WHAT WE’VE HEARD PLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community since 2017 to create street design concepts that incorporate your vision. You want safer streets and more comfortable ways to get around your neighborhood. On many streets, we've developed new lane layouts and redesigned intersections. These concepts are intended to create safer places for everyone—whether you are walking, biking, driving, or taking transit. In some cases, this means losing on-street parking. Based on surveys, emails, meetings, and an open house, these are the themes that we heard: We are currently in the design phase of the project with construction anticipated as soon as 2019. Throughout the next two years we will continue reaching out to neighbors, community groups, and others who frequently use these streets. Please contact us with questions and to sign up for email updates. Thank you. Contact Christa Dumpys (206) 256-5458 greenlakepaving@seattle.gov Make streets safer for people walking and biking • Prefer to get around the neighborhood by bike more than they do today • Feel dissatisfied with biking environment on streets in the project area • Feel somewhat unsafe when crossing streets in the project area • Desire for more crosswalks Improve signal operations • Desire to reduce delay at key intersections Pave more streets • Desire to pave additional streets beyond project area www.seattle.gov/transportation/greenlakepaving.htm MARCH 2018

Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

WHAT WE’VE HEARDPLANNING DESIGN CONSTRUCTION

We are here

Green Lake Area Paving & Safety Projects

We've been engaging with the Green Lake community since 2017 to create street design concepts that incorporate your vision. You want safer streets and more comfortable ways to get around your neighborhood. On many streets, we've developed new lane layouts and redesigned intersections. These concepts are intended to create safer places for everyone—whether you are walking, biking, driving, or taking transit. In some cases, this means losing on-street parking. Based on surveys, emails, meetings, and an open house, these are the themes that we heard:

We are currently in the design phase of the project with construction anticipated as soon as 2019. Throughout the next two years we will continue reaching out to neighbors, community groups, and others who frequently use these streets. Please contact us with questions and to sign up for email updates. Thank you.

ContactChrista Dumpys(206) [email protected]

Make streets safer for people walking and biking• Prefer to get around the neighborhood by bike

more than they do today • Feel dissatisfied with biking environment on

streets in the project area• Feel somewhat unsafe when crossing streets in

the project area• Desire for more crosswalks

Improve signal operations• Desire to reduce delay at key intersections

Pave more streets• Desire to pave additional streets beyond

project area

www.seattle.gov/transportation/greenlakepaving.htm

MARCH 2018

Page 2: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

PAVING AREA & TRAFFIC DATA

MARCH 2018

N 80TH ST

N 83RD ST

NE 65TH ST

NE RAVENNA BLVD

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

GREEN LAKE WAY N

STON

E W

AY N

PHIN

NEY

AVE

NPH

INN

EY A

VE N

2ND

AVE

NE

LATO

NA

AVE

NE

GREE

NW

OOD

AVE

N

WINONA AVE N

N 65TH ST

N 45TH ST

N 50TH ST

N 40TH ST

N 46TH ST

Green Lake

Green LakePark

Woodland Park Zoo

WoodlandPark

MeridianPlayground

WallingfordPlayfield

B.F. DayPlayground

UniversityPlayground

5

E GREEN LA KE DR N

W GREEN LAKE DR

N

W GREEN LAK

E WAY N

Paving projectsGREEN LAKE DR N

AURO

RA A

VE N

99

AURO

RA A

VE N

99

STON

E W

AY N

GREE

N LA

KE W

AY N

E GREEN LAKE WAY N

DEN

SMOR

EAV

E N

*Representative; based on traffic data collected 3/15/17.

Street

Vehicle Traffic

volume*

Bicycle volumes

(collected 3/15/17)

Posted Speed limit

Traffic speed* (85% of vehicles are traveling at listed speed or

below)Collisions(5 years)

Transit Service (Metro)

Bicycle Master

Plan designation

Freight Master Plan designation

Majority in Pedestrian

Priority Investment Network?

N 40th St 11,500/day 30/day 30 MPH 33 MPH 72 Routes 26, 31, 32

In street, minor separation (e.g. bike lanes)

- Yes

N 50th St (east of Stone Way N)

23,500/day 7/day 30 MPH 33 MPH 337 - - Major Freight Route between Stone Way N and Roosevelt Way NE

Yes

N 50th St (west of Stone Way N)

10,200/day 53/day 30 MPH 34 MPH - - - Yes

E Green Lake Dr N 9,500/day 534/day 30 MPH 31 MPH 288 (10% involved people biking)

Route 45; Priority Bus Corridor

Protected Bike Lanes

- Yes

E Green Lake Way N 8,800/day 181/day 30 MPH 34 MPH - Protected Bike Lanes

- No

Green Lake Way N 16,300/day - 30 MPH 32 MPH - Protected Bike Lanes

- No

Green Lake Dr N 3,600/day 135/day 30 MPH 33 MPH - Protected Bike Lanes

- Yes

N 80th St 15,300/day 5/day 30 MPH 31 MPH 134 Routes 26, 316, 82

- - Yes

Page 3: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

MARCH 2018

SEGMENT OVERVIEW MAP1

2

3

4

5

6

7

8

9

10

Green Lake Dr N: Aurora Ave N - Densmore Ave N

E Green Lake Dr N: Densmore Ave N - NE Ravenna Blvd

E Green Lake Way N: NE Ravenna Blvd - W Green Lake Way N

Green Lake Way N: W Green Lake Way N - N 52nd St

Stone Way N: N 50th St - 45th St

N 50th St: Phinney Ave N - Fremont Ave N

N 50th St: Fremont Ave N - Whitman Ave N

N 50th St: Whitman Ave N - Stone Ave N

N 40th St: Stone Way N - Wallingford Ave NE

N 40th St: Wallingford Ave NE - Latona Ave NE

N 80TH ST

N 83RD ST

NE 65TH ST

NE RAVENNA BLVD

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

GREEN LAKE WAY N

STON

E W

AY N

PHIN

NEY

AVE

NPH

INN

EY A

VE N

2ND

AVE

NE

LATO

NA

AVE

NE

GREE

NW

OOD

AVE

N

WINONA AVE N

N 65TH ST

N 45TH ST

N 50TH ST

N 40TH ST

N 46TH ST

Green Lake

Green LakePark

Woodland Park Zoo

WoodlandPark

MeridianPlayground

WallingfordPlayfield

B.F. DayPlayground

UniversityPlayground

5

E GREEN LA KE DR N

W GREEN LAKE DR

N

W GREEN LAK

E WAY N

AURO

RA A

VE N

99

AURO

RA A

VE N

99

E GREEN LAKE WAY N

DEN

SMOR

EAV

E N

2

3

4

5

6

7

8

9 10

1

GREEN LAKE DR NST

ONE

WAY

NSegment will be paved but no changes to road design

Segment will be paved but no changes to road design

Bike enhancements added, no paving

Page 4: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTSGREEN LAKE & STONE WAY N OVERVIEW MAP

1

2

3

4

5

N 80TH ST

N 83RD ST

NE 65TH ST

NE RAVENNA BLVD

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

GREEN LAKE WAY N

STON

E W

AY N

PHIN

NEY

AVE

NPH

INN

EY A

VE N

2ND

AVE

NE

LATO

NA

AVE

NE

GREE

NW

OOD

AVE

N

WINONA AVE N

N 65TH ST

N 45TH ST

N 50TH ST

N 40TH ST

N 46TH ST

Green Lake

Green LakePark

Woodland Park Zoo

WoodlandPark

MeridianPlayground

WallingfordPlayfield

B.F. DayPlayground

UniversityPlayground

5

E GREEN LA KE DR N

W GREEN LAKE DR

N

W GREEN LAK

E WAY N

GREEN LAKE DR N

AURO

RA A

VE N

99

AURO

RA A

VE N

99

STON

E W

AY N

E GREEN LAKE WAY N

DEN

SMOR

EAV

E N

1

2

3

4

5

MARCH 2018

Green Lake Dr N: Aurora Ave N - Densmore Ave N

E Green Lake Dr N: Densmore Ave N - NE Ravenna Blvd

E Green Lake Way N: NE Ravenna Blvd - W Green Lake Way N

Green Lake Way N: W Green Lake Way N - N 52nd St

Stone Way N: N 50th St - 45th St

Page 5: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

NOTES: Cross sections are looking north. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

EXISTING

Sidewalk Planting Strip Shared Parking & Bike Lane Travel Lane Center Turn Lane Travel Lane Shared Bike Lane & Parking Planting Strip Sidewalk

COMING 2019

Sidewalk Planting Strip Bike Lane Parking Travel Lane Travel Lane Parking Bike Lane Planting Strip Sidewalk

SEGMENT 1 DESIGN UPDATE

MARCH 2018

Major Changes:• One-way protected bike lanes with buffers added to both sides of Green Lake Dr N • Bike traffic separated from parking locations • Center turn lane removed to accommodate pedestrian and bike connections

Page 6: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

NOTES: Cross sections are looking north. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

EXISTING

COMING 2019

MARCH 2018

Major Changes:• 2-way protected bike lane added to south side of E Green Lake Dr N• Some parking removed near intersections

Sidewalk Planting Strip Bike Lane Travel Lane Travel Lane Shared Bike Lane and Parking Planting Strip Sidewalk

SidewalkGreen Lake Park Planting Strip 2-way Bike Lane Travel Lane Travel Lane Parking Planting Strip Sidewalk

SEGMENT 2 PROPOSALE Green Lake Dr N: Densmore Ave N - NE Ravenna Blvd

Page 7: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

NOTES: Cross sections are looking north. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

EXISTING

COMING 2019

MARCH 2018

Major Changes:• 2 way protected bike lane added to west side of E Green Lake Way N

SEGMENT 3 PROPOSALE Green Lake Dr N: NE Ravenna Blvd - W Green Lake Way N

SidewalkGreen Lake Park Planting Strip 2-way Bike Lane Travel Lane Travel Lane Parking Planting Strip Sidewalk

Sidewalk Planting Strip Bike Lane Travel Lane Travel Lane Shared Bike Lane & Parking Planting Strip Sidewalk

Page 8: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

NOTES: Cross sections are looking north. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

EXISTING

Sidewalk Planting Strip Bike Lane Travel Lane Center Turn Lane Travel Lane Bike Lane Parking Planting Strip Sidewalk

COMING 2019

SidewalkGreen Lake Park Planting Strip Travel Lane Center Turn Lane Travel Lane Parking Planting Strip Sidewalk

Green Lake Way N: W Green Lake Way N - N 52nd St

MARCH 2018

Major Changes:• 2-way protected bike lanes added • Center turn lane remains for adequate traffic flow

Page 9: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

NOTES: Cross sections are looking north. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

EXISTING

Sidewalk Planting Strip Parking Bike Lane Travel Lane Center Turn Lane Travel Lane Bike Lane Parking Planting Strip Sidewalk

COMING 2019

Sidewalk Planting Strip Bike Lane Parking Travel Lane Center Turn Lane Travel Lane Bike Lane Planting Strip Sidewalk

MARCH 2018

Major Changes:• One way protected bike lane added to both sides of Stone Way N • Parking removed on east side of Stone Way N

Page 10: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTSN 50TH ST OVERVIEW MAP

6

7

8

MARCH 2018

N 80TH ST

N 83RD ST

NE 65TH ST

NE RAVENNA BLVD

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

GREEN LAKE WAY N

STON

E W

AY N

PHIN

NEY

AVE

NPH

INN

EY A

VE N

2ND

AVE

NE

LATO

NA

AVE

NE

GREE

NW

OOD

AVE

N

WINONA AVE N

N 65TH ST

N 45TH ST

N 50TH ST

N 40TH ST

N 46TH ST

Green Lake

Green LakePark

Woodland Park Zoo

WoodlandPark

MeridianPlayground

WallingfordPlayfield

B.F. DayPlayground

UniversityPlayground

5

E GREEN LAKE DR N

W GREEN LAKE DR

N

W GREEN LAK

E WAY N

GREEN LAKE DR N

AURO

RA A

VE N

99

AURO

RA A

VE N

99

STON

E W

AY N

E GREEN LAKE WAY N

DEN

SMOR

EAV

E N

6

7

8 Paving only, no design change

Page 11: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

EXISTING

COMING 2019

MARCH 2018

SEGMENT 6 PROPOSALN 50th St: Phinney Ave N – Fremont Ave N

Sidewalk Planting Strip Shared Parking & Bike Lane Travel Lane Travel Lane Bike Lane Planting Strip Gravel Path

Sidewalk Planting Strip Parking Bike Lane Travel Lane Travel Lane Bike Lane Planting Strip Gravel Path

Major Changes:• Bike lanes widened and striped in both directions

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown.Sidewalk and planting strip widths vary along the corridor.

Page 12: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

EXISTING

COMING 2019

MARCH 2018

SEGMENT 7 PROPOSALN 50th St: Fremont Ave N – Whitman Ave N

Major Changes:• Bike lanes widened and striped in both directions

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown.Sidewalk and planting strip widths vary along the corridor.

Bike Lane Travel Lane Travel Lane Bike Lane Gravel Path

Bike Lane Travel Lane Travel Lane Bike Lane Gravel Path

Page 13: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

EXISTING

COMING 2019

MARCH 2018

SEGMENT 8 PROPOSALN 50th St: Whitman Ave N – Stone Ave N

Major Changes:• Bike lanes widened and striped in both directions

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown.Sidewalk and planting strip widths vary along the corridor.

Sidewalk Planting Strip Shared Parking & Bike Lane Travel Lane Travel Lane Bike Lane Planting Strip Gravel Path

Sidewalk Planting Strip Parking Bike Lane Travel Lane Travel Lane Bike Lane Planting Strip Gravel Path

Page 14: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTSN 40TH ST OVERVIEW MAP

9

10N 80TH ST

N 83RD ST

NE 65TH ST

NE RAVENNA BLVD

ROOS

EVEL

T W

AY N

E

FREM

ONT

AVE

N

GREEN LAKE WAY N

STON

E W

AY N

PHIN

NEY

AVE

NPH

INN

EY A

VE N

2ND

AVE

NE

LATO

NA

AVE

NE

GREE

NW

OOD

AVE

N

WINONA AVE N

N 65TH ST

N 45TH ST

N 50TH ST

N 40TH ST

N 46TH ST

Green Lake

Green LakePark

Woodland Park Zoo

WoodlandPark

MeridianPlayground

WallingfordPlayfield

B.F. DayPlayground

UniversityPlayground

5

E GREEN LAKE DR N

W GREEN LAKE DR

N

W GREEN LAK

E WAY N

GREEN LAKE DR N

AURO

RA A

VE N

99

AURO

RA A

VE N

99

STON

E W

AY N

E GREEN LAKE WAY N

DEN

SMOR

EAV

E N

9 10

MARCH 2018

Bike enhancements added, no paving

Page 15: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

EXISTING

COMING 2019

MARCH 2018

SEGMENT 9 PROPOSALN 40th: Stone Way N - Wallingford Ave NE

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

Sidewalk Parking Lane Travel Lane Travel Lane Parking Lane Sidewalk

Sidewalk Bike Lane Parking LaneTravel Lane Travel Lane Bike Lane Sidewalk

Major Changes:• 1-way protected bike lane added to uphill section of Stone Way N• Bike lane added to downhill section• Travel lanes and parking lanes narrow to accommodate bike safety measures

Page 16: Green Lake Area Paving & Safety Projects - SeattlePLANNING DESIGN CONSTRUCTION We are here Green Lake Area Paving & Safety Projects We've been engaging with the Green Lake community

GREEN LAKE AREA PAVING & SAFETY PROJECTS

EXISTING

COMING 2019

MARCH 2018

SEGMENT 10 PROPOSALN 40th: Wallingford Ave NE - Latona Ave NE

NOTES: Cross sections are looking west. Street configurations at intersections may look different than cross sections shown. Sidewalk and planting strip widths vary along the corridor.

Sidewalk Planting Strip Parking Lane Travel Lane Travel Lane Planting Strip Sidewalk

Sidewalk Planting Strip Travel Lane with Shared Bike Lane

Travel Lane Bike Lane Planting Strip Sidewalk

Major Changes:• 1-way protected bike lane added to uphill section of Stone Way N• Shared bike and travel lane for downhill travel • Parking removal on south side of N 40th St