GRINNELL COLLEGEHumanities & Social Studies Center

Owner and Design Team

➢ Grinnell College HSSC Project

Leadership Team:

➢ Anne Harris

➢ Jim Swartz

➢ Erik Simpson

➢ Keith Brouhle

➢ Rick Whitney

➢ Dave Robinson

➢ Larry Gleason

➢ Keith Archer

➢ Nancy Combs

➢ Christi Baker

➢ Jane Taylor

➢ EYP Architects

➢ Jennifer Amster

➢ Eric Kern

➢ Eric Petersen

➢ Alison Ledwith

➢ OPN Architects

➢ Bill Catrenich

➢ Pylar Eaton

McGough Project Team

➢ Dustin Schwake – Project Executive

➢Matt Schroeder – Senior Project Manager

➢ Ryan Drew– Senior Project Manager

➢ Jennifer Radniecki – Project Manager

➢ Alex Maass – Assistant Project Manager

➢ Amy Robinson – Lead Project Coordinator

➢ Chuck R. Carpenter – Senior Superintendent

➢ Greg Evans – Superintendent

➢ Ed Polito – General Foreman

Subcontractors

➢ 1st Interiors

➢ Advance Equipment Co.

➢ All-American Scaffold

➢ American Fence Co.

➢ American Structural Metals

➢ Architectural Wall Systems

➢ Baker Electric

➢ Baker Group

➢ Bartley Sales

➢ Blue Sky Cleaning

➢ Bolander

➢ C&C Demolition

➢ CGA

➢ D&N Fence

➢ DA Bunch

➢ Danny’s Construction

➢ Des Moines Marble

➢ Energy Control of Iowa

➢ Floors by Beckers

➢ Forman Ford

➢ Heartland Finishes

➢ J&M Roofing

➢ Johnson Specialty Sales

➢ KONE Elevator

➢ Larry’s Window Services

➢ Midwest Caulking

➢ Navetta

➢ PAC-VAN

➢ Pella Tree Service

➢ Peterson Contractors, Inc.

➢ Premier Edge

➢ Pro-Bel

➢ S&F Underground

➢ Seedorff Masonry

➢ Skold Companies

➢ Soil-Tek

➢ Summit Fire Protection

➢ Superior Painting

➢ Swanson & Youngdale

➢ Waldinger Mechanical

➢ Walsh Door & Security

➢ Western Specialty

➢ Wilkie Sanderson

➢ Wynn O. Jones

Current Highlights

➢Carnegie:

➢ Install of glass in storefront

➢ Install of lights and grilles in basement

➢Drywall and taping north rooms 1st/2nd floors

➢Trim install at windows

➢ARH:

➢OH MEP rough-ins – knuckle

➢Patching existing plaster in corridor

➢Painting perimeter offices 2nd floor

➢OH MEP rough-ins 2nd floor

➢Framing knuckle 2nd/3rd floor

➢Drywall 3rd floor

ARH – multipurpose room – looking west

ARH level 1 – plaster renovation at new doors, windows installed

ARH – auditorium – looking west

ARH level 3 – reading room

Carnegie basement – south end – ceiling grid installed

Carnegie – level 1 – monument stairs

Level 1 – entrance into HSSC from Carnegie

Carnegie – faculty lounge – GDCs staged

Carnegie – level 2 – main corridor finishes

Carnegie – bathroom sink/toilet installed

Upcoming Highlights

➢Carnegie:

➢ Install flooring underlayment

➢ Install glass in storefront

➢Paint window trim

➢ Install lighting in ceiling grid

➢ARH:

➢Paint office window trim

➢Layout ceiling grid 1st floor

➢Finishing drywall 1st floor knuckle

➢Frame bathroom ceilings 2nd floor

➢Complete OH piping at 2nd floor knuckle

➢Elevator install