JOI NT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S. C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Environmental Quality Control Water Quality Certification and Wetlands Programs Section 2600 Bull Street Columbia, South Carolina 29201 REGULATORY DIVISION Refer to: PIN # 2011-1190-6IF January 5,2012 Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1341), and the S.C. Construction in Navigable Waters Permit Program (R. 19-450, et. seq., 1976 S.C. Code of Laws, as amended), an application has been submitted to the Department of the Army and the State of South Carolina by Anderson County Parks Department cIa Seamon Whiteside & Associates, Inc. 607 Pendleton Street, Suite 100 Greenville, SC 29601 for a permit to place fill material for a boat launch and two courtesy docks on LAKE HARTWELL At a location at the end of Green Pond Road, south of Highway 24, Anderson County, South Carolina (Latitude 34.515072 N Longitude 82.789768 W) NOTICE is hereby given that written statements regarding the proposed work will be received by the Corps until 15 Days from the Date of this Notice, and SCDHEC will receive written statements regarding the proposed work until 30 Days from the Date of this Notice from those interested in the activity and whose interests may be affected by the proposed work. The proposed work consists of the placement of fill for a six boat launch area and two courtesy docks. In detail, the project consists of building a two 3-lane boat launches and 2 courtesy T-shaped docks in Lake Hartwell. Each 3-lane boat launch is 233.2 feet long and 48 feet wide. The launches are separated by an 8 foot wide ground-out floating dock. In addition, each launch has an L-shaped ground-out floating dock adjacent to the ramp that has an 8 foot wide walkway that leads to a platform 108 feet by 8 feet. Both courtesy docks are T-shaped. One dock is 320.7 feet long with an 8 foot walkway that leads to a platform that is 120 feet by 12 feet. The other dock is 213 feet long with an 8 foot walkway that leads to a platform that is 120 feet by 12 feet. A total of 1,130 cubic yards of fill will be placed and 2,235 cubic yards of material will be excavated for the project. According to the applicant, the project purpose is to enhance boating access for the Lake.

Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

JOI NT PUBLIC NOTICE

CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue

Charleston, South Carolina 29403-5107 and

THE S. C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Environmental Quality Control

Water Quality Certification and Wetlands Programs Section 2600 Bull Street

Columbia, South Carolina 29201

REGULATORY DIVISION Refer to: PIN # 2011-1190-6IF January 5,2012

Pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (33 U.S.C. 1341), and the S.C. Construction in Navigable Waters Permit Program (R. 19-450, et. seq., 1976 S.C. Code of Laws, as amended), an application has been submitted to the Department of the Army and the State of South Carolina by

Anderson County Parks Department cIa Seamon Whiteside & Associates, Inc.

607 Pendleton Street, Suite 100 Greenville, SC 29601

for a permit to place fill material for a boat launch and two courtesy docks on

LAKE HARTWELL

At a location at the end of Green Pond Road, south of Highway 24, Anderson County, South Carolina (Latitude 34.515072 N Longitude 82.789768 W)

NOTICE

is hereby given that written statements regarding the proposed work will be received by the Corps until

15 Days from the Date of this Notice,

and SCDHEC will receive written statements regarding the proposed work until

30 Days from the Date of this Notice

from those interested in the activity and whose interests may be affected by the proposed work.

The proposed work consists of the placement of fill for a six boat launch area and two courtesy docks. In detail, the project consists of building a two 3-lane boat launches and 2 courtesy T-shaped docks in Lake Hartwell. Each 3-lane boat launch is 233.2 feet long and 48 feet wide. The launches are separated by an 8 foot wide ground-out floating dock. In addition, each launch has an L-shaped ground-out floating dock adjacent to the ramp that has an 8 foot wide walkway that leads to a platform 108 feet by 8 feet. Both courtesy docks are T-shaped. One dock is 320.7 feet long with an 8 foot walkway that leads to a platform that is 120 feet by 12 feet. The other dock is 213 feet long with an 8 foot walkway that leads to a platform that is 120 feet by 12 feet. A total of 1,130 cubic yards of fill will be placed and 2,235 cubic yards of material will be excavated for the project. According to the applicant, the project purpose is to enhance boating access for the Lake.

Page 2: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

REGULATORY DIVISION Refer to: PIN # 2011-1190-6IF January 5, 2012

NOTE: Plans depicting the work described in this notice are available and will be provided, upon receipt of a written request, to anyone that is interested in obtaining a copy of the plans for the specific project. The request must identify the project of interest by public notice number and a self-addressed stamped envelope must also be provided for mailing the drawings to you. Your request for drawings should be addressed to the

U.S. Army Corps of Engineers ATTN: REGULATORY DIVISION

1835 Assembly Street, Room 8658-1 Columbia, South Carolina 29201.

The District Engineer has concluded that the discharges associated with this project, both direct and indirect, should be reviewed by the South Carolina Department of Health and Environmental Control in accordance with provisions of Section 401 of the Clean Water Act. As such, this notice constitutes a request, on behalf of the applicant, for certification that this project will comply with applicable effluent limitations and water quality standards (Section 401 of the Clean Water Act). The District Engineer will not process this application to a conclusion until such certification is received. This activity may also require evaluation for compliance with the S. C. Construction in Navigable Waters Permit Program. State review, permitting and certification is conducted by the S. C. Department of Health and Environmental Control. The applicant is hereby advised that supplemental information may be required by the State to facilitate the review. Persons wishing to comment or object to State certification or the navigable waters permit must submit all comments in writing to the S. C. Department of Health and Environmental Control at the above address within thirty (30) days of the date of this notice.

This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery Conservation and Management Act. Implementation of the proposed project would impact freshwater habitat upstream of estuarine substrates and emergent wetlands utilized by various life stages of species comprising the red drum, shrimp, and snapper-grouper management complexes. Our initial determination is that the proposed action would not have a substantial individual or cumulative adverse impact on EFH or fisheries managed by the South Atlantic Fishery Management Council and the National Marine Fisheries Service (NMFS). Our final determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with the NMFS.

Pursuant to Section 7(c) of the Endangered Species Act of 1973 (as amended), the District Engineer has consulted the most recently available information and has determined that the project is not likely to adversely affect any Federally endangered, threatened, or proposed species or result in the destruction or adverse modification of designated or proposed critical habitat. This public notice serves as a request for written concurrence from the U.S. Fish and Wildlife Service and/or the National Marine Fisheries Service on this determination.

Pursuant to Section 106 of the National Historic Preservation Act (NHPA), this public notice also constitutes a request to Indian Tribes to notify the District Engineer of any historic properties of religious and cultural significance to them that may be affected by the proposed undertaking.

In accordance with the NHPA, the District Engineer has also consulted the latest published version of the National Register of Historic Places for the presence or absence of registered properties, or properties listed as being eligible for inclusion therein, and this worksite is not included as a registered property or property listed as being eligible for inclusion in the Register. To insure that other cultural resources that the District Engineer is not aware of are not overlooked, this public notice also serves as a request to the State Historic Preservation Office to provide any information it may have with regard to historic and cultural resources.

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for a public hearing shall state, with particularity, the reasons for

Page 3: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

REGULATORY DIVISION Refer to: P/N#2011-1190-6IF January 5,2012

holding a public hearing.

The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the activity on the public interest and will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency (EPA), under authority of Section 404(b) of the Clean Water Act and, as appropriate, the criteria established under authority of Section 102 of the Marine Protection, Research and Sanctuaries Act of 1972, as amended. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the project must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the project will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production and, in general, the needs and welfare of the people. A permit will be granted unless the District Engineer determines that it would be contrary to the public interest. In cases of conflicting property rights, the Corps of Engineers cannot undertake to adjudicate rival claims.

The Corps of Engineers is soliciting comments from the public; Federal, state, and local agenCies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this project. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the activity.

If there are any questions concerning this public notice, please contact Kristin Riegel at 803-253-3903.

Page 4: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

lll'Ar Location Map ~ JLAr. l.r------------------------------~.I--~--N-UM-B-~-:-'-'~-3-tO--_i.

380COOIcoIdIlllHl.SUIlt300 Green Pond Landing and Event Center ISSUEOATE: 12-22-2011 ~SC20401

843.414.1040 Anderson County, South Carolina ~ 0/AIIthorIDIlan IOO3S9 PIN 2011-1190-6IF

Hartwell Lake

APPI.ICANT INFORMATION: Anderton CoUnty Paries 0eparIment

10t SOUIII Main Stniet, Room 13 Am!enIon. Be 29624

Sheet 1 of 8

Page 5: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

NOTES f.

2. 3. NAVD 88 "

EXisting Site Conditions Jl Jtj[ ~ 380ConoonIs-t.StiIIo300 Green Pond Landing and Event Center ~SC2lt401 ~14._ Anderson County, South Carolina

CerdellloI~lIOII3S9 Sheet 2 of 8

SURVEY COMPlETED BY F&S SURVEYORS, ENGINEERS & PlANNERS. DATED OCT. 25. 2011 THE ELEVATIONS ARE BASED ON NAVD 88

NGVO 29 -0.285 FEET (NOAA VERTCON)

AIl1.a C l.r______________________________~II~~--~----R:-'-'--23-'0--~

ISSUEOATE: 12-22-2011

y . Scate in

APPliCANT INFORMATION: Anderson County Parks Depaftment

101 SouIh Main Sfree~ Room 13 AndetSon, SC 29624

PIN 2011-1190-6IF

Page 6: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

r.:::,:::::::::::::::::::::::1· -..... r'" r'=::::-:::'::::=l6 lane boat launch --.---__ _ ------ ----- I I

-- ---------___ I' . I ..../ ............ courtesy dock 2 ~

/~--.. ----::,~J- ... 1_____ 1---- ,_ ...//...//",/ / truck/trailer parking/_-...- /' t-·.. -·--__,___ L.:::'::_~: /1

/ I -, 7"-<:.7 ,/ I' "" d /'' .• , ,I. , \ \ /'1I I

single car parking -....""- / r -. --.. L ......- .. - \ I' ......- '-f-­amphitheatre/event center ~ '" / ! (- -" _:.~~ '---..t'/-- --....~/" / -~..-'---............,~.._ 1- ramp access route

\ ~ J \'\ U -----­\' / " ! ~ J

J

I ..-­> /".-;;:--1 (1 I \\ / ""--__ !

/ \ "'" f/ iIL_ --. J ~,_" ___... __ __ / _ '---~ courtesy ", / ' ~~~ \ \ "', .. .. - - .. - .---~" I ""­

dock 1 \ / \'11I;A:~>":':~ \\ //--- - -'- - -- f-_ ..- _ _ _ _ "'" II ~"~~----__\ / \ ~)'~ \\ ---- I ...." '\ ---..­\ ( / // ~ \\ /,,/ r--- " If I \"""/~ /' , " J\ --. ____ \

rt\ \ II \ \: \ ~\ ~\,__----// ..../ /' "'\" ~\ I 1L\.. ..r..-.. 1/' \1 \ =-~\ I {"----------. r---..... '--- - .. - - --- ...:,; ","' t / 1-'- -:::J ,lit, a I ( "'-- -. '" ~\i I ,I-I I I I' .- --._"...-- "- ... - - -,_ __ __ "- ---, .\ "\ r.~_~_

..-j- --- -- '- \ ~-~-II; 11------1, fJ)1- 'I ',,----------_ __ ----~ '\ ;;',J -~-~--~-,_/ _....---.. --..-1 \ /!. / $; I /~---..J ') -- -- ..- --, - '-, ) (' \ f ( {j ~, pavilion/restroom -/..--.... \\\\ l'--1j~ Ii ( \1 l__--.,,---- -" ,.. '" ~'-/) \ \ 'r

/ "':~' 'I -- / I \ ­~ --P" ' fr---/ // ,\:55,\"" I I \ \.j/ ,./ ,I I /-- ---_~_( )j \ '" ~ I ..... ---- ..-/..-/ I I ~'-~ ­,-" ,./ \\p "'- ..- I I

! ~ /. ...~... I ----- --... - ~~ ____... _ ... / I

/ ~ \y-A"~ , --- _.. - ---- '- --- - -- '- -/ IJ ' I

i [91~~- . \\ ....- .. ----- ----------------- I

.. -~ ',-.~'_......

_...... ------ .. -- ------- ~-- / ~

,.;

( /'..:: 4 ~.;: '--\_ \ ~~ J;~-:; / ------------_:::-::'-,__ /~ /:-___________ _ I / _ \ ~~_-~~ vi ~ ... " __/ ,/ -__ _ '\ 1(::' -~II \ 7~';<---::;'" -::---..., :~ ~',~,:----- ---"'~/"/ / -, --­\, 'f= -:::, .,.. ---- --_..." -'-__...

\t:- .---\ "-" '\; -'­\ \l-- (---y~ v/'"? ~ .....,__\ \1-: \ ,{Y / ~ , ...'-..,

/ / .....

\ . ,~, t-~ event cente;

j ' ~ ~ //Jr access route.) ,- /,,/~l /" / " .... ,

/// J'( /'~----'____ '~~":if--d:;z,~!'==~;;:~~"~_=:::_!:---.. ft-.-'

/" ... /.

/ '" 7--..::::-.~--.--~ '-.... .:'~/..-/,.----~..

/' / ./ ;.-/ ,

• ,:

,.J :..--~"

GREEN POND LANDING EVENT CENTER SITE GR1626 PLAN DECEMBER 22, 2011 1"=200'·0" PIN 2011-1190-6IF Sheet 3 of 8

Page 7: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

WEIGH-IN DOCK SlTE SHEET 5

I, I I I, I,,, f, I,, I I,

A.rl11 C Proposed Improvements)rj[][ ][wSf 1.~_________o_y_e_~_I_'_S_ne__P_'a_n________-;.r-JOO__N_Um__e_R:_l1_~_31_0__;.

380ConcoIdSIlHl._300 Green Pond Landing and Event Center ISSUE DATE: 12·22-2011 ~SC~t

843.414.1040 Anderson County, South Carolina c..- aI AuII1orfntIon tIIOO359 PIN 2011-1190-6IF

y ; 2i Scole in Feet

APPUCANT INFORMATION: AnderSon Coonty PI.I!ka Deparfment

101 SouIh Main SCleet Room 13 AndI!f8Oll, SC 29624

Sheet 4 of 8

Page 8: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

108.0

U.S. Government l.ake Hartwell

48.0

lID",r

,.!

; i in Feet

Proposed Improvements NOiI"C!RCON$TI'!t!CTION APPlICANT INFORMATION: AnderaM County Padl3 Oepatfment:l Jtj[j[f l.r_________B_o_a_t_R_a_m_p__S_lt_e________-1II.-_~_B_NU_M_B_ER_:_11_~3_10__..-111 101 SouIh MaIn SIre<oI. Room 13

AItderso<o. SC 29624 360eor-ISlletl.s.IIo300 Green Pond Landing and Event Center ISSUSOATE: 12-22-2011

cn..-.. SC20401 ~or__

843.414.1040 Anderson County, South Carolina

PIN 2011-1190-6IF Sheet 5 of 8

Page 9: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

12.0

U.5. (;ove([~mc!1i-" l.-;~i:~! N.1!ttFt:fI

Mlf 111-___

: i in Feet

APPliCANT INFORMATION: Anderson County Parka OeparlmentP_f_~_~_~_9h_-_I':_D_P_~ck_v_e;_i_:_nt_s___il..-:-T:_~_R_CON_.;_:m_1'2_~_O_·-III

101 Soul" Main Street. Room 13 Anderson, SC 29624

380~SllMl.Sullt300 Green Pond Landing and Event Center ISSUEOATE: 12·22·2011

~4~2!I4Of Anderson County, South Carolina PIN 2011-1190-6/F Sheet 6 of 8 ~"'--

Page 10: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

All!).r Proposed Improvementslni!v

\ N

\

t ; f Scote in Feet

APPlICANT INFORMATION: AndGfson County Parks DepatIrnent

1I1-____E_Bs_t_D_o_o_k_S_it_e_p_IB_n____i ..._JOB_NUM_BE_R:_1_1-2_J1_0_ 101 $00111 Mafn Slreot, Room 13 Ancltlnoon, SC 29624

380CoatoorII __300 Green Pond Landing and Event Center 1SSlJE0ATE: 12<22·2011 0.-,0029401 ' __L---------1!II-----------I11CdcaIo::==..1100359 Anderson County, South Carolina PIN 2011-1190-6IF Sheet 7 of 8

Page 11: Green Pond Landing - Charleston District€¦ · 2011-1190-6IF January 5,2012 . ... 15 Days from the Date of this Notice, ... This public notice serves as a request for written concurrence

" •••••••••• 'J,,_,­ .... ···.'1; .... ~... ··.'A_""0 . . 'V;-­ I APPUEO .... ' ... r.nytl.' "P .. ... C'I); TECtlNOlw Il ~ -:. APPROXIMATE : : MAHAGEMENT, INC.: =/.- EXISTING GRADE.. . ... . .~ ,...­ \, M'lQ.C;.: ~ 4000

.. q " -to!o•.\/u".", .' e .. .. \~ •••• - --;..~ 14% GRADE ,., ~ •••• •••• (,S)" - --­ _ ..... , ~ .......... Cfl,' 15% GRADE

TOP'o,,1l:1JJJJ 0 ~~\\~\;\:~--L.':::~'::;;;;::;t.~::;z::=~~:::.e.:-=.-~.. -=. A~!tl6'iTER55' EL£VELEV ee;""'i· I , ......\\\',,,,,,,,,,,\,\ '" CAlla "1

......."'o~.~•••~cSS;;.:··~IA~...,'.. -..;; -­ TOE OF RAMP ~ ••~f\)'t~ v. .:v.,. " ELE.V 630':' OJ,. '-- ~_... ....-::

DETAil "A" PROPOSED CONCRETE SOAT RAMP PROFilE • ; i

Scale in Feet

THREE-lANE CONCRETE BOAT lliREE-LANE CONCRETE BOAT RAMP

8'

DgTAIL "S" PROPOSED CONCRETE SOAT RAMP CROSS SECTION y . 1f

Scale in Feet

-

--oamm~~~~~~~~~~~~~~J.~~~~.J~~~=-~~~C¥~A~E~nRELEV -­ El£V 655'

EXISTING GRADE ~/ --. -.... ~-...

DETAIL "c" PROPOSED TYPICAL DOCK PROFILE t ; i

Scale in Feet

o ,.:

~ ~

:::­:z " o

~

-'1F;.L~Af~!J9.;·.=';la:.~,;r~.~.~.~!~~~~~~~_R~a~m~~p;a~n~d~D~_OC~;k~_D~e;t_a~i;IS_;~~~~~_~<~,~~_:~:_T~:~:!!C_;~R_;;S_1~~I_'2~3_·~1_~~ON!~~i.~;;AnderfIon;I;;1Soulh;PU;~;Main;T;IN;=;;Cepartmlmt;::;;1;:3;;~D ~! .. AndefSon, SC 29624

380eo.-dSltool,_3CO Green Pond Landing and Event Center fSSUEOATE: 12·22·2011 Chadet!on. SO 211401

o .. _or__iIq.4!4.1040 Anderson County, South Carolina Sheet 8 of 8 PIN 2011-1190-6IF

I