14
Liquid Asset Liquid Asset Development, Inc Development, Inc Pervious Concrete Pervious Concrete Water Filtration Water Filtration

Greentech Meetup

  • Upload
    greg00m

  • View
    186

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greentech Meetup

Liquid Asset Liquid Asset Development, IncDevelopment, IncPervious Concrete Pervious Concrete

Water Filtration Water Filtration

Page 2: Greentech Meetup

The Technology The Technology

• Pervious concrete, 30 years of use in Pervious concrete, 30 years of use in parking lots and sidewalksparking lots and sidewalks

• Global infrastructure already in placeGlobal infrastructure already in place

• Decentralized manufacturing Decentralized manufacturing

• Cost effective, efficient, simple, Cost effective, efficient, simple, disruptivedisruptive

• Mining, oil & gas water treatmentMining, oil & gas water treatment

• Metals recoveryMetals recovery

Page 3: Greentech Meetup

Market Opportunity Market Opportunity

• "Demand for water - the natural "Demand for water - the natural resource with no substitute”resource with no substitute”

• Goldman Sachs 2005 report: "The Goldman Sachs 2005 report: "The Essentials of Investing in the Water Essentials of Investing in the Water Sector" Sector"

• $425 billion a year in global demand $425 billion a year in global demand for water technologies as of 2008.for water technologies as of 2008.

• The sector has the potential to The sector has the potential to expand 3% to 5% yearlyexpand 3% to 5% yearly

Page 4: Greentech Meetup

Investment ReturnsInvestment Returns

Return on One Successful Pilot StudyReturn on One Successful Pilot Study

• Capital Outlay $175,000Capital Outlay $175,000

• Combined Revenues in Year One $1.5 Combined Revenues in Year One $1.5 million million

• Potential return 5x total investmentPotential return 5x total investment

Page 5: Greentech Meetup

Immediate Water Sector Immediate Water Sector Targets Targets

• Acid mine drainageAcid mine drainage– Metals loss worth $200 mil. USD, $39 bil. Metals loss worth $200 mil. USD, $39 bil.

Globally every yearGlobally every year– Source: PA DEP report (Rathbun, 2004)Source: PA DEP report (Rathbun, 2004)

• Oil/gas fraccing production waterOil/gas fraccing production water

• Metals recovery, uranium, lithium, Metals recovery, uranium, lithium, silversilver

Page 6: Greentech Meetup

TeamTeam• President/CTOPresident/CTO

– Gregory Majersky, MSCE, EIGregory Majersky, MSCE, EI

• Sec/Treasurer/ControllerSec/Treasurer/Controller– Karen Frye – MSA (30 years experience)Karen Frye – MSA (30 years experience)

• Dan Huffman, Advisor, VP NRMCADan Huffman, Advisor, VP NRMCA

• Peter Bryant, Advisor, Transtech USAPeter Bryant, Advisor, Transtech USA

• SeekingSeeking– CEO/Business Development LeadCEO/Business Development Lead– Senior Engineer (PE)Senior Engineer (PE)

Page 7: Greentech Meetup

Research Results – Lab & Research Results – Lab & Field Field • 50%, 85% and 99% iron removed.50%, 85% and 99% iron removed.

• 5%, 60% and 70% sodium removed.5%, 60% and 70% sodium removed.

• 67% and 74% zinc, 56% and 65% 67% and 74% zinc, 56% and 65% copper removed.copper removed.

• 25% arsenic, 3% magnesium, 66% 25% arsenic, 3% magnesium, 66% manganese removed.manganese removed.

• Phosphorous removal, 3-5x better Phosphorous removal, 3-5x better than more complex systems at 2008 than more complex systems at 2008 CSU competition.CSU competition.

Page 8: Greentech Meetup

Pilot Studies Pilot Studies Project Name Application Status

Guttman Group Marcellus Shale production water recycling, metals recovery

Pre-production planning

R2 Incorporated Uranium production water treatment for CWA compliance, metals recovery

Awaiting final budget approval

Stockholm U, IVL, Predect

Agriculture water bench scale pilot study

Pilot study design accepted, budget being drafted

URS Corporation, Milan, Italy

Heavy metals in soil, remediate process water and metals recovery

Response to RFP submitted

Encana Corporation Shale gas production water remediation, metals recovery

Scheduled to begin pilot study design in January 2011

Page 9: Greentech Meetup

Pilot Studies, cont’dPilot Studies, cont’dProject Name Application Status

Frachetti Engineering Zinc and Phosphorous removal in potable water pre-treatment plan in Georgetown, Colorado

The facility will be available for pilot testing at the end of January, 2011.

Global Community Development, CTI Water

Humanitarian and industrial water treatment

Follow up to successful pilot study in October 2009, waiting for partnership structuring agreement from GCD and project definition from CTI Water

Sierra Asia and American Enterprise Center

Technology sale to China

Formal evaluation of current and future market value of LAD technology has begun.

Page 10: Greentech Meetup

Service Provider RevenueService Provider Revenue• $ per barrel of water treated$ per barrel of water treated

• $0.03-$0.05/barrel in many gas and $0.03-$0.05/barrel in many gas and mining operations, mining operations, $0.50-$10.00/barrel in Marcellus $0.50-$10.00/barrel in Marcellus Shale (much higher TDS and Shale (much higher TDS and hazardous metals).hazardous metals).

• $900.00-$1500.00/month in western $900.00-$1500.00/month in western slope operations at 30k slope operations at 30k barrels/month (~25 gpm).barrels/month (~25 gpm).

• $30k/month in Marcellus at 30k $30k/month in Marcellus at 30k barrels/month (~25 gpm). barrels/month (~25 gpm).

Page 11: Greentech Meetup

Metals Recovery RevenueMetals Recovery Revenue• In most cases a cost offset mechanism.In most cases a cost offset mechanism.

• Economics verified by De Sale mine Economics verified by De Sale mine remediation project in Slippery Rock, PA, remediation project in Slippery Rock, PA, operated by PA DEP (Fe, Al, Mn operated by PA DEP (Fe, Al, Mn recovered).recovered).

• $24,000/month in metals from Marcellus $24,000/month in metals from Marcellus at 30k barrels/month, 50% recovery.at 30k barrels/month, 50% recovery.

• $2000/month in metals from mining pilot $2000/month in metals from mining pilot at 130,000 barrels/month.at 130,000 barrels/month.

• LAD would require % of metals revenue.LAD would require % of metals revenue.

Page 12: Greentech Meetup

Technology Mechanisms Technology Mechanisms

•PrecipitationPrecipitation

•CoagulationCoagulation

•AdsorptionAdsorption

Page 13: Greentech Meetup
Page 14: Greentech Meetup

Summary Summary

• Disruptive, economical, simple, efficientDisruptive, economical, simple, efficient

• Seeking $450,000 for field tests and Seeking $450,000 for field tests and business developmentbusiness development

• Investment return in 3-5 years, 5x Investment return in 3-5 years, 5x potentialpotential

• Equity, debt and convertible noteEquity, debt and convertible note

• Seeking CEO/Business Development Seeking CEO/Business Development LeadLead