3
2 1 WD3000 4 WD3000 3 3 WD4000 14 m² Ground floor Guest Bedroom Tiles 5 m² Ground floor DQ Bedroom Tiles 18 m² Ground floor Lounge Tiles 19 m² Ground floor Dining Tiles FRIDGE STOVE SINK 3 m² Ground floor Guest Loo Tiles 8 m² Ground floor Kitchen Tiles 2 m² Ground floor DQ Tiles 4 m² Ground floor Bathroom1 Tiles 4 5 6 7 8 STAIR NOTE: 17 TREADS @280mm 18 RISERS @170mm 3 2 1 planter 700 W G05 450 W G06 W G08 2 WD4000 D G08 1 WD4000 W G07 W G03 W G04 W G01 W G02 W G09 11740 740 3260 1480 2725 835 1805 900 150 100 150 1990 150 900 150 410 150 1180 150 100 150 875 2285 150 1805 145 605 150 740 300 600 950 600 810 1480 1125 1600 835 1805 900 1990 2500 900 2865 7795 150 700 1950 2195 1950 700 150 150 150 400 150 1950 150 1895 150 1950 150 400 150 150 12340 4000 3550 3665 525 600 740 300 800 550 800 350 460 1490 2060 955 2060 650 525 600 150 100 150 3600 150 1190 150 2060 150 3365 150 375 150 450 150 950 150 800 1000 250 8710 2500 2650 2810 750 150 600 150 150 150 2355 150 1200 150 1000 150 2100 150 100 150 1700 150 670 150 730 D G01 D G02 D G03 D G04 D G05 D G06 D G07 8 m² Ground floor Patio Tiles] 14 m² Ground floor Entrance Tiles 9 - --- 27 m² First floor Master Bedroom Tiles 17 m² First floor Bedroom 2 Tiles 21 m² First floor TV Room Tiles D F03 7 m² First floor Bath 3 tILES 5 m² First floor Bath 2 Tiles 4 5 6 7 8 9 10 11 12 13 14 15 16 17 STAIR NOTE: 17 TREADS @280mm 18 RISERS @170mm PERGOLA to later detail line of beam over wins as per sch line of beam over 18 3 2 1 W F01 BIC SHR 50mm wp W F03 W F04 W F06 W F07 W F08 W F11 W F05 D F01 D F02 D F04 11740 4000 5040 1805 900 740 300 600 950 600 810 1480 2725 835 1805 900 150 90 150 3610 150 1180 150 1125 2285 150 1800 150 605 150 1700 8710 2500 2650 2810 750 150 100 150 2100 150 1360 150 840 150 2410 150 100 150 600 150 11740 4000 3550 3665 525 740 300 800 550 800 350 460 1490 2060 955 2060 650 525 150 90 150 3610 150 1190 150 2060 150 3365 150 375 150 950 7795 150 700 1950 2195 1950 700 150 150 150 400 150 1950 150 1895 150 1950 150 400 150 150 965 10 m² First floor Double Volume line of beam over win as per sch win as per sch wins as per sch W F02 W F09 W F10 5185 250 5435 3400 1085 4485 2860 2860 3610 7195 450 3610 4060 BIC BIC BATH 50mm wp WHB 50mm wp WC 100mm sp 2625 0 2470 PROJECT ARCHITECT GENERAL: All work to comply with the National Building Regulations (SABS 0400), the applicable SABS codes of conduct and standards as prescribed by the National Home Builders Registration Council (NHBRC). Designer accepts no liability for any work conducted on site whatsoever. All materials to be SABS or NHBRC approved. Boundary pegs to be identified by the Client. These are to be checked by the Contractor, including all levels, dimensions, steps, etc. Any apparent discrepancies between the site evaluation and the drawings are to be brought to the Designer's attention. Figured dimensions to be taken in preference to scaling. Foundation to take founding in solid undisturbed ground. All electrical and plumbing work to be carried out by registered qualified subcontractors. Concrete to foundation and surface bed to be 15MPa at 28 days. Fill below surface bed to be well compacted in 150mm layers to achieve a minimum of 92% modified AASHTO. Use is to be made of suitable material which is free of clay content. Brickforce to be built in below and above window level and every forth course incontinuous bands. Provide 4mm galvanized wire ties built 5 courses into external brickwork to secure rooftrusses to wall. Provide laminated safety glass to all doors & windows where glazing is within 900mm above F.F.L. Glazed tiling to full height in all bathrooms and kitchen. FIRE PREVENTION: Any roof space between garage and habitable areas shall be divided by a wall with a 30 minute fire rating. Any door between garage and habitable areas to be a solid timber core door,40mm thick. FLOOR & WATERPROOFING: Ground floor slab: 75mm thick, 15MPa concrete, perfectly level, min. 150 aboveN.G.L. on compacted hardcore min. 92% modified ASHTO: 25mm thick screedand finishes as indicated. Structural concrete floors to eng. spec. FOUNDATIONS & BRICKWORK: All foundations to be 15MPa concrete at least 200x600mm, min. 200 under ground level or to eng. spec. Boundary walls foundation must not encroach on boundary and walls to be finished as per the finishing schedule. Courtyard and screen walls to be at least 1.8m high above N.G.L. Lintels to be supported min. 150mm for openings up to 3.0m and at least 220mm for openings up to 4,8m. STAIRS AND BALUSTRADE: Stairs to be 1110mm min. width, treads 270mm min., risers 186mm max. with 6mm max. deviation.1m high balustrade to all stairs and balconies. Min. headroom to be 2.1m measured from pitchline. DRAINAGE: Anti vac traps to all first floor waste fittings. Any drain not deeper than 350mm under ground level to be protected against load. Provide a chemical temporary toilet in position indicated: keep it in a hygienic and odourless state. All drains to be 110Ø PVC min. fall 1:60. Stacks in ducts to be accessible for cleaning purposes. GLAZING: Glazing of all new windows and doors to be in accordance with part N of SABS 0400 Obscure Glazing to all Bathrooms & Toilets JOB CLIENT STAND NO. DRAWING TITLE JENNY ASPOAS DRAWN CHECKED DATE SCALE REF NO PROJECT CODE DRAWING NO. REV INT ARC ARCHITECT'S SIGNATURE ENGINEER'S SIGNATURE CLIENT'S SIGNATURE 2012/11/19 02:12:19 PM Enter address here 1 : 50 Z:\Client Files\Jonah, Richard - adjiringano\work in progress\UNIT TYPE B_01.rvt Unit B Phoenix Villas Ground floor plan Author Checker Issue Date WD2000 0808 1 : 50 Ground floor 1 1 : 50 First floor 2 NO REVISION DATE DRAWN

Ground floor First floor 2 - Mobus Property · PDF file7195 450 3610 4060 BIC BIC BATH 50mm wp WHB 50mm wp WC 100mm sp ... panel as per NBR 2400 ... Ground floor Tiles

  • Upload
    lykhanh

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

2

1

WD3000 4

WD3000

3

3

WD4000

14 m²Ground floor

Guest BedroomTiles

5 m²Ground floor

DQ BedroomTiles

18 m²Ground floor

LoungeTiles

19 m²Ground floor

DiningTiles

FR

IDG

E

ST

OV

E

SIN

K3 m²

Ground floor

Guest LooTiles

8 m²Ground floor

KitchenTiles

2 m²Ground floor

DQTiles

4 m²Ground floor

Bathroom1Tiles

4 5 6 7 8

STAIR NOTE:17 TREADS @280mm18 RISERS @170mm

321

plan

ter

700

WG05

450

WG06

WG08

2

WD4000

DG08

1

WD4000

WG07

WG03

WG04

WG01

WG02

WG09

11740

740 3260 1480 2725 835 1805 900

150100150 1990 150 900 150 410 150 1180 150 100150 875 2285 150 1805 145 605 150

740 300 600 950 600 810 1480 1125 1600 835 1805 900

1990

2500

900

2865

7795

150

700

1950

2195

1950

700

150

1501

5040

015

019

5015

018

9515

019

5015

040

015

015

0

12340

4000 3550 3665 525 600

740 300 800 550 800 350 460 1490 2060 955 2060 650 525 600

150100150 3600 150 1190 150 2060 150 3365 150 375 150 450 150

950

150

800

1000

250

8710

2500

2650

2810

750

150

600

15015

0150

2355

150

1200

150

1000

150

2100

150

100

150

1700

150

670

150

730

DG01

DG02

DG03

DG04

DG05

DG06

DG07

8 m²Ground floor

PatioTiles]

14 m²Ground floor

EntranceTiles

9

-

---

27 m²First floor

Master BedroomTiles

17 m²First floor

Bedroom 2Tiles

21 m²First floor

TV RoomTiles

DF03

7 m²First floor

Bath 3tILES

5 m²First floor

Bath 2Tiles

4 5 6 7 8

9

10

11121314151617

STAIR NOTE:17 TREADS @280mm18 RISERS @170mm

PERGOLA to later detail

line

of b

eam

ove

r

wins as per sch

line

of b

eam

ove

r

18

321

WF01

BIC

SHR50mm wp

WF03

WF04

WF06

WF07

WF08

WF11

WF05

DF01

DF02

DF04

11740

4000 5040 1805 900

740 300 600 950 600 810 1480 2725 835 1805 900

15090150 3610 150 1180 150 1125 2285 150 1800 150 605 150

1700

8710

2500

2650

2810

750

150

100

150

2100

150

1360

150

840

150

2410

150

100

150

600

150

11740

4000 3550 3665 525

740 300 800 550 800 350 460 1490 2060 955 2060 650 525

15090150 3610 150 1190 150 2060 150 3365 150 375 150

950

7795

150

700

1950

2195

1950

700

150

150

150

400

150

1950

150

1895

150

1950

150

400

150

150

965

10 m²First floor

DoubleVolume

line of beam over

win as per sch

win as per sch

wins as per sch

WF02

WF09

WF10

5185

250

5435

3400 1085

4485

2860

2860

3610

7195

450 3610

4060

BIC

BIC

BATH50mm wp

WHB50mm wp

WC100mm sp

2625

0 2470

PR

OJE

CT

AR

CH

ITE

CT

GE

NE

RA

L:A

ll w

ork

to c

ompl

y w

ith th

e N

atio

nal B

uild

ing

Reg

ulat

ions

(S

AB

S04

00),

the

appl

icab

le S

AB

S c

odes

of c

ondu

ct a

nd s

tand

ards

as

pres

crib

ed b

y th

e N

atio

nal H

ome

Bui

lder

s R

egis

trat

ion

Cou

ncil

(NH

BR

C).

Des

igne

r ac

cept

s no

liab

ility

for

any

wor

k co

nduc

ted

on s

itew

hats

oeve

r.A

ll m

ater

ials

to b

e S

AB

S o

r N

HB

RC

app

rove

d.B

ound

ary

pegs

to b

e id

entif

ied

by th

e C

lient

. T

hese

are

to b

ech

ecke

d by

the

Con

trac

tor,

incl

udin

g al

l lev

els,

dim

ensi

ons,

ste

ps, e

tc.

Any

app

aren

t dis

crep

anci

es b

etw

een

the

site

eva

luat

ion

and

the

draw

ings

are

to b

e br

ough

t to

the

Des

igne

r's a

ttent

ion.

Fig

ured

dim

ensi

ons

to b

e ta

ken

in p

refe

renc

e to

sca

ling.

Fou

ndat

ion

to ta

ke fo

undi

ng in

sol

id u

ndis

turb

ed g

roun

d.A

ll el

ectr

ical

and

plu

mbi

ng w

ork

to b

e ca

rrie

d ou

t by

regi

ster

edqu

alifi

ed s

ubco

ntra

ctor

s.C

oncr

ete

to fo

unda

tion

and

surf

ace

bed

to b

e 15

MP

a at

28

days

.F

ill b

elow

sur

face

bed

to b

e w

ell c

ompa

cted

in 1

50m

m la

yers

toac

hiev

e a

min

imum

of 9

2% m

odifi

ed A

AS

HT

O.

Use

is to

be

mad

e of

suita

ble

mat

eria

l whi

ch is

free

of c

lay

cont

ent.

Bric

kfor

ce to

be

built

in b

elow

and

abo

ve w

indo

w le

vel a

nd e

very

fort

hco

urse

inco

ntin

uous

ban

ds.

Pro

vide

4m

m g

alva

nize

d w

ire ti

es b

uilt

5 co

urse

s in

to e

xter

nal

bric

kwor

k to

sec

ure

roof

trus

ses

to w

all.

Pro

vide

lam

inat

ed s

afet

y gl

ass

to a

ll do

ors

& w

indo

ws

whe

re g

lazi

ng is

with

in 9

00m

m a

bove

F.F

.L.

Gla

zed

tilin

g to

full

heig

ht in

all

bath

room

s an

d ki

tche

n.F

IRE

PR

EV

EN

TIO

N:

Any

roo

f spa

ce b

etw

een

gara

ge a

nd h

abita

ble

area

s sh

all b

e di

vide

dby

a w

all w

ith a

30

min

ute

fire

ratin

g.A

ny d

oor

betw

een

gara

ge a

nd h

abita

ble

area

s to

be

a so

lid ti

mbe

rco

re d

oor,

40m

m th

ick.

FLO

OR

& W

AT

ER

PR

OO

FIN

G:

Gro

und

floor

sla

b: 7

5mm

thic

k, 1

5MP

a co

ncre

te, p

erfe

ctly

leve

l, m

in.

150

abov

eN.G

.L. o

n co

mpa

cted

har

dcor

e m

in. 9

2% m

odifi

ed A

SH

TO

:25

mm

thic

k sc

reed

and

finis

hes

as in

dica

ted.

Str

uctu

ral c

oncr

ete

floor

s to

eng

. spe

c.F

OU

ND

AT

ION

S &

BR

ICK

WO

RK

:A

ll fo

unda

tions

to b

e 15

MP

a co

ncre

te a

t lea

st 2

00x6

00m

m, m

in. 2

00un

der

grou

nd le

vel o

r to

eng

. spe

c.B

ound

ary

wal

ls fo

unda

tion

mus

t not

enc

roac

h on

bou

ndar

y an

d w

alls

to b

e fin

ishe

d as

per

the

finis

hing

sch

edul

e.C

ourt

yard

and

scr

een

wal

ls to

be

at le

ast 1

.8m

hig

h ab

ove

N.G

.L.

Lint

els

to b

e su

ppor

ted

min

. 150

mm

for

open

ings

up

to 3

.0m

and

at

leas

t 220

mm

for

open

ings

up

to 4

,8m

.S

TA

IRS

AN

D B

ALU

ST

RA

DE

:S

tairs

to b

e 11

10m

m m

in. w

idth

, tre

ads

270m

m m

in.,

riser

s 18

6mm

max

. with

6m

m m

ax. d

evia

tion.

1m h

igh

balu

stra

de to

all

stai

rs a

ndba

lcon

ies.

Min

. hea

droo

m to

be

2.1m

mea

sure

d fr

om p

itchl

ine.

DR

AIN

AG

E:

Ant

i vac

trap

s to

all

first

floo

r w

aste

fitti

ngs.

Any

dra

in n

ot d

eepe

r th

an 3

50m

m u

nder

gro

und

leve

l to

be p

rote

cted

agai

nst l

oad.

Pro

vide

a c

hem

ical

tem

pora

ry to

ilet i

n po

sitio

n in

dica

ted:

keep

it in

a h

ygie

nic

and

odou

rless

sta

te.

All

drai

ns to

be

110Ø

PV

C m

in. f

all 1

:60.

Sta

cks

in d

ucts

to b

e ac

cess

ible

for

clea

ning

pur

pose

s.G

LAZ

ING

:G

lazi

ng o

f all

new

win

dow

s an

d do

ors

to b

e in

acc

orda

nce

with

par

t Nof

SA

BS

040

0O

bscu

re G

lazi

ng to

all

Bat

hroo

ms

& T

oile

ts

JOB

CLI

EN

T

ST

AN

D N

O.

DR

AW

ING

TIT

LE

JEN

NY

AS

PO

AS

DR

AW

NC

HE

CK

ED

DA

TE

SC

ALE

RE

F N

O

PR

OJE

CT

CO

DE

DR

AW

ING

NO

.R

EV

INT

AR

C

AR

CH

ITE

CT

'SS

IGN

AT

UR

E

EN

GIN

EE

R'S

SIG

NA

TU

RE

CLI

EN

T'S

SIG

NA

TU

RE

2012/11/19 02:12:19 PM

Ent

er a

ddre

ss h

ere

1 :

50

Z:\C

lient

File

s\Jo

nah,

Ric

hard

- a

djiri

ngan

o\w

ork

inpr

ogre

ss\U

NIT

TY

PE

B_0

1.rv

t

Uni

t B

Pho

enix

Vill

as

Gro

und

floor

pla

n

Aut

hor

Che

cker

Issu

e D

ate

WD

2000

0808

1 : 50

Ground floor1 1 : 50

First floor2

NO REVISION DATE DRAWN

UP

DN

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

150mm concrete blockwork wallMarmoran to Architects spec

150mm block work, plaster andpaint (colour to architects spec)

pergola to later detail

NGLNGL

200

765

5955

6920

750 7960 1450

10160

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m 150mm block work, plaster andpaint (colour to architects spec)

NGL

White Powder coated AluminiumDoors and Windows

150mm concrete blockwork wallMarmoran to Architects spec

Custom made shopfront window

White Powder coated AluminiumWindows and DoorsW

G05

WF05

WG07

WG08

WF09

WF10

9mm x 255mm Nutecboards or similar approvedmaterial - see later detail

NGL NGL

6920

5955

765

200

400

2000

1060

2000

495

765

200

3002150

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

150mm concrete blockwork wallMarmoran to Architects spec

NGL NGL

DG08

WF01

WF02

WG01

WG02

WG06

WF07

WF08

WF11

WG09

pergola to later detail

White Powder coated AluminiumDoors and Windows

9mm x 255mm Nutecboards or similar approvedmaterial - see later detail

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

pergola to later detail

150mm concrete blockwork wallMarmoran to Architects spec

White Powder coated AluminiumWindows and Doors

2400

HEADHEIGHT

FFL

TYPE A TYPE B TYPE C

White powder Coated Aluminium

2 x Top hung opening section1 x Fixed panel

TYPE

SECTION

2400mm from FFLHEIGHT 2400mm from FFL 2400mm from FFL

800

600

600

800

400

2000

400

310

600

600

800

400

2000

400

400

800

600

600

2000

400

450 600

600

600

300

900

1500

900

2 x Top hung opening section1 x Fixed panel

2 x Top hung opening section1 x Fixed panel

White powder Coated Aluminium White powder Coated Aluminium

TYPE D

2400mm from FFL

2 x Top hung opening section1 x Fixed panel

White powder Coated Aluminium

TYPE E TYPE F TYPE G

White powder Coated Aluminium

2 x Top hung opening section1 x Fixed panel

TYPE

SECTION

2400mm from FFLHEIGHT 2400mm from FFL 2400mm from FFL

1160 900

2000

815

600

600

800

2000

400

800

600

600

2000

600

2 x Top hung opening section2 x Fixed panel

2 x Top hung opening section1 x Fixed panel

White powder Coated Aluminium White powder Coated Aluminium

2400

2060

600

600

800

400

HEADHEIGHT

FFL

2400

HEADHEIGHT

FFL

DOOR 3DOOR 2DOOR1

865 75

TYPE

SECTION

HEIGHT

Single door

Semi solid, rised and fieldedSupawood door- Painted

2400mm from FFL

Single door

2400mm from FFL

Double sliding door

Natural AluminuimDouble glass sliding door from centre

2400mm from FFL

SWING Left hand: 37 Right hand:39 Left hand: 1 Right hand:1 Left hand: 00 Right hand:00

Door swing legendRight Left

Natural Aluminuim with glasspanel as per NBR

2400

All glass to be clear glass unless otherwise stated.All glass strictly according to National Building Regulations.

2210

815

2400

2060

2400

90 m²Area

Rentable Area Legend

Building Common Area

86 m²Area

PR

OJE

CT

AR

CH

ITE

CT

GE

NE

RA

L:A

ll w

ork

to c

ompl

y w

ith th

e N

atio

nal B

uild

ing

Reg

ulat

ions

(S

AB

S04

00),

the

appl

icab

le S

AB

S c

odes

of c

ondu

ct a

nd s

tand

ards

as

pres

crib

ed b

y th

e N

atio

nal H

ome

Bui

lder

s R

egis

trat

ion

Cou

ncil

(NH

BR

C).

Des

igne

r ac

cept

s no

liab

ility

for

any

wor

k co

nduc

ted

on s

itew

hats

oeve

r.A

ll m

ater

ials

to b

e S

AB

S o

r N

HB

RC

app

rove

d.B

ound

ary

pegs

to b

e id

entif

ied

by th

e C

lient

. T

hese

are

to b

ech

ecke

d by

the

Con

trac

tor,

incl

udin

g al

l lev

els,

dim

ensi

ons,

ste

ps, e

tc.

Any

app

aren

t dis

crep

anci

es b

etw

een

the

site

eva

luat

ion

and

the

draw

ings

are

to b

e br

ough

t to

the

Des

igne

r's a

ttent

ion.

Fig

ured

dim

ensi

ons

to b

e ta

ken

in p

refe

renc

e to

sca

ling.

Fou

ndat

ion

to ta

ke fo

undi

ng in

sol

id u

ndis

turb

ed g

roun

d.A

ll el

ectr

ical

and

plu

mbi

ng w

ork

to b

e ca

rrie

d ou

t by

regi

ster

edqu

alifi

ed s

ubco

ntra

ctor

s.C

oncr

ete

to fo

unda

tion

and

surf

ace

bed

to b

e 15

MP

a at

28

days

.F

ill b

elow

sur

face

bed

to b

e w

ell c

ompa

cted

in 1

50m

m la

yers

toac

hiev

e a

min

imum

of 9

2% m

odifi

ed A

AS

HT

O.

Use

is to

be

mad

e of

suita

ble

mat

eria

l whi

ch is

free

of c

lay

cont

ent.

Bric

kfor

ce to

be

built

in b

elow

and

abo

ve w

indo

w le

vel a

nd e

very

fort

hco

urse

inco

ntin

uous

ban

ds.

Pro

vide

4m

m g

alva

nize

d w

ire ti

es b

uilt

5 co

urse

s in

to e

xter

nal

bric

kwor

k to

sec

ure

roof

trus

ses

to w

all.

Pro

vide

lam

inat

ed s

afet

y gl

ass

to a

ll do

ors

& w

indo

ws

whe

re g

lazi

ng is

with

in 9

00m

m a

bove

F.F

.L.

Gla

zed

tilin

g to

full

heig

ht in

all

bath

room

s an

d ki

tche

n.F

IRE

PR

EV

EN

TIO

N:

Any

roo

f spa

ce b

etw

een

gara

ge a

nd h

abita

ble

area

s sh

all b

e di

vide

dby

a w

all w

ith a

30

min

ute

fire

ratin

g.A

ny d

oor

betw

een

gara

ge a

nd h

abita

ble

area

s to

be

a so

lid ti

mbe

rco

re d

oor,

40m

m th

ick.

FLO

OR

& W

AT

ER

PR

OO

FIN

G:

Gro

und

floor

sla

b: 7

5mm

thic

k, 1

5MP

a co

ncre

te, p

erfe

ctly

leve

l, m

in.

150

abov

eN.G

.L. o

n co

mpa

cted

har

dcor

e m

in. 9

2% m

odifi

ed A

SH

TO

:25

mm

thic

k sc

reed

and

finis

hes

as in

dica

ted.

Str

uctu

ral c

oncr

ete

floor

s to

eng

. spe

c.F

OU

ND

AT

ION

S &

BR

ICK

WO

RK

:A

ll fo

unda

tions

to b

e 15

MP

a co

ncre

te a

t lea

st 2

00x6

00m

m, m

in. 2

00un

der

grou

nd le

vel o

r to

eng

. spe

c.B

ound

ary

wal

ls fo

unda

tion

mus

t not

enc

roac

h on

bou

ndar

y an

d w

alls

to b

e fin

ishe

d as

per

the

finis

hing

sch

edul

e.C

ourt

yard

and

scr

een

wal

ls to

be

at le

ast 1

.8m

hig

h ab

ove

N.G

.L.

Lint

els

to b

e su

ppor

ted

min

. 150

mm

for

open

ings

up

to 3

.0m

and

at

leas

t 220

mm

for

open

ings

up

to 4

,8m

.S

TA

IRS

AN

D B

ALU

ST

RA

DE

:S

tairs

to b

e 11

10m

m m

in. w

idth

, tre

ads

270m

m m

in.,

riser

s 18

6mm

max

. with

6m

m m

ax. d

evia

tion.

1m h

igh

balu

stra

de to

all

stai

rs a

ndba

lcon

ies.

Min

. hea

droo

m to

be

2.1m

mea

sure

d fr

om p

itchl

ine.

DR

AIN

AG

E:

Ant

i vac

trap

s to

all

first

floo

r w

aste

fitti

ngs.

Any

dra

in n

ot d

eepe

r th

an 3

50m

m u

nder

gro

und

leve

l to

be p

rote

cted

agai

nst l

oad.

Pro

vide

a c

hem

ical

tem

pora

ry to

ilet i

n po

sitio

n in

dica

ted:

keep

it in

a h

ygie

nic

and

odou

rless

sta

te.

All

drai

ns to

be

110Ø

PV

C m

in. f

all 1

:60.

Sta

cks

in d

ucts

to b

e ac

cess

ible

for

clea

ning

pur

pose

s.G

LAZ

ING

:G

lazi

ng o

f all

new

win

dow

s an

d do

ors

to b

e in

acc

orda

nce

with

par

t Nof

SA

BS

040

0O

bscu

re G

lazi

ng to

all

Bat

hroo

ms

& T

oile

ts

JOB

CLI

EN

T

ST

AN

D N

O.

DR

AW

ING

TIT

LE

JEN

NY

AS

PO

AS

DR

AW

NC

HE

CK

ED

DA

TE

SC

ALE

RE

F N

O

PR

OJE

CT

CO

DE

DR

AW

ING

NO

.R

EV

INT

AR

C

AR

CH

ITE

CT

'SS

IGN

AT

UR

E

EN

GIN

EE

R'S

SIG

NA

TU

RE

CLI

EN

T'S

SIG

NA

TU

RE

2012/11/19 02:12:33 PM

Ent

er a

ddre

ss h

ere

As

indi

cate

d

Z:\C

lient

File

s\Jo

nah,

Ric

hard

- a

djiri

ngan

o\w

ork

inpr

ogre

ss\U

NIT

TY

PE

B_0

1.rv

t

Uni

t B

Pho

enix

Vill

as

Ele

vatio

ns

Aut

hor

Che

cker

Issu

e D

ate

WD

3000

0808

1 : 100

East1

1 : 100

North2 1 : 100

South3

1 : 100

West4

NO REVISION DATE DRAWN

Window Schedule

TYP

E

WIN

DO

W N

O

LEV

EL

WID

TH

HE

IGH

T

HE

AD

HE

IGH

T

A G01 Ground floor 800 2000 2400A G02 Ground floor 800 2000 2400B G03 Ground floor 310 2000 2400B G04 Ground floor 310 2000 2400C G05 Ground floor 450 2000 2400C G06 Ground floor 450 2000 2400D G07 Ground floor 600 1500 2400D G08 Ground floor 600 1500 2400E G09 Ground floor 2060 2000 2400Ground floor: 9A F01 First floor 800 2000 2400A F02 First floor 800 2000 2400B F03 First floor 310 2000 2400B F04 First floor 310 2000 2400C F05 First floor 450 2000 2400F F06 First floor 815 2000 2400C F07 First floor 450 2000 2400E F08 First floor 2060 2000 2400G F09 First floor 600 2000 2400G F10 First floor 600 2000 2400E F11 First floor 2060 2000 2400First floor: 11

Window QTY

TYP

E

CO

UN

T

LEV

EL

MA

RK

A 2 Ground floorB 2 Ground floorC 2 Ground floorD 2 Ground floorE 1 Ground floor G09Ground floor: 9 9A 2 First floorB 2 First floorC 2 First floorE 2 First floorF 1 First floor F06G 2 First floorFirst floor: 11 11

Door Schedule

TYP

E

DO

OR

NO

.

LEV

EL

WID

TH

HE

IGH

T

FRO

M R

OO

M

1 G01 Ground floor 864 2134 Dining2 G02 Ground floor 815 2400 DQ Bedroom2 G03 Ground floor 815 2400 Kitchen1 G04 Ground floor 864 2134 DQ Bedroom1 G05 Ground floor 864 2134 Entrance1 G06 Ground floor 864 2134 Bathroom11 G07 Ground floor 864 2134 Dining3 G08 Ground floor 2060 2400 DiningGround floor: 81 F01 First floor 864 2134 TV Room1 F02 First floor 864 2134 TV Room1 F03 First floor 864 2134 Master Bedroom1 F04 First floor 864 2134 Bedroom 2First floor: 4

Door QTY

TYP

E

CO

UN

T

LEV

EL

TYP

E M

AR

K

815 x 2400mm 3 2 Ground floor 20864 x 2134mm 5 Ground floor 12400x2060 2 1 Ground floor 3Ground floor: 80864 x 2134mm 4 First floor 1First floor: 4Grand total: 12 1 : 100

Ground floor5

1 : 100

First floor6

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

21 m²First floor

TV RoomTiles

19 m²Ground floor

DiningTiles

14 m²Ground floor

EntranceTiles

10 m²First floor

DoubleVolume

1185

275

2000

400

255

405

2400

100

6920

1460

5460

1460

2400

660

2400

100

DF01

1310

150

5460

200

1110

150

2400

255

2805

Monier Coverland Deep -rollDouble Roman concrete roof tile@ 10 deg on 50 x 50 mm battensall in accordance tomanufacturers specification opapproved underlay on rooftrussesto MITEC or equal & approvedEngineers specification

sisilation or equal and approvedinsulation attached to 175 x 50mmrafters to engineers spec

Custom made shopfront window

1000mm high Stainless steel andglass balustrade to detail all inacc with nbr

pergola to later detail

170mm Beam & Block ConcreteSlab all in accordance withEngineers design andspecifications

Derbigum or equal & approvedwaterproofing with min 5 yearswarranty wrapped up and over allparapet walls.

170mm max Concrete Surfacebed all in accordance withEngineers design andspecification on approved DPMon termite proof soil compactedin layers to min 95%MODASSHTO

350 x 700mm Concrete StripFoundation all in accordance withEngineers design andspecifications

White Powder coated AluminiumWindows and Doors

9mm x 255mm Nutecboards or similar approvedmaterial - see later detail

DPC

DPC

DPCNGL

DPMDPC

NGL

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

350 x 700mm Concrete StripFoundation all in accordance withEngineers design andspecifications

Monier Coverland Deep -rollDouble Roman concrete roof tile@ 10 deg on 50 x 50 mm battensall in accordance tomanufacturers specification opapproved underlay on rooftrussesto MITEC or equal & approvedEngineers specification

Custom made shopfront window

White Powder coated AluminiumDoors and Windows

1000mm high Stainless steel andglass balustrade to detail all inacc with nbr

Skimplatered gypsum boardceiling to rake of rafters trimmedin between with shadowline detail

STAIR NOTE:17 TREADS @280mm18 RISERS @170mm

7 m²First floor

Bath 3tILES

14 m²Ground floor

EntranceTiles

27 m²First floor

Master BedroomTiles

5 m²Ground floor

DQ BedroomTiles

2 m²Ground floor

DQTiles

8 m²Ground floor

KitchenTiles

200

1000

2660

255

2805

100

200

672069

20

1200

260

2400

660

2400

150mm concrete blockwork wallMarmoran to Architects spec

170mm max Concrete Surfacebed all in accordance withEngineers design andspecification on approved DPMon termite proof soil compactedin layers to min 95%MODASSHTO

255mm Beam & Block ConcreteSlab all in accordance withEngineers design andspecifications

sisilation or equal and approvedinsulation attached to 175 x 50mmrafters to engineers spec

DPMDPM

DPCNGL

NGL

DPC

DPC

WG07

WG08

WF09

WF10

BIC BIC BIC

12

34

56

78

9

2660

170

1360

Ground floor+0.000 m

First floor+3.060 m

Roof Plan+6.120 m

sisilation or equal and approvedinsulation attached to 175 x 50mmrafters to engineers spec

DPMNGL

DPC

DPM

DPC

NGL

WF03

WG03

WG05

WF05

WF09

WF10

150mm concrete blockwork wallMarmoran to Architects spec

Monier Coverland Deep -rollDouble Roman concrete roof tile@ 10 deg on 50 x 50 mm battensall in accordance tomanufacturers specification opapproved underlay on rooftrussesto MITEC or equal & approvedEngineers specification

Custom made shopfront window

170mm Beam & Block ConcreteSlab all in accordance withEngineers design andspecifications

Derbigum or equal & approvedwaterproofing with min 5 yearswarranty wrapped up and over allparapet walls.

Skimplatered gypsum boardceiling to rake of rafters trimmedin between with shadowline detail

255mm Beam & Block ConcreteSlab all in accordance withEngineers design andspecifications

1000mm high Stainless steel andglass balustrade to detail all inacc with nbr

White Powder coated AluminiumDoors and Windows

170mm max Concrete Surfacebed all in accordance withEngineers design andspecification on approved DPMon termite proof soil compactedin layers to min 95%MODASSHTO

350 x 700mm Concrete StripFoundation all in accordance withEngineers design andspecifications

200

1000

260

2400

255

2805

100

6920

100

200

6720

345

150

200

1000

260

2400

660

2400

100

18 m²Ground floor

LoungeTiles

19 m²Ground floor

DiningTiles

3 m²Ground floor

Guest LooTiles

5 m²First floor

Bath 2Tiles

21 m²First floor

TV RoomTiles

27 m²First floor

Master BedroomTiles

150 3850 150 4740 150 2555 150 520

3805

CONCRETE SLAB

12260

965

7495

950

675

1008

5

12260

4000 7740 520

Monier Coverland Deep -rollDouble Roman concrete roof tile@ 10 deg on 50 x 50 mm battensall in accordance tomanufacturers specification opapproved underlay on rooftrussesto MITEC or equal & approvedEngineers specification

170mm Beam & Block ConcreteSlab all in accordance withEngineers design andspecifications

Derbigum or equal & approvedwaterproofing with min 5 yearswarranty wrapped up and over allparapet walls.

PR

OJE

CT

AR

CH

ITE

CT

GE

NE

RA

L:A

ll w

ork

to c

ompl

y w

ith th

e N

atio

nal B

uild

ing

Reg

ulat

ions

(S

AB

S04

00),

the

appl

icab

le S

AB

S c

odes

of c

ondu

ct a

nd s

tand

ards

as

pres

crib

ed b

y th

e N

atio

nal H

ome

Bui

lder

s R

egis

trat

ion

Cou

ncil

(NH

BR

C).

Des

igne

r ac

cept

s no

liab

ility

for

any

wor

k co

nduc

ted

on s

itew

hats

oeve

r.A

ll m

ater

ials

to b

e S

AB

S o

r N

HB

RC

app

rove

d.B

ound

ary

pegs

to b

e id

entif

ied

by th

e C

lient

. T

hese

are

to b

ech

ecke

d by

the

Con

trac

tor,

incl

udin

g al

l lev

els,

dim

ensi

ons,

ste

ps, e

tc.

Any

app

aren

t dis

crep

anci

es b

etw

een

the

site

eva

luat

ion

and

the

draw

ings

are

to b

e br

ough

t to

the

Des

igne

r's a

ttent

ion.

Fig

ured

dim

ensi

ons

to b

e ta

ken

in p

refe

renc

e to

sca

ling.

Fou

ndat

ion

to ta

ke fo

undi

ng in

sol

id u

ndis

turb

ed g

roun

d.A

ll el

ectr

ical

and

plu

mbi

ng w

ork

to b

e ca

rrie

d ou

t by

regi

ster

edqu

alifi

ed s

ubco

ntra

ctor

s.C

oncr

ete

to fo

unda

tion

and

surf

ace

bed

to b

e 15

MP

a at

28

days

.F

ill b

elow

sur

face

bed

to b

e w

ell c

ompa

cted

in 1

50m

m la

yers

toac

hiev

e a

min

imum

of 9

2% m

odifi

ed A

AS

HT

O.

Use

is to

be

mad

e of

suita

ble

mat

eria

l whi

ch is

free

of c

lay

cont

ent.

Bric

kfor

ce to

be

built

in b

elow

and

abo

ve w

indo

w le

vel a

nd e

very

fort

hco

urse

inco

ntin

uous

ban

ds.

Pro

vide

4m

m g

alva

nize

d w

ire ti

es b

uilt

5 co

urse

s in

to e

xter

nal

bric

kwor

k to

sec

ure

roof

trus

ses

to w

all.

Pro

vide

lam

inat

ed s

afet

y gl

ass

to a

ll do

ors

& w

indo

ws

whe

re g

lazi

ng is

with

in 9

00m

m a

bove

F.F

.L.

Gla

zed

tilin

g to

full

heig

ht in

all

bath

room

s an

d ki

tche

n.F

IRE

PR

EV

EN

TIO

N:

Any

roo

f spa

ce b

etw

een

gara

ge a

nd h

abita

ble

area

s sh

all b

e di

vide

dby

a w

all w

ith a

30

min

ute

fire

ratin

g.A

ny d

oor

betw

een

gara

ge a

nd h

abita

ble

area

s to

be

a so

lid ti

mbe

rco

re d

oor,

40m

m th

ick.

FLO

OR

& W

AT

ER

PR

OO

FIN

G:

Gro

und

floor

sla

b: 7

5mm

thic

k, 1

5MP

a co

ncre

te, p

erfe

ctly

leve

l, m

in.

150

abov

eN.G

.L. o

n co

mpa

cted

har

dcor

e m

in. 9

2% m

odifi

ed A

SH

TO

:25

mm

thic

k sc

reed

and

finis

hes

as in

dica

ted.

Str

uctu

ral c

oncr

ete

floor

s to

eng

. spe

c.F

OU

ND

AT

ION

S &

BR

ICK

WO

RK

:A

ll fo

unda

tions

to b

e 15

MP

a co

ncre

te a

t lea

st 2

00x6

00m

m, m

in. 2

00un

der

grou

nd le

vel o

r to

eng

. spe

c.B

ound

ary

wal

ls fo

unda

tion

mus

t not

enc

roac

h on

bou

ndar

y an

d w

alls

to b

e fin

ishe

d as

per

the

finis

hing

sch

edul

e.C

ourt

yard

and

scr

een

wal

ls to

be

at le

ast 1

.8m

hig

h ab

ove

N.G

.L.

Lint

els

to b

e su

ppor

ted

min

. 150

mm

for

open

ings

up

to 3

.0m

and

at

leas

t 220

mm

for

open

ings

up

to 4

,8m

.S

TA

IRS

AN

D B

ALU

ST

RA

DE

:S

tairs

to b

e 11

10m

m m

in. w

idth

, tre

ads

270m

m m

in.,

riser

s 18

6mm

max

. with

6m

m m

ax. d

evia

tion.

1m h

igh

balu

stra

de to

all

stai

rs a

ndba

lcon

ies.

Min

. hea

droo

m to

be

2.1m

mea

sure

d fr

om p

itchl

ine.

DR

AIN

AG

E:

Ant

i vac

trap

s to

all

first

floo

r w

aste

fitti

ngs.

Any

dra

in n

ot d

eepe

r th

an 3

50m

m u

nder

gro

und

leve

l to

be p

rote

cted

agai

nst l

oad.

Pro

vide

a c

hem

ical

tem

pora

ry to

ilet i

n po

sitio

n in

dica

ted:

keep

it in

a h

ygie

nic

and

odou

rless

sta

te.

All

drai

ns to

be

110Ø

PV

C m

in. f

all 1

:60.

Sta

cks

in d

ucts

to b

e ac

cess

ible

for

clea

ning

pur

pose

s.G

LAZ

ING

:G

lazi

ng o

f all

new

win

dow

s an

d do

ors

to b

e in

acc

orda

nce

with

par

t Nof

SA

BS

040

0O

bscu

re G

lazi

ng to

all

Bat

hroo

ms

& T

oile

ts

JOB

CLI

EN

T

ST

AN

D N

O.

DR

AW

ING

TIT

LE

JEN

NY

AS

PO

AS

DR

AW

NC

HE

CK

ED

DA

TE

SC

ALE

RE

F N

O

PR

OJE

CT

CO

DE

DR

AW

ING

NO

.R

EV

INT

AR

C

AR

CH

ITE

CT

'SS

IGN

AT

UR

E

EN

GIN

EE

R'S

SIG

NA

TU

RE

CLI

EN

T'S

SIG

NA

TU

RE

2012/11/19 02:12:38 PM

Ent

er a

ddre

ss h

ere

As

indi

cate

d

Z:\C

lient

File

s\Jo

nah,

Ric

hard

- a

djiri

ngan

o\w

ork

inpr

ogre

ss\U

NIT

TY

PE

B_0

1.rv

t

Uni

t B

Pho

enix

Vill

as

Sec

tions

1

Aut

hor

Che

cker

Issu

e D

ate

WD

4000

0808

NO REVISION DATE DRAWN

1 : 50

Section B1

1 : 50

Section A2

1 : 50

Section C3

1 : 100

Roof Plan4