Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
GridPP Status ReportGridPP Status Report
Executive Summary Executive Summary NewsNews ““Unfunded” EU Unfunded” EU
DataGrid PostsDataGrid Posts Shadow Project Shadow Project
Management Board Management Board Management Management
StructureStructure
Major DeliverablesMajor Deliverables Information Flow Information Flow GridPP TeamGridPP Team SummarySummary 1st GridPP Collab. 1st GridPP Collab.
Meeting - AgendaMeeting - Agenda
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Executive SummaryExecutive Summary
£40M 3-Year Programme£40M 3-Year Programme LHC Computing ChallengeLHC Computing Challenge = Grid Technology= Grid Technology Five Components:Five Components:
Foundation Production Middleware Exploitation Value-added Exploitation
Emphasis on Grid Service Emphasis on Grid Service and Core Middlewareand Core Middleware
UK computing strength UK computing strength within CERNwithin CERN
Integrated with EU Integrated with EU DataGrid, PPDG and DataGrid, PPDG and GrPhyNGrPhyN
Facilities at CERN, RAL Facilities at CERN, RAL and up to four UK Tier-2 and up to four UK Tier-2 sitessites
Centres = DisseminationCentres = Dissemination LHC developments LHC developments
integrated into current integrated into current programme programme (BaBar,CDF,D0)(BaBar,CDF,D0)
Robust Management Robust Management StructureStructure
Deliverables in March Deliverables in March 2002, 2003, 20042002, 2003, 2004
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
NewsNews
2/4/12/4/1 GridPP document submitted GridPP document submitted - - large effort by many people: large effort by many people:
http://ppewww.ph.gla.ac.uk/~doyle/GridPP/GridPP.doc (.htm)
5/4/15/4/1 PPARC Ad-Hoc Committee metPPARC Ad-Hoc Committee met allocated 6 EU DataGrid posts (Bristol, Glasgow, Imperial,
Liverpool, Manchester, UCL)
…….. .. and disbanded => Internal Discussions and disbanded => Internal Discussions GridPP approved to internally determine postsGridPP approved to internally determine posts
3/5/13/5/1 Shadow Project Management Board ConstitutedShadow Project Management Board Constituted Goal: allocate 9 remaining EU DataGrid posts
Internal Tenders due by Monday 21st May
24/5/124/5/1 1st GridPP Meeting - late bookings? 1st GridPP Meeting - late bookings? contact [email protected] [email protected]
30/5/130/5/1 1st PPARC e-science Steering Meeting1st PPARC e-science Steering Meeting
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
““Unfunded” EU DataGrid PostsUnfunded” EU DataGrid Posts
AREAAREA RA Allocation RA Allocation
Data Management Data Management 0.50.5
Monitoring Services Monitoring Services 2.02.0
Testbed Testbed 2.0 2.0
Mass Storage Mass Storage 1.01.0
HEP Applications HEP Applications 3.5 3.5
Total Total 9.09.0
Contact: Robin MiddletonContact: Robin Middleton Contacts: Contacts:
Steve Lloyd (ATLAS), Nick Brook (LHCb), Steve Lloyd (ATLAS), Nick Brook (LHCb), Dave Dave Britton (CMS), Ian Bloodworth (ALICE).Britton (CMS), Ian Bloodworth (ALICE).
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Shadow Project Management BoardShadow Project Management Board
Goal: allocate 9 remaining EU DataGrid postsGoal: allocate 9 remaining EU DataGrid posts Interim Project Leader Tony Doyle Interim Deputy Project Leader John Gordon Interim Chair of the CB Steve Lloyd Interim Chair of the TB Robin Middleton Experiments Representative Dave Britton Experiments Representative Nick Brook CERN Liaison Les Robertson e-Science Director (in Att) Neil Geddes
Structure reflects proposed PMB constitution (takes place Structure reflects proposed PMB constitution (takes place Peer Review Selection Committee in final structure)Peer Review Selection Committee in final structure)
Final PMB structure will be determined starting from Final PMB structure will be determined starting from election of Collaboration Board chair election of Collaboration Board chair
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Management StructureManagement Structure
= Basis for TechnicalInformation Flow
= Basis for TechnicalInformation Flow
Integrate this meeting
into this structure
Integrate this meeting
into this structure
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Major DeliverablesMajor Deliverables
Prototype IPrototype I Mar 2002Mar 2002 Performance and scalability testing of components of the
computing fabric (clusters, disk storage, mass storage system, system installation, system monitoring) using straightforward physics applications. Testing of the job scheduling and data replication software from the first DataGrid release (M9).
Prototype IIPrototype II Mar 2003Mar 2003 Prototyping of the integrated local computing fabric, with
emphasis on scaling, reliability and resilience to errors. Performance testing of LHC applications. Distributed HEP and other science application models using the second DataGrid release (M21).
Prototype IIIPrototype III Mar 2004Mar 2004 Full scale testing of the LHC computing model with fabric
management and Grid management software for Tier-0 and Tier-1 centres, with some Tier-2 components. This will use the software from the final DataGrid release (M33).
M9 important:working demonstrators
(public spending review)need to ensure key areas are visible
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Information FlowInformation Flow
announcements via:
web communication via:
http://www.hep.grid.ac.uk/
We can improve here….
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
GridPP TeamGridPP Team
Dissemination/ Collaborations (Roger Jones)
Software Experiments TestbedSupport (Nick Brook) (Dave Newbold)(Andrew McNab)
Workload Information Services Monitoring Mass StorageManagement and Services and(Dave Colling) Data Management (Robin Middleton) Fabric Management
(Alex Martin) (Themis Bowcock)
Security Networking (Dave Kelsey) (Pete Clarke)
CERN (Les Robertson)
= Basis for Technical Information Flow? = Basis for Technical Information Flow?
...Technical Task Force( = 1 month)
...Technical Task Force( = 1 month)
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
SummarySummary
Learning to crawl…Learning to crawl… … … quicklyquickly Immediate Priority: Immediate Priority:
allocating EU DataGrid allocating EU DataGrid postsposts timescale: 21st May scope: 1 page short technical input
Medium Term (M9): Medium Term (M9): important to translate important to translate into demonstratorsinto demonstrators
Medium Term Medium Term (M9, in parallel):(M9, in parallel):
Implementation of final Implementation of final GridPP structureGridPP structure
Definition of scope of Definition of scope of Collaboration… Collaboration…
First steps…First steps… 1st Collaboration Meeting1st Collaboration Meeting
All Welcome! Contact Cosener’s House [email protected] quote “GridPP”
Tony Doyle - University of Glasgow
GRIDIID
UKParticlePhysics
Agenda (10/5/01)Agenda (10/5/01)
1st GridPP Collaboration Meeting - Cosener's House: May 24/25th1st GridPP Collaboration Meeting - Cosener's House: May 24/25th
24th May24th May
10:30-11:00 Arrive (Coffee)10:30-11:00 Arrive (Coffee)
Scope, Aims and Background to the Meeting [Chair: Paul Jeffreys]Scope, Aims and Background to the Meeting [Chair: Paul Jeffreys]
11:00-11:30 Introduction - Steve Lloyd11:00-11:30 Introduction - Steve Lloyd
11:30-12:00 Current Project Structure - Tony Doyle11:30-12:00 Current Project Structure - Tony Doyle
12:00-12:30 Current Manpower Allocations - Dave Britton12:00-12:30 Current Manpower Allocations - Dave Britton
12:30-1:30 Lunch12:30-1:30 Lunch
Middleware I "Midfield" [Chair: Roger Barlow]Middleware I "Midfield" [Chair: Roger Barlow]
1:30-1:45 Architecture Task Force - Steve Fisher1:30-1:45 Architecture Task Force - Steve Fisher
1:45-2:00 A: Workload Management - Steve Fisher1:45-2:00 A: Workload Management - Steve Fisher
(PP Dave Colling)(PP Dave Colling)
2:00-2:30 B: Information Services and Data Management - Alex Martin2:00-2:30 B: Information Services and Data Management - Alex Martin
2:30-3:00 C: Monitoring Services - Robin Middleton2:30-3:00 C: Monitoring Services - Robin Middleton
3:00-3:30 D: Fabric Management and Mass Storage - John Gordon3:00-3:30 D: Fabric Management and Mass Storage - John Gordon
(PP Themis Bowcock)(PP Themis Bowcock)
3:30-4:00 Tea3:30-4:00 Tea
Middleware II "Defence" [Chair: Fabrizio Gagliardi]Middleware II "Defence" [Chair: Fabrizio Gagliardi]
4:00-4:30 E: Security - Dave Kelsey4:00-4:30 E: Security - Dave Kelsey
4:30-5:00 F: Networking - Pete Clarke4:30-5:00 F: Networking - Pete Clarke
5:00-5:30 K: CERN - Tony Cass5:00-5:30 K: CERN - Tony Cass
(PP Les Robertson)(PP Les Robertson)
5:30-6:00 Discussion5:30-6:00 Discussion
6:00-7:00 Dinner6:00-7:00 Dinner
Experiment Objectives and Collaborations "Attack" [Chair: Pete Watkins]Experiment Objectives and Collaborations "Attack" [Chair: Pete Watkins]
7:00-7:30 G: Prototype Grid - Dave Newbold7:00-7:30 G: Prototype Grid - Dave Newbold
7:30-8:00 H: Software Support - Andrew McNab7:30-8:00 H: Software Support - Andrew McNab
8:00-8:30 I: Experiment Objectives - Nick Brook8:00-8:30 I: Experiment Objectives - Nick Brook
8:30-9:00 J: Dissemination - Roger Jones8:30-9:00 J: Dissemination - Roger Jones
25th May25th May
Open Issues DiscussionOpen Issues Discussion
9:00-10:00 Technical Issues Discussion Leader - John Gordon9:00-10:00 Technical Issues Discussion Leader - John Gordon
10:00-11:00 Experiment/Collab. Issues: Discussion Leader - Andy Parker10:00-11:00 Experiment/Collab. Issues: Discussion Leader - Andy Parker
11:00-11:30 Coffee11:00-11:30 Coffee
11:30-12:30 Sub-group Discussions11:30-12:30 Sub-group Discussions
(Probably 4 groups - to be determined)(Probably 4 groups - to be determined)
1. Attack1. Attack
2. Midfield2. Midfield
3. Defence3. Defence
4. Shadow Project Management Board4. Shadow Project Management Board
12:30-1:30 Lunch12:30-1:30 Lunch
Preparations for E-science CommittteePreparations for E-science Committtee
1:30-2:00 PPARC perspective - Neil Geddes1:30-2:00 PPARC perspective - Neil Geddes
The e-science committee meets in the following week (30-31/5/01). We haveThe e-science committee meets in the following week (30-31/5/01). We have
been asked to present the GridPP proposal to the committee. An agenda forbeen asked to present the GridPP proposal to the committee. An agenda for
this section will be drawn up once this becomes clearer...this section will be drawn up once this becomes clearer...
3:00-3:30 Round Up Discussion on Future Plans: Discussion Leader?3:00-3:30 Round Up Discussion on Future Plans: Discussion Leader?
3:30-4:00 Depart (Tea)3:30-4:00 Depart (Tea)