98
13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG Ainring, April 08-11.2013 1 GRIMM Aerosol Technik Environmental Approval Situation by Hans GRIMM

GRIMM Aerosol Technik Environmental Approval Situation approval situat… · GRIMM Aerosol Technik Environmental Approval Situation ... Motivation for new Measurement design Instrument

  • Upload
    vocong

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

1

GRIMM Aerosol Technik

Environmental Approval Situation

by Hans GRIMM

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

2

Motivation for new Measurement design

Instrument calibration

PM 10 approval

PM2.5 approval

Additional approvals

Two in one approval

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

3

Motivation for new Measurement

Instrument selcection and set-up

PM 10 approval

PM2.5 approval

Additional approvals

Two in one approval

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

4

Requirements for a new

Methode for PM Monitoring

Particles Sizing Capabilities

Simultaneous 3 PM values

Low concentration monitoring

Fast 1 min monitoring

No loss of Semi Volatiles

Elimination of Radioactive Source

Insensitive to vibrations

Reduction of consumables

Reduction of Service

Remote Maintenance

Mobility and simplicity

All-in-one solution

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

5 5

TSP

WRAC

(Wilson and Suh, 1996)

Particle Size in (µm)

TSP

Hi-vol

PM10 PM2.5

PM1

Concept via PM SIZE DISTRIBUTION

DIFFUSION SEDIMENTATION

GRIMM AEROSOL SPECTROMETER RANGE

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

6

1 Instrument for four functions

PM-10 and PM-2.5 as Standard

PM-1 and TC als Option

Particle Size distribution in >30 Sizes

1 Instrument only to Service so

much lower service cost and with

a Data logger aslo remote control

1 unit and nearly no consumables

lower cost and lower electricity

Configuration requirements for a new

Methode for PM Monitoring

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

7

GRIMM Two Dust Monitor Solutions

The rack solution

model EDM 180

(left)

-----------------------

The stand-alone

solution EDM 365

(right)

Production in Germany in accordance to ISO 9001

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

8

Motivation for Measurement design

Instrument Calibration

PM 10 approval

PM2.5 approval

Additional approvals

Two in one approval

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

9

The core is the

Spectrometer

GRIMM-EDM 180 Configuration

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

10

Calibration with diff. Particle Sizes (by use of Latex sheres)

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

11

Calibration of MASS Particle Sizes (by use of Dolomite)

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

12

Werkskalibrierung bei Raumluft

System Calibration to Normal Indoor Air

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

13

System Validation to Outdoor Air (1)

At the roof of the factory test site

with one EDM 180 and one EDM 365 test unit.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

14

Instrument intercomparison to Outdoor Air (2)

Inside the factory test site

wich nine EDM 180 units running in parallel.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

15

Motivation for Measurement

Instrument selcection and set-up

PM 10 Approval

PM2.5 approval

Additional approvals

Two in one approval

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

16 16

GERMAN test sites and conditions

for EN 12341 Continuous Dust

Monitors for PM 10

A: Karlsruhe

B: Stuttgart

C: Feldberg

D: Heidelberg

The EC test requirements for PM-10 (EN

12341) where written 20 years after the US-

EPA specifications and do not require anymore

the US EPA cyclone for PM sampling, but

many more laboratory and field test inter-

comparisons.

A detailed German test report is available on

request.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

17 17

A: Karlsruhe

B: Stuttgart

C: Feldberg

D: Heidelberg

Reference systems for PM10

Low-Volume

Sampler LECKEL

SEQ 47/50

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

18

PM10 – Germany for 106 days

Winter time comparison between Grimm and grafimatrical reference

system Leckl filter collector

Correlation 0,974 and data quality >95%

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

19

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

20

Belgium PM 10 & PM2.5

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

21

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

22

Belgium PM 2.5

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

23

2006 – European EN12341 – PM10

• Official certification on the 8th of April 2006

• by the German UMEG

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

24

Motivation for Measurement

Instrument selcection and set-up

PM 10 approval

PM2.5 Approval

Additional approvals

Two in one approval

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

25

US EPA PM 2.5 Class III FEM Approval

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

26 26

USA Test sites and conditions

for Class III Continuous Dust Monitors for PM2.5

A: Bakersfield, CA

B: Denver, CO

C: St-Louis, MI

D. New Haven, CT

A: Winter & Summer

B & C: Winter Only

D: Summer Only

And 3 candidate

and 3 reference

units of the same

type and model.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

27 27

Links to the respective results for PM2.5

Bakersfield, CA

Denver, CO

St-Louis, MI

New Haven, CT

APPROVED by U.S. EPA

As a Class III Equivalent Method Designation

for the measurement of PM 2.5

Automated Equivalent Method: EQPM-0311-195

Federal Register: Vol. 76, page 15974, 03/22/2011

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

28 28

US-EPA field test in 2008/9 for MP2.5

* Finished fall 2009

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

29

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

30

EU field test in 2008 for MP2.5 (for 116 days!)

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

31 31

Zeitreihen von PM2.5 und PM10

In USA for PM 2.5 Exposure Research Laboratory, Reference and Equivalent

Method Program (MD-D205-03), U. S. Environmental

Protection Agency, Research Triangle Park, North

Carolina 27711 for an equivalent method determination

under 40 CFR Part 53 on a candidate method based on the

Grimm Technologies, EDM 180. [§53.4(a)]

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

32

2006 - EN12341 – PM10

* Official publicated certification on the 8th of April 2006 by the German UMEG

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

33

Motivation for Measurement

Instrument selcection and set-up

PM 10 approval

PM2.5 approval

Two-in-one approval

Additional approvals

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

34 34

Two-in-one unit EC Approval

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

35 35

Herby is officially confirmed by the

European Union that with one EDM 180

of GRIMM Aerosol device the same service

is provided as if the user gets with

one PM 10 and one MP2.5 instrument.

Two-in-one unit EC Approval

The EU ensure that, when it is granted

at the tender by simultaneous demand

for a PM 10 and PM 2.5, a

single device by GRIMM is sufficient

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

36

Motivation for Measurement

Instrument selcection and set-up

PM 10 approval

PM2.5 approval

Two in one approval

Additional approvals

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

37

Guidance for the Demonstration of Equivalence

GUIDE TO THE

DEMONSTRATION OF EQUIVALENCE

OF AMBIENT AIR MONITORING METHODS

• Since the 1st of January 2010

• Section 9 -> PM10 & PM2.5 AMS

• New standard for field tests (4 data sets

– 2 sites, min & max concentration of

dust)

• Quality assurance program

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

38

EDM180 Gleichlauf

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

39

PM2.5 – Netherland

Raw data without any correction – 30days,

correlation to reference R² = 0,95, data quality 100%

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

40

PM2.5 – Austria

Raw data without any correction – 34days,

correlation to reference R² = 0,93, data quality 98%

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

41

Comparison PM 10 Grimm – TEOM FDMS

in Netherland by the DCMR

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

42

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

43

2011 - Russia

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

44

Motivation for Measurement

Instrument selcection and set-up

PM 10 approval

PM2.5 approval

Additional approval as Two in one unit

Additional improvements

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

45

Additional Instrument Benefice

All EDM units can be upgraded: (at any later time)

Mass Fraction: ……….. PM1

Total Particle Count as .. TC

Particle Size distribution in 31 Size Channels

--------------------------------------------------

Additional data logger for remote Data transfer

Additional …………………Nano Sensors

Additional …………………SVC Sampling system

Meterological Sensors for Temp, rH, wind speed +direction

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

46

New: Firmware „S“ Version

Permits preventive Maintenance.....

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

47

In Europe. Mobile calibration busses

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

48 48

System Integration

of GRIMM

ENVIRONcheck

19” Stationary Dust Monitor

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

49

Many thanks for your attention

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

50

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

51

Hans GRIMM

GRIMM Environmental Field data correlations

EDM `s improvements and world data basis

Situation

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

52

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

SVC Upgrade

World data base

International comparisons

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

53

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

SVC Upgrade

World data base

International comparisons

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

54

All GRIMM Instruments are Spectrometer, so each:

Gives all the PM`s at the same time

Or the Mass distribution

Or the Size distribution

Or the SVC differentiation

And Gravimetric correlation

all this is based on the atmospheric aerosol composition

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

55 55

TSP

WRAC

(Wilson and Suh, 1996)

Particle Size in (µm)

TSP

Hi-vol

PM10 PM2.5

PM1

PM SIZE DISTRIBUTION

By mass distribution correlation

GRIMM AEROSOL SPECTROMETER RANGE

DIFFUSION SEDIMENTATION

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

56

GRIMM- Type of instruments used for comparasion

Most tests are made

with the (left) EDM 180

And right) EDM 365

But we also made with

the EDM 164 (top)

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

57

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

SVC Upgrade

World data base

International comparisons

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

58

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

59

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

World data base

International comparisons

SVC Upgrade

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

60

GRIMM Aerosol Technik

Environmental Approval Situation

seeE2 presentation April 18th by H. GRIMM

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

61

Vergleichsmessungen EPA in USA

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

62

PM2.5-Vergleiche in Denver

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

63

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

SVC Upgrade

World data base

International comparisons

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

64

Air Pollution/ Typical Sources

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

65

Why Semi-Volatile-Compounds Monitoring?

1. SVC`s have a significant contribution to mass

concentrations.

2. The health effect of SVC`s substances is probably

different from the health effect of non volatile solid

particles.

3. The use of DPFs reduces the emissions of soot

particles, but increases the concentration of precursor

gases for semi-volatile particles.

Therefore, it is necessary to make a quantitative

measurement of SVC.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

66

Messungen mit dem

EDM180

Test site in Melnitz, Germany

Three diff. PM HV Ref units from EU ans 1 US sampler

And in background GC, MS and Grimm SVC test units

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

67

Daten vom E-SVC 265

E-SVC Heater: 100°C, Intervall Ein / Aus

0

5

10

15

20

25

30

35

40

07

:13

07

:38

08

:03

08

:28

08

:53

09

:18

09

:43

10

:08

10

:33

10

:58

11

:23

11

:48

12

:13

12

:38

13

:03

13

:28

13

:53

14

:18

14

:43

15

:08

15

:33

µg

/m³

0

20

40

60

80

100

120

°C

PM-10

PM-2.5

Heater

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

68

Daily Semi-Volatile Concentrations

0

10

20

30

40

50

60

1 3 5 7 9

11

13

15

17

19

21

23

25

27

29

31

33

35

37

39

41

43

45

47

49

51

53

55

57

59

Days of Februar and March

µg

/m3

GRIMM (feuchtereguliert)

PM10 originale Daten

GRIMM (95 °C) PM10

originale Daten

Simply heated vs none heated

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

69

Daily Semi-Volatile Concentrations

0

10

20

30

40

50

60

1 3 5 7 9

11

13

15

17

19

21

23

25

27

29

31

33

35

37

39

41

43

45

47

49

51

53

55

57

59

Days of Februar and March

µg

/m3

GRIMM (feuchtereguliert)PM10 originale Daten

NH4 µg/m3 PM10

GRIMM (95 °C) PM10 originaleDaten

Unheated data vs heated and the NH4 contribution

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

70

Daily Semi-Volatile Concentrations

0

10

20

30

40

50

60

1 3 5 7 9

11

13

15

17

19

21

23

25

27

29

31

33

35

37

39

41

43

45

47

49

51

53

55

57

59

Days of Februar and March

µg

/m3

GRIMM (feuchtereguliert) PM10 originaleDatenNO3 µg/m3 PM10

NH4 µg/m3 PM10

GRIMM (95 °C) PM10 originale Daten

Unheated data vs heated and NO3 and NH4 contribution

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

71

Measurements of PM2.5 and SVC`s

Loss of Nitrates (semi volatile)

PM2.5, NO3, SO4, NH4

PM2.5, EC, OM

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

72

EDM 365-SVC

(shown) or

EDM180-SVC

Sampling Pipe with two different inlets

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

73

GRIMM EDM-180/365 SVC

The EDM 180/365-SVC uses a heated

and one not heated sample pipe.

This concept works with

• TSP, PM10, PM2.5, PM1.0 and

• and also for particle sizing

The Temperature of the heated pipe is selectable

from ambient to 300°C.

In addition the dehumification system with the

Nafion dryer is used as well

A timed valve switches between the two sampling

pips

The difference are the SVC`s

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

74

SVC –Measurement results GRIMM #365-SVC

Particle Mass Heated pipe

Measurement with Nafion

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

75

Particle counts Heated pipe

Nafion

SVC –Measurement results GRIMM #365-SVC

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

76

SVC-Measurement results shown with new software

Particle number

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

77

Particle Mass

SVC-Measurement results shown with new software

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

78

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

SVC Upgrade

World data base

International comparisons

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

79

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

80

Every user or

dealer/etc.

can register

on this page Data remain

Confidential

or only shown

for service….

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

81

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

82

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

83

Motivation for Measurement Comparisons

Factory Calibration

Field Calibration

World data base

International comparisons

SVC Upgrade

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

84

Examples of >20 countries

with EDM180 tests

Deutschland Bosnien

Belgien Kroatien

Österreich Italien

England Norwegen

Korea Spanien

Tschechien Ungarn

China Australien

Südafrika Kanada

Holland Mongolei

Türkei Polen

Ungarn U.S.A.

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

85

Customer correlation Examples between

different EDM instruments in the field

1. EDM 164 vs EDM 365

2. EDM 365 vs EDM 180

3. EDM 107 vs EDM 180

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

86

1. SVC Measurements of EDM 365

as PM-10 vs EDM 164 in Malaysia

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

87

1. SVC Measurements of EDM 365

as PM 2.5 vs. EDM 164 in Malaysia

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

88

1. Correlation of EDM 365 vs

EDM 164 in Malaysia

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

89

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

90

Measurements of EDM 180 in Germany

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

91

Measurements of EDM 180 in Itiaque, Chile

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

92

Measurements of EDM 180 in Tibet, China

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

93

Station in 16.000ft on the K2

Measurements of EDM 180 in India

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

94

Motivation for Measurement Comparisons

International comparisons

Ads

Factory Calibration

Field Calibration

Conclusions

Service and preventive maintenance

Agenda

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

95

Werkskalibrierung

a. Nach Korngrösse

b. Nach Masse

c. Validierung mit

Raumluft und

Aussenluft

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

96

New: Firmware „S“ Version

Permits preventive Maintenance.....

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

97

Mobile Quality control by user

leak test

zero test

flow control

with GRIMM support kit

13th Grimm Dealer Meeting © Grimm Aerosol Technik GmbH & Co. KG

Ainring, April 08-11.2013

98

Vielen Dank für Ihre Aufmerksamkeit