GROUP 1 FINAL GROUP 1 FINAL PRESENTATION PRESENTATION Ragad Al-Huq Ragad Al-Huq Michael Fabery Michael Fabery Mustansir Pratapgarhwala Mustansir Pratapgarhwala Yeonshin Won Yeonshin Won Dae-Geun Yoon Dae-Geun Yoon

GROUP 1 FINAL PRESENTATION

Embed Size (px)

DESCRIPTION

GROUP 1 FINAL PRESENTATION. Ragad Al-Huq Michael Fabery Mustansir Pratapgarhwala Yeonshin Won Dae-Geun Yoon. Week 1 Task Management. Webmaster - Michael, Mustansir Budget Analysis and Ordering - Yeonshin Testing - Michael, Mustansir, Yoon Design – Michael, Mustansir, Ragad - PowerPoint PPT Presentation

Citation preview

GROUP 1 FINAL GROUP 1 FINAL PRESENTATIONPRESENTATION

Ragad Al-HuqRagad Al-Huq

Michael FaberyMichael Fabery

Mustansir PratapgarhwalaMustansir Pratapgarhwala

Yeonshin WonYeonshin Won

Dae-Geun YoonDae-Geun Yoon

Week 1 Task ManagementWeek 1 Task Management

Webmaster - Michael, MustansirWebmaster - Michael, Mustansir Budget Analysis and Ordering - YeonshinBudget Analysis and Ordering - Yeonshin Testing - Michael, Mustansir, YoonTesting - Michael, Mustansir, Yoon Design – Michael, Mustansir, RagadDesign – Michael, Mustansir, Ragad Building/Soldering – YoonBuilding/Soldering – Yoon Alignment Tolerance & Analyisis – Mustansir, Alignment Tolerance & Analyisis – Mustansir,

YoonYoon

Week 2 Test Receiver Board Week 2 Test Receiver Board Results Results

D 21.5

K 28.7

K 28.5

PRBS7

Week 3 – Optical Link Week 3 – Optical Link BudgetBudget

Week 4 – Transceiver Week 4 – Transceiver SchematicSchematic

Week 5 – Parts OrderedWeek 5 – Parts Ordered

Week 6 – Power Supply Week 6 – Power Supply FilterFilter

Week 7 – Final PCB LayoutWeek 7 – Final PCB Layout

Transceiver BoardsTransceiver Boards

Standard Design

Aggressive Design

Week 8 – Receiver TestingWeek 8 – Receiver Testing

Receiver Conservative PRBS7 Receiver Aggressive PRBS7

Conservative/Aggressive Receiver 5 dB

Week 9 – Tx TestingWeek 9 – Tx Testing

Conservative TX 0 dB Conservative Tx 5 dB

Aggressive Tx 0 dB Aggressive Tx 5 dB PRBS7

Week 10 Loopback Testing Week 10 Loopback Testing Aggressive DesignAggressive Design

Conservative PRBS7 0 dB Aggressive PRBS7 0 dB

Aggressive D21.5 5 dB

Week 10 – Alignment Week 10 – Alignment Tolerance Bad ResultsTolerance Bad Results

PRBS7 0 dB

K28.5 0 dB

D21.5 0 dB

Week 11 – Alignment Week 11 – Alignment Tolerance Good ResultsTolerance Good Results

Rx 0 dB D21.5

Rx 0 dB K28.5Rx 0 dB PRBS7

Week 12 – Shielding 1 of 3Week 12 – Shielding 1 of 3

K28.5 Before Shielding 5 dB PRBS7 Before Shielding 5 dB

K28.5 After Shielding 5 dB PRBS7 After Shielding 5 dB

Week 12 – Shielding 2 of 3Week 12 – Shielding 2 of 3

K28.5 Before Shielding 10 dB PRBS7 Before Shielding 10 dB

K28.5 After Shielding 10 dB PRBS7 After Shielding 10 dB

Week 12 – Shielding 3 of 3Week 12 – Shielding 3 of 3

K28.5 Before Shielding 15 dB PRBS7 Before Shielding 15 dB

K28.5 After Shielding 15 dB PRBS7 After Shielding 15 dB

Alignment ToleranceAlignment Tolerance

Final Gantt ChartFinal Gantt Chart

How Much?How Much?

Quantities of 1000