GSM BSS R&D Efficiency KPIs:FDE_n
FDE_s
FDE_f
Scope: Internals persons
Toni Oksanen / 17.4.2013
Version 1.5
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 2/18
Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_n for BSS
Definitions
Formula FDE_n = Net Development / Total Development
▪ Total Development= total monthly capacity of all BSS R&D persons
(i.e. BTS, BSC and E2E included).
= headcount from Location Plan * (no. of nominal
working days / mon) *7.5 hrs
Example: 21 days * 7.5hrs = 157.5 hrs
NOTE: the “21 days” may be corrected to
overcome errors due to varying number o fworking
days in a month, see pages “Error terms and
fluctuations”
▪ Net Development
= monthly reported hours for New FeatureDevelopment of all BSS R&D persons (i.e. BTS,
BSC and E2E included).
= program level sum of NFD work from B34
excel
Questions & remarks
▪ Total Development- use the “official” actual SAP headcount end of
each period
▪ Net Development
- use the programs to separate NFD and non-
NFD actuals – program lookup table:
- Pool-based separation does not currently add
value at all as programs do not have pools that
separate NFD and non-NFD actuals.
- TrackView activity –based separation would not
add much value due to smallish amounts of
additional reported hours to be cathegorized as
non-NFD.
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 3/18
Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_s for BSS
Definitions
Formula FDE_s = System Verification / Total Development
▪ Total Development
- see slide FDE_n for BSS
▪ System Verification
= total monthly monthly capacity of all BSS E2E
R&D persons
= headcount from Location Plan * 157.5 hrs
Questions & remarks
▪ Total Development
- see slide FDE_n for BSS
▪ System Verification
- using headcounts is instructed in MBB slides and is
easy=fast to collect, but then all non-BSS NFD work
(maintenance, Horizon, general work, etc.) done by SyVe
people is included. Also, it may not change monthly, i.e. it
is a very “slow” KPI.
Should “SyVe” figure exclude non-NFD ? If yes, the best
way would be to collect actual hours for all NFD
programs instead of using headcounts.
At the moment the collected data is based on
headcounts.
FOR REFERENCE P8/2012 NUMBERS:- via headcounts
24 FTE FDE_n= 10.8%
- via actuals/programs (same lookup table as for FDE_n):
10.5 FTE FDE_n= 5.1%
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 4/18
Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_f for BSS
Definitions
Formula FDE_f = Bug Fixing / Net Development
▪ Net Development
- see slide FDE_n for BSS
▪ Bug Fixing
= total monthly reported effort of all bug fixing work
related to prontos raised within all release
programs before P8 milestone.
Questions & remarks
▪ Net Development
- see slide FDE_n for BSS
▪ Bug Fixing
- the efforts are collected via “pre P8 pronto fixing”
TrackView items created under the ongoing NFD
programs.- actual hours for BTS and BSC are collected
under entity programs; for E2E under system
programs.
- for the list of TracView items see attachment in
slide “FDE_n for BSS”.
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 5/18
Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_n for BTS, BSC and E2E
Definitions
Formula FDE_n = Net Development / Total Development
▪ Total Development= total monthly monthly capacity of all entity R&D
persons.
= headcount from Location Plan * (no. of nominal
working days / mon) *7.5 hrs
Example: 21 days * 7.5hrs = 157.5 hrs
NOTE: the “21 days” may be corrected to
overcome errors due to varying number of working
days in a month, see pages “Error terms and
fluctuations”.
▪ Net Development
= monthly reported hours for New Feature
Development of all entity R&D persons.
= program level sum of NFD work from B34
excel
Questions & remarks 1/2
▪ Total Development- use the “official” actual SAP headcount end of
each period
▪ Net Development
- see slide FDE_n for BSS
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 6/18
Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_s for BTS, BSC and E2E
Definitions
Formula FDE_s = System Verification / Total Development
▪ Total Development
- see earlier slide
▪ System Verification
= ??
Questions & remarks
▪ Total Development
- see earlier slide
▪ System Verification
- ??
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 7/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
FDE_f for BTS, BSC and E2E
Definitions
Formula FDE_f = Bug Fixing / Net Development
▪ Net Development
- see slide FDE_n for BSS
▪ Bug Fixing
= total monthly reported effort of all bug fixing
work related to prontos raised within all release
programs before P8 milestone.
Questions & remarks
▪ Net Development
- see slide FDE_n for BSS
▪ Bug Fixing
- the efforts are collected via “pre P8 pronto fixing”
TrackView items created under the ongoing NFD
programs.- actual hours for BTS and BSC are collected
under entity programs; for E2E under system
programs.
- for the list of TracView items see attachment in
slide “FDE_n for BSS”.
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 8/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
The process and maintenance
▪ PROCESS FOR COLLECTING DATA- extracting B34 from Artemis/PRM with ready-made parameter settings – TONI OR BSC ASSISTANTS
KIRSI/JOHANNA
- updating the actual headcount figures – TONI
- picking the actual NFD hours and “pre P8 pronto fixing” hours from B34 manually with help of a filtering instructions and a
program lookup table
~3 hrs/round for BSS and entity R&D’s altogether - BSC ASSISTANTS KIRSI/JOHANNA
- put the data to BSS FDE_x excel template, check sanity and email to relevant people and/or archieve to Sharenet
- BSC ASSISTANTS KIRSI/JOHANNA AND TONI
▪ “MAINTENANCE” OF KPI DATA PARAMETERS
- a new “pre P8 pronto fixing” TrackView item must be created every time a new NFD program is established. The actual
creation via EaspLanner is done by the Program, but initiating it must be done by KPI maintenance – TONI
- the NFD Program lookup table needs to be updated every time a new NFD program item is created or an ongoing
program reaches P8, or a new “pre P8 pronto fixing” TrackView item is created – TONI
- B34 filter instructions needs to be updated every time we have ARTEMIS organisation, program code or program group
changes - TONI
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 9/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Error terms and data fluctuations 1/3
ERROR TERMS
1. Reporting-% will be less than 100% when a period ends. In a big organisation 100% reporting cannot be reached all the time.
- Consequence: a typical error term (too small FDE_n) of about 2%-5% after 1st run.
- Correction 1: in practice this error term vanishes via the re-run after a month. THIS IS IMPLEMENTED
- Correction 2. Strenghtened discipline and reporting remindings may decrease the error term in the 1st run but would not
remove it. NOT IMPLEMENTED
2. The varying no. of week-days (Mon-Fri) in each month, causes an error term compared to a fixed number of working days (e.g.
21 days/mon) to be used for calculating the “Total development”
- Consequence: error term of -9.5%... +4.8% in FDE_n- Correction: use the actual no. of Mon-Fri days in each month. THIS IS IMPLEMENTED
3. The varying no. of WORKING days in each month due to national holidays causes an error term if not taken into account when
calculating “Total Development”.
- Consequence: error term = too small FDE_n
- Correction: collect calendar data of all countries where we have sites, expand the FDE_n calculation process&excels to list
each country within each entity R&S and BSS separately and calculate the accurate “Total Development” accordingly
THIS IS IMPLEMENTED
4. Headcount increase within a period can cause an error term (lower FDE_n) if a new person joins BSS R&D. As the “Total
Development” figure generated by using the official SAP end-of-month headcount figure, new persons joining somewhere in the
middle of a month cause an error term. (Note that a headcount decrease will not cause error terms or fluctuations).
- Consequence: an permanent error term for one month only
- Correcting: manual investigation of newcomes and the dates they join; then manual adjustment of the end-of-month
headcount figures for the relevant entity R&D and the whole BSS NOT IMPLEMENTED - NO NEED AS THIS WILL
VERY SELDOM CAUSE SIGNIFICANT ERROR TERMS.
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 10/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Error terms and data fluctuations 2/3
ERROR TERMS (con’t)
5. The actual end-of-period headcounts are taken from SAP (=“official” figures), which usually has the the correct numbers and team
data. In case of persons are moving between teams, the moving between teams in Artemis is a separate action and normally
happens after a delay of ~days …~weeks after SAP updating. Error term appears mainly if the Artemis moves happen in the nextperiod after the SAP update. There are 2 types of error terms:
- 1. A person moves between teams and the scope of work changes. Assuming the scope changes at the moment SAP is
updated, the reporting reflecting the new scope is counted as part of the old team THE ERROR PRESUMABLY SMALL
AND HAPPENS SELDOM; NO CORRECTION PLANNED
- 2. A person moves between teams but the scope of the work does not change. The reporting of the person will be counted
as part of the old team instead of part of the new team THE ERROR PRESUMABLY SMALL AND HAPPENS SELDOM;NO CORRECTION PLANNED
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 11/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Error terms and fluctuations 2/2
FLUCTUATIONS
1. The data will fluctuate due to popular holidays seasons like July in Finland.
- Consequence: not an error term but a big fluctuation by month
- Correction: Interpolate the figures somehow to eliminate the fluctuation NOT IMPLEMENTED
To smoothen the fluctuations and error terms, also ROLLING AVERAGE figures are shown in the report excel sheets
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 12/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Monthly actual data extraction 1/2B34 excel creation and filtering
▪ Parameters for B34 creation from Artemis/PRM
- Program Group: select only items beginning with “MBB…”; remember to exclude items *All and <N/A><N/A>
- Start month: select the month i.e. the first calendar month shown in the B34 excel. Remember to select at least two months in the historyas the re-collection of data has to be done for the month that has ended a month ago.
▪ Filtering the B34 excel
- common filtering (do in this order)
- column H: leave only “Active”
- column Y: exclude all items starting with “closed…”
- column AR: leave only “Reported” - column M: leave only items starting with “MBB GSM BSS…”
- column A: include all NFD items, exclude all other items (see Program Lookup Table attachment on page 2)
- BSS filtering
- go to the preferred month column, e.g. 2012/P09 column AS, select all cells and take the sum that excel
calculates = Net Development (hours)
- column AA: leave only item starting “pre P8 pronto fixing…”
- go to the preferred month column, e.g. 2012/P09 column AS, select all cells and take the sum that excel
calculates = Fault correction efforts (hours)
- column AA: select again all items. - BSC filtering
- column M: leave only items starting with “MBB GSM BSS BSC…”
- go to the preferred month column, e.g. 2012/P08 column AS, select all cells and take the sum that excel
calculates = Net Development (hours)
- column AA: leave only item starting “pre P8 pronto fixing…”
- go to the preferred month column, e.g. 2012/P09 column AS, select all cells and take the sum that excel
calculates = Fault correction efforts (hours)
- column AA: select again all items.
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 13/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Monthly actual data extraction 2/2B34 excel creation and filtering
▪ Filtering the B34 excel (con’t)
- BTS filtering - column M: leave only items starting with “MBB GSM BSS BTS…”
- go to the preferred month column, e.g. 2012/P08 column AS, select all cells and take the sum that excel
calculates = Net Development (hours)
- column AA: leave only item starting “pre P8 pronto fixing…”
- go to the preferred month column, e.g. 2012/P09 column AS, select all cells and take the sum that excel
calculates = Fault correction efforts (hours)
- column AA: select again all items.
- E2E filtering
- column M: leave only items starting with “MBB GSM BSS E2E…” - go to the preferred month column, e.g. 2012/P08 column AS, select all cells and take the sum that excel
calculates = Net Development (hours)
- column AA: leave only item starting “pre P8 pronto fixing…”
- go to the preferred month column, e.g. 2012/P09 column AS, select all cells and take the sum that excel
calculates = Fault correction efforts (hours)
- column AA: select again all items.
▪ Filling the report graph excel
- when copying the result data from B34, leave the decimals away (i.e. do “truncation” not “rounding”)
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 14/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Pre P8 pronto fixing - TrackView items
Available TrackView items Dec 2012
NFD PROGRAMS ACTIVITY TEXT STRING
A0S17 MBB GSM 0S17 RG40 BSC pre P8 pronto fixing S17
AB161 MBB GSM B161 RG30 EP1 System Program pre P8 pronto fixing RG30EP1 Step1
AB161 MBB GSM B161 RG30 EP1 System Program pre P8 pronto fixing RG30EP1 Step2
AB161 MBB GSM B161 RG30 EP1 System Program pre P8 pronto fixing RG30EP1 Step3
AB16N MBB GSM B16N RG30 System Program pre P8 pronto fixing RG30
AEX51 MBB GSM EX51 RG30EP1 BTS EX5.1 SW Development pre P8 pronto fixing EX51 Step 1 AEX51 MBB GSM EX51 RG30EP1 BTS EX5.1 SW Development pre P8 pronto fixing EX51 Step 2
AEX5N MBB GSM EX5N RG30 BTS SW Development pre P8 pronto fixing EX5N
AHEXB MBB GSM HEXB BTS Crockett SW Development pre P8 pronto fixing HEXB
AS161 MBB GSM S161 RG30 EP1 BSC Development pre P8 pronto fixing S16.1 Step1
AS161 MBB GSM S161 RG30 EP1 BSC Development pre P8 pronto fixing S16.1 Step2
AS161 MBB GSM S161 RG30 EP1 BSC Development pre P8 pronto fixing S16.1 Step3
AS16N MBB GSM S16N RG30 BSC pre P8 pronto fixing S16
ASM3B MBB GSM Flexi MR ID SM DTC and TD-LTE Evolution pre P8 pronto fixing SM3B A0GF2 MBB GSM 0GF2 RG30EP1 BTS GF2.0 Development pre P8 pronto fixing 0GF2
AGFC2 MBB GSM GFC2 RG30EP1 BTS Development pre P8 pronto fixing GFC2
A0VGS MBB GSM 0VGS RG20EP2 BTS SW Vegas Program pre P8 pronto fixing 0VGS
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 15/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Data from Artemis 1/2
Available PRM report excels
▪ B34
- all data shown per activity, pool and program - includes per person
- all cumulative total reported hours including hours before the monthly scope of the B34
- the reported hours per month (the number of passed months selectable via parameters)
- ETC
- EAC (what is this? Not visible as a column)
▪ A36
- includes per person- the reported hours per month per pool (for selected number of months)
- allocations per pool
- capacities
▪ A27
- includes per team (as separate rows; calendar span towards history is selectable)
- monthly capacity
- monthly actuals and allocations in same row
▪ B24
- includes list of all activities for one program
- does not show the pools
- shows also cumulative reported hours per activity
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 16/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Data from Artemis 2/2
Listings from A7
▪ Program WBS/pool/ODC code list Excel extraction- shows all
- program names
- wbs codes
- pools
- ODC codes
- no TrackView activities
version 1 2 Candidate Draft Released
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 17/18Dept. / Author / Date
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
© Nokia Siemens Networks 2011
Category. Financial
Customer
People & Innovation
Other
E2E: Customer Process
E2E: Product Process
E2E: Delivery Process
Data
Confidentiality
Secret Confidential For Internal Use
Graph/Chart
AvailableData Levels
Product Line, Business Line
CommentsandAdditionalInformation
Accounting discipline is required to run this KPI.
Feature Development Efficiency
NSN Information Security Policy
version
number:
1.2 Candidate Draft Released
Abbreviation FDE
Business Owner Head of BL / Head of R&D
KPI/Metric ConceptOwner
MBB / PfM / R&D EfficiencyJouni Tiainen
KPI/Metric ReportProvider
Head of Planning & Support
Purpose and
Objective
• Understand and drive improvement measures to
- increase net development for new customerfeatures- reduce effort spent on fault correction- reduce effort needed to detect defects in latephase
• Improvement of KPI indicates increase indevelopment efficiency
Source System(s) • Artemis, backlog management system
Calculation FDE _n (Net Developm ent %)
= Net Developm ent / total Developm ent
• Net Development = New feature coding + moduletesting + unit testing + system component testing (done bysame SW dev. team) + creation/contributions/review offeature specs + refactoring + change notes/requests +quality improvement actions in backlogs
• Total development = Headcount of whole organization – System VerificationFDE_f (Fault Correct io n Rate )
= bug fixing effor t as % of Net Development
• Fault correction effort = Effort for fixing of reportedfaults originated typically by SW build test, EntityIntegration, NeVe and Field
• Net Development = as above
FDE_s (System Veri f icat ion Rate) = System
Veri f icat ion effort as rat io on top of total
Developmen t effort
• Calculated on basis of HC per organization
Unit of Measurement %
Aggregation Method Product line view based on monthly figures,BL view can be calculated in case of multiple PLs,release view not needed
10%
15%
20%
25%
30%
35%
40%
45%
P6 P7 P8 P9 P10 P11 P12
Net Dev.(% of totaldev.)
FaultCorrectionRate (% of
net dev.)SyVe Rate(% on topof totaldev.)
8/10/2019 GSM BSS Efficiency KPIs Process
http://slidepdf.com/reader/full/gsm-bss-efficiency-kpis-process 18/18
Confidential This documentation is legally privileged and for initial planning purposes only. Any concrete plans and implementation decisions are subject to NSNdecision-making governance and subject to, where applicable, consultation with employee representatives and fulfillment of legal conditions.
Assumption
• Initially only include internal NSN Headcount, partners is phase 2
• Net Feature Development (NFD) is a KPI to reflect R&D efficiency
• NFD is measured in headcount share of total R&D headcount (HC%)
• NFD comprises the tasks1) System-level specification
2) Entity-level specification3) SW- and HW-development
4) Module- and Component testing
5) Entity testing
• Non-NFD tasks includea) System Verification = E2E test
b) Program Management
c) Program Support and planning
d) L4/L3 Management and Admin staffe) SW- and HW development support (as tooling)
f) I&V support (as lab staff, test tooling)
g) SW- and HW-Maintenance
h) For external R&D: non-efficiency assumption is classified as non-NFD
i) Process, Audit and Efficiency Improvement activities
GSM, R&D efficiencyNet Feature Development