Scope of WorkS The Grosvenor Mine is located 5 kilometres north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional Longwall Methods. The scope of the Grosvenor Project was to construct temporary office and workshop facilities, install 2 portal arches, backfill boxcuts and infrastructure, excavate by EPBM method 967m of 1:6 gradient Conveyor Drift and 1,258m of 1:8 gradient Transport Drift, development of 2,520m of pit bottom area roadways and development of 10,550m of the first longwall tailgate. conStruction ActivitieS / Establishment Office and Workshop Facilities / Install portal arches / Backfill boxcut infrastructure / Excavate drifts by EPBM method / Install permanent roadway in drifts / Excavate pit bottom roadways / Excavate first tailgate / Installation of Underground Conveyor Systems / Installation of Permanent Mine Services reSourceS uSed / Armco structures x 2 / 8.0m diameter Robbins EPB TBM x 1 / Jaicon MSV x 2 / 300 t/hr conveyor systems / Joy 12CM212 Continuous Miners x 2 / Joy 12SC42 Shuttle Cars x 2 / Drift runners x 2 client: Anglo American Metallurgical Coal project value: A$264.5 Million duration: 3 Years GroSvEnor MinE MorAnbAh, centrAl QueenSlAnd

GroSvEnor MinE MorAnbAh, centrAl QueenSlAnd · 2020. 7. 7. · arches, backfill boxcuts and infrastructure, excavate by EPBM method 967m of 1:6 gradient Conveyor Drift and 1,258m

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GroSvEnor MinE MorAnbAh, centrAl QueenSlAnd · 2020. 7. 7. · arches, backfill boxcuts and infrastructure, excavate by EPBM method 967m of 1:6 gradient Conveyor Drift and 1,258m

Scope of WorkSThe Grosvenor Mine is located 5 kilometres north of the township of Moranbah and was established to extract coal from the Goonyella Middle Seam by conventional Longwall Methods.

The scope of the Grosvenor Project was to construct temporary office and workshop facilities, install 2 portal arches, backfill boxcuts and infrastructure, excavate by EPBM method 967m of 1:6 gradient Conveyor Drift and 1,258m of 1:8 gradient Transport Drift, development of 2,520m of pit bottom area roadways and development of 10,550m of the first longwall tailgate.

conStruction ActivitieS

/ EstablishmentOfficeandWorkshopFacilities

/ Installportalarches

/ Backfillboxcutinfrastructure

/ ExcavatedriftsbyEPBMmethod

/ Installpermanentroadwayindrifts

/ Excavatepitbottomroadways

/ Excavatefirsttailgate

/ InstallationofUndergroundConveyorSystems

/ InstallationofPermanentMineServices

reSourceS uSed

/ Armcostructuresx2

/ 8.0mdiameterRobbinsEPBTBMx1

/ JaiconMSVx2

/ 300t/hrconveyorsystems

/ Joy12CM212ContinuousMinersx2

/ Joy12SC42ShuttleCarsx2

/ Driftrunnersx2

client: AngloAmericanMetallurgicalCoalproject value: A$264.5Millionduration: 3Years