Upload
helene
View
43
Download
0
Embed Size (px)
DESCRIPTION
Guidance and Support of ITS Programs. Michael Freitas May 2000. US Department of Transportation Federal Highway Administration. Overview. Introduction Technical Assistance Types of Assistance Future Technical Assistance ITS Web Resources. Introduction. - PowerPoint PPT Presentation
Citation preview
Guidance and Support of Guidance and Support of ITS ProgramsITS Programs
Michael FreitasMichael FreitasMay 2000May 2000
US Department of TransportationFederal Highway Administration
OverviewOverview IntroductionIntroduction Technical AssistanceTechnical Assistance
– Types of AssistanceTypes of Assistance Future Technical AssistanceFuture Technical Assistance ITS Web ResourcesITS Web Resources
IntroductionIntroduction Focus of Current ITS Program is on Focus of Current ITS Program is on
DeploymentDeployment Fundamental Premise of ITS Deployment Fundamental Premise of ITS Deployment
ProcessProcess– There Are Basic Types of Knowledge and There Are Basic Types of Knowledge and
Skills Required at Every Stage of Deployment Skills Required at Every Stage of Deployment in Order for a Project to Make It Through the in Order for a Project to Make It Through the Entire Process SuccessfullyEntire Process Successfully
Technical Assistance Program is Based Technical Assistance Program is Based on That Premiseon That Premise
Deployment Stages Knowledge AreasGeneralAwareness
General ITS
Planning ITS Transportation Planning, Regional Architecture, NationalArchitecture & Integration, Modeling, Benefits, AgencyLeaders
Administrative Financing, Procurement/Contracting, Legal Issues,Partnerships, Telecom options, Federal Requirements
Technical National ITS Architecture, Standards, Telecom,Software/Hardware, Technologies, Specifications, Concepts ofOperation, Human Factors
Installation Contract Management, Configuration Management/Documentation, Testing, Personnel Training
Operations Evaluating Operations, O & M Issues/Options, Interagency,Operational Issues, Costs
Evaluations Cost/Benefit, Project Evaluation
Deployment Stages/ Deployment Stages/ Required Knowledge AreasRequired Knowledge Areas
Deployment Stages Low – LevelDeployment
Medium – LevelDeployment
High – LevelDeployment
General Awareness X
Planning X X X
Administrative X X
Technical X X
Installation X X
Operations X X
Evaluation X X
Level of ITS DeploymentLevel of ITS Deployment
ITS Deployment Process
Peer-to-Peer
PCB Program
Service Plans
ITS Deployment Process/Technical ITS Deployment Process/Technical Assistance OptionsAssistance Options
GuidanceMaterial
Planning/Analysis
Tools
Technical AssistanceTechnical Assistance Service PlansService Plans Peer to Peer ProgramPeer to Peer Program Professional Capacity Building Professional Capacity Building
ProgramProgram Guidance MaterialGuidance Material Planning/Analysis ToolsPlanning/Analysis Tools
Service PlansService Plans Service Plans Define How FHWA Service Plans Define How FHWA
and FTA Will Provide Technical and FTA Will Provide Technical Support in an Area (Metropolitan or Support in an Area (Metropolitan or Rural) Deploying and Integrating of Rural) Deploying and Integrating of ITS Technologies and Procedures.ITS Technologies and Procedures.
Service Plans Replaced Informal Ad Service Plans Replaced Informal Ad Hoc Responses to Technical Hoc Responses to Technical Assistance RequestsAssistance Requests
Service PlansService Plans Strategic Technical Assistance Strategic Technical Assistance
PlansPlans– Field-BasedField-Based– Outcome OrientedOutcome Oriented– Facilitate Integrated DeploymentFacilitate Integrated Deployment– Funded at Over $1.0M/Year (Up to Funded at Over $1.0M/Year (Up to
$1.5M in FY 01)$1.5M in FY 01)
Service Plan ActivitiesService Plan Activities Service Plan Activities IncludeService Plan Activities Include
– Scanning ReviewsScanning Reviews– TrainingTraining– Architecture DevelopmentArchitecture Development
Tier I /II Workshops Tier I /II Workshops
Tier I /II WorkshopsTier I /II Workshops Objective - Assist MPOs in Developing Objective - Assist MPOs in Developing
Their Regional ArchitecturesTheir Regional Architectures– Tier I WorkshopTier I Workshop (1 Day) - Focused on (1 Day) - Focused on
Organizing the Architecture Development Organizing the Architecture Development ProcessProcess
– Tier II WorkshopTier II Workshop (2 1/2 days) - Focused (2 1/2 days) - Focused on Laying Out an Initial Regional on Laying Out an Initial Regional Architecture and Pointed at Steps to Architecture and Pointed at Steps to Complete the ProcessComplete the Process
ITS Peer-to-Peer ProgramITS Peer-to-Peer Program Program Established to Provide ITS Program Established to Provide ITS
Peer SupportPeer Support Over 120 Peers, Primarily Public Over 120 Peers, Primarily Public
Sector Sector Program Matches Peer With Program Matches Peer With
RequestRequest Program Pays Peer Expenses Program Pays Peer Expenses
ITS Peer-to-Peer ProgramITS Peer-to-Peer Program Over 370 Requests Received and Over 370 Requests Received and
ProcessedProcessed 66% Response Completion Within 66% Response Completion Within
1 Month1 Month Customer Service PortalCustomer Service Portal
– One number access: 1-888-700-PEEROne number access: 1-888-700-PEER– www.its.dot.gov/peer/peer.htmwww.its.dot.gov/peer/peer.htm
Professional Capacity Professional Capacity Building (PCB) ProgramBuilding (PCB) Program
The ITS PCB Program Was Formed to The ITS PCB Program Was Formed to Assist Transportation Professionals in Assist Transportation Professionals in Developing the Knowledge, Skills, and Developing the Knowledge, Skills, and Abilities Required to Deploy, Operate Abilities Required to Deploy, Operate and Manage ITS Projects. and Manage ITS Projects. – All Levels of Government All Levels of Government – Academia, and Professional Academia, and Professional
AssociationsAssociations– Public and Private SectorPublic and Private Sector
Professional Capacity Professional Capacity Building (PCB) ProgramBuilding (PCB) Program
The Program Is Comprehensive and The Program Is Comprehensive and Multi-modal in Nature (24 Courses Multi-modal in Nature (24 Courses Offered)Offered)
The Web Site Provides a Comprehensive The Web Site Provides a Comprehensive List of ITS PCB Program Offerings List of ITS PCB Program Offerings – http://pcb.volpe.dot.govhttp://pcb.volpe.dot.gov
It Also Includes Links to Other Relevant It Also Includes Links to Other Relevant Web SitesWeb Sites
PCB Program - Course PCB Program - Course TopicsTopics
AwarenessAwareness ArchitectureArchitecture Architecture & Architecture &
Standards ConformityStandards Conformity Commercial Vehicle Commercial Vehicle
OperationsOperations Freeway ManagementFreeway Management Incident ManagementIncident Management ITS Procurement and ITS Procurement and
AcquisitionAcquisition
ITS StandardsITS Standards Regional Multimodal Regional Multimodal
Traveler Information Traveler Information (ATIS)(ATIS)
RuralRural TelecommunicationsTelecommunications Traffic Signal ControlTraffic Signal Control Transit ManagementTransit Management
Professional Capacity Professional Capacity Building (PCB) ProgramBuilding (PCB) Program
PCB TrainingPCB Training– 9,000 People in Travel Management 9,000 People in Travel Management
Related TopicsRelated Topics– 3,000 People in Commercial Vehicle 3,000 People in Commercial Vehicle
Operations Operations Currently Piloting 3 Web-based Currently Piloting 3 Web-based
Training CoursesTraining Courses
Guidance MaterialGuidance Material Guidance Documents Are Intended Guidance Documents Are Intended
to Aid Transportation Practitioners to Aid Transportation Practitioners in:in:– Planning and Deploying ITS SystemsPlanning and Deploying ITS Systems– The Use of the National ITS Architecture The Use of the National ITS Architecture – To Foster the Integration of To Foster the Integration of
Transportation Systems Within a Transportation Systems Within a Region.Region.
Guidance Material Guidance Material Typical Guidance Documents Include:Typical Guidance Documents Include:
– Developing ITS Using the National ITS Developing ITS Using the National ITS ArchitectureArchitecture
– ITS Deployment of Transit SystemsITS Deployment of Transit Systems– Developing Traffic Signal Control SystemsDeveloping Traffic Signal Control Systems– Developing Traveler Information SystemsDeveloping Traveler Information Systems
All Documents Are Available All Documents Are Available Electronically on the ITS Web-site (EDL)Electronically on the ITS Web-site (EDL)
Guidance MaterialGuidance Material ITS Benefits Special Studies InitiativeITS Benefits Special Studies Initiative
– Benefit BrochuresBenefit Brochures– Cross Cutting StudiesCross Cutting Studies– Case Studies Case Studies – Implementation GuidesImplementation Guides– Technical ReportsTechnical Reports
Topic Areas - CVO, Emergency Services, Freeway Topic Areas - CVO, Emergency Services, Freeway and Arterial Management, Planning and and Arterial Management, Planning and Integration, Weather Information for Traveler & Integration, Weather Information for Traveler & Maintenance Etc.Maintenance Etc.
Guidance MaterialGuidance Material Examples of ITS Benefit Studies - Examples of ITS Benefit Studies -
Reports/Brochures Reports/Brochures – Transportation Management Center Concepts of Transportation Management Center Concepts of
Operations: Implementation GuideOperations: Implementation Guide– Transportation Management Center concept of Transportation Management Center concept of
Operation: A Cross-Cutting StudyOperation: A Cross-Cutting Study To Order ITS Benefit Special Studies - Go to the To Order ITS Benefit Special Studies - Go to the
Following Web-site and Click on Order FormFollowing Web-site and Click on Order Form– http://www.its.dot.gov/eval/Metro/http://www.its.dot.gov/eval/Metro/ Metro_BenefitsSpecial_EDLDocs.htmMetro_BenefitsSpecial_EDLDocs.htm
New ITS Planning/Analysis New ITS Planning/Analysis ToolsTools
ITS Deployment Analysis System (IDAS) and Turbo ITS Deployment Analysis System (IDAS) and Turbo Architecture SoftwareArchitecture Software– Available Through McTrans, May 2000Available Through McTrans, May 2000– User Manual Included w/ SoftwareUser Manual Included w/ Software– Free Technical Support Is AvailableFree Technical Support Is Available– Turbo; 1 Day Training Course for Headquarters and Turbo; 1 Day Training Course for Headquarters and
Field Staff - Available in July 2000Field Staff - Available in July 2000– IDAS; 2 Day Training Course is Under Development IDAS; 2 Day Training Course is Under Development
- Available October 2000 at Resource Centers - Available October 2000 at Resource Centers
ITS Deployment Analysis ITS Deployment Analysis System (IDAS) SoftwareSystem (IDAS) Software
Tool Used to Enhance the Planning of Tool Used to Enhance the Planning of Proposed ITS ImprovementsProposed ITS Improvements
Complements the Traditional Travel Complements the Traditional Travel Demand Forecasting ProcessDemand Forecasting Process
Benefits of ITS Improvements Are Benefits of ITS Improvements Are Calculated and Compared With the Calculated and Compared With the Deployment CostsDeployment Costs
Provides a Direct Way to Compare a Provides a Direct Way to Compare a Number of Alternative ITS DeploymentsNumber of Alternative ITS Deployments
Turbo Architecture Turbo Architecture SoftwareSoftware
Interactive Software Program to Interactive Software Program to Assist Transportation Planners and Assist Transportation Planners and System Integrators, in the System Integrators, in the Development of Regional and Development of Regional and Project ArchitecturesProject Architectures
Uses the National ITS Architecture Uses the National ITS Architecture As Starting PointAs Starting Point
Technical Assistance - Technical Assistance - Commercial Vehicle Commercial Vehicle
OperationsOperations CVISN Operational and Architectural Compatibility CVISN Operational and Architectural Compatibility
Handbook (COACH)Handbook (COACH)– Comprehensive Checklist of What Is Required to Comprehensive Checklist of What Is Required to
Conform W/ Commercial Vehicle Information Conform W/ Commercial Vehicle Information Systems and Networks (CVISN), Operational Systems and Networks (CVISN), Operational Concepts and Architecture.Concepts and Architecture.
CVISN WorkshopsCVISN Workshops– Scope WorkshopScope Workshop– Planning WorkshopPlanning Workshop– Design WorkshopDesign Workshop
For More Information: For More Information: http://www.jhuapl.edu/cvisn/http://www.jhuapl.edu/cvisn/
Future Technical Future Technical AssistanceAssistance
Expectation That Significant Expectation That Significant Technical Assistance Will Be Technical Assistance Will Be Needed When the Architecture Needed When the Architecture Consistency Policy Becomes Final Consistency Policy Becomes Final
Planning Process Has Begun to Planning Process Has Begun to Determine What Kinds of Technical Determine What Kinds of Technical Assistance Will Be Needed Assistance Will Be Needed
Additional ITS Web Additional ITS Web ResourcesResources
ITS Joint Program Office:ITS Joint Program Office:– http//:www.its.dot.govhttp//:www.its.dot.gov
ITS Electronic Document Library (EDL):ITS Electronic Document Library (EDL):– http//:its.fhwa.dot.gov/cyberdocs/http//:its.fhwa.dot.gov/cyberdocs/
welcome.htmwelcome.htm ITS Cooperative Deployment Network (ICDN):ITS Cooperative Deployment Network (ICDN):
– http//:www.nawgits.com/jpo/http//:www.nawgits.com/jpo/ ITS AmericaITS America
– http://www.itsa.org/http://www.itsa.org/