER CONSULTING ME PACKAGE 4 - ROADS & INFRASTRUCTURE IN AL KHEESA

NORTH - GEOTECHNICAL INVESTIGATION 176,021

Qatar HYDER CONSULTING ME PACKAGE 5 : ROADS & INFRASTRUCTURE IN AL KHOR

INDUSTRIAL AREA 96,189

Qatar HYDER CONSULTING ME PACKAGE 6 : MKEINES UMMBAB LINK ROAD 155,687

Qatar AL FOWRIYA TRADING &

CONTRACTING G+1 SAFARI HYPER MARKET AT AIN KHALID DOHA 3,433

Qatar PUNJ LLOYD LTD SOIL RESISTIVITY SURVEY - WORK ORDER 1,370

Qatar CHIYODA CORPORATION BARZAN ONSHORE PLANNING PROJECT- GEOTECHNICAL

INVESTIGATION 120,890

Qatar AL UMMA TRADING &

CONTRACTING

DRILLING GROUNDWATER WELLS AT BIN MAHMOUD

AREA 4,110

Qatar SINOHYDRO CORPORATION CP1

PROJECT

LUSAIL DEVELOPMENT PRELIMINARY INFRASTRUCTURE

WORKS P GEOTECHNICAL INVESTIGATION 67,605

Qatar INTERNATIONAL CONTRACTING

& TRADING CO. QATAR FOUNDATION - DRILLING WATER WELL 4,438

Qatar HYDER CONSULTING ME PACKAGE 4 A - ROADS & INFRASTRUCTURE IN UMM

QARN - GEOTECHNICAL INVESTIGATION 36,177

Qatar ARUP EDUCATION CITY 0

Qatar ARUP IQ TOWER - THE CRYSTAL - GEOTECHNICAL

INVESTIGATION 512,378

Qatar FERNAS CONSTRUCTION CO. DRILLING EARTHING BOREHOLES 24,690

Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY 12,096

Qatar MEDCO QATAR BAHRIAN CAUSEWAY - SOIL INVESTIGATION 100,226

Prequalification 2011

26

Qatar ATLAS INTERNATIONAL QSTRG STAGE -3 - DRILLING EARTHING BOREHOLE 24,164

Qatar EL SEIF ENGINEERING CONTG P94-NDIA, DRILLING BOREHOLES FOR EARTHING 102,753

Qatar DOPHA PETROLEUM CONT CO

LTD GRC 05/115 DRILLING EARTHING BOREHOLES 9,189

Qatar HYDER CONSULTING ME LUSAIL PUMPING STATION , GEOTECHNICAL

INVESTIGATION WORKS 43,984

Qatar ATELIERS JEAN NOUVEL NEW QATAR NATIONAL MUSEUM GEOTECHNICAL

INVESTIGATION 275,970

Qatar NEW VISION DRILLING EARTHING BOREHOLES AT SALWA ROADQ 1,644

2007

Location Client Project Value (US$)

Qatar CDE IRELAND LTD GEOTECHNICAL INVESTIGATION FOR SAND WASHING

PLANT AT AL KARANA 22,563

Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – GEOTECHNICAL INVESTIGATION

FOR BRIDGES ACROSS COOLING WATER CHANNEL 10,931

Qatar JGC - KBR C/O QATAR SHELL GEOTECHNICAL WORKS FOR THE FIREWATER TANK /

WEST LAYDOWN AREA LOT W7A 9,445

Qatar JGC KBR - QATAR SHELL POTABLE WATER & FIRE WATER SYSTEM, CAMP AREA,

RASLAFFAN - GEOTECHNICAL INVESTIGATION 14,400

Qatar NIPPON KOEI CO. LTD / ASCO

CONSULTING ENGINEER

ABU HAMOUR SOUTHERN OUT FALL - GEOTECHNICAL

AND GEOPHYSICAL INVESTIGATION 224,459

Qatar STRABAG QATAR WLL PLANT OFFICE AREA BUILDINGS - GEOTECHNICAL

INVESTIGATION

1

4,

0

1

5

Qatar PRIVATE ENGINEERING OFFICE /

GHD

PRIVATE BEACH VILLA AL THAKHIRA - GEO TECHNICAL

INVESTIGATION 11,740

Qatar CONSOLIDATED CONTRACTORS

INT'L CO. (CCIC)

QATARGAS II LNG FACILITIES PROJECT, RASLAFFAN -

DRILLING EARTHING BORE HOLE (CONTRACT GTC-QG-11-

ONS-15)

149,658

Qatar GEA BARWA BUSINESS CENTER - GEOTECHNICAL &

HYDROLOGICAL INVESTIGATION 305,462

Qatar AL JABER ENERGY SERVICES COMMON SULPHUR PLANT, QATAR GAS II - RLIC,

GEOTECHNICAL INVESTIGATION 22,551

Qatar ENCANA INTERNATIONAL

(QATAR) LIMITED DRILLING WATER WELL & PUMPING TEST 61,200

Qatar RAS LAFFAN OLFINS COMPANY

LTD (RLOC) ETHYLENE PIPELINE - MESAIEED TOPOGRAPHICAL SURVEY 30,155

Qatar GEA GERMAN ENGINEERS AND

ARCHITECTS

BARWA BUSINESS CENTER - GEOTECHNICAL &

HYDROLOGICAL INVESTIGATION - 2ND PHASE 386,473

Qatar ATKINS QATAR FOUNDATION EDUCATION CITY - ADDITIONAL

GEOTECHNICAL INVESTIGATION 65,642

Qatar CBI SHELL PEARL GTL TANKAGE- CBI CONTRACT NO. 153130 -

GEOTECHNICAL SITE INVESTIGATION 803,320

Qatar STFA MARINE CONSTRUCTION CONSTRUCTION OF NEW TEMPORARY BERTH NO. 7 AT

MESAIEED - STAND PIPE INSTALLATION & ASS. WORKS 61,136

Prequalification 2011

27

Qatar JGC MIDDLE EAST FZE GROUND WATER MONITORING WELLS CONSTRUCTION AT

DOLPHIN PROJECT 54,301

Qatar RAFAEL VINOLY ARCHITECTS ARAB MUSEUM OF MODERN ART - GEOTECHNICAL

INVETIGATION 117,722

Qatar JGC KBR - QATAR SHELL STORAGE OF CORE BOXES 23,836

Qatar FCB QNC-3 ANCHORS IN ROCK UMMBAB - DRILLING

BOREHOLES FOR ANCHORS 62,740

Qatar QATAR PRIMARY MATERIALS GEOLOGICAL PROSPECTING FOR SAND DEPOSITS, SOUTH

QATAR. SITE INVESTIGATION 79,301

Qatar QATAR PRIMARY MATERIALS QPMC SAND WASHING PLANT-SOUTH OF AL-KARANA,

GROUND INVESTIGATION 19,759

2006

Location Client Project Value (US$)

Qatar HALCROW DEVELOPMENT OF RUWAIS PORT PHASE 2, DRILLING

EARTHING BOREHOLES 89,067

Qatar HALCROW NEW DOHA INT’L AIRPORT, AIRLINE OPERATIONS

FACILITIES GEOTECHNICAL INVESTIGATION 112,182

Qatar GULF ENGINEERING MULTI PURPOSE ADMIN. COMPLEX – RASLAFFAN,

GEOTECHNICAL INVS. 68,000

Qatar PUNJ LLOYD NDIA FUEL SYSTEM-GEOTECHNICAL & GEOPHYSICAL

SIOL INVESTIGATION 153,829

Qatar CTJV AL KHALEEJ PROJECT PHASE 2, GEOTECHNICAL &

TOPOGRAPHICAL SURVEY 52,250

Qatar IMCO DRILLING EARTHING BOREHOLES & INSTALLATION OF

EARTH RODS 40,288

Qatar CHIYODA TECHNIP AL KHALEEJ GAS PROJECT 28,125

Qatar QATAR SHELL GTL PEARL GTL PROJECT PI-017, HARBOUR TANK FARM

INTERIM SITE INESTIGATION 90,297

Qatar HALCROW OLD DOHA PORT REDEVELOPMENT GEOTECHNICAL

INVESTIGATION 28,127

Qatar HYDER CONSULTING LUSAIL DEVELOPMENT GROUND WATER

INVESTIGATION 377,632

Qatar STS CONSULTANTS QATAR CONVENTION CENTER & TOWER

GEOTECHNICAL SITE INVESTIGATION 255,556

Qatar ELLERBE BECKET SPECIALITY TEACHING HOSPITAL IN EDUCATION CITY,

GEOTECHNICAL INVS. 48,564

Qatar CHIYODA TECHNIP QATAR LIQUIFIED GAS CO PMP/AGX PROJECT

GEOTECHNICAL & TOPOGRAPHICAL SURVEY 96,497

Qatar FCB CEMENT THIRD EXTENSION OF UMMBAB CEMENT PLANT-

GEOTECHNICAL INVESTIGATION 52,844

Qatar CHIYODA TECHNIP QATAR GAS 3 & 4 ONSHORE PROJECT TRAINS 6 & 7

SUB CONTRACTORS CAMP 31,280

Qatar HYDRO ALUMINIUM AS QATALUM PROJECT-GEOTECHNICAL INVESTIGATION 12,986

Qatar BAUER INTERNATIONAL OLD GHANIM SITE DRILLING GROUND WATER

MONITORING WELL 22,132

Qatar QATAR KENTZ RL3 COMMON OFFLOT PROJECT-RASLAFFAN 37,836

Qatar QATAR KENTZ PEARL GTL PLANT TANK AREA BOREHOLE WORK 75,973

Qatar QATAR SHELL PEARL GTL PROJECT CONSTRUCTION CAMP TRIAL PIT

WORK 30,462

Qatar QAPCO SIOL & WATER CONTAMINATION SURVEY IN AREA A &

B OF QATOFIN PROJECT 85,622

Prequalification 2011

28

Qatar CBI CBI CONTRACT # 146682, RASLAFFAN GEOTECHNICAL

INVESTIGATION 88,638

Qatar GALFAR ALMISNAD EPIC UMMBAB TO SALWA ROAD DUAL CARRIAGE,

EARTHING BOREHOLES 112,534

Qatar LINDE AG AIR SEPERATION UNITS, RASLAFFAN –

PEARL QATAR, GEOTECHNICAL INVS. 109,671

Qatar JGC-KBR C/O QATAR SHELL PEARL GTL PROJECT ADDITIONAL CAMP SOIL

INVESTIGATION WORK 95,463

Qatar AL-JABER & PARTNERS PEARL PROJECT-EFFLUENT TREATMENT PLANT,

GEOTECHNICAL INVESTIGATION 432,359

Qatar GALFAR ALMISNAD CONSTRUCTION OF ROADS, UTILITY CROSSINGS &

STREET LIGHTING IN INDUSTRIAL AREA, MESAIEED 25,077

Qatar HYDRO ALUMINIUM AS QATALUM PROJECT – ADDITIONAL TOPOGRAPHICAL,

BATHYMETRICAL & GEOTECHNICAL INVESTIGATION 107,103

2005

Location Client Project Value (US$)

Qatar MANNAI CORPORATION WAREHOUSE AT STREET 23/24 SALWA INDUSTRIAL

AREA 3,658

Qatar QATAR DREDGING CO. PEARL OF THE GULF PROJECT – DOHA 47,136

Qatar HYDRO ALUMINIUM AS QATAR ALUMINIUM PROJECT 266,858

Qatar J & P QATAR W.L.L ERC 0492/C1 AL GHARRAFFA INTERCHANGE 2,411

Qatar KBAS CONTRACTIN & TRADING QUARRY FEASIBILITY AT KARAMA 17,205

Qatar INDUSTRIAL SERVICE GROUP OFFICE BLDG (2B +G + 9) AT NEW NEW KHOLAIFAT 6,027

Qatar CHIYODA CORPORATION RASGAS NEW CAMP AREA FOR TRAIN 6 & FEED

PROJECT 78,840

Qatar KBAS CONTG & TRADING KHALIFA STADIUM 1,842

Qatar MANNAI CORPORATION WARE HOUSE AT ST 23/24 SALWA INDUSTRIAL AREA –

ENVIRONMENTA SAMPLING & TESTING 3,658

Qatar C C C RAS LAFFAN EXPANSION PROJECT GROUND WATR

MONITORING WELLS 7,397

Qatar KBAS CONTRACTING SALAM STREET / DRILLING OF SOAKWAY BOREHOLES 5,589

Qatar JGC MIDDLE EAST FZE DOLPHIN – UPSTREAM AND COMPRESSION FACILITIES 18,315

Qatar MTC SURVEY QAFAC II & GEOTECHNICAL SURVEY 39,082

Qatar MTC SURVEY

NEW BRITISH EMBASSY OFFICES RESIDENCE &

AMENITIES TOPOGRAPHICAL & GEO TECHNICAL

SURVEY

12,671

Qatar CHIYODA CORP

SOIL INVESTIGATION & TOPOGRAPHICAL SURVEY –

QATAR GAS III – PROJECT QATAR GAS 3 FEED PROJECT

RASLAFFAN

304,372

Qatar J & P DRILLING BORE HOLES OUR QUOTE ER/6553 4,171

Qatar QATAR KENTZ WLL

QATARGAS II DEVELOPMENT PROJECT RLIC CAMP

AREA, RASLAFFAN, (7-BOREHOLES, SOIL & ROCK

SAMPLING LAB TEST)

9,849

Qatar FBJ ENTERPRISES VILLA COMPLEX LUQTA – GEOTECHNICAL

INVESTIGATION 5,971

Qatar GULF ENGINEERING &

INDUSTRIAL CONSULTANCY

BMC 2004023 CONSULTANCY QTY SURVEY FOR

AQUATIC & FISHERIES REASEARCH CENTRE AT

WAKRAH

33,879

Qatar SMEC INTERNATIONAL HALUL ISLAND REMEDIATION 103,667

Qatar COWI A/S NORTH BEACH DEVELOPMENT ADDITIONAL

BOREWELL 3,397

Prequalification 2011

29

Qatar QATAR KENTZ 524-QG-II LABOUR CAMP FACILITIES PHASE II –

RASLAFFAN 6,685

Qatar DODSAL PTE LTD DOLPHIN UPSTREAM & COMPRESSION FACILITIES

PROJECT RLIC – DRILLING EARHING BOREHOLES 3,767

Qatar PENINSULAR PETROTECH ENG. HALUL TANK CP SYSTEM, DRILLING BOREHOLES FOR

CATHODIC PROTECTION 61,349

Qatar ARAB CONSULTING ENGINEERS 15 NEW SCHOOLS AROUND DOHA AND VILLAGES 50,137

Qatar CPC/LATTANZI DOHA AIRPORT – GEOTECHNICAL INVESTIGATION 5,765

Qatar QATAR PETROLEUM GEOTECHNICAL INV. FOR GABBRO PROJECT 346,927

Qatar DESCON ENGINEERING RLIC AREA EARTHING BOREHOLE 5,308

Qatar KELLOG BROWN ROOT FEED FOR RATIONALIZATION OF CONTROL SYSTEM AT

KHATIYAH AND FAHAHIL DEGASSING STATION 15,795

Qatar TRAGS AL KHOR CLUB CONVERSION – EARTHING BOREHOLES 5,088

Qatar C.D.C BARJEEL RESIDENTIAL TOWERS AT WEST BAY – PILING

AND EXCAVATION WORKS 123,844

Qatar J & P DRILLIJNG BORE HOLE FOR STREET LIGHTING 1,956

Qatar ALHUDA ENG WORKS DEVELOPMENT OF KHALIFA TENNIS & SQUASH 4,877

Qatar Q-CON EPIC OF 11KV DUKHAN TOWNSHIP NETWORK

UPGRADE 18,808

Qatar ATKINS PRIMARY INFRASTRUCTURE DESIGN SERVICES FOR

EDUCATION CITY 110,818

Qatar QATAR PETROCHEMICAL HIGH COD TANK IN ETHYLENE PLANT GEOTECHNICAL

INVESTIGATION 7,767

Qatar ATKINS FEED FOR LPG PIPELINE FROM QP REFINARY TO NEW

LPG BOTTLING PLANT 42,941

Qatar PRIVATE ENGINEERING OFFICE VILLA AT AL THAKIRA – GEOTECHNICAL

INVESTIGATION 5,589

Qatar GULF DESIGN PROPOSED BUILDING AT A-RING ROAD FOR AHMED

DARWISH 5,247

Qatar ATKINS QATAR PRIMARY ROUTES DHUKAN HIGHWAY 74,014

Qatar CHIYODA TECHNIP JOINT

VENTURE

ADDITIONAL TOPOGRAPHICAL SURVEY OF

DESALINATED WATER PIPES ROUTE AND

GEOTECHNICAL INVESTIGATION AT LEAN LNG TANK

AREA

28,962

Qatar SLAG AGGREGATE PRODUCER QUARRY FEASIBILITY STUDY AT KARAMA 7,808

Qatar AL-SAAD CONSULTING ENG 2B+G+M+14+SERVICE FLOOR FOR DR. SUMAIKH AT

OLD SALATA 9,781

Qatar CTJV RASGAS ONSHORE/ONPLOT EXPANSION PROJECT –

GEOTECH INVESTIGATION 78,840

Qatar SILVER ARACH PROPOSED G+5 BUILDING AT UMM GHUWALINA 4,384

Qatar CCC/TEYSEER JV QATAR GAS II DEVELOPMENT PROJECT RASLAFFAN –

DRILLING GROUND WATER 18,630

Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR THE GABBRO

SUPPORT SERVICES 346,927

Qatar CDC BARJEEL RESIDENTIAL TOWER AT WEST BAY – PILING

AND EXCAVATION WORKS 123,844

Qatar TEFFEN EPIC OF RASLAFFAN, MESAIEED ETHANE

TRANSMISSION PIPELINE PROJECT 37,151

Qatar WS ATKINS NEW DOHA INTERNATIONAL AIRPORT –

INFRASTRUCTURE ROAD PRELIMINARY DESIGN 106,135

Qatar HALCROW LTD MUSEUM OF ISLAMIC ARTS – GEOTECHNICAL

INVESTIGATION 27,555

Prequalification 2011

30

2004

Location Client Project Value (US$)

Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN

161,995

Qatar KETTANESH CONSTRUCTION RAS LAFFAN LNG TANK-5 40,860

Qatar AL HUDA ENGINEERING WORKS KHALIFA SPORTS HALL – DOHA 12,329

Qatar DOHA PETROLEUM CONST. CO. HELIUM RECOVERY UNIT – RAS LAFFAN 18,767

Qatar AMERICAN INT’L.

CONTRACTORS INC. (AICI)

MILLENNIUM VILLAGE FACILITIES – AL UDEID AIRBASE 11,849

Qatar CHIYODA CORPORATION AL KHALEEJ GAS PROJECT – LPG TANKS – RAS LAFFAN 50,431

Qatar QATAR PETROLEUM GEOTECHNICAL INVESTIGATION FOR PHOTOGRAPHY

MUSEUM 41,856

Qatar ENELPOWER RAS LAFFAN POWER & DESALINATION STATION 14,932

Qatar LG ENGG. & CONST. CORP. –

KOREA

QP LAB PROJECT – MESAIEED 20,966

Qatar OVERSEAS BECHTEL,

INCORPORATED – UK

NEW DOHA INTERNATIONAL AIRPORT PROJECT 1,730,653

Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN

(ON-PLOT) 121,185

Qatar W.S ATKINS & PARTNERS DUKHAN ROAD – DETAILED DESIGN 40,592

Qatar AL ATTIYAH CONTG. & TRADG.

CO.

ERC 0588 C1 RIW IN NORTH OF DUHAIL – STAGE 2 16,767

Qatar CHIYODA CORPORATION RLIC – CAMP AREA 106,443

Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT PROJECT –

MONITORING WELLS IN DUKHAN 45,842

Qatar MECON QAPCO EXPANSION PROJECT – MESAIEED 26,458

Qatar DORNIER CONSULTING GROUNDWATER ASSESSMENT – HALUL ISLAND 24,932

Qatar JAMES CUBITT & PARTNERS

ENGINEERING CONSULTANCY

LAFFAN TOWER (3 B+G+M+32+2 P+15)

ADMINISTRATIVE TOWER AT WEST BAY 11,767

Qatar JOANNOU & PARASKEVAIDES

QATAR W.L.L.

ERC 0492/C1 – AL GHARRAFFA INTERCHANGE 34,603

Qatar

QATAR PETROLEUM LTC 172/03 – BASELINE SURVEY AND MONITORING OF

THE GROUNDWATER MONITORING WELLS IN

MESAIEED INDUSTRIAL CITY

281,418

Qatar FCB CEMENT QATAR CEMENT PLANT UMM BAB 27,123

Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT PROJECT – SULPHUR

HANDLING AREA & PIPELINE ROUTE 61,014

Qatar BUZWAIR E&C. ERC 0390 C5 – DESIGN & CONST. OF ACCESS ROADS

TO MOTORCYCLE RACETRACK 15,452

Qatar

MARUBENI GTC 1/2002 – POWER SUPPLY TO QATAR

FOUNDATION AND 132kV OHL REPLACEMENT BY

CABLE IN GHARRAFA – DOHA

52,041

Qatar COWI – QATAR NORTH BEACH DEVELOPMENT – DOHA 727,617

Qatar QATAR PETROLEUM SO # 30443 – FIREWALL TANK AT FAHAHIL STRIPPING

PLANT 6,493

Qatar MMAA – DRAINAGE DEPT. 7A+7B+7E – ABU HAMOUR SOUTHERN OUTFALL 20,990

Qatar ATKINS NEW QASCO DIRECT REDUCTION IRON FACILITY 7,397

Qatar INDUSTRIAL SERVICES GROUP TOWER BUILDING AT WEST BAY 7,808

Qatar NASSER S. AL HAJRI CO. LTD. DOLPHIN ONSHORE FACILITIES PROJECT – RAS LAFFAN 136,986

Qatar QATAR DREDGING CO. NDIA – CORE DRILLING IN ROCK OUTCROP 11,616

Qatar QATAR LIQUEFIED GAS CO. AMINE REGENERATION UNIT AREA 7,808

Prequalification 2011

31

Qatar MEDGULF CONST. CO. GTC 04/175/ED – EPIC OF NEW PRODUCTION &

INJECTION WELLS AT ARAB D PLANT IN DUKHAN 25,327

Qatar ATKINS DUKHAN HIGHWAY – ADDITIONAL BOREHOLES 16,896

Qatar RMJM – DUBAI DUBAI TOWER – DOHA 583,578

Qatar CHIYODA CORPORATION QATARGAS II LNG PLANT FEED PROJECT – RAS LAFFAN 8,135

Qatar MOHAMED BIN MUBARAK

SALEH AL KULAIFI

DEVELOPMENT AT WEST BAY LAGOON – DOHA 6,671

Qatar TRADING & AGENCY SERVICES DUKHAN FITNESS CENTRE, DUKHAN TOWNSHIP 11,027

*Pre-2004 project references are available on request.

Major Completed Projects Laboratory

Client Project Details Period

PUBLIC WORK AUTHORITY

(ASHGHAL) TENDER#AA/DOM/10-11M/1398

DRAINAGE NETWORKS

ANALYSTICAL PROGRAMME

Jan 2011

ongoing

HYDER CONSULTING`

DA/07-08/D/025/1 – SECOND PHASE

EXPANSION OF INDUSTRIAL AREA

SEWERAGE TREATMENT FACILITY

EXPANSION OF INDUSTRIAL

AREA SEWAGE TREATMENT

FACILITY

Jan 2011 –

on going

SINOHYDRO CORPORATION NDIA – CP- 1 PROJECT – LUSAIL

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE ,

STEEL AND ASPHALT TESTING

year 2008

and on going

HYUNDAI ENGINEERING QAFCO 5 & QAFCO 6

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

July 2008

Ongoing

J&P PARASKEVAIDES MALE & FEMALE STUDENTS HOUSING

AT QATAR FOUNDATION

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE

TESTING

Nov 2010 -

Ongoing

KETTANEH

CONSTRUCTIONS

PLATEAU MAINTENANCE PROJECT ON

SHORE FACILITIES RAS LAFFAN

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE

TESTING

Nov 2011 on

going

QATAR CONSTRUCTION

ENGINEERING

Q3 99 – WASTE WATER DISPOSAL

SURFACE FACILITIES

SOIL, AGGREGATE AND

CONCRETE TESTING - CALL ON

BASIS

Feb 2011 on

going

QATAR CONSTRUCTION

ENGINEERING

CONSTRUCTION OF OPERATATOR

SHELTER LIFTING STATION AND SEWER

NETWORK – DOLPHIN

SOIL, AGGREGATE AND

CONCRETE TESTING - CALL ON

BASIS

Dec 2012 on

going

QATAR CONSTRUCTION

ENGINEERING Q 356 – HALUL ISLAND

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

TESTING

Feb 2011 on

going

QATAR ENGINEERING &

CONSTRUCTION CO QAFCO MELAMINE

SOIL, CONCRETE AND IN-SITU

TESTING

Feb 2008 –

Ongoing

QATAR ENGINEERING &

CONSTRUCTION CO DOLPHIN

SOIL, CONCRETE AND IN-SITU

TESTING

Apr 2008 –

Ongoing

QATAR ENGINEERING &

CONSTRUCTION CO INTERIM MODIFICATION

SOIL, CONCRETE AND IN-SITU

TESTING

Aug 2010 –

Ongoing

QATAR ENGINEERING &

CONSTRUCTION CO ORYX GTL

SOIL, CONCRETE AND IN-SITU

TESTING

Sep 2010 –

Ongoing

SUB SEA PROTECTION

SYSTEM LLC ARAMCO CONCRETE TESTING

Mar 2011 on

going

MIDMAC CONTRACTING NDIA CP 14- AIRSIDE & LAND SIDE ROAD

WORKS

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Feb 2006 -

Ongoing

MIDMAC CONTRACTING NDIA CP 28- PASSENGER TERMINAL -

FOUNDATIONS

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Aug 2007 –

Sept 2009

Prequalification 2011

32

CCIC NDIA CP 17 – AIR TRAFFINC CONTROL

SUPPORT & FACILITIES

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Apr 2007 –

Ongoing

CCIC NDIA CP 27 – MIDFIELD AREAS ACCES

SYSTEM

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

October

2007 -

Ongoing

CCIC NDIA – CP 96

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Mar 2011 on

going

CCIC NDIA – CP 19

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Mar 2011 on

going

CCIC NDIA- CP 95

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Mar 2011 on

going

CCIC NDIA CP - 93

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Mar 2011 on

going

CCIC NDIA CP - 76

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Mar 2011 on

going

BILFINGER BERGER BARWA CITY PHASE 1

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE , AND

ASPHALT TESTING

Sep 2007 –

Ongoing

REDCO INTERNATIONAL BARWA CITY PROJECT CONCRETE AND MATERIAL

TESTING

Jan 2010 –

Ongoing

REDCO INTERNATIONAL LUSAIL READYMIX

ONSITE LABORATORY FOR SOIL,

AGGREGATE , AND CONCRETE

TESTING

March 2010

– Ongoing

REDCO INTERNATIONAL 12 NEW DEPARTURE GATE AT DIA CONCRETE AND MATERIAL

TESTING – CALL ON BASIS

March 2011

On going

REDCO INTERNATIONAL SIMULATOR CENTRE (QATAR AIRWAYS) CONCRETE AND MATERIAL

TESTING – CALL ON BASIS

Jan 2011

ongoing

GALFAR AL MISNAD CONSTRUCTION OF THE CULTURAL

VILLAGE

CONCRETE, MATERIALS AND IN-

SITU TESTING

Jan 2009 –

April 2010

GALFAR AL MISNAD CONSTRUCTION OF THE

INFRUSTRUCTURE FOR KATARA

CONCRETE, MATERIALS AND IN-

SITU TESTING

July 2010 –

Ongoing

GALFAR AL MISNAD EPIC FOR PRODUCED WATER CONCRETE, MATERIALS AND IN-

SITU TESTING

Feb 2010 -

Ongoing

RENCO QATAR CP-35 AIR TRAFFIC & METEOROLOGICAL

SPECIFIC EQUIPMENT

CONCRETE AND MATERIAL

TESTING

Oct 2010 –

Ongoing

GCC / SELEX CP-35 CONCRETE AND MATERIAL

TESTING

March 2011

on going

DEGREMONT DOHA WEST STP SEWAGE WATER ANALYSIS Jan 2009 on

going

DEGREMONT BARWA HOUSING PROJECT SEWAGE WATER ANALYSIS Mar 2010 on

going

FIVE OCEANS – OMAN ODC ENVIRONMENTAL MONITORING ENVIRONMNETAL ANALYSIS Dec 2010 on

going

GHD 75/10530/02 – CONSTRUCTION SITE SOIL & WATER ANALYSIS

QDVC SHERATON CAR PARK GROUND WATER ANALYSIS Feb 2011 on

going

TCJV PMP DRINKING WATER ANLYSIS Feb 2011 on

going

ZOOM STEEL MINING & EXPLORATORY WORKS -

OMAN CHEMICAL ANALYSIS OF ROCK

Jan 2010 –

April 2010

TECHNITAL UPD/TAC/T/04/08-09 NOISE MONITORING &

ECOLOGICAL SURVEY

Nov 2010 -

Ongoing

ULTRA CONSTRUCTION DOHA NORTH SEWAGE & ASSCOCIATED

WORKS ENVIRONMNETAL ANALYSIS

Sept 2009 -

Ongoing

Prequalification 2011

33

IBER DROLA MESAIEED POWER PLANT ENVIRONMENTAL SAMPLING &

ANALYSIS

June 2008 -

Ongoing

NEW DOHA PORT PROJECT

COMMITTEE NEW DOHA PORT

ENVIRONMENTAL SAMPLING &

ANALYSIS

March 2010-

Sept 2010

HYDER CONSULTANTS MMUP- CONCEPT DESIGN OF

ROAD/INFRASTRUCTURE. NOISE MONITORING Dec2009

HYDER CONSULTANTS MMUP- CONCEPT DESIGN OF

ROAD/INFRASTRUCTURE. NOISE MONITORING Sept 2008

MIDMAC - TARMAC DOHA INTERNATIONAL AIRPORT ADDITIONAL 14 BAY APRONS AT

DOHA INTERNATIONAL AIRPORT

Jan 2009 –

Sept 2009

DANWAY QATAR GTC/07/122/ED- SUB STATIONS AT

DUKHAN OIL FIELDS SOIL & IN-SITU TESTING OWRKS

June 2008 –

Dec 2009

ASCO NAKHILAT SHIP REPAIR YARD, RAS

LAFFAN SOIL & IN-SITU TESTING OWRKS

Aug 2009 –

Dec 2010

ASCO EMERGENCY & SAFETY COLLEGE, RAS

LAFFAN SOIL & IN-SITU TESTING OWRKS

June 2009 –

Ongoing

CCIC CBCS – QATAR FOUNDATION CONCRETE TESTING Aug 2007 –

Mar 2008

CHIYODA TECHNIP JOINT

VENTURE – CTJV QATAR GAS 3 & 4

POTABLE WATER SAMPLING

AND ANALYSIS

June 2008 –

Ongoing

COMPASS CATERING QATALUM SEWAGE WATER ANALYSIS April 2008 -

Ongoing

COMPASS CATERING QATALUM PROJECT POTABLE WATER ANALYSIS April 2008 -

Ongoing

COMPASS CATERING QATAR SHELL GTL POTABLE WATER ANALYSIS March 2009 -

Ongoing

COWI QATALUM GROUND WATER ANALYSIS Aug 2008 -

Ongoing

CONSPEL QATAR CHILLED WATER NETWORK AT PEARL

QATAR CHILLED WATER ANALYSIS

July 2010 -

Ongoing

DESCON ENGINEERING QATAR SHELL GTL ALL TESTING WORKS INCLUDING

ON-SITE LABORATORY

Sep 2008 –

Feb 2011

DOLPHIN ENERGY GROUND WATER MONITORING WELLS ENVIRONMENTAL ANALYSIS Aug 2009 -

Ongoing

GULF DRILLING RIG – GULF4, AL ZUBARAH, ADL DOHA,

GULF 3

POTABLE WATER AND SEWAGE

WATER ANALYSIS

Aug 2008 –

Ongoing

J&P PARASKEVAIDES PEARL QATAR SOIL AND AGGREGATE TESTING Feb 2009 –

Ongoing

J&P PARASKEVAIDES

CONSTRUCTION OF ADVANCE WORKS

FOR THE CONVENTION CENTRE - QATAR

FOUNDATION

ONSITE LABORATORY FOR SOIL,

AGGREGATE , CONCRETE

TESTING

Aug 2009 –

Aug 2010

J&P PARASKEVAIDES AL WAKRAH HOSPITAL ASPHALT TESTING Jun 2010 -

Ongoing

ITT WATER & WASTE

WATER - UK DOHA SOUTH STW

SAMPLING & ANALYSIS OF

SEWAGE WATER

AUG 2010 –

OCT 2010

JANDENUL DREDGING GABBRO BERTH EXPENSION ENVIRONMENTAL ANALYSIS Aug 2009 –

Feb 2010

JANDENUL DREDGING GABBRO BERTH EXPENSION SOIL AND AGGREGATE TESTING Aug 2009 –

Feb 2010

VEOLIA QATAR DOHA SOUTH STW & INDUSTRIAL AREA

STP

SAMPLING & ANALYSIS OF

SEWAGE WATER

AUG 2009 –

OCT 2010

KEPPEL SHEGERS AL DHAKEERA SEWAGE TREATMENT

PLANT SEWAGE WATER ANALYSIS

Oct 2008 –

Ongoing

KEPPEL SHEGERS DOHA NORTH SEWAGE TREATMENT

WORKS SEWAGE WATER ANALYSIS

Oct 2008 –

Ongoing

METITO AL KHOR STP SEWAGE WATER ANALYSIS Jun 2009 –

Ongoing

METITO DOHA WEST SEWAGE WATER ANALYSIS March 2010

– Ongoing

METITO QATALUM WWTP SEWAGE WATER ANALYSIS Aug 2010 –

Ongoing

Prequalification 2011

34

METITO PEARL QATAR SEWAGE WATER ANALYSIS Dec 2009 –

Ongoing

QATAR ALUMINUM QATALUM SEA WATER AND WASTE

WATER ANALYSIS

Jan 2010 –

Ongoing

QATAR AIRWAYS WATER ANALYSIS POTABLE WATER ANALYSIS Apr 2010 –

Ongoing

QATAR SHELL GTL PEARL GTL WASTE WATER ANALYSIS Dec 2009 –

Ongoing

QATAR KENTZ RASLAFFAN POTABLE WATER ANALYSIS Jan 2009 –

Ongoing

QATAR COOL PEARL QATAR CHILLED WATER ANALYSIS Apr 2010 –

Ongoing

QATAR COOL WEST BAY DISTRICT COOLING CHILLED WATER ANALYSIS Apr 2010 –

Ongoing

QATAR PETROLEUM BASLINE SURVEY OF GROUND WATER

MONITORING WELLS ENVIRONMENTAL ANALYSIS

Jan 2010 –

Ongoing

QATAR VINYL COMPANY MESAIEED ENVIRONMENTAL ANALYSIS Jul 2009 -

Ongoing

REDCO GROUP RAYYAN PALACE SOIL AND IN-SITU TESTING Apr 2010 –

Ongoing

SCHLUMBERGER ASGHAL, VINCI ENVIRONMENTAL ANALYSIS Nov 2009 –

Ongoing

STRABAG QATAR QATAR SHELL PEARL GTL CONCRETE AND MATERIAL

TESTING

Jan 2008 –

May 2010

SIX CONSTRUCT SEWAGE TREATMENT PLANT SEWAGE WATER SAMPLING

AND ANALYSIS

Aug 2010 –

Ongoing

SIX CONSTRUCT RO PLANT POTABLE WATER ANALYSIS Aug 2010 –

Ongoing

TRANSFIELD MANNAI AL WOSAIL TOWER, QATAR

FOUNDATION POTABLE WATER ANALYSIS

Aug 2009 –

Ongoing

WAAGNERBIRO QATAR ASGHAL SEWAGE WATER SAMPLING

AND ANALYSIS

Oct 2009 -

Ongoing

TEKFEN QATAR NORTH ROAD CONCRETE TESTING Jan 2008 –

Jun 2009

GULF CEMENT CO NEW CEMENT FACTORY, UMMBAB-

FEASIBLITY STUDY.

CHEMICAL ANALYSIS ON

LIMESTONE

Oct – Dec

2006

CCIC RLX, RAS LAFFAN GROUND WATER MONITORING April 2006 -

Ongoing

JGC MIDDLE EAST DOLPHIN, RAS LAFFAN GROUND WATER MONITORING Oct 2005 -

Ongoing

SYNOHYDRO GAMUDA NEW DOHA INT’NATIONAL AIRPORT ENVIRONMENTAL TESTING &

POTABLE WATER ANALYSIS

April 2006 -

Ongoing

METITO PROJECT; C705 ENVIRONMENTAL TESTING Dec 2006 –

Ongoing

URS CORPORATION ORYX GTL, RAS LAFFAN ENVIRONMENTAL TESTING Mar-06

A.A. ENGINEERING INDUSTRIAL AREA STW SEWAGE WATER TESTING Mar 2006 –

Ongoing

RUMAILLAH SERVICES PUMPING STATIONS-DOHA SEWAGE WATER TESTING Sep 2005 –

Sep 2006

QATAR DREDGING CO NEW DOHA INTERNATIONAL AIRPORT ENVIRONMENTAL TESTING Jan 2005 -

2007

SATCO International RAS LAFFAN ENVIRONMENTAL TESTING ON

SOIL & WATER

Aug 06 -

Ongoing

BOSKALIS WESTMINSTER RAS LAFFAN ENVIRONMENTAL TESTING ON

SOIL & WATER

Feb 2006

Ongoing

MUSHRIF CONT.CO DOHA WEST STW MATERIALS AND IN-SITU

TESTING

Sep 2006-

Ongoing

DESCON ENG.CO OLEFIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU

TESTING

Jul 2006-

Ongoing

ALJABER ENERGY COMMON SULPHUR, QATARGAS II, RAS MATERIALS AND IN-SITU Jun 2006-

Prequalification 2011

35

LAFFAN TESTING Ongoing

FLUOR MIDDLE EAST RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU

TESTING

Sep2006-

Ongoing

NASSER AL HAJRI RAS GAS, RAS LAFFAN MATERIALS AND IN-SITU

TESTING

Sep 2006-

Ongoing

NASSER AL HAJRI QATARGAS SRU, RAS LAFFAN MATERIALS AND IN-SITU

TESTING

Sep 2006-

Ongoing

CDC/TAKENAKA NEW INTERNATIONAL AIRPORT SOIL, & CONCRETE TESTING Sep 2006-

Ongoing

MIDMAC NEW INTERNATIONAL AIRPORT SOIL, ASPHALT, CONCRETE

AGGREGATE TESTING

Sep 2005 -

Ongoing

SIX CONSTRUCTION CO. NEW INTERNATIONAL AIR PORT CONCRETE TESTING Aug 2005 -

Nov 2006

ITT INDUSTRIES DOHA SOUTH SEWAGE WATER

ANANLYSIS SEWAGE WATER TESTING Jun - Jul 2005

ASHGHAL AL DHAKIRA SEWAGE TREATMENT

WORK SEWAGE WATER TESTING

May - Jun

2005

NASSER AL HAJRI DOLPHIN PROJECT, RAS LAFFAN MATERIALS AND IN-SITU

TESTING

Oct 2004 –

Ongoing

QATAR PETROLEUM BASE LINE SURVEY OF GROUND WATER

MONITORING WELLS AT MIC

GROUNDWATER SAMPLING

AND LABORATORY TESTING.

Jul 2004 –

Apr 2008

SIX CONSTRUCT MUSEUM OF ISLAMIC ARTS MATERIALS AND IN-SITU

TESTING

Jan 2004 -

Feb 2005

SIX CONSTRUCT / MIDMAC KHALIFA STADIUM REDEVELOPMENT –

PACKAGE 3 – WEST STAND

MATERIALS AND IN-SITU

TESTING

Oct 2003 to

Mar 2005

OVERSEAS BECHTEL INC. NEW DOHA INTERNATIONAL AIRPORT

PROJECT

SOIL AND WATER SAMPLING

AND TESTING FOR VARIOUS

CONTAMINANT SPECIES

Feb - Aug

2004

HYDER CONSULTING

DOHA WEST SEWAGE TREATMENT

WORKS - FLOW SAMPLING AND

LABORATORY TESTING

SEWAGE SAMPLING AND

LABORATORY TESTING

Sep - Oct

2003

QAPCO QATOFIN PROJECT, MESAIEED

SOIL AND WATER SAMPLING

AND TESTING FOR VARIOUS

CONTAMINANT SPECIES

Nov-03

AL BAIDA TECHNICAL

SERVICES

DEEP WELL DRILLING PROJECTS, SW

QATAR

HEAVY METAL ANALYSIS OF

GROUND WATER SAMPLES Jul-03

QP / MIC NODCO REFINERY AREA, MESAIEED ENVIRONMENTAL ANALYSIS –

HEAVY METALS AND TPH Apr-03

MMAA – DRAINAGE

DEPARTMENT

GROUND WATER SAMPLING AND

ANALYTICAL LABORATORY TESTING –

PUMP STATIONS ENVIRONMENTAL

IMPACT STUDY

GROUND WATER SAMPLING

AND LABORATORY TESTING FOR

VARIOUS CONTAMINANT

SPECIES

May-03

MMAA – DRAINAGE

DEPARTMENT CP-505 INDUSTRIAL AREA SEWERAGE

LABORATORY ANALYSIS OF

SEWAGE SAMPLES Feb-03

QATAR PETROLEUM WOQOD BITUMEN STORAGE AND

LOADING FACILITIES – MESAIEED

SOIL AND WATER SAMPLING

AND TESTING FOR VARIOUS

CONTAMINANT SPECIES

Jan-03

NITCO AL KHOR SEWAGE TREATMENT WORKS LABORATORY ANALYSIS OF

SEWAGE SAMPLES

May - Sep

2002

MMAA – DRAINAGE

DEPARTMENT ABU HAMOUR SOUTHERN OUT FALL.

MARINE WATER, LAKE SURFACE

WATER & SEDIMENT AND

DISCHARGE WATER SAMPLING

AND ANALYSIS FOR

CONTAMINATION STUDY.

OFFSHORE CURRENT AND TIDAL

MONITORING.

Jun 2002 -

Apr 2003

GULF HOUSING & CONST. QATARGAS – DEBOTTLENECKING

PROJECT, RAS LAFFAN

MATERIALS AND IN-SITU

TESTING

Jul 2002 – Jul

2005

GRANDI LAVORI FINCOSIT LAND RECLAMATION IN LPG STORAGE

AREA AT RAS LAFFAN

MATERIALS AND IN-SITU

TESTING

Mar 2002 –

May 2003

Prequalification 2011

36

GRANDI LAVORI FINCOSIT MULTI-PRODUCTS BERTH, MESAIEED MATERIALS AND IN-SITU

TESTING

Oct 2001 –

Sep 2004

GRANDI LAVORI FINCOSIT CRUSHED STONE FACILITY AT MESAIEED MATERIALS AND IN-SITU

TESTING

Oct 2001 -

Aug 2004

GRANDI LAVORI FINCOSIT RAS LAFFAN COMMON COOLING WATER

PROJECT

MATERIALS AND IN-SITU

TESTING

Jun 2002 -

Nov 2003

CCIC RAS LAFFAN COMMON COOLING WATER

PROJECT

MATERIALS AND IN-SITU

TESTING

Jun 2002 -

Sep 2004

CCIC RAS LAFFAN EXPANSION PROJECT MATERIALS AND IN-SITU

TESTING

Oct 2001 –

2004

J&P IMMIGRATION & SALWA INTERCHANGES MATERIALS AND IN-SITU

TESTING

Apr 2003 –

Sep 2004

CCIC KHALIFA SPORTS HALL MATERIALS AND IN-SITU

TESTING

Sep 2003 –

Aug 2005.

READINESS MANAGEMENT U.S. AIRBASE, AL UDEID ASPHALT AND CONCRETE

TESTING WORKS

Apr - Jun

2002

INTERBETON QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING

ONSITE LABORATORY

May 2002 –

May 2003

CCIC QAFCO – IV EXPANSION, MESAIEED ALL TESTING WORKS INCLUDING

ONSITE LABORATORY 2002 – 2004

WSP INTERNATIONAL RAS ABU ABOUD - EIA

SAMPLING AND ANALYSIS OF

SOIL AND WATER FOR

CONTAMINATION STUDY

Dec-02

QAPCO GROUND WATER MONITORING WELLS

SAMPLING AND ANALYSIS OF

SOIL AND WATER FOR

CONTAMINATION STUDY

Feb-02

MECON / KHARAFI SULPHUR RECOVERY EXPANSION LAB AND FIELD TESTING OF

SOIL, CONCRETE & AGGREGATE 2001 – 2002

ERM / LAHMYER RAS ABU FONTAS, SAILIYAH, WAJBAH

AND DOHA SOUTH – EIA

SAMPLING AND ANALYSIS OF

SOIL AND WATER FOR

CONTAMINATION STUDY

Sep-01

HYDER CONSULTING

DOHA SOUTH SEWAGE TREATMENT

WORKS – FLOW SAMPLING &

LABORATORY TESTING

SEWAGE SAMPLING &

LABORATORY TESTING Jul-01

TECHNIP ALBA, BAHRAIN ALL TESTING WORKS INCLUDING

ONSITE LABORATORY 1999 – 2001

LG ENGINEERING NODCO REFINERY EXPANSION,

MESAIEED

ALL TESTING WORKS INCLUDING

ONSITE LABORATORY 1999 – 2001

QAFCO QAFCO – IV CONTAMINATED LAND

INVESTIGATION

SAMPLING AND ANALYSIS OF

SOIL AND WATER FOR

CONTAMINATION STUDY

May-00

DAMES & MOORE

NGL-4 BASE CASE, NGL-3 AND NGL TANK

FARM – ENVIRONMENTAL IMPACT

ASSESSMENT

SAMPLING AND ANALYSIS OF

SOIL AND WATER FOR

CONTAMINATION STUDY

Aug-99

MIDMAC CONTRACTING CO QAFCO – III EXPANSION, MESAIEED LAB AND FIELD TESTING OF

SOIL, CONCRETE & AGGREGATE 1996 – 1998

TOYO ENGINEERING QATAR GAS UPSTREAM PROJECT, RAS

LAFFAN

ALL TESTING WORKS INCLUDING

ONSITE LABORATORY 1995 – 1998

TAYLOR WOODROW QATAR FLOUR MILL, DOHA LAB AND FIELD TESTING OF

SOIL, CONCRETE & AGGREGATE 1995 - 1997

CHIYODA CORPORATION QATAR GAS LNG PROJECT, RAS LAS

LAFFAN CONCRETE TESTING 1994 - 1996

Prequalification 2011

37

APPENDIX D

FIELD AND LABORATORY TESTING

38

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

1 CONCRETE

1.01 Compressive strength & Density of cube BS EN 12390 -3&7 As per project specification As per project specification

1 Day

1.02 Water absorption BS 1881 : Part 122 Not applicable 3 samples from each set 5 days

1.03 Chloride ion penetration ASTM C 1202 As per project specification As per project specification 3 Days

1.04 Compressive strength of concrete cylinders ASTM C 39 As per project specification As per project specification

1 Day

1.05 Flexural strength of concrete beams ASTM C 78 As per project specification As per project specification 1 Day

1.06 Indirect Tensile Strength of concrete cylinders ASTM C 496 As per project specification As per project specification 1 Day

1.07 Compressive strength, density and visual examination of drilled concrete cores

BS 1881 : Part : 120 Min. 2 days Length greater than diameter

4 Days

1.08 Compressive strength of concrete blocks including weight and nominal dimensions BS : 2028, Appendix F Not applicable 12 samples from

each lot 2 Days

1.09 Water absorption and volume of permeable voids ASTM C 642 As per project specification 1 sample from each

set 7 Days

1.10 Initial surface absorption test (ISAT) BS 1881 : Part : 208 As per project specification As per project specification

2 Days

1.11 Concrete Mix Design and laboratory trial mixes. Client shall provide all material BS 1881 : Part:125 Not applicable As per project

specification 35 days including 28 days compression result

1.12 Water permeability test DIN 1048 As per project specification 3 cubes per set 4 Days

1.13 Chloride Migration NT Build 492 As per project specification As per project specification 4 Days

Chemical Analysis

1.14 Sulphate content BS 1881:Part:124 ASAP 2 kg 3 Days

1.15 Chloride content BS 1881:Part:124 ASAP 2 kg 3 Days

Prequalification 2011

39

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

2 FRESH CONCRETE TESTING AT SITE

2.01 Slump test and temperature BS EN 12350-2 Max. 2hours Each truck Immediate

2.02 Air content BS EN 12350-7 Max. 2hours As per project specification Immediate

2.03 Sampling and manufacture of specimen BS EN 12390-2 Max. 2hours As per project specification 1 Day

3 TILES / MARBLES

3.01 Water absorption of Terrazzo tiles BS EN 13748-1 Not applicable As per project specification 3 Days

3.02 Breaking strength of Terrazzo tile BS EN 13748-1 Not applicable As per project specification 3 Days

3.03 Absorption & Bulk Specific gravity of dimension stone

ASTM C 97 Not applicable As per project specification

3 Days

3.04 Modulus rupture of dimension stone ASTM C 99 Not applicable As per project specification 3 Days

3.05 Compressive strength ASTM C 170 Not applicable As per project specification 3 Days

4 BITUMINOUS MIXTURES

4.01 Density and compaction of Core samples BS EN 12697-6 or ASTM D 2726 ASAP As per project

specification 2 days

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

4.02 Binder content by Centrifuge extraction and Sieve analysis of aggregate obtained

ASTM D 2172 and ASTM C 136 or BS 812 Part: 103.1

ASAP 25 kg 2 days

4.03 Binder content by Ignition & Particle size distribution

BS EN 12697-39 and BS EN 12697-2 ASAP 25 kg 1 day

4.04 Marshal Test on Plant mixed sample (3 specimens) BS EN 12697-34 ASAP 3 specimen 2 Days

4.05 Marshal Design. (Client shall provide all material) BS EN 12697-34 Not applicable 100 kg each material 14 Days

Prequalification 2011

40

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

5 AGGREGATES

5.01 Sieve analysis (dry) BS:812, Part:103.1Test7.3

Not applicable 10 kg 2 days

5.02 Sieve analysis of fine and coarse aggregates ASTM C 136-01 Not applicable 10 kg 2 days

5.03 Materials Finer than 75 microns. ASTM C 117-03 or BS 812 Part 103 Test 7.2 Not applicable 10 kg 2 days

5.04 Clay lumps and friable particles ASTM C 142 Not applicable 10 kg 3 days

5.05 Particle shape – Flakiness Index BS: 812 Section 105.1 Not applicable 5 kg 2 days

5.06 Particle shape – Elongation Index BS: 812 Section 105.2 Not applicable 5 kg 2 days

5.07 Density, Relative Density (Specific Gravity), and absorption of coarse aggregate ASTM C 127-01 Not applicable 5 kg 3 days

5.08 Particle Density and water absorption BS: 812 Part 2, Test 5.4 or 5.5 Not applicable 5 kg 3 days

5.09 Specific Gravity and absorption ASTM C 128-01 Not applicable 5 kg 3 days

5.10 Los Angeles abrasion value ASTM C 131-03 Not applicable 25 kg 3 days

5.11 Soundness of aggregate using sodium sulfate or magnesium sulfate ASTM C 88-99 Not applicable 15 kg 8 days

5.12 Moisture content BS : 812: Part:109 Not applicable 5 kg 2 days

5.13 Bulk density (compacted and un-compacted) BS : 812: Part:2 Not applicable 25 kg 3 days

5.14 Shell content (visual description) BS : 812: Part: 106 Not applicable 5 kg 3 days

5.15 Aggregate impact value BS : 812: Part:112 Not applicable 10 kg 3 days

5.16 Aggregate crushing value BS : 812: Part: 110 Not applicable 10 kg 3 days

5.17 Ten percent fines value BS : 812: Part: 111 Not applicable 10 kg 3 days

5.18 Drying shrinkage BS EN 1367- 4 Not applicable 10 kg 15 days

Prequalification 2011

41

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

Chemical Analysis

5.19 Acid soluble Sulphate content BS 812 Part:118 Test 6 Not applicable 2 kg 3 days

5.20 Acid Soluble Chloride content BS 812 Part:117.Appendix C Not applicable 2 kg 3 days

5.21 Organic impurities ASTM C 40 Not applicable 2 kg 3 days

6 SOILS

6.01 Particle size distribution BS :1377, Part 2, Test 9.2 Not applicable 25 kg 3 days

6.02 Liquid Limit. Plastic limit & PI BS :1377, Part 2, Test 4.3 Not applicable 2 kg 3 days

6.03 Liquid limit, Plastic limit, & Plasticity Index ASTM D 4318-00 Not applicable 2 kg 3 days

6.04 Dry Density / Moisture content relationship BS :1377, Part 4, Test 3.5 & Test 3.6 Not applicable 50 kg 3 days

6.05 Dry Density / Moisture content relationship ASTM D 1557-02 Not applicable 50 kg 3 days

6.06 California bearing ratio (CBR) BS :1377, Part 4, Test 7 & CML Test 10-97

Not applicable 25 kg 6 days

6.07 California bearing ratio (CBR) ASTM D 1883 Not applicable 50 kg 6 days

6.08 Moisture content BS : 1377: Part:2 ASAP 5 kg 2 Days

6.09 Wet density undisturbed sample BS : 1377: Part:2 ASAP 5 kg 2 Days

6.10 Dry density undisturbed sample BS : 1377: Part:2 ASAP 5 kg 2 Days

6.11 Specific gravity BS : 1377; Part:2 Not applicable 5 kg 2 Days

6.12 Sedimentation analysis BS : 1377 Part : 2 Test 9.5

Not applicable 5 kg 4 Days

6.13 Linear shrinkage BS : 1377: Part:2 Not applicable 5 kg 4 Days

Prequalification 2011

42

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

6.14 Sand Equivalent Value ASTM D 2419 Not applicable 5 kg 4 Days

6.15 1-Dimensional consolidation test BS:1377 Part-5 Test 3 ASAP 5 Kg 4 Days

6.16 Direct Shear Test BS:1377 Part-7 Test 4 ASAP 5 Kg 4 Days

6.17 Tri axial Test – Un Consolidated un-drained (UU) BS:1377 Part-7 Test 8 ASAP Core sample 4 Days

6.18 Tri axial Test – Consolidated un-drained (CU) BS:1377 Part-8 Test 7 ASAP Core sample 4 Days

6.19 Tri axial Test – Consolidated Drained (CD) BS:1377 Part-8 Test 8 ASAP Core sample 4 Days

6.20 In-situ Density Testing –Nuclear gauge BS 1377 Part: 9 Not applicable As per project specification 1 Day

6.21 In-situ Density Testing –Sand replacement BS 1377 Part: 9 Not applicable As per project

specification 1 Day

6.22 California Bearing Ratio Tests BS 1377 Part: 9 Not applicable As per project specification 1 Day

6.23 Plate Bearing Tests BS 1377 Part: 9 Not applicable As per project specification 1 Day

Chemical Analysis

6.24 pH Value BS 1377:Part:3 Test - 9 ASAP 2 Kg 2 Days

6.25 Water Soluble Sulphate content BS 1377:Part:3 Test –5.3 ASAP 2 Kg 3 Days

6.26 Water Soluble Chloride content BS 1377:Part:3 Test -7.2 ASAP 2 Kg 3 Days

6.27 Acid Soluble Sulphate content BS 1377:Part:3 Test -5.2 ASAP 2 Kg 3 Days

6.28 Acid Soluble Chloride content BS 1377:Part:3 Test -7.3 ASAP 2 Kg 3 Days

6.29 Organic matter content BS 1377:Part:3 Test -3 ASAP 2 Kg 3 Days

6.30 Carbonate content BS 1377:Part:3 Test -6 ASAP 2 Kg 3 Days

Prequalification 2011

43

No. Test Method Sample Holding Time Required Volume Standard Turn Around Time

6.31 Electrical Resistivity BS 1377:Part:3 Test - 10 Not applicable 10 Kg 3 Days

6.32 Redox Potential BS 1377:Part:3 Test -11 Not applicable 5 Kg 4 Days

7 ROCKS

7.01 Point load test ASTM D 5731 Not applicable Min: 10 pieces 2 Days

7.02 Uni-axial compression test ASTM D7012 Method C ASAP Core sample 2 Days

7.03 Uniaxial compression test and Modulus of deformation ASTM D 7012 Method D ASAP Core sample 2 Days

7.04 Splitting tensile strength ASTM D 3967 ASAP Core sample 2 Days

7.05 Slake Durability Test ASTM D 4644 ASAP 5 Kg 3 Days

7.06 Grading of Rock armor – shall be conducted at site CIRIA SP-83 Test 3.2.2.2

Not applicable Min: 3 Tone 4 Days

7.07 Drop Test- Breakage Index CIRIA SP-83 Test A2.11.4

Not applicable Min: 3 Tone 4 Days

7.08 Density CIRIA SP-83 Test A2.6 Not applicable 10 kg 4 Days

7.09 Water Absorption CIRIA SP-83 Test A2.7 Not applicable 10 kg 4 Days

7.10 Soundness ASTM C 88-99 Not applicable 10 kg 7 Days

7.11 Los Angeles abrasion value ASTM C 131-03 Not applicable 20 kg 3 Days

8 CEMENT

8.01 Initial and final setting times BS EN 196-3 ASAP 2 kg 2 Days

8.02 Soundness of cement BS EN 196-3 ASAP 2 kg 2 Days

8.03 Fineness of cement BS EN 196-6 ASAP 2 kg 2 Days

8.04 Compressive strength of mortar cubes using standard sand BS EN 196-1

ASAP 3 kg 28 Days

8.05 Chemical Analysis BS EN 196-2 ASAP 2 Kg 4 Days

Prequalification 2011

44

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time

9 Pulverized Fuel Ash (PFA)

9.01 Magnesia content BS EN196-2ASTM C114

9.02 Sulphate content BS EN196-2ASTM C114

9.03 Loss on ignition BS EN196-2ASTM C114

9.04 Moisture content BS 3892 -1 /ASTM C114

9.05 Fineness BS 3892 -1 /ASTM C114

ASAP 2 Kg 4 Days

10 Micro silica

10.01 Silica content (SiO2) ASTM C1240/C114

10.02 Moisture content ASTM C1240/C114

10.03 Loss on ignition ASTM C1240/C114

10.04 Percent retained on 45-µm ASTM C1240

ASAP

2 Kg

4 Days

11 Water for Concrete purpose

11.01 pH BS 6068.2.50 -1995

11.02 Sulphate, Chloride &TDS BS 1377 Part:3:1990

11.03 Alkalinity -Carbonate & Bi carbonate BS EN ISO 9963-1:1996

ASAP 500 ml 3 Days

12 Admixture

12.01 Chloride content BS EN 480-10

12.02 Relative Density BS EN 480-2

12.03 Dry Material Content BS EN 480-8

ASAP 500 ml 3 Days

Prequalification 2011

45

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time

13 Soil For Agricultural Purpose

13.01 Sodium Absorption Ratio (SAR)

13.02 Boron

13.03 Cat ion Exchange capacity

13.04 Exchangeable Sodium

13.05 Salinity

13.06 Chloride

13.07 Sulphate

13.08 Phosphate

13.09 Total Kjeldahl Nitrogen (TKN)

13.10 Total Nitrogen

13.11 Carbonates

Laboratory Manual for the Examination of Water, Wastewater and Soil

Not applicable 3 Kg 7 Days

13.12 Particle size distribution BS 1377 Part:2 Not applicable 3 Kg 2 Days

14 Steel Reinforcement

14.01 Tensile strength & Elongation BS 4449/BS EN 10002-1 Not applicable 1M 3 Days

14.02 Bend BS 4449 Not applicable 1M 3 Days

14.03 Rebend BS 4449 Not applicable 1M 3 Days

14.04 Chemical Analysis – C, S, Mn, Si &P BS 4449 Not applicable 100 g 4 Days

Prequalification 2011

46

CHEMICAL & ENVIRONMENTAL TESTING

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time

15 Marine water/ Ground water

15.01 pH value APHA/AWWA 4500-H+B ASAP 500 ml 2 Days

15.02 Electrical Conductivity APHA/AWWA 2510 B ASAP 500 ml 2 Days

15.03 Ammonia Nitrogen (NH4N) APHA/AWWA 4500 NH3 F ASAP 500 ml 2 Days

15.04 Nitrate Nitrogen APHA/AWWA4500 NO3 E ASAP 500 ml 2 Days

15.05 Nitrite Nitrogen APHA/AWWA4500 NO2 B ASAP 500 ml 2 Days

15.06 Total Kjeldahl Nitrogen (TKN) APHA/AWWA 4500- N org B &

4500 NH3C ASAP 500 ml 2 Days

15.07 Total Nitrogen APHA/AWWA 4500 N C ASAP 500 ml 2 Days

15.08 Phosphate APHA/AWWA 4500-PC ASAP 500 ml 2 Days

15.09 Sulphide APHA/AWWA 4500 S2-F ASAP 500 ml 2 Days

15.10 Total Suspended Solids APHA/AWWA 2540 D ASAP 500 ml 2 Days

15.11 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days

15.12 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days

15.13 Dissolved oxygen APHA/AWWA 4500 O C ASAP 500 ml 2 Days

15.14 Chemical Oxygen Demand (COD) APHA/AWWA 5220 B 7 Days 500 ml 2 Days

15.15 Biochemical Oxygen Demand (BOD) APHA/AWWA -5210 B 24 Hours 500 ml 6 Days

15.16 Chlorine content APHA/AWWA 4500 Cl ASAP 500 ml 2 Days

15.17 Chloride (Cl) APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days

15.18 Salinity APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days

Prequalification 2011

47

No. Test Method Sample Holding Time

Required Volume Standard Turn Around Time

15.19 Cyanides APHA/AWWA 4500 CN- F ASAP 500 ml 2 Days

15.20 Fat, Oil & Grease APHA/AWWA 5520 B ASAP 500 ml 2 Days

15.21 Chlorophyll a APHA/AWWA 10200 H ASAP 500 ml 2 Days

15.22 Fecal Coliforms APHA/AWWA 9222 D 6 Hours 500 ml 2 Days

15.23 Total Coliforms & E. Coli APHA/AWWA 9222 B 6 Hours 500 ml 2 Days

15.24 BTEX USEPA 5021/8260C 14 Days 500 ml 4 Days

15.25 Chlorinated Hydrocarbons USEPA 3510/8021 14 Days 500 ml 4 Days

15.26 Chloro phenols USEPA 3510/8041A 14 Days 500 ml 4 Days

15.27 PCBs USEPA 3510/8082A 14 Days 500 ml 4 Days

15.28 Pesticides USEPA 3510/8081B 14 Days 500 ml 4 Days

15.29 Phenols USEPA 9065 14 Days 500 ml 4 Days

15.30 Polyaromatic hydrocarbon (PAH) USEPA 3510C/8270D/8100 14 Days 500 ml 4 Days

15.31 Semi volatile organic compounds (SVOC) USEPA 3510/8270D 14 Days 500 ml 4 Days

15.32 Total Organic Carbon (TOC) USEPA 9060 A 14 Days 500 ml 4 Days

15.33 Total petroleum hydrocarbons (TPH) USEPA 5030B/8015C/3510C/8270D

14 Days 500 ml 4 Days

15.34 Tri halo methane USEPA 8260C 14 Days 500 ml 4 Days

15.35 Volatile organic compounds (VOC) USEPA5021/ 14 Days 500 ml 4 Days

Marine water/ Ground water - Heavy Metals

15.36 Aluminum (Al) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.37 Antimony (Sb) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.38 Arsenic (As) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.39 Barium (Ba) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.40 Beryllium (Be) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

Prequalification 2011

48

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time 15.41 Boron (B) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.42 Cadmium (Cd) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.43 Calcium (Ca) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.44 Chromium (Cr) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.45 Cobalt (Co) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.46 Copper (Cu) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.47 Iron (Fe) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.48 Lead (Pb) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.49 Lithium (Li) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.50 Magnesium (Mg) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.51 Manganese (Mn) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.52 Mercury (Hg) USEPA 3005B/Hydride/6010C 6 months -preserved 200 ml 5 Days

15.53 Molybdenum (Mo) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.54 Nickel (Ni) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.55 Phosphorous (P) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.56 Potassium (K) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.57 Selenium (Se) USEPA 3005B/Hydride/6010C 6 months -preserved 200 ml 5 Days

15.58 Silicon (Si) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.59 Silver (Ag) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.60 Sodium (Na) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.61 Sulphur (S) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.62 Thallium (Tl) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.63 Titanium (Ti) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.64 Vanadium (V) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

15.65 Zinc (Zn) USEPA 3005B/3015A/6010C 6 months -preserved 200 ml 5 Days

Prequalification 2011

49

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time

16 Potable water

16.01 Total Hardness (CaCO3) APHA/AWWA 3500-Ca D / 3500 Mg B

ASAP 500 ml 2 Days

16.02 Total Alkalinity (CaCO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days

16.03 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days

16.04 Calcium (Ca) APHA /AWWA3500-Ca D ASAP 500 ml 2 Days

16.05 Magnesium (Mg) APHA/AWWA 3500 Mg B ASAP 500 ml 2 Days

16.06 Carbonate (CO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days

16.07 Bicarbonate (HCO3) APHA/AWWA 2320 B ASAP 500 ml 2 Days

16.08 Sulphate (SO4) APHA/AWWA 4500-SO42-E ASAP 500 ml 2 Days

16.09 Chloride (Cl) APHA/AWWA 4500-Cl-B ASAP 500 ml 2 Days

16.10 Nitrate (NO3) APHA/AWWA 4500-NO3 D ASAP 500 ml 2 Days

16.11 Iron (Fe) APHA/AWWA 3500 Fe B ASAP 500 ml 2 Days

16.12 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days

16.13 pH Value @ 25°C APHA/AWWA 4500-H +B ASAP 500 ml 2 Days

16.14 Electrical Conductivity APHA/AWWA 2510 B ASAP 500 ml 2 Days

16.15 Bacteria - Total Coliforms APHA/AWWA 9222 B ASAP 500 ml 2 Days

16.16 Bacteria - Faecal Coliforms APHA/AWWA 9222 D ASAP 500 ml 2 Days

16.17 Tri halo methane USEPA 5021/826C ASAP 500 ml 2 Days

17 Waste water/Sewage water/Treated Effluent

17.01 pH value APHA/AWWA 4500-H+B ASAP 500 ml 2 Days

17.02 Ammonia Nitrogen APHA/AWWA: 4500 NH3C ASAP 500 ml 3 Days

17.03 Nitrate Nitrogen APHA/AWWA 4500 NO3E ASAP 500 ml 3 Days

Prequalification 2011

50

No. Test Method Sample Holding Time

Required Volume Standard Turn Around Time

17.04 Nitrite Nitrogen APHA/AWWA 4500 NO2B ASAP 500 ml 3 Days

17.05 Total Nitrogen APHA/AWWA 4500 NO3 , NO2,

4500 N org ASAP 500 ml 3 Days

17.06 Total Kjeldahl Nitrogen (TKN) APHA/AWWA 4500- N org ASAP 500 ml 3 Days

17.07 Chemical Oxygen Demand (COD) APHA/AWWA 5220 D 7 Days 500 ml 2 Days

17.08 Biochemical Oxygen Demand (BOD) APHA/AWWA 5210 B 24 Hours 500 ml 6 Days

17.09 Dissolved oxygen APHA/AWWA 4500 O C ASAP 500 ml 2 Days

17.10 Phosphate APHA/AWWA 4500-PC ASAP 500 ml 2 Days

17.11 Sulphide APHA/AWWA 4500 S2-F ASAP 500 ml 2 Days

17.12 Total Suspended Solids APHA/AWWA 2540 D ASAP 500 ml 2 Days

17.13 Total Dissolved Solids (TDS) APHA/AWWA 2540 C ASAP 500 ml 2 Days

17.14 Turbidity APHA/AWWA 2130 B ASAP 500 ml 2 Days

17.15 Sludge Volume Index APHA/AWWA 2710 D ASAP 500 ml 2 Days

17.16 MLSS APHA/AWWA 2540 D ASAP 500 ml 2 Days

17.17 MLVSS APHA/AWWA 2540 E ASAP 500 ml 2 Days

17.18 Chlorine content APHA/AWWA 4500 Cl ASAP 500 ml 2 Days

17.19 Cyanides APHA/AWWA 4500 CN- F ASAP 500 ml 2 Days

17.20 Fat, Oil & Grease APHA/AWWA 5520 B ASAP 500 ml 2 Days

17.21 Fecal Coliforms APHA/AWWA 9222 D ASAP 500 ml 2 Days

17.22 Total Coliforms APHA/AWWA 9222 B ASAP 500 ml 2 Days

17.23 Nematode Eggs APHA/AWWA 10750 C ASAP 500 ml 2 Days

17.24 Hexavalant Chromium (Cr+6) APHA/AWWA 3500 Cr B 14 Days 500 ml 2 Days

Prequalification 2011

51

No. Test Method Sample Holding Time

Required Volume Standard Turn Around Time

17.25 BTEX USEPA 5021/8260C 14 Days 500 ml 2 Days

17.26 Chlorinated Hydrocarbons USEPA 3510/8021 14 Days 500 ml 3 Days

17.27 PCBs USEPA 3510/8082A 14 Days 500 ml 3 Days

17.28 Pesticides USEPA 3510/8081B 14 Days 500 ml 3 Days

17.29 Phenols USEPA 9065-1986 14 Days 500 ml 3 Days

17.30 Polyaromatic hydrocarbon (PAH) USEPA 3510/8270D-2007/8100 14 Days 500 ml 3 Days

17.31 Semi volatile organic compounds (SVOC) USEPA 3510/8270D 14 Days 500 ml 3 Days

17.32 Total Organic Carbon (TOC) USEPA 9060 A 14 Days 500 ml 3 Days

17.33 Total petroleum hydrocarbons (TPH) USEPA 5030B/8015C/3510C/8270D 14 Days 500 ml 3 Days

17.34 Volatile organic compounds (VOC) USEPA5021/8260C 14 Days 500 ml 3 Days

Waste water/Sewage water/Treated Effluent - Heavy M etals

17.35 Aluminum (Al) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.36 Antimony (Sb) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.37 Arsenic (As) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days

17.38 Barium (Ba) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.39 Beryllium (Be) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.40 Boron (B) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.41 Cadmium (Cd) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.42 Calcium (Ca) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.43 Chromium (Cr) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.44 Cobalt (Co) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.45 Copper (Cu) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

Prequalification 2011

52

No. Test Method Sample Holding Time

Required Volume Standard Turn Around Time

17.46 Iron (Fe) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.47 Lead (Pb) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.48 Lithium (Li) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.49 Magnesium (Mg) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.50 Manganese (Mn) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.51 Mercury (Hg) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days

17.52 Molybdenum (Mo) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.53 Nickel (Ni) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.54 Phosphorous (P) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.55 Potassium (K) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.56 Selenium (Se) USEPA 3010/Hydride/6010C- 6 months -preserved 200 ml 4 Days

17.57 Silicon (Si) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.58 Silver (Ag) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.59 Sodium (Na) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.60 Sulphur (S) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.61 Thallium (Tl) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.62 Titanium (Ti) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.63 Vanadium (V) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

17.64 Zinc (Zn) USEPA 3010A/3015A/6010C 6 months -preserved 200 ml 4 Days

18 Marine sediment/Soil/Sludge/Solid Waste

GRH-USEPA 8015/HS Trap

DRH-USEPA 8015/3540/8270 18.01 Total petroleum hydrocarbons (TPH)

Heavy Fraction- USEPA 9071B

14 Days 250 gm 4 Days

18.02 BTEX USEPA 5021/8260C 14 Days 250 gm 4 Days

18.03 Chlorinated Hydrocarbons USEPA 3540/8021 14 Days 250 gm 4 Days

Prequalification 2011

53

No. Test Method Sample Holding Time

Required Volume Standard Turn Around Time

18.04 Flammability test USEPA 1050 14 Days 250 gm 4 Days

18.05 Oil & Grease USEPA 9071 B 14 Days 250 gm 4 Days

18.06 PCBs USEPA 3540/8082A 14 Days 250 gm 4 Days

18.07 Pesticides USEPA 3540/8081B 14 Days 250 gm 4 Days

18.08 Polyaromatic hydrocarbon (PAH) USEPA 3540/8270D-2007/8100 14 Days 250 gm 4 Days

18.09 Pyrophoric test USEPA 1050 14 Days 250 gm 4 Days

18.10 Semi volatile organic (SVOC) USEPA 3540/8270D 14 Days 250 gm 4 Days

18.11 Sulphide USEPA 9030 B /9034 14 Days 250 gm 4 Days

18.12 TCLP USEPA 1311/6010C 14 Days 250 gm 4 Days

18.13 Volatile organic compounds (VOC) USEPA5021/8260C 14 Days 250 gm 4 Days

Marine sediment/Soil/Sludge/Solid Waste - Heavy Met als

18.14 Aluminum (Al) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.15 Antimony (Sb) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.16 Arsenic (As) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days

18.17 Barium (Ba) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.18 Beryllium (Be) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.19 Boron (B) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.20 Cadmium (Cd) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.21 Calcium (Ca) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.22 Chromium (Cr) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.23 Cobalt (Co) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.24 Copper (Cu) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.25 Iron (Fe) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

Prequalification 2011

54

No. Test Method Sample Holding Time Required Volume Standard Turn Around

Time

18.26 Lead (Pb) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.27 Magnesium (Mg) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.28 Manganese (Mn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.29 Mercury (Hg) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days

18.30 Molybdenum (Mo) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.31 Nickel (Ni) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.32 Phosphorous (P) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.33 Potassium (K) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.34 Selenium (Se) USEPA 3050B/Hydride/6010C 6 months -preserved 250 gm 4 Days

18.35 Silicon (Si) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.36 Silver (Ag) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.37 Sodium (Na) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.38 Sulphur (S) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.39 Thallium (Tl) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.40 Titanium (Ti) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.41 Vanadium (V) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.42 Zinc (Zn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.43 Potassium (K) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.44 Selenium (Se) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.45 Silicon (Si) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.46 Silver (Ag) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.47 Sodium (Na) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.48 Thallium (Tl) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.49 Titanium (Ti) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days 18.50 Vanadium (V) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

18.51 Zinc (Zn) USEPA 3050B/3015A/6010 C 6 months -preserved 250 gm 4 Days

1