18

Grupo Planificaciones Mundiales Presentation

Embed Size (px)

DESCRIPTION

Grupo Planificaciones Mundiales Presentation

Citation preview

Page 1: Grupo Planificaciones Mundiales Presentation
Page 2: Grupo Planificaciones Mundiales Presentation

Spanish group created in 2007

Head office in Fuerteventura

Present in 16 countries (Europe, Africa, Asia and America)

More than 40 companies

Page 3: Grupo Planificaciones Mundiales Presentation

Sectors of Activity Renewable energies

Real estate projects

Telecommunications

Patents research and development

Platform for Healthcare development

Food and Agriculture Industry

Page 4: Grupo Planificaciones Mundiales Presentation

4 continents: EUROPE, AFRICA, ASIA and AMERICA.

GPM present in 16 countries:

o Europe: Spain (Canaries and Peninsula), Bulgaria,

Latvia, Lithuania, Sweden, Croatia, Estonia, Poland,

Ukraine.

o Eurasia: Turkey.

o Asia: Kazakhstan.

o Africa: Morocco, Cape Verde, Equatorial Guinea,

Mauritania.

o America: Cuba, Panama

Activity countries

Page 5: Grupo Planificaciones Mundiales Presentation

Proyectos Inmobiliarios (pendiente)

Inserta el texto de todas formas

Renewable Energies

Solar energy

Wind power

Hydraulic power

Waste Processing

Biomass

Page 6: Grupo Planificaciones Mundiales Presentation

Photovoltaic Energy

Bulgaria:

o European reference in terms of development of Renewable

Energies, in particular the Photovoltaic Energy.

o Fiscal incentives for investment in Photovoltaic Energy

(Corporate Tax: 10 %).

o Guaranteed purchase of 100% of the energy fed into the

grid, at a rate regulated and guaranteed by the State,

during a 25 years period.

o Purchase rate: 386 € / Mwh.

o Actually, GPM owns 12 PHOTOVOLTAIC POWER PLANTS with

different capacities (between 3,5MW and 50MW).

o Total capacity: 121 MW.

Page 7: Grupo Planificaciones Mundiales Presentation

Wind Power Latvia – Lithuania - Kazakhstan:

o Huge advances in terms of development of Renewable

Energies, in particular Wind power.

o Fiscal incentives for investment in Wind power (Corporate Taxes:

15 % in Latvia and Lithuania and 17,5 % in Kazakhstan).

o Guaranteed purchase of 100% of the energy fed into the

grid, at a rate regulated and guaranteed by the State,

during a 20 years period.

o Purchase rates:

96-113€/Mwh in Latvia

87€/Mwh in Lithuania

90€/Mwh in Kazakhstan

o Actually, GPM owns 8 WIND FARMS with different

capacities (between 30MW and 630MW).

o Total capacity: 1.555 MW.

Latvia: 5 wind farms – 275MW.

Lithuania: 1 wind farm – 630MW.

Kazakhstan: 2 wind farms – 650MW.

Page 8: Grupo Planificaciones Mundiales Presentation

Real Estate Projects

All kind of projects:

• Master Plan

• Plots and Lands: hotel, industrial,

residential, commercial, etc.

• Premises, warehouses, etc.

• Apartments, duplexes, villas, etc.

4 performance countries:

• Cape Verde: Islands of Sal, Boa Vista and Maio

• Morocco

• Spain – Canaries Islands (Fuerteventura Island)

• Panama

Page 9: Grupo Planificaciones Mundiales Presentation

Cape Verde Projects in the most touristic islands of the archipelago:

Sal island

Master Plan PORTO MURDEIRA: 504 hectares with plots of several

types, sport port, 2 golf courses, clinic with heliport, sport centre,

shopping centres, spare time parks, business centres.

The residential SOL VERDE: 104 apartments (studio apartments

and apartments of 1 and 2 bedrooms), reception, snack bar,

restaurant, reception.

Boa Vista island

Master Plan FONTE NOVA: 260 hectares with plots of several

types, 1 golf course (18 holes), shopping centres.

Master Plan BOAVISTA BEACH: 54 hectares with plots of several

types, 1 golf course (9 holes), sport centre, clinic, shopping

centres.

Maio island

Residential ATLANTIC BEACH: 322 apartments (60 villas of 3

bedrooms and 262 apartments of 2 bedrooms), swimming

pools, reception, snack bar - restaurant, Beach Club, diving

club, surf club, children’s areas.

FASHION BEACH Centres : Sal, Boa Vista and Maio

Page 10: Grupo Planificaciones Mundiales Presentation

MoroccoProject CHOROK TARFAYA:

Project area: 1.000.000 m2

First phase: 300.000 m2

Warehouses, department stores, hypermarket, Hotel-

Casino 5 *, petrol station, restaurant, craft market, etc.

Fuerteventura – Tarfaya: 96 km.

Project elaborated following the establishment of with

the shipping line Puerto del Rosario – Tarfaya. (+ good air connections).

Project mentioned in the last promotional video

realized by the Government of the Kingdom of

Morocco, presenting GPM as a “foreign reference

investing group” (Video: "Morocco: Portrait of a Nation”)

Page 11: Grupo Planificaciones Mundiales Presentation

Fuerteventura

Several projects:

Plots and Lands: commercial, residential, hotelier, industrial,

etc.

Premises, warehouses, etc.

Duplexes, villas, apartments - 4 principal residentials:

Mirador de Lobos Golf : Corralejo – Residential of 150 properties, duplexes and villas of 3 bedrooms with private golf

course.

Caleta del Mar: Caleta de Fuste – Residential of 14 villas of 3 bedrooms.

El Castillo: Caleta de Fuste – exclusive residential of 6 villas

Guacimara: La Oliva – Plots of 1.000m2 or more with license and project to build a single-family villa with 4 bedrooms,

Page 12: Grupo Planificaciones Mundiales Presentation

Panama

Horizon Tower: Balboa Avenue - Panama City

Exclusive building located in one of the best areas of

Panama City.

Total area: 68,000 m2

Apartments, offices and hotel.

67 floors and 3 basements.

Page 13: Grupo Planificaciones Mundiales Presentation

TelecommunicationsGPM covers all the areas included in this sector of activity:

Overall Telecommunication Consultancy

Mobile phones

Internet services

Government networks

Studies for the implementation of telecommunication services,

particularly in emerging countries

GPM owns the following concessions:

Telephone and Internet provider in SPAIN.

Telephone and Internet provider in CAPE VERDE.

We are currently developing similar

projects with the Government of Kazakhstan

Page 14: Grupo Planificaciones Mundiales Presentation

Platform for Health Care Development

Pharmaceutical Industry:

Implementation or improvement of the pharmaceutical

industry

Production of basic Medicines.

Implementation of Controlling bodies.

Health Care:

Primary Health Care and Specialists: installation of health

centres, hospitals, both permanent and mobile.

Especially in Emerging Countries

We are currently developing a project with the

Government of Equatorial Guinea to improve the

National Health Service.

E-Health, Pharmaceutical Industry Implementation and Control

Agency.

Page 15: Grupo Planificaciones Mundiales Presentation

Innovation and Patents Development GPM has created a network of more than 300

innovators for the development of patents of any kind

of product and system, in particular:

Products and Systems for Renewable Energies.

Electronic Products and Systems.

Innovative Products and Systems.

Products and Systems for the Automotive industry.

Products and Systems for the Fight Against Hunger.

GPM Patents Property:

Gear Solid Lens

The ball process

Electrolytic cells for sealing of hydrogen

RUFT (Ready to Use Therapeutic Food)

Patent in development: generator and storage of water by condensation,

eco-gym energy, portable solar water purifier, motorcycle airbag jacket, etc.

Page 16: Grupo Planificaciones Mundiales Presentation

Food and Agriculture Industry

Elaboration of studies and systems for the

Food and Agriculture Industry sector:

Development of products and systems to fight against

hunger: RUFT, agriculture production systems, the

cultivation of sea vegetable food crops, biofuels and Soil

Fertility.

Page 17: Grupo Planificaciones Mundiales Presentation

Sponsorships

Social Projects:

Orphanage Laâyoune.

Football games against Cystic Fibrosis

Sports Sponsorship:

TENNIS: David Ferrer, Juan Carlos Ferrero, Paul

Martin, etc.

FOOTBALL: Juande Ramos.

Sponsors of local football club, Windsurfing,

Basketball, Paddle, etc.

Cultural Sponsorship:

Carnivals, beauty pageants, film festivals, music festivals,

etc.

Page 18: Grupo Planificaciones Mundiales Presentation