10
22-08-17 GSC-8 024 GTSC 11 AGENDA ITEM: ITU-T Study Group Restructuring TITLE: TSACC SOURCE: ITU-T Study Group Restructuring ITU-T Study Group Restructuring J. MacFie Tel. +1 613-765-6641 Fax +1 613-763-2697 Email [email protected]

GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

Embed Size (px)

Citation preview

Page 1: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

23-04-19

GSC-8 024

GTSC 11AGENDA ITEM:

ITU-T Study Group RestructuringTITLE:

TSACCSOURCE:

ITU-T Study Group RestructuringITU-T Study Group Restructuring

J. MacFie

Tel. +1 613-765-6641

Fax +1 613-763-2697Email [email protected]

Page 2: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

OutlineOutline

• Why look at the ITU-T SG structure?• Developing an ITU-T SG structure proposal

– start from generic elements of a prototypical network– consolidation considerations

• positioning ITU-T for the future• fold like areas together• horizontal vs. vertical activities• participation levels: critical mass; maximum size• need to take a macro view, show flexibility

• Hierarchy, Roles, Meetings– no need for change

• Conclusions• Next Steps

Page 3: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

Why look at the ITU-T SG structure?Why look at the ITU-T SG structure?• Diffusion of work across multiple SGs impacts

effectiveness– difficult for members to optimally allocate resources,

participants may need to attend multiple SGs to cover a topic– declining participation levels with industry downturn– difficult for new participants to determine where to go– difficult for external bodies to identify with whom to interact– high volume of Liaisons between SGs may delay progress,

consumes resources

• Need to position ITU-T as forward looking, efficient– a well-thought-out SG structure will help address perception

issues, improve efficiency and effectiveness– need to stimulate a resurgence of interest in ITU: make it

attractive to move under the ITU-T umbrella

• within TSAG’s mandate and role: confirmed at PP-02

Page 4: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

In developing a proposal, what should be In developing a proposal, what should be the starting point?the starting point?

• Performance• Applications and Services incl. TV, Sound, MM• Service Signalling• Transport• Telecommunication management & operations• Tools and Methods• Mobility of Applications and Terminals• Security• Disaster Relief• Regulatory Aspects• TSAG These are the generic elements of a

prototypical telecommunications network.

Page 5: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

Consolidation Considerations IConsolidation Considerations I

• Fold like areas together– competing interests: keep together to manage as a package– fold general software aspects into application architecture– combine architecture for lower layers with optical and other

transport networks• Some activities are “horizontal”, others “vertical”

– keep like together, don’t mix and match– vertical (focus is on one area):

• Applications and services• Service signalling• Transport• Mobile Telecommunications

– horizontal (cut across multiple areas):• Performance• Tools and methods• Telecommunication management and operations• Security• Disaster relief

Page 6: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

Consolidation Considerations IIConsolidation Considerations II

• Need to clearly position ITU for the future– include study on “next generation” in each category– need right structure as basis for promotion as future-oriented– cannot afford redundant or divergent activities

• Participation levels– over time, some SGs have grown large, others have

become small– need to achieve a better balance of participation levels

• Regulatory matters (SG 3): no changes proposed– MSs may wish to make changes within a new SG structure

• TSAG provides a valuable and useful function– no changes are proposed

Page 7: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

Consolidation Considerations IIIConsolidation Considerations III• SGs need critical mass to be a “going concern”:

– need at least 150 participants for:• adequate diversity of interests and a challenging, interesting,

cross-fertilized and sizeable work program• an adequate talent pool for leaders: Rapporteurs, WP Chairmen• legitimacy in representing the ITU-T to external organizations

• SGs need to avoid becoming large and unwieldy:– maximum of about 350-400 participants

• Macro view, flexibility:– keep a macro view: look after the forest, not just the trees– be reasonably flexible in groupings: activities that are not closely

related can still run independently within one SG• hosting of a sub-group outside Geneva remains manageable and

should be encouraged– consolidation may reduce TSB overhead of Collective Letters,

Liaisons, etc.: some economies of scale may be possible

Page 8: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

SGs, WPs, RGs: Hierarchy, Roles, MeetingsSGs, WPs, RGs: Hierarchy, Roles, Meetings

Are the current hierarchy and responsibilities appropriate?

– Study Groups

• high level management

• formal (official) meetings

– Working Parties

• manage the technical work

• formal (official) meetings

– Rapporteur Groups

• do the technical work

• informal meetings

Is meeting frequency appropriate?Type Level Frequency Duration

(months) (days)

Face-to-face SG 8 1-2

Face-to-face WP 4-8 1-2

Face-to-face RG as req’d 2-5 (+/-)or electronic

• WPs meet when SG meets.• Rapporteur Groups meet when WPs meet.• Rapporteur Groups may hold additional

meetings as required.

• Current three level hierarchy and roles fit the needs• Meeting frequency and duration are appropriate• No need seen for lengthy debate on these matters

Page 9: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

ConclusionsConclusions

• Need to look at ITU-T SG structure to:– address negative impacts of diffusion of work– position ITU-T as forward looking, efficient

• Structure of ITU-T SGs:– should be firmly based on generic elements of a prototypical

telecommunications network– should contribute strongly to positioning ITU-T as forward

looking on converged technologies and networks• distinct from maintenance of legacy and historical aspects• clear domains for various facets of NGN work

– should pass multiple reasonableness and consistency tests• critical mass, reasonable maximum size• obviate need to designate “lead SGs”, reduce coord effort

• Leave further details to SG leadership– i.e., WPs, Rapporteur Groups, etc., just as in the past

Page 10: GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel.+1 613-765-6641

April 19, 2023 GSC-8, OTTAWA

Next StepsNext Steps

• TSAG Feb 2003: agreed on need, establish principles, mandate a group to progress the topic– Correspondence Group (Mar - Nov 2003)– Face to face meeting (October 2003)

• TSAG Nov 2003: agree target SG structure for next Study Period– current SGs: apply in development of new/revised Questions

• TSAG Jun 2004: finalize SG structure and Questions for WTSA-2004

• Sep 2004: WTSA-2004 endorsement