Tony Doyle - University of Glasgow GRID I I D UK Particle Physics GridPP Status Report GridPP Status Report Executive Summary Executive Summary News News Unfunded” EU Unfunded” EU DataGrid Posts DataGrid Posts Shadow Project Shadow Project Management Board Management Board Management Management Structure Structure Major Deliverables Major Deliverables Information Flow Information Flow GridPP Team GridPP Team Summary Summary 1st GridPP Collab. 1st GridPP Collab. Meeting - Agenda Meeting - Agenda

GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report Executive Summary News “Unfunded” EU DataGrid Posts Shadow

Embed Size (px)

Citation preview

Page 1: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

GridPP Status ReportGridPP Status Report

Executive Summary Executive Summary NewsNews ““Unfunded” EU Unfunded” EU

DataGrid PostsDataGrid Posts Shadow Project Shadow Project

Management Board Management Board Management Management

StructureStructure

Major DeliverablesMajor Deliverables Information Flow Information Flow GridPP TeamGridPP Team SummarySummary 1st GridPP Collab. 1st GridPP Collab.

Meeting - AgendaMeeting - Agenda

Page 2: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Executive SummaryExecutive Summary

£40M 3-Year Programme£40M 3-Year Programme LHC Computing ChallengeLHC Computing Challenge = Grid Technology= Grid Technology Five Components:Five Components:

Foundation Production Middleware Exploitation Value-added Exploitation

Emphasis on Grid Service Emphasis on Grid Service and Core Middlewareand Core Middleware

UK computing strength UK computing strength within CERNwithin CERN

Integrated with EU Integrated with EU DataGrid, PPDG and DataGrid, PPDG and GrPhyNGrPhyN

Facilities at CERN, RAL Facilities at CERN, RAL and up to four UK Tier-2 and up to four UK Tier-2 sitessites

Centres = DisseminationCentres = Dissemination LHC developments LHC developments

integrated into current integrated into current programme programme (BaBar,CDF,D0)(BaBar,CDF,D0)

Robust Management Robust Management StructureStructure

Deliverables in March Deliverables in March 2002, 2003, 20042002, 2003, 2004

Page 3: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

NewsNews

2/4/12/4/1 GridPP document submitted GridPP document submitted - - large effort by many people: large effort by many people:

http://ppewww.ph.gla.ac.uk/~doyle/GridPP/GridPP.doc (.htm)

5/4/15/4/1 PPARC Ad-Hoc Committee metPPARC Ad-Hoc Committee met allocated 6 EU DataGrid posts (Bristol, Glasgow, Imperial,

Liverpool, Manchester, UCL)

…….. .. and disbanded => Internal Discussions and disbanded => Internal Discussions GridPP approved to internally determine postsGridPP approved to internally determine posts

3/5/13/5/1 Shadow Project Management Board ConstitutedShadow Project Management Board Constituted Goal: allocate 9 remaining EU DataGrid posts

Internal Tenders due by Monday 21st May

24/5/124/5/1 1st GridPP Meeting - late bookings? 1st GridPP Meeting - late bookings? contact [email protected] [email protected]

30/5/130/5/1 1st PPARC e-science Steering Meeting1st PPARC e-science Steering Meeting

Page 4: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

““Unfunded” EU DataGrid PostsUnfunded” EU DataGrid Posts

AREAAREA RA Allocation RA Allocation

Data Management Data Management 0.50.5

Monitoring Services Monitoring Services 2.02.0

Testbed Testbed 2.0 2.0

Mass Storage Mass Storage 1.01.0

HEP Applications HEP Applications 3.5 3.5

Total Total 9.09.0

Contact: Robin MiddletonContact: Robin Middleton Contacts: Contacts:

Steve Lloyd (ATLAS), Nick Brook (LHCb), Steve Lloyd (ATLAS), Nick Brook (LHCb), Dave Dave Britton (CMS), Ian Bloodworth (ALICE).Britton (CMS), Ian Bloodworth (ALICE).

Page 5: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Shadow Project Management BoardShadow Project Management Board

Goal: allocate 9 remaining EU DataGrid postsGoal: allocate 9 remaining EU DataGrid posts Interim Project Leader Tony Doyle Interim Deputy Project Leader John Gordon Interim Chair of the CB Steve Lloyd Interim Chair of the TB Robin Middleton Experiments Representative Dave Britton Experiments Representative Nick Brook CERN Liaison Les Robertson e-Science Director (in Att) Neil Geddes

Structure reflects proposed PMB constitution (takes place Structure reflects proposed PMB constitution (takes place Peer Review Selection Committee in final structure)Peer Review Selection Committee in final structure)

Final PMB structure will be determined starting from Final PMB structure will be determined starting from election of Collaboration Board chair election of Collaboration Board chair

Page 6: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Management StructureManagement Structure

= Basis for TechnicalInformation Flow

= Basis for TechnicalInformation Flow

Integrate this meeting

into this structure

Integrate this meeting

into this structure

Page 7: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Major DeliverablesMajor Deliverables

Prototype IPrototype I Mar 2002Mar 2002 Performance and scalability testing of components of the

computing fabric (clusters, disk storage, mass storage system, system installation, system monitoring) using straightforward physics applications. Testing of the job scheduling and data replication software from the first DataGrid release (M9).

Prototype IIPrototype II Mar 2003Mar 2003 Prototyping of the integrated local computing fabric, with

emphasis on scaling, reliability and resilience to errors. Performance testing of LHC applications. Distributed HEP and other science application models using the second DataGrid release (M21).

Prototype IIIPrototype III Mar 2004Mar 2004 Full scale testing of the LHC computing model with fabric

management and Grid management software for Tier-0 and Tier-1 centres, with some Tier-2 components. This will use the software from the final DataGrid release (M33).

M9 important:working demonstrators

(public spending review)need to ensure key areas are visible

Page 8: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Information FlowInformation Flow

announcements via:

[email protected]

web communication via:

http://www.hep.grid.ac.uk/

We can improve here….

Page 9: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

GridPP TeamGridPP Team

Dissemination/ Collaborations (Roger Jones)

Software Experiments TestbedSupport (Nick Brook) (Dave Newbold)(Andrew McNab)

Workload Information Services Monitoring Mass StorageManagement and Services and(Dave Colling) Data Management (Robin Middleton) Fabric Management

(Alex Martin) (Themis Bowcock)

Security Networking (Dave Kelsey) (Pete Clarke)

CERN (Les Robertson)

= Basis for Technical Information Flow? = Basis for Technical Information Flow?

...Technical Task Force( = 1 month)

...Technical Task Force( = 1 month)

Page 10: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

SummarySummary

Learning to crawl…Learning to crawl… … … quicklyquickly Immediate Priority: Immediate Priority:

allocating EU DataGrid allocating EU DataGrid postsposts timescale: 21st May scope: 1 page short technical input

Medium Term (M9): Medium Term (M9): important to translate important to translate into demonstratorsinto demonstrators

Medium Term Medium Term (M9, in parallel):(M9, in parallel):

Implementation of final Implementation of final GridPP structureGridPP structure

Definition of scope of Definition of scope of Collaboration… Collaboration…

First steps…First steps… 1st Collaboration Meeting1st Collaboration Meeting

All Welcome! Contact Cosener’s House [email protected] quote “GridPP”

Page 11: GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow

Tony Doyle - University of Glasgow

GRIDIID

UKParticlePhysics

Agenda (10/5/01)Agenda (10/5/01)

1st GridPP Collaboration Meeting - Cosener's House: May 24/25th1st GridPP Collaboration Meeting - Cosener's House: May 24/25th

24th May24th May

10:30-11:00 Arrive (Coffee)10:30-11:00 Arrive (Coffee)

Scope, Aims and Background to the Meeting [Chair: Paul Jeffreys]Scope, Aims and Background to the Meeting [Chair: Paul Jeffreys]

11:00-11:30 Introduction - Steve Lloyd11:00-11:30 Introduction - Steve Lloyd

11:30-12:00 Current Project Structure - Tony Doyle11:30-12:00 Current Project Structure - Tony Doyle

12:00-12:30 Current Manpower Allocations - Dave Britton12:00-12:30 Current Manpower Allocations - Dave Britton

12:30-1:30 Lunch12:30-1:30 Lunch

Middleware I "Midfield" [Chair: Roger Barlow]Middleware I "Midfield" [Chair: Roger Barlow]

1:30-1:45 Architecture Task Force - Steve Fisher1:30-1:45 Architecture Task Force - Steve Fisher

1:45-2:00 A: Workload Management - Steve Fisher1:45-2:00 A: Workload Management - Steve Fisher

(PP Dave Colling)(PP Dave Colling)

2:00-2:30 B: Information Services and Data Management - Alex Martin2:00-2:30 B: Information Services and Data Management - Alex Martin

2:30-3:00 C: Monitoring Services - Robin Middleton2:30-3:00 C: Monitoring Services - Robin Middleton

3:00-3:30 D: Fabric Management and Mass Storage - John Gordon3:00-3:30 D: Fabric Management and Mass Storage - John Gordon

(PP Themis Bowcock)(PP Themis Bowcock)

3:30-4:00 Tea3:30-4:00 Tea

Middleware II "Defence" [Chair: Fabrizio Gagliardi]Middleware II "Defence" [Chair: Fabrizio Gagliardi]

4:00-4:30 E: Security - Dave Kelsey4:00-4:30 E: Security - Dave Kelsey

4:30-5:00 F: Networking - Pete Clarke4:30-5:00 F: Networking - Pete Clarke

5:00-5:30 K: CERN - Tony Cass5:00-5:30 K: CERN - Tony Cass

(PP Les Robertson)(PP Les Robertson)

5:30-6:00 Discussion5:30-6:00 Discussion

6:00-7:00 Dinner6:00-7:00 Dinner

Experiment Objectives and Collaborations "Attack" [Chair: Pete Watkins]Experiment Objectives and Collaborations "Attack" [Chair: Pete Watkins]

7:00-7:30 G: Prototype Grid - Dave Newbold7:00-7:30 G: Prototype Grid - Dave Newbold

7:30-8:00 H: Software Support - Andrew McNab7:30-8:00 H: Software Support - Andrew McNab

8:00-8:30 I: Experiment Objectives - Nick Brook8:00-8:30 I: Experiment Objectives - Nick Brook

8:30-9:00 J: Dissemination - Roger Jones8:30-9:00 J: Dissemination - Roger Jones

25th May25th May

Open Issues DiscussionOpen Issues Discussion

9:00-10:00 Technical Issues Discussion Leader - John Gordon9:00-10:00 Technical Issues Discussion Leader - John Gordon

10:00-11:00 Experiment/Collab. Issues: Discussion Leader - Andy Parker10:00-11:00 Experiment/Collab. Issues: Discussion Leader - Andy Parker

11:00-11:30 Coffee11:00-11:30 Coffee

11:30-12:30 Sub-group Discussions11:30-12:30 Sub-group Discussions

(Probably 4 groups - to be determined)(Probably 4 groups - to be determined)

1. Attack1. Attack

2. Midfield2. Midfield

3. Defence3. Defence

4. Shadow Project Management Board4. Shadow Project Management Board

12:30-1:30 Lunch12:30-1:30 Lunch

Preparations for E-science CommittteePreparations for E-science Committtee

1:30-2:00 PPARC perspective - Neil Geddes1:30-2:00 PPARC perspective - Neil Geddes

The e-science committee meets in the following week (30-31/5/01). We haveThe e-science committee meets in the following week (30-31/5/01). We have

been asked to present the GridPP proposal to the committee. An agenda forbeen asked to present the GridPP proposal to the committee. An agenda for

this section will be drawn up once this becomes clearer...this section will be drawn up once this becomes clearer...

3:00-3:30 Round Up Discussion on Future Plans: Discussion Leader?3:00-3:30 Round Up Discussion on Future Plans: Discussion Leader?

3:30-4:00 Depart (Tea)3:30-4:00 Depart (Tea)