Work package 1Grid policy outreach

Progress to date

■ Identifying and networking with contacts from related projects including e-IRG, EGI and OGF

■ Represented GridTalk at OGF23 and the EC eConcertation meeting in Barcelona

■Getting up to speed with policy documents, issues, etc

■Drafting first policy-related article for iSGTW

Page 3: GridTalk PMB

www.gridtalk-project.eu

Work package 2GridCafé

Progress to date

■ Editing and updating text from the GridCafé website; added links to iSGTW and GridCast

■ Prepared and chose hardware for the OGF23 GridCast, created websites and blogging team; filmed, edited and uploaded 14 podcasts with more to come

■Uploaded all the videos to Youtube and Google video websites

■ Promoting GridGuide to grid projects and working with BELIEF to coordinate with their “myspace” project

Page 4: GridTalk PMB

www.gridtalk-project.eu

Progress to date

■ Published 4 issues iSGTW

■Delivered monthly report on readership statistics, editorial content to board & PMB

■ Designed & sent readership survey – 169 responses so far

■ Coordinated workload, duties, with co-editor in USA

■Mastering Photoshop for web and HTML program, with goal of streamlining it with Xenomedia

Work package 3iSGTW

Page 5: GridTalk PMB

www.gridtalk-project.eu

Work package 4Management

Progress to date

■ Recruited Cristy Burne, Dan Drollette and Corentin Chevalier

■ Holding weekly team meetings by phone

■ GA and Form As signed by all parties – awaiting funds from EC (deadline 25 June)

■ CA in final draft

■ Produced GridTalk logo, website, .ppt template, poster and two media releases

■ Arranged with EGEE to run a feedback session at EGEE3

Page 6: GridTalk PMB

www.gridtalk-project.eu

GridCast at OGF23Metrics and lessons

Metric Past events Actual to date

Number of bloggers 6, 8, 5 10

Number of podcasts 8, 15, 0 14 so far with more to come

Unique visitors to GridCast website

N/A, 662, 550 in the GridCast month

309 as of Tuesday morning

Countries to visit GridCast website

N/A, 47, 46 in the GridCast month

31 as of Tuesday morning

Unique visitors to blog - 464 as of Tuesday morning

Number of blog posts 24, 5,17 51 so far

Media coverage - 4 non-project clips, plus at least four video sites, including YouTube, and coverage on multiple grid project sites

■ Articles in iSGTW and adding to Google News work well

■ Need formal agreement with host organisation on publicity, and should produce posters and flyers

Page 7: GridTalk PMB

www.gridtalk-project.eu

Forthcoming deliverables(next 3 months)

Month 2 (June)

■ D1.2 Policy article CJB is drafting based on OGF23. Draft for circulation next week. Request from EGEE for summary of cloud computing paper as next policy article.

■ M2.1 GridCast Successfully produced at OGF23: see www.gridcast.org

■ D4.1 QA Guide Draft in production, to be circulated to the PMB next week

Page 8: GridTalk PMB

www.gridtalk-project.eu

Forthcoming deliverables(next 3 months) II

Month 3 (July)

■ D1.1 Policy engagement strategy First draft will be produced by start of July, for circulation to PMB mid-July. CJB making contacts and canvassing suggestions.

■ D3.2 iSGTW survey Was sent out yesterday. 2 weeks for replies: draft survey report due early July.

■ D4.2 Dissemination material for EC Being collated by CJB. Includes presentation, poster, media releases, articles.

Page 9: GridTalk PMB

www.gridtalk-project.eu

Forthcoming deliverables(next 3 months) III

Month 4 (August)

■ D3.3 iSGTW marketing package/ M3.1 iSGTW marketing material produced and distributed. Outlining marketing strategy; preliminary consultation about posters & other printed matter with APO. First draft by end of July.

■ M2.2 New design for GridCafe website agreed APO and CC developing new look and feel for website. 4 design ideas for circulation by end July.

■ M4.1 PMB meeting Met by today’s meeting

Page 10: GridTalk PMB

www.gridtalk-project.eu

Deliverables and milestones tracking

Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 WP1 Grid policy reporting

T1.1 Grid policy articles and reports

D1.2 On-

going

D1.3 M1.2

D1.4 M1.2

T1.2 Engaging policy makers

D1.1 M1.1 M1.1

WP2 GridCafé

T2.1 GridCafé M2.2 D2.1 M2.3

T2.2 Gridcasts M2.1 M2.1 M2.1 M2.1 M2.1 D2.5 M2.1

T2.3 GridMap M2.4 D2.2 D2.3 D2.4 M2.5

WP3 iSGTW

T3.1 iSGTW weekly newletter

D3.1 On-

going D3.2

D3.3 M3.1

D3.2 M3.4 D3.2 D3.2

T3.2 Resource section M3.2 M3.3 D3.4 M3.5 WP4 Management

T4.1 Management M4.1 D4.1 D4.2 M4.1 M4.1 D4.2 M4.1 D4.3 D4.4 M4.1 D4.2 M4.1 M4.1 D4.2 M4.1 D4.3 D4.5 D4.6

Complete

In preparationOverdue