98
Greater Toronto Area This route started as a project for Bombardier/TCS to aid in training new GO Transit operators in 2006/07. It was originally built in two pieces; GO East and GO West. Accuracy of the trackwork and signaling was most important, as was the physical operation of the equipment. Reliable smooth simulator operation was also important. The route did not have as many background details as most MSTS routes to enhance the smooth operation. The route takes the East and West GO Project and combines them into one large project. More details and track work were added and the route and equipment were refined into the Greater Toronto Area (GTA). Route Build: Andy Hockin Locos: Ed Sketcher Equipment: Ian Dodd, Ed Sketcher Downtown Towers: Ian Dodd, Ed Sketcher Activities: Andy Hockin Sound Recordings: Robin Claxton The route has over 230 miles of main track, 43 passenger stations, dozens of yards and hundreds of industrial leads. GO Transit, Via and CN equipment is included in 20 activities that run over 8 subdivisions. The subs include all of the USRC, Halton, Weston, Oakville, Uxbridge and portions of the York, Bala, Newmarket and Kingston. The trackwork is accurate for modern operation including the latest upgrades not shown in the included CN track profiles. The passenger activities are taken from the operating schedule all beginning or ending at Union Station.

Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Greater Toronto Area This route started as a project for Bombardier/TCS to aid in training new GO Transit operators in 2006/07. It was originally built in two pieces; GO East and GO West. Accuracy of the trackwork and signaling was most important, as was the physical operation of the equipment. Reliable smooth simulator operation was also important. The route did not have as many background details as most MSTS routes to enhance the smooth operation. The route takes the East and West GO Project and combines them into one large project. More details and track work were added and the route and equipment were refined into the Greater Toronto Area (GTA). Route Build: Andy Hockin Locos: Ed Sketcher Equipment: Ian Dodd, Ed Sketcher Downtown Towers: Ian Dodd, Ed Sketcher Activities: Andy Hockin Sound Recordings: Robin Claxton The route has over 230 miles of main track, 43 passenger stations, dozens of yards and hundreds of industrial leads. GO Transit, Via and CN equipment is included in 20 activities that run over 8 subdivisions. The subs include all of the USRC, Halton, Weston, Oakville, Uxbridge and portions of the York, Bala, Newmarket and Kingston. The trackwork is accurate for modern operation including the latest upgrades not shown in the included CN track profiles. The passenger activities are taken from the operating schedule all beginning or ending at Union Station.

Page 2: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that are just now being completed during the current downtown building boom.

Major yards modeled in the route include the Brampton intermodal, the Willowbrook/Via service centers in Mimico, the Oakville Ford plant and the Aldershot. The Union Station Rail Corridor (USRC) has been accurately modeled which made the use of Xtracks necessary due to the countless double slip switches on each approach ladder. The number of single dwarf signals in the USRC had to be reduced from the prototype, as there were too many signals in the area for MSTS to process. There are still enough of them to give a great feel of the area.

Page 3: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

The GTA has many features that will only work with the use of the MSTS “Bin”. The Bin fixes many issues with MSTS and it helps with the stability of the sim. The route will operate without it, however the sim may post messages indicating problems. The bin can be downloaded from the link in the requirements section below. The GTA will be open to development by any person willing to submit objects or activities to Maple Leaf Tracks. If anyone would like to make or improve a model of a structure, vegetation, texture, etc, to be placed on the route, MLT on approval of the submission, will build an update for the owners of the GTA. These updates will include any necessary fixes to the route and will be free to download and distribute to the GTA owners. Changes to the trackwork unfortunately cannot be made due to the nature of MSTS. During the combining of the East and West GO projects, the Oshawa leg could not be added. The database became corrupted due to the local route database that defines the dynamic track becoming too large for MSTS to process. This will be looked into to see if that leg can be added to the GTA. Other route combining will also be looked into such as adding the Niagara Corridor and the Bala Sub. In certain areas, the frame rate (fps) will drop due to the number of track and world objects. The USRC and Mimico yard are two of these areas. If your fps drops or the sim crashes, the following suggestions will help: Do a disc clean and defragmentation of your computer. Turn off all programs running in the background such as messenger. Go into the MSTS options and turn off all shadows and specular lighting. Lower the world object density to 8 or 7. Set the display resolution to 1024 or higher. You may also need to adjust other options to improve performance. Start each act from a fresh boot of the computer. Required elements not supplied by MLT for the GTA are as follows: MSTS V1.2 http://tsinsider.com/Support/v1Downloads.aspx#tsupdate MSTS “Bin” http://mstsbin.uktrainsim.com/ Xtracks http://www.nklj.se/xtracks/XTracks.htm

Page 4: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that
Page 5: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that
Page 6: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that
Page 7: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

302.7=310'304.6=275'

147N

147S

146N

146S023T1

024T1

023T4

024T4

023T3

024T3

023T2

024T2EASTWARDor

SOUTHWARDSIGNALS

WESTWARDor

NORTHWARDSIGNALS

3

102

102

Subway OverheadBridge

Grade Xing RiverBridge

Culverts forstreams & rivers

C.R.O.Rule 102 Limits

Mileage Post

Splitrail Derail

Regular Derail

Switching SignalRoute Available

C.M.A. Zones (SDC)(Behind Frt. Speed Line)

1

3

=#20 (45MPH)

5 =#12 or Smaller (15MPH)

=#16 (30MPH)

SWITCHES=#12 or Smaller Spring Switch

SS

Inoperative SemaphoreSignal (Used as Approach)

Signal No.s denoted with an arroware intermediate, ABS, or advance signals.

Signal's denoted with a MASTand/oroff-set heads

are intermediate, ABS, or advance signals. LEGEND

Station Platform Station Platform No Longer in use.

Stop BoardsCrossing Pushbutton

Switch Blower

Switch Heater

Hot Box Scanner

Station

In CTC - Hand operated Swt.In ABS - X-over Swt.Electric Lock

Out Building

Radio Tower

Reflectorized crossbuckGates and LightsLights and Bells onlyWig-WagsCrew Protect

}RGL

WC

CrossingProtection

Foreign Owned TrackageC.R.O. Rule 102 Not Applicable

Foreign Owned TrackageC.R.O. Rule 102 APPLICABLE

CN Trackage - Out of Service

Farm Xing.

Page 8: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Foreman'scrossing

Foreman'scrossing

Western Lead

FormerBathurst SouthStorage Yard

FormerBathurst SouthStorage Yard

15

60PSGR

FRT

John St.

Oakville Sub.

Oakville Sub.

Kingston Sub.Kingston Sub.

3333ND

3333SD

001ND

001SD

002SD

002ND

003ND

003SD004ND

004SD

To: Bathurst St.North Yard

To: Bathurst St.North Yard

Flyunder

Weston Sub. toParkdale

Weston Sub. toParkdaleTo

CP RailGalt Sub.

ToCP Rail

Galt Sub.

C1

C2

A2

A3

D1

D2

To Don Yard

Bathurst St.

1.1

Toronto

0.0

John St.West

John St.West

John St.East

John St.East

Scott St.(USRC)Scott St.(USRC)

1 0

} USRC to Union Stn.USRC to Union Stn.

1.09

Bathurst St.

Foreman'scrossing

Foreman'scrossing

Locked withSpecial LockLocked withSpecial Lock

R3-0.00-1.30Weston Sub.03\07\25dmn

1 1

009T3

009T496D1

96D2

42310 42414

West Limits USRC =D Tracks = Mile 1.0West Limits USRC =D Tracks = Mile 1.0

West Limits USRC =A Tracks = Mile 1.2West Limits USRC =A Tracks = Mile 1.2

011T1

011T2118A2

118A3

15

45PSGR

FRT

1 0Weston Sub.

R4-0.00-1.25Oakville Sub.03\07\25dmn

Oakville-Kingston North Connecting Track

Oakville-Kingston South Connecting Track

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

USRC

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RC U

SR

CRTC: CH8T1, *5-460#

Sim

co

eS

t.S

imco

eS

t.0.2

5

Page 9: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

102

102

15

45PSGR

FRT

Strachan

1.5

2

1.9

9F701

F700Storage

Dow

nFrt.

North

TrackW

estonSub.

SouthTrack

Weston

Sub.

North

TrackCP

Galt

Sub.

SouthTrack

CP

Galt

Sub.

1.5

9

1.6

3F

ore

man

’sC

ross

ing

Fore

man

’sC

ross

ing

G

Str

ach

an

Av

e.

Str

ach

an

Av

e.

15N

15S158C1

158C2

158GN

158GS

1.6

35

55PSGR

FRT

Note: Westward movements = 30 MPHMile 1.3 to 1.6 until Strachan Ave. occupied.

Eastward movements = 30 MPHMile 1.9 to 1.6 until Strachan Ave. occupied.

(CP

Mil

e1.4

4)

CP Galt Sub. (514) 392-5393

1.6

1.5

R5-1.30-2.10Weston Sub.06\02\01dmn

1.30 = 257'2.10 = 290'

Kin

gS

t.

15-1

15-2

}USRC

CP Galt Sub.

CN Weston Sub.

West Limits Union Station Rail Corridor50 feet West of Strachan Ave. Crossing

For Both CN and CP Rail.CN = Mile 1.6CP = Mile 1.45

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

CT

C

CT

CU

SR

C

US

RC

CT

C

CT

CU

SR

C US

RC

1.6

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

(CP

Mil

e1.9

7)

Page 10: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

35

55PSGR

FRT

Parkdale

2.5 Weston Sub.

(42250)

3

Qu

een

St.

Qu

een

St.

2.4

6

2.4

4F

ore

man

'sX

ing

102 CP Galt Sub. (514) 392-5393

Antonio Gaspar(Lakeview Fruit Market)

23N

23S24S

24N

26

2.4

9

2.5

3

A

B

1

3

2.4 Newmarket Sub.

R4-2.10-3.45Weston Sub.06\02\01dmn

Newmarket Sub.Newmarket Sub.2.7

9B

rock

Av

e.

3.1

2

Lan

sdo

wn

eA

ve.

3.4

5W

esto

nS

ub. 3.37

NewmarketSub.

3.37NewmarketSub.

Du

nd

as

St.

Du

nd

as

St.

R3-2.40-3.65Newmarket Sub.99\09\23dmn

2.30 = 290'3.45 = 355'

35N

35S33-1

33-2

25-1

25-226-1

26-2

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

JCT

SW

T2.5

4W

esto

nS

ub

2.4

0N

ewm

arket

Sub

JCT

SW

T2.5

4W

esto

nS

ub

2.4

0N

ewm

arket

Sub

(CP

Mil

e2.9

6)

(CP

Mil

e2.3

3)

(CP

Mil

e2.6

2)

(CP

Mil

e3.3

4)

Page 11: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

35

55PSGR

FRT

Bloor

4.0

4

Blo

or

St.

Blo

or

St.

Wall

ace

Av

e.

Ped

est

rian

Bri

dg

eW

all

ace

Av

e.

Ped

est

rian

Bri

dg

e

3.9

6

XXXXXXXX

4.6

0

47N

47S

49-3

03

02

57-2

59N

57-1

59S

Du

po

nt

St.

Du

po

nt

St.

47-160

N

58-2

46-1

60S

58-1

46-2

CP

Nor

thTor

onto

Sub.

CP Galt Sub.

CPMactier Sub.

4.9

54.8

84.8

74.8

64.8

5

Note: Remotely controlled by St.L&H RTC.DO NOT ISSUE RULE 564 UNLESS

CREW IS IN POSSESSION OF RULE 610AUTHORITY FROM St.L&H RTC.

4.8Note: Max. speed=35 MPH

over diamond Mile

(WEST TORONTO DIAMOND)

102

102

CP Galt Sub. (514) 392-5393

4.6 CP Galt Sub.

4.8 CN Weston Sub.

4.2

7

01

03B

47B

R5-3.45-5.10Weston Sub.06\02\01dmn

3.45 = 355'4.95=398'

To Davenport

Note: Westward TrainsMax. Speed = 35 MPH

Mile 4.6 to Mile 5.0

43-1

43-2 36-1

36-2

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Former CPRoadbed

Former CPRoadbed

SWT

Old

Wes

ton

Rd

.O

ldW

esto

nR

d.

4.9

9

CP

0.2

3M

acti

erS

ubG

04

52N

52S

(CP

Mil

e3.8

1)

(CP

Mil

e4.1

2)

(CP

Mil

e4.4

5)

50-1

B

50-1

50-2

50-3

Page 12: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

102

60

80PSGR

FRT

6

Bla

ck

Cre

ek

Bla

ck

Cre

ek

Ro

gers

Rd

.R

og

ers

Rd

.6.1

2

0.9

0.2

5.7

5.1

CP Mactier Sub.CP Mactier Sub.

CP Mactier Sub.CP Mactier Sub.

CP Mactier Sub.CP Mactier Sub.

CN Weston Sub.CN Weston Sub.

CN Weston Sub.CN Weston Sub.6.4

0

6.4

5B

lack

Cre

ek

Dr.

Bla

ck

Cre

ek

Dr.

6.6

5C

ulv

ert

6.8

2E

gli

ng

ton

Av

e.

7.1

7R

ayA

ve.

75

76

7.7

0Ja

ne

St.

Jan

eS

t.

Facelle

J362

-677

'

Gate

Gate

7.7

1(E

L770)

7.7

1(E

L770)

Facelle

J350-8

16'

7.4

8J360

192'

7.9

6D

en

nis

on

Av

e.

G

R5-5.10 - 7.95Weston Sub.06\02\01dmn

7

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

(CP

Mil

e3.1

7)

102

102

35

55

West Toronto

5.142230

St.

Cla

irA

ve.W

est

St.

Cla

irA

ve.W

est

Keele

5.3

5.3

0

60

80PSGR

FRT

1 3

5.4

8

5.4

5

CP Mactier Sub (514) 392-5392

5.3

Str

eam

5.6

5

53N

53S

53D

54

Note: Eastward TrainsMax. Speed=35 MPHMile 5.4 to Mile 5.0

Note: Eastward TrainsMax. Speed=35 MPHMile 5.4 to Mile 5.0

06 05

06B

(CP

Mil

e0.5

5)

(CP

Mil

e1.3

4)

(CP

Mil

e1.6

6)

(CP

Mil

e2.0

3)

(CP

Mil

e2.4

0)

(CP

Mil

e2.9

2)

Page 13: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

8.9

4

(CP

=4.1

5)

(CP

=3.9

5)

(CP

=3.8

4)

Ch

urc

hS

t.C

hu

rch

St.

8.1

0

102102

Weston

8.642220

8

Law

ren

ce

Av

e.

8.4

4

3.6 CP Mactier Sub.CP Mactier Sub.

8.4 CN Weston Sub.CN Weston Sub.

CN

-C

r

P

g

C

in

oct

nne

Tack

CN

-C

r

P

g

C

in

oct

nne

Tack

8.6

3Jo

hn

St.

Joh

nS

t.

8.7

4K

ing

St.

Kin

gS

t.

GGG

102

4.5 CP Mactier Sub.CP Mactier Sub.

9.3 CN Weston Sub.CN Weston Sub.9.5

1W

est

on

Rd

.W

est

on

Rd

.

9

CP Mactier Sub (514) 392-5392

8.00 414'9.60 458'

94

95

McGill

9.4

R6-7.95-9.51Weston Sub.06/02/01dmn

Note: PSO=35 MPH all TrainsBetween Mile 8.2 and Mile 9.3

To MactierTo Mactier

TH

ISIS

NO

TA

LEG

AL

DO

CU

MEN

T-

FO

RIN

TER

NA

LC

NIN

FO

RM

ATIO

NO

NLY

TH

ISIS

NO

TA

LEG

AL

DO

CU

MEN

T-

FO

RIN

TER

NA

LC

NIN

FO

RM

ATIO

NO

NLY

60

80PSGR

FRT

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

(CP

Mil

e3.6

3)

Page 14: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

11.0

7(E

L1109)

11.0

7(E

L1109)

10

.25

60

80PSGR

FRT

Etobicoke NorthEtobicoke North

11.0

10

Hu

mb

er

Riv

er

Hu

mb

er

Riv

er

Isli

ng

ton

Av

e.

9.6

09

.61

9.9

3

No

Han

dra

ils,

No

Walk

way

s

Pri

vat

eG

olf

Clu

b

Pri

vat

eG

olf

Clu

b

10.4

1

10

.50

Cu

lvert

Cu

lvert

10.6

8H

WY

No

.4

01

HW

YN

o.4

01

11.1

3

North ServiceTrack X100

Labatt's Brewery

X104-5

95'

X105-9

39'

X106-8

36'

X108-2

218

'

X112-8

58'

X110-1

513'

Sears Ltd.

XT

LT

ran

spo

rt

11.0

7K

ipli

ng

Av

e.

11

9.55=458'11.13=522'

RexdaleIndustrial

Spur

RexdaleTool houseX

120

R3-9.51-11.13Weston Sub.06/04/17dmn

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

XXXXXXXXXXXXXXXXXXXXX

GOStation Parking

GOStation Parking

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

Page 15: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

60

80PSGR

FRT

Rexdale Industial Area

12

Cu

lvert

Mart

inG

rov

eR

d.

Mart

inG

rov

eR

d.

11

.73

X115-950Team Track

X208

X2

09

-28

3'

X2

10

-47

6'

X20

7-29

4'

1

2

3

North Service Track

South Service Track

X172-1

137'

Han

ford

Lum

ber

X263

1

2

3

Consumer's Distributing

L.C.B.O.

Crawford Barbco

11

.50

Gat

e

X1

73

-32

8'

X17

5-1

15

9'

X174-5

06'

X1

76

-10

12

'

Sp

iked

Sp

iked

Sp

iked

X180-1145'

X1

83-3

00

'

X18

6-9

42

'

X18

6-94

2'

X18

1-97

2'X

182-

345'

X189-662'

X188-606'

X187 652'

X1

94-2

40'

H2

66

-97

0'

Un

iver

sal

Fla

vo

urs

(Can

ada)

X21

8-16

28'

Can

ada

Iron

Found

ry

HighburyIndustrial

Lead

5

5

6

6

7

7

7

8

8

88

9

9

10

10

11

11

12

12

13

13

14

14

Valcan Ashphalt

Hauseman Ltd.

Intercontinental Warehouse

General Mill's

Atlas Supply Co.

Leco Ind.

Consumer's Glass

Building Productsof Canada Ltd.

Cowie Ind. Dev. Ltd.

Krist E. Apog

11.13=522'12.10=551'

R3-11.13-12.35Weston Sub.99/12/16dmn

Bethridge Rd.

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

Page 16: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

13.9

7

13.7

0M

imic

oC

reek

East

Bra

nch

Go

rew

ay

Dr.

Go

rew

ay

Dr.

13.6

0

60

80PSGR

FRT

Woodbine EastWoodbine East

12.5

1314

Hw

y.N

o.

27

12.3

7

125D

123S

123D

126D

126S

126

1

3

12.4

8

12.5

2

12.5

3

12.5

8

Sp

iked

Sp

iked

A

A

B

B

X312LX322

X323

X326

X3

27

AB

CIn

teri

ors

G400

X344L

MacMillanBloedel

SPEX

X348-1000'X350-848'

HowellWarehousing

13.0

6

Carl

ing

vie

wD

r.C

arl

ing

vie

wD

r.

G

X355-1303'

X356-1305'

X358-372'

ValentineDevelopments

13.5

0

13.5

2

Hw

y.N

o.

42

7H

wy.

No

.4

27

Hw

y.N

o.

42

7/4

09

Ram

pH

wy.

No

.4

27

/40

9R

am

p

American CanLead

Note: Max Speed=30 MPHOn North Track Mile 12.5 to 14.1

Note: Max Speed=30 MPHOn North Track Mile 12.5 to 14.1

Northwest Dr.

Home DepotHome Depot

RR

Orlando Dr.Lead

G735-8

41'

G790-1486'

G791-712'

Ku

ehn

e&

Nag

el

139S

139N

140D

140S

1B

A

14.0

4

14.0

9

Woodbine West

14.1R4-12.35 - 14.20Weston Sub.03/07/25dmn

ALL

ALL

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

Page 17: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Der

ryR

d.

Der

ryR

d.

14.8

0

Mim

ico

Cre

ekW

est

Bra

nch

15.7

0

60

80PSGR

FRT

Malton

14.742215

G740-6

34'

G744 G

743-5

41'

G75

0-15

92'

No

rth

wes

tD

riv

eL

ead

DeHavillandMacDonald Douglass

Mim

ico

Cre

ekW

est

Bra

nch

Bo

xed

Cu

lver

t

15.2

0

15.5

0

Air

po

rtR

d.

Air

po

rtR

d.

14.8

7

15

15.2

7

No

rth

Ala

rto

nS

t.(S

carb

oro

St.

)N

ort

hA

lart

on

St.

(Sca

rbo

roS

t.)

15.6

5(E

L1567)

15.6

5(E

L1567)

15.6

4(E

L1566)

15.6

4(E

L1566)

157

158

North Service Track X100

South Service Track X206

R3-14.20 - 15.80Weston Sub.01/04/01dmn

1

1 1

2

2

Schenker of Canada

Norampac

15.50 = 551'

G

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

GOStation Parking

GOStation Parking

VIA

VIARTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

Page 18: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

10

.47

PSGR

FRT

10

55

6011.2

112S

Halwest

11.1

G

R7-9.70-11.25Halton Sub.05/11/16dmn

R8-15.80-17.00Weston Sub.06/07/13dmn

112N

42355

111D

111N

111S

169

1 5

7

9

11

.21

11

.14

11.1

0

16.9

4

11.0

6

16.9

0

11

.13

JCT

.S

WT

.w

ith

Wes

ton

Su

b(1

7.0

)11

.13

JCT

.S

WT

.w

ith

Wes

ton

Su

b(1

7.0

)

11

.07

11

.01

(Hal

ton

Sub

)

(Wes

ton

Sub

)

Hw

y.N

o.40

7

11

.00

A

AB

B

106N 105N

105N1

1

Y292 1800'

Y291 1800'

Y290 North Service Track 7390'

C300 South Service Track 8976'

C310 1978'

C311 1508'

C312 1392'

C313-C314

Pocket Track

C332

C301

C302

C303

C304 - ECORAIL

Receiving & Departure

Receiving & Departure

Receiving & Departure

Malport YardOffice

Malport YardOffice

10

.49

Torb

ram

Rd.

To

rbra

mR

d.

Torbram

10.5

PSGR

FRT 50

50

All

Halton-W

eston

Connecting

Track

Halton-W

eston

Connecting

Track

Malport

9.742365

16.17

Weston

SubSouth

Service

C315 to C319

C330

Ramp

C331

Team Track 1

Team Track 2

C335

C336

Jct. withWeston Sub

Jct. withWeston Sub

11

.13

Halto

nS

ub

17

.0W

eston

Su

b11

.13

Halto

nS

ub

17

.0W

eston

Su

b

10.8

0

11

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Cu

lvert

Wes

ton

Rd

.L

um

ber

Wes

ton

Rd

.L

um

ber

C3

55

G783

Domtar

G784

G785

G786Nestle

G782

ECORAIL COMPOUND

3

S

16.9

RTC: CH4T2,*5-011#

RTC: CH4T2,*5-011#

16.8

2

1109

Page 19: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

GO StationParking

GO StationParking

32

5.3

0P

sgr.

Tunnel

Als

oto

St.

Cla

irA

ve

Psg

r.T

unnel

Als

oto

St.

Cla

irA

ve

32

5.2

06

0.6

6U

xb

rid

ge

Su

b.

60

.66

Ux

bri

dg

eS

ub

.

St.

Cla

irA

ve.

East

St.

Cla

irA

ve.

East

32

4.9

7

Ux

bri

dg

eS

ub

.to

Sto

uff

vil

leU

xb

rid

ge

Su

b.to

Sto

uff

vil

le

60

.54

Opposi

te325.1

5O

pposi

te325.1

5

Mid

lan

dA

ve.

32

3.6

0

32

4.0

0

32

4.2

3

324

.05

32

4.3

0

Cu

lvert

Cu

lvert

Cu

lvert

Cu

lvert

Cu

lvert

32

3.6

5M

cC

ow

an

Rd

.M

cC

ow

an

Rd

.

Scarborough325.2

60

LRC

PSGR

FRT

100

90

32

4.2

2

32

5.2

7

Bri

mle

yR

d.

Bri

mle

yR

d.

S350 - 900’S350 - 900’

S280 - 940’S280 - 940’Atlantic

PackagingAtlantic

Packaging

ToolHouse

S356-500'

S354-374'

3242T1

3242T2

3242T3

3243T1

3243T2

3243T3

41798

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

3232T1

3232T2

3232T3

3233T1

3233T2

3233T3

323.2

5

325.2

2M

tce.

Xin

gM

tce.

Xin

g

XXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXX

324325

R3-323.24-325.30Kingston Sub.02/12/16dmn

325.3=535' 324.4=555' 323.3=534'

323.8

7

RTC: CH2T2*5-009#

RTC: CH2T2*5-009#

Page 20: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

327.8

6

3279N

3279S3278N

3278S

32

5.3

5M

tce.

Xin

g.

32

5.5

5

CT

C

OC

SC

TC

OC

S

325.7

6

326.1

5

326.5

0

327.0

1

327.1

6

Ken

ned

yR

d.

Ken

ned

yR

d.

Wo

od

row

Av

e.

Bir

ch

mo

un

tR

d.

Bir

ch

mo

un

tR

d.

Dan

fort

hA

ve.

Ward

en

Av

e.

32

5.7

4C

ulv

ert

R6-325.30-327.90Kingston Sub.02/12/02dmn

3267S

3267N

3266S

3266N

Scarborough

60

PSGR

FRT

100

90

LRC

3253

1,3 & 5

3253T1

3253T2

3253T3

325.4

5

325.5

3

JCT

.

SW

T.

JCT

.

SW

T.

325.5

8

325.6

6

3256N

7 only

3256S

1

3

7

5

Uxbridge Sub. MainUxbridge Sub. Main

Kingston Sub. Track 2Kingston Sub. Track 2

Kingston Sub. Track 3Kingston Sub. Track 3

Scarborough Jct. Swt.Mile 325.56 Kingston Sub.Mile 61.03 Uxbridge Sub.

Scarborough Jct. Swt.Mile 325.56 Kingston Sub.Mile 61.03 Uxbridge Sub.

61.0 Uxbridge Sub.Uxbridge Sub.

326.5

8

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

325.5

6

Track 1Track 1

JCT

.

SW

T.

JCT

.

SW

T.

327 326

327.8=427' 325.3=535'

61.0

3C

ulv

ert

*

RTC: CH2T2*5-009#

RTC: CH2T2*5-009#

Page 21: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH2T2*5-009#

RTC: CH2T2*5-009#

32

8.4

5

Mtc

e.X

ing

.M

tce.

Xin

g.

327.9

3

Vic

tori

aP

ark

Av

e.

Vic

tori

aP

ark

Av

e.

3288S

3288N

R3-327.90-329.02Kingston Sub.06/09/18dmn

60

100

90

LRC

PSGR

FRT

Danforth328.6

42432

42432

328.6

0

328.6

4

328.7

6S

wt.

rem

oved

32

9.0

2

32

8.7

0S

pik

ed

Note: Signals 3287N & 3287SAre mounted on Signal Bridge

which is attached to pedestrian bridge.

Note: Signals 3287N & 3287SAre mounted on Signal Bridge

which is attached to pedestrian bridge.

No Parking @ DanforthPedestrian Access only

From Main St

No Parking @ DanforthPedestrian Access only

From Main St

Note: Dual Control Swtsat Danforth are equippedwith Sargeant/Greenleaf

High Security Locks

Note: Dual Control Swtsat Danforth are equippedwith Sargeant/Greenleaf

High Security Locks

Sp

iked

328.8

3

328.9

1

328.8

4

Main

St.

Main

St. P

ed

est

rian

Ov

erh

ead

Bri

dg

eP

ed

est

rian

Ov

erh

ead

Bri

dg

e

Fen

ce

Y101-3720'

Y102-3500'

XXXXXXXXXXXXXX

Danforth Yard

(Require permission fromMTS Oshawa/Don toenter Danforth Yard)

(Require permission fromMTS Oshawa/Don toenter Danforth Yard)

Y202-1200'

1

3 5

7

3288

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Fen

ce

3287S

3287N

3287

328329

329.0=405' 328.6=427'

Page 22: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

330.0

8

330.0

9W

oo

dfi

eld

Rd

.P

ed

est

rian

Un

derp

ass

Wo

od

field

Rd

.P

ed

est

rian

Un

derp

ass

329.8

0

330.2

8

331.6

8

331.1

2

331.

12

331.

30

331.3

0

331.3

9

331.0

9

33

0.3

GR

EN

&G

RE

SO

NE

S

Co

xw

ell

Av

e.

Gre

en

wo

od

Av

e.

Qu

een

St.

E.

Qu

een

St.

E.

Car

law

Ave

Car

law

Ave

Log

anA

ve.

Du

nd

as

St.

E.

Du

nd

as

St.

E.

Gerr

ard

St.

E.

Gerr

ard

St.

E.

Carl

aw

Av

e.

329.2

3

330.6

8

Wo

od

bin

eA

ve.

Jon

es

Av

e.

331.0

1

Sp

iked

Fo

rem

an

'sT

urn

aro

un

d

Y282-440'

329.5

0

329.9

5

Cu

lvert

Cu

lvert

6060

10070

9060

LRCLRC

PSGRPSGR

FRTFRT

3299N

329.7

8

3299S3298N

3298S

TorontoTransit

Commision

TorontoTransit

Commision

3309N

Y230

330.7

1

3309S3308N

3308S

3317N

331.5

6331.5

8

3317S3316N

3316S

330.9

6P

ap

eA

ve.

Ped

est

rian

Ov

erp

ass

Pap

eA

ve.

Ped

est

rian

Ov

erp

ass

Tha

cker

aySt.

Log

anA

ve.

Dundas St. E.

Dundas St. E.

Col

gate

Pal

mol

ive

Co.

Col

gate

Pal

mol

ive

Co.

Dickens St.

P201 - 5911'

P200 - South Service Track - 3.6 Miles - Out of ServiceP200 - South Service Track - 3.6 Miles - Out of Service

331.0TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

330331

R3-329.02-331.68Kingston Sub.06/09/18dmn

331.7=279' 329.0=405'

RTC: CH2T2*5-009#

RTC: CH2T2*5-009#

Page 23: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Union Station

Rail Corridor

Union Station

Rail Corridor CT

CC

TC

332.1

3D

on

Vall

ey

Park

way

Do

nV

all

ey

Park

way

331.8

9

332.6

0

332.6

2

East

ern

Av

e.

Ch

err

yS

t.C

herr

yS

t.

TorontoH

arbour District

TorontoH

arbour District

TorontoH

arbour Com

missioners

Trackage

(USR

C)

TorontoH

arbour Com

missioners

Trackage

(USR

C)

Service Track P200Service Track P200 "The 3rd Track""The 3rd Track"

Cherry St.Tower

Cherry St.Tower

Kingston Sub. South TrackKingston Sub. South Track

Kingston Sub. North TrackKingston Sub. North Track

7 North P200-3000'7 North P200-3000'

6 North P201-3000'6 North P201-3000' Service Track P201Service Track P201

R5-331.69-332.64Kingston Sub.07/01/08dmn

R5-1.00-1.89Bala Sub.07/01/08dmn

6015

7030

6030

LRCLRC

PSGRPSGR

FRTFRT

332.1

5D

on

Riv

er

24

5ft

.D

on

Riv

er

24

5ft

.

171

162

332.3

1

332.3

9

175

164

Bala

Su

b.

Bala

Su

b.

Cherry StreetCherry Street332.6

Don Yard

CP

Bell

ev

ille

Su

b.

CP

Bell

ev

ille

Su

b.

42422

332.4

170N

174S

159 167141

148

134 166168

US

RC

160

161157

169

173 172

332.6

6

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

332

332.4=265' 331.7=279'

(Field Sign)

(Field Sign)

332.4

332.4

RTC: CH2T2*5-009#

RTC: CH2T2*5-009#

GO Yard L7GO Yard L7

GO Yard L8GO Yard L8

GO Yard L9GO Yard L9

GO Yard L10GO Yard L10

Don Yard

Page 24: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

(0.5

0B

ala

Su

b)

(0.5

0B

ala

Su

b)

33

3.3

2Ja

rvis

St.

Jarv

isS

t.

127

259

264

120

113

138

253254B

254A

124

33

2.8

5

(0.9

0B

ala

Su

b)

(0.9

0B

ala

Su

b)

(0.7

0B

ala

Su

b)

(0.7

0B

ala

Su

b)

(0.2

0B

ala

Su

b)

(0.2

0B

ala

Su

b)

(0.0

4B

ala

Su

b)

(0.0

4B

ala

Su

b)

33

3.1

2

33

3.6

3

33

3.7

5

Parl

iam

en

tS

t.P

arl

iam

en

tS

t.

Sh

erb

ou

rne

St.

Sh

erb

ou

rne

St.

CN North Connecting TrackCN North Connecting Track

North Connecting Track-10,032 ft. (Including USRC)North Connecting Track-10,032 ft. (Including USRC)

33

3.8

TO

RO

NT

OU

NIO

NS

TA

TIO

N4

24

14

33

3.8

TO

RO

NT

OU

NIO

NS

TA

TIO

N4

24

14

CN South Connecting TrackCN South Connecting Track

South Connecting Track-10,665 ft.South Connecting Track-10,665 ft.

Oakville-Kingston Connecting Tracks(Max. Speed = 15 MPH)

Oakville-Kingston Connecting Tracks(Max. Speed = 15 MPH)

Yo

ng

eS

t.Y

on

ge

St.

Bay

St.

Bay

St.

R4-332.64-333.34Kingston Sub.07/01/08dmn

R4-0.00-1.00Bala Sub06/04/21dmn

15

30

30

LRC

PSGR

FRT

126

119125

280

AB

143261

129271

255

136266

122276

115288

292

142262

121277

289

285

128272

135267

131270

275

291 117

145260

265

225

232

234

236

233

Short

Ladde

r

Short

Ladde

r

Che

rry

Ladde

r

Che

rry

Ladde

r

Jarv

isLad

der

Jarv

isLad

der

1

2

3

4

5

6

269

274

279

282

3333

ND

3333

SD

287

284284

286

283

Scott St.Tower

Scott St.Tower

See Oakville Sub.for continuation

See Oakville Sub.for continuation

Scott St. InterlockingWest of Jarvis Ladder

NOT SHOWN

Scott St. InterlockingWest of Jarvis Ladder

NOT SHOWN

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Union Station

Rail Corridor

Union Station

Rail Corridor

Advance Signals:Advance Signals:

333

CTC

CTC

USR

CU

SRC

CTC

CTC

USR

CU

SRC

112

Page 25: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

(0.50

Bala

Sub

)33

3.32

Jarvi

s St.

127

259

264

120

113

109

138

253254B

254A

124

112

332.8

5(0.

90 B

ala S

ub)

(0.70

Bala

Sub

)

(0.20

Bala

Sub

)

(0.04

Bala

Sub

)

333.1

2

333.6

3

333.7

5

Parlia

ment

St.

Sherb

ourne

St.

CN North Connecting Track

North Connecting Track-10,032 ft. (Including USRC)

333.8

TORO

NTO

UNIO

NST

ATIO

N42

414

CN South Connecting Track

South Connecting Track-10,665 ft.

Oakville-Kingston Connecting Tracks(Max. Speed = 15 MPH)

Yong

e St.

Bay S

t.

R2-332.64-333.34Kingston Sub.01/08/20dmn

R3-0.00-1.00Bala Sub01/08/20dmn

15

3030

LRCPSGRFRT

108251

131270

275

291 117

145260

265

225

232

234

236

233

Short La

dder

Cherry L

adder

269

274

279

282

3333N

D

3333SD286

283

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Advance Signals:

333

CTCCTC

USRCUSRC

CTCCTC

USRCUSRC

Page 26: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

CTC

CTC

332.1

3Do

n Vall

eyPa

rkway

331.8

9

332.6

033

2.62

Easte

rn Av

e.

Cherr

y St.

Ashbridges Bay Spur

Toronto Harbour Commissioners

Trackage(USRC)

331.6

9

P111 Gate

Service Track P200 "The 3rd Track"

Cherry St.Tower

Kingston Sub. South Track

Kingston Sub. North Track

7 North P200-3000'

6 North P201-3000' Service Track P201

P102-2366'

R2-331.69-332.64Kingston Sub.01/08/20dmn

R2-1.00-1.89Bala Sub.01/08/20dmn

6015

70306030

LRCLRCPSGRPSGRFRTFRT

332.1

5Do

n Rive

r24

5 ft.

171

162 332.3

1

332.3

9

175

164

Bala

Sub.

Cherry Street332.6

Don Yard

CPBe

llevil

le Su

b.

42422

332.4

170N

174S

159 167141

148

134 166168

USRC

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Pullback Track P102

332

332.4=265' 331.7=279'

Page 27: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

2341530

2.0

R6-1.90 - 4.34Bala Sub.01/08/20dmn

102

Don2.0

}42422

199 191

200

205

206019

USRC

CP Belleville Sub.514-392-5392

2.30026

039

026D

0251

2.51

Rosedale3.642517

P500 - Siding - 7050'

039D

4.01

CP B

ellev

ille S

ub.

CP Belleville Sub.

CN Bala Sub.

1022.6

208.7

1

1021.9

209.4CP Belleville Sub.

CN Bala Sub.

2094

Bloor

St. E

.

Quee

n St. E

.

Dund

as S

t.

Gardi

ner E

xpres

sway

Ramp

from

D.V.

P.

Gerra

rd St

.

D.V.

P. to

Bayv

iew E

xtenti

on

Forem

an's

Plank

Cros

sing

Rive

rdale

Park

Pede

strian

Brid

ge

1.98

2.26

1.93

2.45

3.31

3.65

4.03

2.67

Don River

Don River

3035PSGR

FRT

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

040 194A(Dwarf)

CTC

CTC

USRC

USRC

USRCSignal

CNSignal

Page 28: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

5678

4.34 = 257'8.95 = 364'

6.9 4.5

3035PSGR

FRT 3035PSGR

FRT

8.80

8.60

8.50

8.35

8.10

8.00

7.90

7.70

H.E.

P.C.

7.50

7.40

6.80

6.70

6.40

6.00

5.60

4.92

4.34

4.43

G

4.70

4.94.9

1Ro

seda

le (D

ALE)

5.39

6.50

6.53

6.60

8.26

88

89

62

63

6.20

8.85

8.94

Don R

iver

Don R

iver

Don R

iver

Don R

iver

Strea

mSt

ream

Wes

t Don

Rive

r

Strea

m

Strea

m

Don R

iver Strea

m

Don R

iver

Millw

ood R

d.

Potte

ry Rd

.

Don M

ills R

d.

Pede

strian

Brid

geDo

n Vall

ey P

kwy.

CP B

ellev

ille S

ub.

L

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LYR2-4.34-8.95Bala Sub98/02/11dmn

3540PSGR

FRT

Eglin

gton A

ve.

Beec

hwoo

d Rd.

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Page 29: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

9104050PSGR

FRT 3035PSGR

FRT

10.0

8.95 = 364'12.00 = 475'

1112

Oriole11.3

12.2

42572

11.12

(EL 1

117)

Z161-3800'

Z161-Former Lea sid e Sp urOu t o f S er vi ce

Z162-1200' (out of service)

Z156-450'

East ServiceTrack

Northward movements stopped atOriole GO Staion

Max = 25 MPHuntil crossing mile 12.36 fully occupied.

To CP Leaside

A.E.I

112D

112

11.16

1

119

120 1

119D

12.01

9.70

9.30

9.22

9.18

9.00

9.20

9.60

10.28

12.36

11.14

11.86

12.10

12.16

12.20

12.23

Don V

alley

Pkw

y.

Lawr

ence

Ave

. E.

Don M

ills R

d.

T.T.C

. Priv

ateTe

mpora

ry Rd

.

York

Mills

Rd.

Lesli

e St.

Forem

ans X

ing

Oriol

e Go

Pede

strian

Brid

ge

Hwy.

No. 4

01 R

amp

Hwy.

No. 4

01Hw

y. No

. 401

Ram

p

Z164-Siding-3468'

Oriole

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

111

R4-8.95-12.50Bala Sub.01/07/19dmn

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

G

Page 30: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

138

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Stee

les A

ve. E

.Do

n Rive

rTr

ibutar

y

Cumm

er Av

e.Pe

destr

ialW

alkwa

y

H.E.

P.C.

Finch

Ave

. E.

Old Cummer14.1

Shep

pard

Ave.

E.Sh

eppa

rd Av

e. E.

TTC

Tran

sit S

ubwa

y

15.70

15.55

15.40

15.22 15.17

14.80

14.55

14.50

14.20

14.18

13.91 13.88

13.40

13.20 12.54

12.50

12.6012.90

Don R

iver

139

14.16 Z1

95

Doncaster South15.4

153

154 1

15.38

154S

13.4

4050PSGR

FRT5065PSGR

FRT131415

13.00 = 469'15.80 = 545'

R3-12.50-15.80Bala Sub.98/02/11dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 31: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

LCS Push-button

Ea st

C o nne c ting

Trac k

LCS

Push

-butto

n

Crossin

gCircu

it

16.21

18.27

16175065PSGR

FRT

16.0

5060PSGR

FRT

15.80 = 545'17.00 = 590'

16.32

16.33

G

16.52

Doncaster16.1

So uth C o nnecting Track

Usable length =3350'Max. speed = 15 MPH

Sou th W

yeBala Sub 164

PB

Note: Any movement withincircuit limits with

No. 11 SWT in Hand throwMUST reset circuit. Entire

movement Must be clear ofcircuit limits before circuit

can be reset.

See N

ote

We st Tra c k

East Track

R5-15.80 -17.33Bala Sub.00/06/28dmn

41957

187D

183N

183S

159

9

7

1

3

11

161West MainTrack

Usable length = 7525'Max. speed = 50 MPH

Mile 16.3 - 17.5 Bala SubMax. speed = 15 MPH

Mile 16.3 Bala Subto Mile 18.7 York Sub

18.83

18.7918.78

18.7518.72 Jct. Swt.18.71

A

B

A

B

ALL except No 9

Doncaster ToolhouseAnd Track Supvr. Office

York Sub.

15.9215

.95Cu

lvert

18.54

16.08

York

Sub.

Bala

Sub.

16.91

16.92

John

St.

Gree

n Lan

e

Pede

strian

Unde

rpass

Bayv

iew A

ve.

Note: Max Speed AllTrains = 50 MPH

Over Doncaster DiamondYork & Bala Subs

West Track

East Track

LCS SWT

STOP

Main TrackMain Track

ForemansCrossings

5

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

188N

188S

LCS

LCS

PushButton

Page 32: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rt181920

17.30 = 600'20.20 = 710'

GO S

tation

Parki

ng

XXXXXXXXXXX

Hills

view

Ave.

Pede

strian

Xing

.

GSt

orm C

ause

way

Drain

age

Holy

Cros

s Cem

etary

Priva

te Un

derpa

ss

Pede

strian

Unde

rpass

Langstaff18.3

175W

175E

17.52

17.59

17.64

17.72

31A

B A

B

178W

178E ALLZ422

C.E. Mathews &C.C. Chemicals

18.00

Lang

staff R

d.

Hwy.

No. 7

Hwy N

o. 40

7WHw

y No.

407E

191W

191E192E

192W

19.15

20.18

19.60

19.44

18.80

18.05 17.33

18.15

18.1

Lang

staff (

LANE

& LA

NW)

18.19

18.23

18.21

17.80

19.47

18.95

18.45

Carrv

ille R

d.(16

th Av

e.)

Bantr

y Ave

.

High

Tech

Dr.

G

Langstaff SignalPlant

R5-17.33-20.20Bala Sub00/05/15dmn

5060PSGR

FRT

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 33: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

21.60

21.40

Culve

rt

Culve

rt

5060PSGR

FRT21

20.20 = 710'21.85 = 758'

21.57

Z540

21.49

21.51

(EL 2

154)

21.10

G

Richmond Hill21.0

42592

20.3020.31

207W

207E208D

208E

208W

20.58

20.63

20.64

20.66

20.71

5

3

1BB

AA

20.85

G

21.11

Z517 4500'

Z519 200'

Z526 728'

Z524 1040'

Z518 260'Team Track

G

21.48

Ramer Fuels

Z546

Rona

ld's F

edera

ted

Ratcl

iffe C

an. L

td.

21.80

Drain

age

Drain

age

Weld

rick R

d. E.

Major

Mac

kenz

ieDr

ive E

ast

Centr

e St. E

.

Cros

by A

ve.

Germ

an M

ills C

reek

No. 3 & 5A Only

No. 1 & 5B

R4-20.20-21.85Bala Sub01/07/19dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

XXXXXXXXXXX

Page 34: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

25.60

Priva

te Rd

.

25.04

Farm

Xing

.

Elgin

Mills

Rd.

E.To

wn of

Rich

mond

Hill

22.16

G

25.53

Roug

e Rive

rTr

ibutar

yDr

ainag

e25

.50

Lesli

e St.

York

Reg.

Rd. 1

2Tw

p. of

Markh

am25

.49

L

25.39

Roug

e Rive

rTr

ibutar

y

24.89

24.60

24.60

24.40 24.10

Cree

k

23.90

23.50 23.39

Cree

k

19TH

Ave

.Tw

p. of

Markh

am23

.61

L

Cree

k

Cree

k22

.30

Elgin22.2

22

222

221E

221W

22.20

1

22.20

22.80

22.81

22.50

Drain

age

Pede

strian

Und

erpas

s

Cree

k

23

23.023

.77Ba

yview

Ave

.Tw

p. of

Markh

am

246

21.85 = 758'25.75 = 895'

245060 PSGR

FRT25

(Gormley)51386

25.0

4045PSGR

FRT35DU

25.15

251

R3-21.85-25.75Bala Sub.01/09/25dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Adv

ance

Ar

row

L L

Page 35: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

B

CTC

CTC

1.15

1.09

7

1.17

Jane

St.

Snider West1.2

012N

012S

1.26

1.19

3

Nelso

n Agg

regate

Co.

(Pine

crest)

A602

-3218

'A6

01 3

360'

A603

Runa

round

812'

Pinec

rest L

ead

1.11

1.05

1

13.35

23.97

1.16

250T

2

0.01

0.060.070.10

0.74

0.11

250T

100

3S

005

008

007

LCS1

0.71

York 1

York 2

York 3

24.36

JCT.

SWT.

0.00 H

ALTO

N SU

B.24

.3 YO

RK S

UB.

24.05

24.00

23.96

24.00

23.93

23.92

23.97

23.92

23.89 23

.85

23.80

17

15

1311

7 23

5 9

1

240T1

Mile 0.4

240T2

240T3

134

129E

129W

So uth C o nne c tin g Tra c k

235S

235N

24.13

Halto

n I/B

York

3 Dep

arture

Ha lt o n

O u tb o un d

York

1

York

2

York

3

(rem

ote un

its in

opera

tion)

A610

Seto

ff & Li

ft Trac

k - 28

50'

Keele

St.

12.92Steeles Ave.

No rth Wye = 135

0 '

So uth Wye = 1230 'Snider23.6 York Sub.

12.9 Newmarket Sub.

PB

24

12.92

12.94

12.87

215

240By-Pass- Usable = 7800'Total Length = 8078'

Max. Speed = 30 MPH

19

23.99

9

L21

L11-2

0

L8L9

L10Green Route

South Ind. Lead

Halton O/B

Auto Compound Lead

Storage Yard

L 35 L

Switcher

Blue

011N

011N1

011S1

011S

003N

00/11/09dmn

TrainmansShanty

73

LCS

9

Map not to Scale

N

E

S

W

0.30 Halton Inbound

Halton Outbound25.0 York Sub

&

Halto

nIn

b ou n

d

Page 36: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

23.46

Forem

ans C

rossin

g

CTC

CTC

CTC

CTC

CTC

CTC

0.97

0.75

Culve

rt

Culve

rt

R7-23.00-25.00York Sub.01/06/22dmn

A610

2859

'

005

007S

LCS

0.71

MacMillan Yard41975

Ha lto n

Outb o

und

Halton Sub.Halton Sub.

By-Pass TrackUsable Length = 7800'

Total Length = 8078'Max. Speed = 30 MPH

York 2

York 3

York 1

Y o rk 3-D e pa r ture T ra c k

R6-0.00-1.00Halton Sub.00/11/09dmn

0.00 H

alton

Sub

.24

.36 Y

ork S

ub.

24.05

24.00

23.96

23.97

23.99

23.93

23.92

23.97

23.92

23.85

23.89

23.80

17B

A

15

1311

7

5 9

11 23

240T1

240T2

240T3

240

129E

(Dwa

rf)12

9W

North Connecting Track

So u th C o nne c ting Tra c k

Note: Usable length = 5350'Max. speed = 15 MPH

235S

235N

24.13

Keele

St.

12.92

0.30 13.81

Steeles Ave.

Hwy. No. 407

North Wye=1350'Max. speed=15 MPH

South Wye=1230'Max. speed=15 MPH

A A

B B

B

A

A

B

B

A

Newm

arket

Sub

23.6

Snider23.6

41969

1,5,7,9,21 & 23

PB

Note: Any movement withincircuit limits with No. 15 or No. 17 SWT in Hand throwMUST reset circuit. Entire

movement Must be clear ofcircuit limits before circuit

can be reset.

See Note Above

25

PSGRFRT 30

30 PSGR 50FRT 50

1.0=648' 0.0=680' 25.2=680' 23.40=630'

0.7

0.7 0.3

PSGR

PSGRPSGR

FRT

FRTFRT

30

20

30

20

PSGRFRT 50

50

50

50

23.71

24

134

19

21

Ha lt o n

Inb o

und

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

0.0

HaltonInbound

&Outbound

HaltonOutbound

0.3 Halton Inbound&

Halton Outbound.01

0.40

.10.11

AEIAEI AEI

003N

250T

2

250T

100

3S

.06

.07

PB

Note: Usable length=1900'South of Derail (13.75)Max. speed=15 MPH

Hwy. No. 407 Hwy. No. 407

Note: Movements on South Connectingtrack Snider must be authorized by R564 and R566

between Snider and Snider South

Page 37: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGRFRT 50

50

3.44

Culve

rt3.6

2Cu

lvert

3.82

Culve

rt

Open

Dec

k Culv

ert13

ft.2.3

0

1.13

Culve

rt

1.17

(Reg

. Rd.

55)

Jane

St.

1.95

2.00

Hwy.

No. 4

00

Hwy 4

00S

Ramp

to Hw

y 407

A.E.

I.

2.38

(Reg

. Rd.

56)

Wes

ton R

d.

PSGRPSO PSGRFRTPSO FRT

350405040

Snider West1.2

R4-1.00-4.30Halton Sub.01/09/12dmn

4.18

4.11

St. L

. & H

. Mac

tier S

ub

(Reg

. Rd.

7)Isl

ington

Ave

.

041N

041S

3.69

(Reg

. Rd.

57)

Pine V

alley

Rd.

3

026N

026S 025S

025N

2.44

H150 1601'Carpenter's

Black

Cree

k1.4

01.4

1

012N

012S

1.26

1.19 Trainmans

ShantyDiverging signalRules 421, 425 & 426

Applicable

3 7A A

B B

NelsonAggregate Co.

Halton Outbound

Halton Main Track

By-Pass Track

A602

321

8'

A601

336

0'

A603

Runa

round

812

'

Stora

ge Y

ard Le

ad

1.11

1.15

1.09

1.05

1.16

Note: Loaded ore cars30 MPH at mile 2.6

Note: Max. = 30 MPHon By-Pass Track

2

4.06

3.9

MacMillan YardStorage Yard

1

1.00=648'4.10=545'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

5

9

DV

Page 38: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Humber4.3

R3-4.30-7.90Halton Sub00/02/09dmn

Humberline Industrial SpurCommonwealth

Plywood

H112Deco Automotive

Sloug

h Esta

tesH1

13

H122Fibreglass St. Lawrence

Chemicals

C.S.R. Co-opH131 H134

H135H124

Clair

ville

Dr.

Humb

erline

Rd.

Albion Rd.6.94

(EL 7

00)

RR

7.50

7.35

6.92

Indian

Line

Wes

t Hum

ber R

iver

277 f

t.

064N

064S 063S

063N078N

078S 079S

079N

6.16

HWY

No. 2

7

046N

046S

1

4.52

Equil

ateral

Turno

ut

4.40

Humb

er Ri

ver

602 f

t.

5.61

Stee

les A

ve.

42385

4.6

7.20

HWY

No. 4

27

Clairville Conservation

Area

PSGR PSO PSGRFRT PSO FRT50 40

50 407 6

H110

}

4.90=512'6.65=568'

5

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 39: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGRFRT

95050

Goreway8.8

G

R3-7.90-9.70Halton Sub.00/02/03dmn

Airpo

rt Rd.

Hwy. No. 407

9.65

1.22

C314 to C319

094SC-300

C-301

C-302

C-303

C-304

094

093S

1

XX

9.30

9.50

Y204

478

2'

Y202

487

6' Y201 09

6ND

090N2

090N1

090N

090S

Malport SignalPlant

Note: SelfRestoring Derail

Note: Swt. equipped with lock.May be left line and locked

in either position.

089N

089S

7B

A

95

3

090N3

8.80

Gorew

ay D

r.

SeeBrampton Intermodal Terminal

42368

8.87

8.79

8.72

8.70

Track 1Track 2East Leg of Wye

W e st Le g o

f Wye

3000' Between Wye Swts.

7.91

Finch

Ave

8.80

8.60

ALL

8.81

8

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Culve

rt

Culve

rt

Page 40: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

10.47

PSGRFRT

105560

11.2

112S

Halwest11.1

G

R4-9.70-11.25Halton Sub.01/03/30dmn

112N

42355

113D

111D

111N

111S

169

1 5

7

9

11.21

11.14

11.10

16.94

11.06

16.90

11.13

JCT

. SW

T. wi

thW

eston

Sub

11.07

11.01

11.01

(Out

of Se

rvice

)

(Halt

on Su

b)

(Wes

ton Su

b)

Hwy.

No. 4

07

11.00

A

AB

B

106N 105N

105N1

1

Y292 1800'

Y291 1800'

Y290 North Service Track 9345'

C300 South Service Track 8976'

C310 1978'C311 1508'C312 1392'

C313-C314

Pocket Track

C332

C301

C302

C303

C304 - ECORAIL

Receiving & Departure

Receiving & Departure

Receiving & Departure

Malport Yard Office

10.49

Torbr

am R

d.

Torbram10.5

PSGRFRT 50

50

All

Halton-Weston

Connecting Track

Malport9.742365

16.16

Weston Sub South Service

C315 to C319

C335

C336Jct. withWeston Sub11.1 Halton Sub17.0 Weston Sub

10.80

11

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Culve

rt

ECORAIL COMPOUND

3

Wes

ton R

d.Lu

mber

C355 C330

RampC331

Team Track 1

Team Track 2

G783

Domtar

G784

G785

G786Nestle

G782

S

Page 41: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

12.00

12.24

Culve

rts

Culve

rt

11.71

Psgr.

Tu

nnel

11.40 HA

LN &

HAL

S

PSGRFRT

125560

Bramalea11.6

R5-11.25-12.40Halton Sub.00/12/05dmn

12.39

Dixie

Rd.

F605-670'Can. Liquid Air

12.18

D436-2566'

D435

-353'

D434-369'

D433-370' D430-274'

D429T.J.Lipton

T.J.Lipton Lead

Robert Transport

Valle

y Foa

m

11.99

Torbr

am In

dusti

alLe

ad -

D45

0 - 3.

5 Mile

s

Kuehne & NagelDistribution Services

F602-1755'

F601-1010'

F603-3903'

F604-356'Metal Improvement Ltd.

11.85

11.80

11.39

Stee

les A

ve.

Maint

.Xin

g

Bram

alea R

d.

42214

Weston Sub South Service Track

G789-466'

Malton Lumber

11.27

11.90

Sprin

g Cree

k19

ft.

Bramalea East Service Track = D420-3100'

11.20=605'12.40=630'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

11.2

Page 42: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

12.42

13.32

PSGRFRT

135560

R5-12.40-13.73Halton Sub.01/06/26dmn

F642-378'

F641 673'

Tricont Industries

F646

447

'No

rthwo

od M

ills Lt

d.Stearns & Foster

Polyliner

E549-580'

E548-220’E5

46-50

0’

Butch

erEn

ginee

ring

E541 386'Tricont Industries

13.72

Orenda Rd.

0.18R

0.200.220.36

0.65

Blair Dr.Clarke Blvd.Glidden Rd.

Finley Dr.

F636

443

'BF

Goo

drich

F632

476

'

F631

463

'Ne

w Ho

lland

Sperr

y Ran

dR

RR

R

13.36

13.33

Heart

lake R

d.Hw

y. No

. 410

Bramalea West Service Track E510 4500'

F625

510

'

F621

449

'

F620

406

'

Debro

Stee

l

Domt

ar Pa

ckag

ing

Pearl

Equ

ipmen

t

Wes

t Driv

e12

.83

E522

E523

E526

E511DO

MEX

ZOCH

EM

ABCPolybottle

E528

E531E532

E536

E535

E527

Orenda Rd.

0.71

0.17

Clarke Blvd.

R

R

Dominion Glass

F617

403

'F618-827'Weldwood

Canada

F615

101

8'

Ford

Motor

Part

s

126S

126N 127S

127N

12.64

(EL 1

269)

12.40=630'13.73=690'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 43: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGRFRT

145050

15.2

Brampton East15.2

R3-13.73-15.25Halton Sub.00/02/09dmn

152N

152S

1

15.15

15.14

Union

St.

15.05

A.E.

I.Qu

een S

t.Hw

y. No

. 7

151

42211

John

St.

Jame

s St.

14.95

14.93

14.90

Etob

icoke

Cree

k

G G

14.78

Centr

e St.

14.56

True

man S

t.Pe

destr

ian B

ridge

14.32

Kenn

edy R

d.

144

143N

143S

Peel14.3

42212

1

14.24

14.20

R

R Eastern Ave.

Orenda Rd.

0.45

0.25

General Latex

E556

-212'

E555

-211'

E552

-347'

Iko In

dustr

ies

Bram

pton I

ndus

trial

Lead

14.10

South Service Track F610 - 7600'

Runaround F611-1370'

F612-859'

F613-1700'

Peel VillageIndustrial Lead

F650-59

66'

13.74

Ruthe

rford

Rd.

14.2PSGRFRT 55

60

Note: All Trains = 45 MPHat Mile

15

Note: All Trains = 45 MPHat Mile

13.73=690'15.25=711'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 44: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

15.28

Main

St.

PSGRFRT

165570

Brampton15.4

GO/VIA StationParking

R5-15.25-18.50Halton Sub.01/06/06dmn

J951-424'

J950-174'

17.38

17.98

173N

173S172N

172S

17.24

2ND

Line W

est

Ching

uaco

usy R

d.16

.26Mc

Laug

hlin R

d.

Ontario Hydro

0.22 7.81

0.48

Railroad St.

Nelson St.

R

R

16.01

Dixie Cup Spur

(Out of Service)

158N

158S

A

B

1

9478

7763

3

156D 15.55

15.63

15.68

15.53

Mill S

t.

GG

155N

155S

42210

Oran

gevil

le-Br

ampto

n Rail

way

Owen

soun

d Sub

Note: Timing circuit on North Track.Westbound signal 155N will revert to

STOP after 2 min. 20 sec.Pushbutton to reclear signal.

Note:

Dua

l con

trol S

wt. N

o. 3

remov

ed fro

m se

rvice

- CRO

Rrul

e 104

.2 No

t App

licab

le

15.60

15.7PSGRFRT 50

50

Note: On Halton Sub CRORRules 564 and 610 applicable.

On OBR Owen Sound Sub CRORRule 610 ONLY applicable.

J940

-2806

'

SWT

16.02

Fletch

ers C

reek

Farm

ers X

ing17

.90St

ream

J944-390'Royce Transport

Brampton BusDepot

15.30

17

15.25=711'18.50=805'

XXXXXXXXXXXXXX

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Psgr.

Tu

nnel

s

VIA

Page 45: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

223S

223N 189N

189S190N

190S

207N

207S206N

206S

21.98

21.90

21.86

19.90

19.30

PSGRFRT 55

7022.7

Credit22.5

R2-18.50-22.90Halton Sub.00/12/05dmn

42205

22.89

BRMN

& B

RMS

Maple

Ave

.

226N

226SCr

edit R

iver

22.50

1 322

.67

22.34

22.3

Note: All Trains = 45 MPH atMile 22.3 and Mile 22.7

PSGRFRT 50

50

G

19.17

Miss

issau

ga R

d.

HWY

No. 7

18.32

18.88

20.60

18.16

18.20

22.221

21.15

22.13

Priva

te

Wins

ton C

hurch

illBo

uleva

rd

G

20.14

5TH

Line W

est

21.71

21.48

G

19.40

20.66

20.82

21.50

Farm

Xing

Farm

Xing

Farm

Xing

Farm

Xing

Farm

Xing

20 1922

21.80=806'22.90=830'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt22.9

Page 46: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

1

ALL

OCS

25.31

Culve

rt

23.50Ps

gr.

Tunn

el

23.24

Swt C

lampe

dCR

OR 10

4.2 N

/A

Swt C

lampe

dCR

OR 10

4.2 N

/A

PSGRFRT

245050

24.2

Silver24.1

VIA & GOStation Parking

R9-22.90-25.50Halton Sub.01/04/02dmn

25.43

25.30

44692

GG

002

242N

242S

239S

239N

238S

238N

3

GEXR

Gue

lph S

ub

24.09

23.64

24.00

24.06

24.16

Halt

on S

ub29

.98 G

EXR

Guelp

h Sub

Georgetown23.5

42202

A

B

23.63

JCT

SWT.

234D

232D

231N

231S

1

35

235D

237D

BB40 2745' (1200' between Leads)

BB48 1442'

Victor

ia St

. Acc

ess

Rose

tta S

t. Acc

ess

John St.

23.10

Note: All trains=45 MPH on North Track at Mile 24.2

Note: Equipment must not bestored on North Service Track

between lead swt and signal 232D

No. 1 Swt. only

23.59

23.13

23.70

(17TH

Side

road)

(7TH

Line)

Halto

n Reg

. Rd.

3

Halto

n Reg

. Rd.

11

Trafa

lgar R

d.Ma

ple A

ve.

Main

St.

HWY

No. 7

John

St.

Moun

tainv

iew R

d.

Silve

r Cree

k30

ft.

22.90=830'25.50=880'

25

7

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

RAMP

BB45 1396'

BB46 1395'

BB47 1136'

FenceService Track

Semi-AutomaticSwitches

CTC CTC

OCS

VIA

Page 47: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

31.79

Culve

rt

Culve

rt

31.60

Farm

Xing

.

Farm

Xing

.Fa

rm X

ing.

Farm

Xing

.31

.20

PSGRFRT

325050

Mansewood32.3

301

300

R9-25.50-33.00Halton Sub.00/11/14dmn

BC05

-1500

'

BC07

-1500

’ BC04

-600'

BC06

-306’

BC09

-466’

BC08

-525’

CO Steel Ltd.

32.42

32.52

32.26

1

323

324N

324S

Note: All trains = 45 MPHat Mile 32.3

32.24

44686

5TH

Sidero

ad

L

30.29

10TH

Side

road

L

29.76

3rd Li

ne(D

oes N

OT cr

oss t

racks

)

28.67

4TH

Line

L

27.65

5TH

Line

G

26.63

15TH

Side

road

G

1

28.02

281S

281N

282

Speyside28.0

44687

Note: All trains=45 MPHat Mile 28.1

Note: All trains=45 MPHbetween Mile 26.3

and Mile 26.527

26.36

16 M

ile C

reek

600 f

t.

Stewarttown26.4

44688

266S

266N

1

263N

263S3

26.48

Equil

ateral

Equil

ateral

26.29

26.00

26.2028.40

28.20

Cree

k C

reek

31.14

25.50=880'33.00=700'

283031 29

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 48: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

34.00

33.78

Culve

rt

Culve

rt

33.58

PSGRFRT

345050

R1-33.00-34.10Halton Sub.95/09/19dmn

33.58

HWY

No. 4

01

33.0=700'34.10=685'

Milton Town Spur

BC21 1108'

BC23-1860' BC22

BC15-1358Taiga Wood

& Main LumberWheel Abrator

Industrial TaskForce

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 49: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

40.15

Culve

rt

Culve

rt

Farm

Xing

.Fa

rm X

ing.

Farm

Xing

.

Farm

Xing

.

Farm

Xing

.

36.39

Culve

rt

Culve

rt

Culve

rt39

.23

38.02

PSGRFRT

375050

Ash39.5

L

R3-34.10-40.50Halton Sub.95/11/20dmn

40.07

1

396N

396S

395

39.40

39.44

38.72

36.78

MILB

Brita

nnia

Rd.

Derry

Rd.

377

378

36.6

Main

St.

35.61

36.42Reliance

Products Ltd.(Plastic)

BC38680'

35.10

34.81 BC

30-10

66'

BC35

-431' BC

36-67

0'

BC32-1033'BC31-1008'

BC34-1735'

Stee

les A

ve.

C.P.

R. G

alt S

ub

RMarket St.

0.53

34.37

Martin

St.

Hwy.

No. 2

534

.31

361

362

343N

344 343S

34.27

1

Milbase34.3

4467744671

Note: All trains=45 MPHat Mile 39.4

Note: All trains=45 MPHat Mile 34.3

G

35Oa

kville

Cree

k34

.88

38.20

38.40

38.70

39.75

3640 39

34.10=685'40.50=585'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY X X

X X Swt. NormalWhen set for BC32

KARMAXConsumer'sGlass Lead

Consumer'sGlass

Page 50: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Farm

Xing

.

Farm

Xing

.

Culve

rt

Culve

rt

Apple

by C

reek

Shore

acres

Cree

kSp

iked

41.77

45.64

46.03

43.52

Spike

d

PSGRFRT

42435050

Tansley43.1

R4-40.5-46.3Halton Sub.01/06/06dmn

46.01

45.55

OE29432'

OE27-742'

45.19

44.44

43.74

Uppe

r Midd

le Rd

.

Apple

by Li

neDu

ndas

St.

Hwy.

No. 5

448S

448N 447S

447N

43.73

OE25-696'

Canada BrickCo. Ltd.

Canada BrickCo. Ltd.

OE20-486'

432S

432N 429N

429S

43.13

42.98

42.20

42.80

No. 1

Side

road

Burnh

amtho

rpe R

d.

Hwy.

No. 4

07

G G R

43.10

Twelv

e Mile

Cree

k-537

ft.

42.08

(Frog

remo

ved)

(Swt

Spik

ed)

OntarioHydro

OE10468'

41.63

40.69

G G

Regio

nal R

d. No

. 22

Trem

aine R

d.

Lowe

r Bas

eline

Rd.

412S

412N 411N

411S

DegussaCanada

StrasserAlloy

Steel Ltd.

4466946

.16Ma

inway

Dr.

L

44

Note: Loaded ore cars35 MPH at mile 44.7

46

OE26

46.30=430' 40.50=585'

40.70

41.01

42.70

41

1

3

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

43.2 42.9

ALL 45PSO

EquilateralTurnouts

Page 51: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

46.52

46.78

Culve

rt

Culve

rt

Tuck

Cree

k

47.59

PSGRFRT

485050

R3-46.30-48.90Halton Sub.99/09/24dmn

OE70

-595'

OE71

-229'

48.71

48.66

Q.E.

W.&

Hwy

. No.

403

47.95

Guelp

h Line

47.63

OE64

-1273

'Le

on's

Furni

ture

Spike

d

NalcoLtd.

477N

477S478N

478S

47.45

OE60

-1231

'Ta

marac

k Lum

ber 47.05

OE55

-1116

'Bu

tler M

anufa

cturin

g

46.81

OE58-374'

OE57-1013'

Quaker State Oil

46.78 OE

56

Candian GeneralElectric

46.65

Walk

er's L

ine

OE40

-2330

'

OE42

-751'

OE41

-963'

Brad

ley-F

enn

Enter

prise

s

Cana

dian C

anne

rsLtd

.

Ball

Pack

aging

46.36

463N

463S462N

462S

47

48.90=330' 46.30=430'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 52: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

49.10

Ramb

oCr

eek

PSGRFRT

495050

317T1

317T2

317T3

Burlington31.5

OD43 1670' Doubling Track

31.67

31.69 OD36

680'

OD381197'

078

320S

320N

321N

321S

493N

493S

31.92

Bran

t St.

Plains

Rd.

E.32

.30

324N

324S 077D

Halton Sub.

49.21

OD45OD44-1220'

OD47-920'

OD64 700'

OD63

OD62

OD59695'

OD60

OD50

Manure Track Team Track

Shed Track

Hercules Canada

Fairview St.West Leg of Wye

Reichhold Ltd.

Gray

's La

neOD57460'

OD56-900'

Burlington West49.5

Beach S

pur

Jct. with Oakville Sub.

32.2 Oakville Sub49.5 Halton Sub

R2-48.90-49.50Halton Sub.01/01/06dmn

OD40South Service Track

48.97

Note: Multi-level auto carriersPROHIBITED

On Halton-Oakville Conn. Track

Halton-Oakville Connect

ing

48.92 Plains Rd. E.

7

115

9 13

15

17

19

44660

1

Oakville Sub.

Note: PSO=40 MPH all trainsbetween Mile 49.0 and Mile 49.5

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Out of Service

Spike

d

Spike

d

Page 53: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

3535PSGR

FRT

2.54 = 309'3.65=356'

Parkdale2.5 Weston Sub.

(42250)

3

Quee

n St.

2.46

2.44

Forem

an's

Plank

XingJC

T.SW

T.

102 C.P. Galt Sub. (514) 392-5393

C.P. Galt Sub.

Antonio Gaspar(Lakeview Fruit Market)

23N

23S24S

24N

26

2.49

2.532.5

4

A

B1

3

2.4 Newmarket Sub.

Newmarket Sub.Weston Sub. North TrackWeston Sub. South Track

2.79

Broc

k Ave

.

3.12

Lans

down

eAv

e.

3.45

3.37 N

ewma

rket S

ub.

Dund

as S

t.R5-2.40-3.65Newmarket Sub.99/12/15dmn

35N

35S33-1 25-1

26-133-2 25-2

26-2

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 54: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

G

Davenport4.642163

4

Bloor

St.

3.91

3.92

Paton

Rd.

Ped.

Tunn

el(cl

osed

to pu

blic)

4.08

4.19

Wall

ace A

ve.

4.29

E241347'

Gate

E242470'E245

340'E246417'

41

3535PSGR

FRT

45

46

Dupo

nt St

.

Controlled Interlocking.Controlled by CP

RTC TorontoCROR Rule 610 must be obtained

from CP RTC prior toobtaing CROR Rule 564

from RTC-YB Toronto

4.51

CPNo

rth To

ronto

Sub.

From

Wes

t Toro

nto

3.65 = 356'4.82 = 405'

American Standard

53-1

53-2

54-2

54-1

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LYR3-3.65-4.82Newmarket Sub.99/12/15dmn

Page 55: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Drain

age C

ulvert

6.89

Castl

efield

Ave

.

G

Fairbank6.6

Dunra

ven D

r.Pe

d. Un

derpa

ss

6.50

Eglin

ton A

ve.

63646.9

0

3535PSGR

FRT

Contr

olled

Sign

als

7.81

Lawr

ence

Ave

. W.

7.90

Priva

te CN

8.08 = 580'

X

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

6.12

Drain

age C

ulvert

5.86

Roge

rs Rd

.

5

Dave

nport

Rd.

4.87

4.83

D1 1 0 -5 31 'D11 1 -9 5 4 '

P. Culotta & Co.

D119-827'

5.24

St. C

lair A

ve.

(Old St. Clair Ave.)(42160)

5.40

5.65

Innes

Ave

.Pe

d. Br

idge

4.82 = 405'

6

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LYR4-4.82-8.08Newmarket Sub.99/12/15dmn

78

Page 56: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rt

Culve

rt

9.80

10.30

10.70

Culve

rt

Culve

rt

Culve

rtSw

t Spik

ed

Swt S

piked

Contr

olled

Sign

als

Culve

rt11.60

11.30

11.65

11.19

11.17

Snider South12.1

Carha

ll Rd.

9.99

Gate

A236-550'Menkes

Develop. Inc.

D.N.D. DepotC.F.B. Toronto

A235-500'

A238-1700'

de HavillandIncorporated

11.17

Shep

pard

Ave.

10.39

10.87

6075PSGR

FRT

(Old Airbase Siding)-A228-4100'

A229-

680 '

( Dow

nsvie

w )

105

A278764'

VitafoamProducts

Canada Ltd.

11.65

Finch

Ave

.

A284-609'A285-618'

A286-709'11.97

12.14

Imperial Oil(ESSO)

1

121

122E

122W(Dwarf)

WalkerWarehousing

J.D.S.Investments

&

42128

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

s

L

Drain

age C

ulvert

Drain

age C

ulvert

Drain

age C

ulvert

Drain

age C

ulvert

Spicer9.2

9

Hwy.

No. 4

01

3535PSGR

FRT

B419-3135' Total

Derai

l

8.50

8.40

8.30

Downview Yard(42148)

8.80

8.71

9.50

9.12

Wils

on A

ve.

9.12

8.08 = 580'9.45=635'

91

92

R6-8.08-12.20Newmarket Sub.01/02/20dmn

1012 11

D

Page 57: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

13.45

Drain

age C

ulvert

23.93

23.92

23.97

23.92

23.85

23.89

23.80

17

B

A15

13

11

7

9

19134

129E

A298-750'

Flint St.

129W

South Connecting TrackNote: Usable length = 5350'

Max. speed = 15 MPH23

5S

235N

12.92

Stee

les A

ve.

YORK

SUB

North

Wye

= 13

50'

Max.

spee

d = 15

MPH

South

Wye

= 12

30'

Max.

spee

d = 15

MPH

A

B

A

B

Newmarket Sub

Snider12.9

41969

PB

Note: Any movement withincircuit limits with No. 15 or No. 17 SWT in Hand throwMUST reset circuit. Entire

movement Must be clear ofcircuit limits before circuit

can be reset.

See N

ote A

bove

13.20

See York Sub. Plans

12.92

12.87

12.29

12.43 A2

97-75

0'Va

n Wate

r&

Roge

rs

Forem

ans A

cces

sRo

ad

Note: PSO all TrainsMax. Speed=50 MPHMile 12.9 to Mile 13.3

Newmarket Sub.

6075PSGR

FRT13

13.35

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LYR7-12.20-13.45Newmarket Sub.01/06/22dmn

23.97

23A

B

R

2123.99

S

Note: Movements on South Connectingtrack Snider must be authorized by R564 and R566

between Snider and Snider South

Page 58: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rt

Culve

rt

B

15.40

Don R

iver

15.29

A872

784

'

GG

Snider North14.0

42124

14

Hwy.

No. 7

Hwy.

No. 4

07

13.70

13.75

CTCOCS

CTC

OCS

139

140

6075PSGR

FRT

14.23

13.81

14.27

14.65

14.23

Priva

te

(Old Concord)42126

14.82

Rive

rmed

e Rd.

A873275'

A870

183

5'W

elded

Tube

Can

ada

15.50

Lang

staff R

d.

154

Concord15.5

15

14.30 = 630'15.55 = 668'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

R5-13.45-16.00Newmarket Sub.00/11/09dmn

Page 59: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rtCulve

rt

Culve

rt

20.03

20.43

Farm

Xing

.

Farm

Xing

.

19.72

Farm

Xing

.

18.50

Craw

ford S

and&

Grav

elKe

ele V

alley

Dum

p

GO StationParking

GO StationParking

17.54

Priva

te Rd

.

18.50

18.70

A955

-642'

Anco

Che

mica

l

16.83

19.60

19.42

18.10

G GL

Maple

Rutherford

(Opening on Jan. 8th, 2001)

18.3

16.7

42122

17 16181920

Ruthe

rford

Rd.

Reg.

Rd. 7

3

Keele

St.

Reg.

Rd. 6

Testo

n Side

Rd.

Major

Mac

kenz

ie Dr

.Re

g. Rd

. 25

16.70

17.40

17.50

17.85

19.66

19.70

19.90

20.10

20.30

19.35

19.51

15.55=668'

R7-16.00-20.50Newmarket Sub.00/11/08dmn

176

17.55

19.04

18.69

19.29

A940

-1000

'Ar

go &

Alpa

Lumb

er Inc

.

Station St.

20.5=955'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

17.9

50 6060 75PSGR PSGR

FRT FRT

A938-2300'

(Track A938)(Max.= 5 MPH)

Page 60: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

22.73

Stati

on R

d.

21.10

Farm

Xing

.

21.49

Farm

Xing

.

21.70

Farm

Xing

.

20.66

21.99

G LL

5060PSGR

FRT

King City22.742118

21222324

Kirby

Rd.

King-V

augh

anTo

wnlin

e Rd.

20.55

20.65

20.65

21.20

21.50

21.84

22.95

23.10

24.25

24.40

24.57

23.60

23.80

23.90

22.60

22.80

20.5=955'

R2-20.50-24.57Newmarket Sub.99/01/01dmn

GO StationParking

Drain

age

23.28

23.26

23.30

King R

d.Re

g. Rd

. 11

Keele

St.

Reg.

Rd. 6

King LumberA957-843' 24

.16

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

21.5=995'22.6=952'23.3=975'24.57=960'

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Page 61: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rt

GOStation Parking

25.25

Farm

Xing

.

24.63

29.17

29.99

28.50

26.10

LLG L

5060PSGR

FRT

Aurora29.942112

252627282930Dr

ain

Strea

man

d Catt

le Un

derpa

ss

East

Humb

erRi

ver

Duffe

rin S

t.Re

g. Rd

. 53

Engle

hard

Dr.

Well

ington

St. E

.

Yong

e St.

Hwy.

No. 1

1

Bloom

ington

Rd.

Side R

d. 15

24.60

25.30

25.50

25.70

25.90

26.09

26.60

29.40

28.10

28.30

28.51

28.80

28.85 27.66

27.70

24.85

24.9224.98

24.57=960'25.0=953'30.0=883'

R2-24.57-30.00Newmarket Sub.99/01/01dmn

26.50

Bathu

rst S

t.Re

g. Rd

. 38

(Old Cherry)(Mi. 27.5)

FireHall

26.5=996'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Page 62: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Magna Int'l.Plydex Div'n

NA50-846'

30.79

Cree

k

Cree

k

Holla

nd R

iver

66 ft.

32.20

30.20

30.2

33.70

30.04

31.28

32.75

33.55

33.64

GGG LL

50406050 PSGRPSGR

FRTFRT

Drain

Club

inis C

reek

34 ft.

Centr

e St.

St. J

ohn's

Side

Rd.

Muloc

k Dr.

Wate

r St.

Timoth

y St.

30.60

30.90

32.60

32.70

32.75

32.80

32.85

32.95

33.0533.40

32.45

30.1031.50

32.00

R1-30.00-33.70Newmarket Sub.98/01/20dmn

32.45

32.59

NB36-834'NB38-861'

Rimply Mfg.(Magna Int'l.)

Rimply Mfg.(Magna Int'l.)

32.78

NB40

-588'

Ont. H

ydro

Swt. S

piked

-Frog

remo

ved

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

30.0=883'33.7=780'

33.3

313233

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rt

S

Page 63: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

37.77

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rt

Culve

rts

Parking

35.61

37.65

36.38

37.71

34.16

33.95

GGLL R

Newmarket34.242106

34353637

Cree

k

Quee

n St.

Davis

Dr.

Gree

n Lan

e Rd.

Chap

man S

t.

2nd C

onc.

Rd.

(Main

St.)

Old Y

onge

St.

(Holl

and L

andin

g)

34.30

34.40

34.60

34.85

35.02

35.42

35.50

35.60

35.70

36.00

36.20

36.38

36.40

36.85

37.40

37.41

37.50

37.70

37.76

34.88

33.7=780'35.7=761'

R4-33.70-37.80Newmarket Sub.99/11/08dmn

(Old Newmarket Stn.)(Mi. 34.10)

Note: City TrafficLights interconnectedto Crossing Protection.

Swt. S

piked

Parking

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

36.4

5060PSGR

FRT 4050PSGR

FRT

Page 64: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

41.40

41.25

Priva

te Rd

.

TotalLength5180'( )

38.43

39.33

40.53

40.93

41.00

39.66

RG LLL

GO StationParking

5060PSGRCROR Rule 105

Special Instruction (1)Applicable

FRT

Bradford41.551182

Holla

nd R

iver

275 f

t. Brad

ford S

t.

Oriol

e Rd.

Kalve

r St.

Toll R

d.

Bathu

rst S

t.To

wnlin

e Rd.

37.97

38.40

38.20

R4-37.80-41.70Newmarket Sub.01/08/30dmn

Hwy. No. 11

41.38

41.49

41.61

RAMP

NC56-587'

Bradford Co-opStorage

41.11

Swt s

et no

rmal

when

Lined

for N

C49

Bailey River& Hardoc

Priva

te Rd

.

41.26

NC54-626'

Hwy. No. 11Bridge St.

Give

n Rd.

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

NC61TeamTrack

NC49 - Passing Track - 4275'

NC50-Service Track-1792'

41 40 39 38

Culve

rt

Culve

rt

Culve

rt

OCS

OCS

MT

MT

XXXX

Page 65: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rtCu

lvert

Culve

rt

41.96

Priva

te Rd

.(M

in. of

Env

ironm

ent)

42.26

42.15

43.00

R

L

CROR Rule 105and Special Instruction 1

CROR Rule 105and Special Instruction 1

Track AbandonedMovements are PROHIBITED

North of Mile 43 Newmarket Sub

4243

Indus

trial R

d.

42.60

42.89

43.37

42.25

R4-41.70-43.00Newmarket Sub.01/02/02dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

NC63-1070'NC49-4275'

NC62-1520'

Wayside Power

Go Storage Tracks

41.84

41.87

NC70

-724'

NC74

-520'

Domi

nion F

armPr

oduc

e

Swt to

NC

63Ma

y be l

eft lin

e & lo

cked

in eit

her p

ositio

n.

Osha

wa H

olding

s Ltd.

(Ont.

Prod

uce)

41.95

Dissette St.0.10

XXXX

Page 66: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Foreman'scrossing

Foreman'scrossing

Western Lead

FormerBathurst SouthStorage Yard

FormerBathurst SouthStorage Yard

15

60PSGR

FRT

John St.

Oakville Sub.

Oakville Sub.

Kingston Sub.Kingston Sub.

3333ND

3333SD

001ND

001SD

002SD

002ND

003ND

003SD004ND

004SD

To: Bathurst St.North Yard

To: Bathurst St.North Yard

Flyunder

Weston Sub. toParkdale

Weston Sub. toParkdaleTo

CP RailGalt Sub.

ToCP Rail

Galt Sub.

C1

C2

A2

A3

D1

D2

To Don Yard

Bathurst St.

1.1

Toronto

0.0

John St.West

John St.West

John St.East

John St.East

Scott St.(USRC)Scott St.(USRC)

1 0

} USRC to Union Stn.USRC to Union Stn.

1.09

Bathurst St.

Foreman'scrossing

Foreman'scrossing

Locked withSpecial LockLocked withSpecial Lock

R3-0.00-1.30Weston Sub.03\07\25dmn

1 1

009T3

009T496D1

96D2

42310 42414

West Limits USRC =D Tracks = Mile 1.0West Limits USRC =D Tracks = Mile 1.0

West Limits USRC =A Tracks = Mile 1.2West Limits USRC =A Tracks = Mile 1.2

011T1

011T2118A2

118A3

15

45PSGR

FRT

1 0Weston Sub.

R4-0.00-1.25Oakville Sub.03\07\25dmn

Oakville-Kingston North Connecting Track

Oakville-Kingston South Connecting Track

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

USRC

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RCU

SR

C

CT

C

CT

C

US

RC U

SR

CRTC: CH8T1, *5-460#

Sim

co

eS

t.S

imco

eS

t.0.2

5

126

Page 67: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

013T1

013T2

013T3

013T4

013D

015D

022T1A

A

B

B

B

B

B B

A A

A

A

022T2

022T3

022T4

1.5

7

Fort York

1.8

Western LeadWestern Lead

FortYorkS&C

FortYorkS&C

ToolHouseTool

House

2.0

20

60PSGR

FRT2

60

70

1.9

R7-1.10-2.10Oakville Sub.03/06/10dmn

3

5

13

1.6

5

1.6

8

1.9

0F

ore

man

’sC

ross

ing

Fo

rem

an’s

Cro

ssin

g

1.6

4

1.6

6

1.6

2

9

11

1.6

0

1.5

81

.59

1.5

7

2521

23

19

15

1.5

6

1.5

4

1.5

31

.53

1.5

1

1.5

0

PSGR

FRT

ALL

Str

ach

anA

ve.1

.63

43315

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

2.0

4P

sgr.

Tu

nn

elP

sgr.

Tu

nn

el

B

A

(Fie

ldS

ign

)

(Fie

ldS

ign

)

1.3

1.3

017D2

RTC: CH8T1, *5-460#

Exhibition

Page 68: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

4.9

0R

ivers

ide

Dri

ve

(Kin

gsw

ay

)R

ivers

ide

Dri

ve

(Kin

gsw

ay

)

4.5

4

4.1

7

Ell

isA

ve.

Co

lbo

rne

Lo

dg

eD

riv

eC

olb

orn

eL

od

ge

Dri

ve

3.8

9

3.9

8

Park

sid

eD

riv

eP

ark

sid

eD

riv

e

PSGR

FRT3

60

703.1

2.3

8D

uff

eri

nS

t.D

uff

eri

nS

t.

023T1

023T2

023T3

023T4

024T1

024T4

024T3

024T2

Old VIA ExhibitionPlatforms

Old VIA ExhibitionPlatforms

3.0

2

2.8

5

2.6

9

Do

wli

ng

Av

e.

Jam

eso

nA

ve.

Du

nn

Av

e.

3.5

4P

edes

tria

nO

ver

pas

sP

edes

tria

nO

ver

pas

s

60

80

Dufferin

2.5R2-2.10-4.95Oakville Sub.99/01/04dmn

3

5

2.3

8

2.3

0

PSGR

FRT

HSt. JosephHospital

St. JosephHospital

(Old Sunnyside)

4

4.7

0W

ind

em

ere

Av

e.

040T1

040T2

040T3

040T4

041T2

041T1

041T3

041T4

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

A

A

B

B

RTC: CH8T1, *5-460#

Page 69: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

M210-435'M211-1340'

M212-500'

(Out of Service)

M21

3-4

80'

M21

3-4

80'

5.9

4

5.3

2T

TC

Lo

op

TT

CL

oo

p

PSGR

FRT 60

80

5.6

1Q

.E.W

.

Fo

rem

an's

Cro

ssin

gF

ore

man

'sC

ross

ing

Ontario FoodTerminal

43325

Ontario FoodTerminal

43325

5.8

2

Mim

ico

Cre

ek

10

0ft

.M

imic

oC

reek

10

0ft

.

Park

Law

nR

d.

Park

Law

nR

d.

Park

Law

n

Christie Brown

R5-4.95-6.00Oakville Sub.06\02\04dmn

5.6

8

5.0

2

5.1

5

(Tra

ck

nu

mb

er1

on

ly)

5.3

-G

OW

.I.L

.D.

Hu

mb

er

Riv

er

20

1ft

.H

um

ber

Riv

er

20

1ft

.

Fo

rmerl

yQ

ueen

St.

(Str

uctu

rein

pla

ce

Ro

ad

Clo

sed

)

Fo

rmerl

yQ

ueen

St.

(Str

uctu

rein

pla

ce

Ro

ad

Clo

sed

)

5

051T1

051T3

051T4

051T2050T1

050T2

050T3

050T4

4.9

9

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

6

W

RTC: CH8T1, *5-460#

Page 70: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGRPSGR

FRTFRT

061T2

061T3

061T4

064

064T3

066T2

6060

8095

Mimico EastMimico East

6.2

061T1

062D

068D2

1

2

6.7

7

6.6

7P

sgr.

Tu

nn

elP

sgr.

Tu

nn

el

Ro

yalY

ork

Rd

.R

oy

alY

ork

Rd

.

1

2

Inbound Inbound

Outbound OutboundV.T.M.C.

Willowbrook LeadWillowbrook Lead

5

27

Mimico6.7

1 3 5A 7

9 11 13

15

17

27

5B

VIAToronto Maintenance

Centre

VIAToronto Maintenance

Centre( )

M312505'M312505'

Canadian FoundrySupplies

Canadian FoundrySupplies

Lantic Sugar

R7-6.00-6.80Oakville Sub.06/10/17dmn

43335

43330

Note:Only switches Nos. 19 & 27 is Dual Control.All others are Power switches.

Only switches Nos. 19 & 27 is Dual Control.All others are Power switches.

3

1

9

7

11

17

13

15

6.5

4

6.6

6.0

9

6.0

3

6.2

9

6.2

8

6.2

1

6.2

0

6.1

6

6.1

2

6.0

8

6.2

3

6.1

86

.19

6.1

7

6.1

3

6.1

0

6.0

5

6.2

5

Old MimicoStation

Old MimicoStation

CTC CTC

066T1

A

B

B

A

A

B

B

A

B

A

A

B

B

A

B

A

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

066

068D1

SoundBarrier

**RTC: CH8T1, *5-460#

19A

B

6.5

7

6.6

5

Page 71: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT 60

95

Mimico South Yard

NorthServiceTrack

NorthServiceTrack

7.46

Islington Ave.

8.0

5K

ipli

ng

Ave.

Willowbrook

Yard

CN - CP Joint Yard

Fuel Standard

6.80-8.10Oakville Sub.93\02\25dmn

8 7

See Desk manual forMimico Yard Details.See Desk manual forMimico Yard Details.

075T1

075T2

075T3

074T1

074T2

074T3

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY RTC: CH8T1, *5-460#

Page 72: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT

081T1

081T2

081T3

085

088T3

088T2

088T1

60

95

Canpa

8.4

G

081

083D

081D

085D

OldCanpaTower

OldCanpaTower

Horner Ave.

5

3

1

8.7

730th

Str

eet

A

M735704'M735704'

A

B

B

Gilbey's CDNDistilery

Gilbey's CDNDistilery

Flincote LeadFlincote Lead

M747575'M747575'

M748435'M748435'

R4-8.10-8.80Oakville Sub.99/12/15dmn

So

uth

a kTr c

So

uth

a kTr c

No

r thT rack

No

r thT rack

CPCanpa Sub.

CPCanpa Sub.

North Service

Willowbrook Lead

43347

Note: All switches at Canpaare Power SwitchesAll switches at Canpaare Power Switches

113

23

17

13

11

159

21

19

8.4

4

8.3

6

8.3

6

8.4

0

8.4

4

8.5

18

.50

8.5

68

.56

8.5

68

.57

8.6

18

.59

8.6

6

8.6

7

ALL

A

B

B

A

A

B A

B

A

B

Note: Permissable speed through Nos.5,9 and 11 swts = 30 MPHPermissable speed through Nos.5,9 and 11 swts = 30 MPH

C

CD

D

M746FlextileM746Flextile

Atlas RoofingAtlas Roofing

The Banana TrackThe Banana Track

CTC

CTC

CTC

CTC

Gat

e

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

To CPGalt Sub

To CPGalt Sub

088D

RTC: CH8T1, *5-460#

Page 73: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

GO StationParking

GO StationParking

Psg

r.T

un

nel

Psg

r.T

un

nel

10.3

0

PSGR

FRT9

60

95

Long BranchLong Branch

9.6

Bro

wn's

Lin

e

Dix

ieR

oad

10.1

8

9.4

1

9.7

0

M725376'M725376'

M727270'M727270'

M726760'M726760'

M780

M779-1686'

M764-606'

M75

4-38

0'

Burmah-Castrol Oil

Flintcote Lead M783-3000'

AB

C

Lister F.G.Lister F.G.

McKay & Hughes(1973) Ltd.

McKay & Hughes(1973) Ltd.

Northern PaperNorthern Paper

A

B

C

10

9.3

4(E

L093)

9.3

4(E

L093)

9.1

0

9.1

2

Gate

Gate

098T1

098T3

098T2

093T1

093T3

093T2

R6-8.80-10.50Oakville Sub.99/12/15dmn

Note:

PSO No.3 Track OnlyPsgr Max = 60 MPH

Between mile 9.3 and mile 10.3

PSO No.3 Track OnlyPsgr Max = 60 MPH

Between mile 9.3 and mile 10.3

43352

9.8

2

Apple

wood

Cre

ekA

pple

wood

Cre

ek

M76

0

Jock

eyL

ead

9.8

1

Eto

bic

ok

eC

reek

18

4ft

.E

tob

ico

ke

Cre

ek

18

4ft

.P

ed

est

rian

Su

bw

ay

Ped

est

rian

Su

bw

ay

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY RTC: CH8T1, *5-460#

Page 74: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT11

60

95

Port Credit EastPort Credit East

11.5

G

OA33

OA361051'OA361051'

OA354044'OA354044'

OA37180'OA37180'OA34

2543'OA342543'

109T1

109T2108T1

108T2115T3

116T3

116

11

.47

11

.02

10

.84

10

.59

Caw

thra

Rd

.C

aw

thra

Rd

.

Ale

xan

dra

Av

e.

Og

den

Av

e.

Haig

Blv

d.

Haig

Blv

d.Hwy 2

G G

Ontario Hydro-Lakeview Generating StationOntario Hydro-Lakeview Generating Station

Ontario WaterResourcesCommission

Ontario WaterResourcesCommission

10.6

0

R

R4-10.50-11.90Oakville Sub.00/02/08dmn

11

.53

1

10

.61

11

.80

Co

ok

svil

leC

reek

45

ft.

Co

ok

svil

leC

reek

45

ft.

Ser

son

Cre

ek

Note: Movements stopped on No 3 Trackwithin 1000' of crossings: 10.59, 10.84 and 11.02Must push start button to lower gates.

Note: Movements stopped on No 3 Trackwithin 1000' of crossings: 10.59, 10.84 and 11.02Must push start button to lower gates.

OA51 6300'

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY RTC: CH8T1, *5-460#

Page 75: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH8T1, *5-460#

GO StationParking

GO StationParking

GO StationParking

GO StationParking

PSGR

FRT 60

95

Port Credit

12.8

G

121T1

121T2120T1

120T2

129T1

129T2

129T3

134N

134S

134

G

12

.02

12

.73

12

.81

13

.11

13

.39

Rev

us

Ave.

Sta

veb

ank

Rd.

Hw

y.10

Huro

nta

rio

St.

Hw

y.10

Huro

nta

rio

St.

Cre

dit

Riv

er

27

5ft

.C

red

itR

iver

27

5ft

.

Mis

siss

auga

Rd.

Hwy. 2

OA51 Service Track

Auxiliary Tracks to beremoved in 2000

Auxiliary Tracks to beremoved in 20001

2.7

6(E

L1

27

)1

2.7

6(E

L1

27

)Park St.

43610

R4-11.90-13.75Oakville Sub.01\09\07dmn

Note: Max. 45 MPH for ALLTrains Mile 13.0-13.2

No. 1 Track only.

Max. 45 MPH for ALLTrains Mile 13.0-13.2

No. 1 Track only.

1213

1 5

7

9

ALL

13

.13

13

.20

13

.31

13

.38

13

.40

13

.47

13

.27

B A A

BBA

Lakeshore RoadLakeshore Road

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Psg

r.T

unnel

Psg

r.T

unnel

*

Page 76: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

15.8

4T

urt

leC

reek

15.4

5B

irch

wo

od

Cre

ek

PSGR

FRT

15

60

95

G

Lo

rne

Park

Rd

.L

orn

eP

ark

Rd

.1

5.0

6

157S

159N

158N

158S

158

Service Track

16.0

9

Cla

rkso

nR

d.

Cla

rkso

nR

d.

G

OB31

OB40840'OB40840'

OB31 8030'

OB41-1090'

OB42-1310'

OB43-1020'

OB44-815'

OB45-505

OB46-870'

OB475000'OB475000'

West Legof Wye

16 14

14

.0

Petro CanadaPetro Canada

Clarkson Yard

East Legof Wye

R3-13.75-16.60Oakville Sub.99/12/15dmn

1

147N

147S

146N

146S

Clarkson SignalPlant

Clarkson SignalPlant

Lakeshore Rd.HWY. No. 2

Lakeshore Rd.HWY. No. 2

15

.72

14.5

2

14

.72

(Act

ual

=1

4.0

7)

14

.20

PC

DN

&P

CD

S

Lo

rnew

oo

dC

reek

Tecu

mse

hC

reek

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY RTC: CH8T1, *5-460#

Page 77: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Cu

lvert

Cu

lvert

18

.50

18

.22

16.8

9

16

.91

16.6

5

PSGR

FRT17

60

95

Clarkson

16.7

16

.62

South

dow

nR

d.

168N

168S

OH29-350'

OH30930'OH30930'

175N

175S

175

176D

178N

178S

OH

34-9

00

'O

H34-9

00'

OH

35-4

15

'O

H35-4

15'

OH38-250'OH

37-6

00

'O

H37-6

00'

OH

36-1

200

'O

H36-1

200'

17

.92

A.E

.I.

A.E

.I.

Win

sto

nC

hu

rch

ill

Blv

d.

Win

sto

nC

hu

rch

ill

Blv

d.

Win

sto

nC

hu

rch

ill

Blv

d.

Win

sto

nC

hu

rch

ill

Blv

d.

17.6

OB31

OB49-968'

OJ53

OJ47-690'

OJ49-690'

OJ4

3-1

10

0'

OJ4

1-1

15

5'

OJ3

9-9

00

'O

J39

-90

0'

OJ3

5-6

69

'O

J35

-66

9'

OJ3

6

OJ3

7

OJ6

0

St.LawrenceCement

St.LawrenceCement

Royal Windsor Dr.Royal Windsor Dr.

43630

R5-16.60-18.99Oakville Sub.03/02/11dmn

A

BB C

Lead trackLead trackService trackService track

Av

on

hea

dR

oad

Av

on

hea

dR

oad

1 3

5

18

.67

L

ALL

17

.67

17

.60

17

.59

17

.50

17

.52

17

.48

Psg

r.T

un

nel

Psg

r.T

un

nel

16

.68

Sh

eri

dan

Cre

ek

Div

ers

ion

Sh

eri

dan

Cre

ek

Div

ers

ion

18

Ford

Dri

ve

OJ6

2

D

E

A Canadian Salt (Windsor) Co.Canadian Salt (Windsor) Co.

BGeneral Polymers(Ashland Cemical)General Polymers(Ashland Cemical)

C IPEX

E

D Petro-Canada RefineryPetro-Canada Refinery

Ralston PurinaRalston Purina

R

A

B

B

B

A

A

169N

169S

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Royal

Win

dso

rD

r.

(Hw

y.N

o.122)

Royal

Win

dso

rD

r.

(Hw

y.N

o.122)

Park RoyalPark Royal

RTC: CH8T1, *5-460#RTC: CH8T1, *5-460#

Page 78: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT 60

95

9th Line9th Line

19.3

191N

191S

191

194

194N

194S

192

South Service TrackOH60 (Total Length = 6500')

OH61-4230' (Field Sign)

OH62-4042'

OH63-3854'

R5-18.99-20.50Oakville Sub.04/07/28dmn

North Service Track

OakvilleNorth Yard

OakvilleNorth Yard

OakvilleYard Office

OakvilleYard Office

OH65-1450'

OG66 5400' Between East & West Leads

Aut

oPar

tsLea

d

Pretri

pTra

cks

Shop

Lead

1920

1

3

5

C.B.M. Siding

OG31 1260'

OG32

OG65

OG33

OG34

OG35

OG30 1350'

OG29 1440'

OG28 1530'

OG27 1710'

OG26 1800'

OG25 1890'

OG24 2070'

OG23 2160'

OG22 2160'

OG21 2160'

OG20 2160'

ToFord Plant

ToFord Plant

Lead

to

OG

46-O

G57

Lead

to

OG

46-O

G57

OG

58

Shop

Track

OG

58

Shop

Track

Powerhouse

LeadO

G25-O

G35

Powerhouse

LeadO

G25-O

G35 OG17

OG19(34X)

OG36-OG56OG36-OG48

19.3

319.3

4

19.3

219.3

0

19.2

8

OakvilleSouth Yard

OakvilleSouth Yard

Auto Switch Liner (auto lines forwestward movements ONLY)

Normal position when setfor Auto Parts Lead.

Auto Switch Liner (auto lines forwestward movements ONLY)

Normal position when setfor Auto Parts Lead.

A

B

B

A

ALL

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

A

A

20.2

RTC: CH8T1, *5-460#

Page 79: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT21

60

95

R6-20.50-21.65Oakville Sub.02/06/13dmn

215T2

215T3216S

Oakville

21.4

Parking

203

2031

205

203S

203N

208T1

208T2

208T3

206D

21.2

3T

rafa

lgar

Rd

.T

rafa

lgar

Rd

.212T3

213T3

Parking

1

2 1

2 Canadian General TowerCanadian General Tower

Alpa Lumber Inc.Alpa Lumber Inc.

5

OH74-795'

OH71-200’

43640

20.7

8(L

ock

208)

20.7

8(L

ock

208)

Note:Maximum speed = 30 MPHfor ALL trains on No. 3 track

between Mile 20.7 and mile 21.7

Note:Maximum speed = 30 MPHfor ALL trains on No. 3 track

between Mile 20.7 and mile 21.7

20.5

5C

hart

well

Rd

.C

hart

well

Rd

.

G

Oakville Yard

20.643640

1 5

93

20.7

3

20.6

7

20.6

3

20.6

1

20.6

5

20.6

0

20.5

6

20.7

1

20.6

6

20.6

1

20.5

6

20.6

9

21.6

4

1

B B

B

B

B

B

AA

A

A A

A

Note: Permissible speedthrough switches

Oakville Yard = 30 MPH

Note: Permissible speedthrough switches

Oakville Yard = 30 MPH

ALL

13

21.3

3P

sgr.

Tu

nn

elP

sgr.

Tu

nn

el

VIA

711

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Oak

vil

leRTC: CH8T1, *5-460#

Page 80: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

PSGR

FRT 60

95

Kerr St.

22.1

G

R6-21.65-24.25Oakville Sub.06/07/27dmn

219N

219S222T2

222T3

Cro

ssA

ve.

Six

teen

Mil

eC

reek

49

0ft

.S

ixte

en

Mil

eC

reek

49

0ft

.Kerr

St.

Kerr

St.

21

.94

21

.71

21.7

0

Unassigned

222T1

OH842030'OH842030'

22

.38

NAMPAC

22

.59

Do

rval

Dri

ve

Do

rval

Dri

ve

22

.99

23

.13

McC

ran

ey

Cre

ek

16

ft.

McC

ran

ey

Cre

ek

16

ft.

Fo

urt

hL

ine

Fo

urt

hL

ine

237T1

237T2

237T3

236T1

236T2

236T3

OC301259'OC301259'

Canadian General Electric

23

.85

24

.18

Fo

urt

een

Mil

eC

reek

-45

ft.

Fo

urt

een

Mil

eC

reek

-45

ft.

24

.19

(EL

24

25

)2

4.1

9(E

L2

42

5)

OC31

OC32 440'

348'

OC33567'OC33567'

JEMPAK Canada Ltd.JEMPAK Canada Ltd.

A

222324

G

Note:

OC30 Scheduled to beremoved - 2000

OC30 Scheduled to beremoved - 2000

Maximum speed = 45 MPH for PSGR trainsand 30 MPH for FRT trains.Between mile 22.1 and mile 22.2on Turnout to NO. 1 track

Maximum speed = 45 MPH for PSGR trainsand 30 MPH for FRT trains.Between mile 22.1 and mile 22.2on Turnout to NO. 1 track

BC

A

B

C

D

7

5 9

LWyecroft Rd.Wyecroft Rd.

ALL

22

.23

22

.15

22

.13

22

.05

22

.04

21

.97

A.E

.I.

Sca

nn

erA

.E.I

.S

can

ner

A

B

A

B

B

A

3

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY RTC: CH8T1, *5-460#

Page 81: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Psg

r.T

un

nel

Psg

r.T

un

nel

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

PSGR

FRT25

60

95

Bronte

24.7

24.6

6(E

L247)

24.6

6(E

L247)

24

.42

Thir

dL

ine

25

.33

25

.02

OC43-1724'

OC40-1120'

OC31-2148'

OC34-1123'

OC35-1737'

OC36-556'

1400'

1085'

2

4

Ontario HydroOntario Hydro

ROPAK Industries(Husky Oil)

ROPAK Industries(Husky Oil)

Procor Ltd.

25

.69

Bro

nte

Rd.

R5-24.25-25.70Oakville Sub.05/07/10dmn

(43647)

253T1

253T2

253T3

252T1

252T2

252T3

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Note: Various Procor DerailsLocated on Procor Trackage.Switching on these tracks mayonly be performed in the presenceof a Procor Rep. who will beresponsible for these derails

Note: Various Procor DerailsLocated on Procor Trackage.Switching on these tracks mayonly be performed in the presenceof a Procor Rep. who will beresponsible for these derails

RTC: CH8T1, *5-460#

25

.65

OC

55

-97

0’

OC

56

-10

00

’O

C5

6-1

00

0’

OC

57

-60

0’

BPB Canada Inc.BPB Canada Inc.

Page 82: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH8T1, *5-460#

269T1

269T3

269T2272T1

272T3

272T2

26

.20

PSGR

FRT27

60

95

Burloak

27.1

G

25

.87

Bro

nte

Cre

ek

55

8ft

.B

ron

teC

reek

55

8ft

.

25

.94

(EL

26

0)

25

.94

(EL

26

0)

OC60 3943'

OC62 1080'

OC63 1080'

OC64 1205'

OC67-840'

OC661958'OC661958'

OC68-662'2

6.7

0(E

L2

67

)2

6.7

0(E

L2

67

)

26

.71

Sh

eld

on

Cre

ek

East

30

ft.

Sh

eld

on

Cre

ek

East

30

ft.

26

.96

Bu

rlo

ak

Dri

ve

Bu

rlo

ak

Dri

ve

43650

27

.45

Sh

eld

on

Cre

ek

35

ft.

Sh

eld

on

Cre

ek

35

ft.

LoadingRackLoadingRack

26

R5-25.70-27.50Oakville Sub.04/10/15dmn

1

3 5

7

A

B

A

BA

B

B

A

27

.13

26

.98

27

.18

27

.11

27

.06

27

.05

26

.95

26

.88

ALL

Em

erg

en

cy

Fir

eC

ross

ing

Em

erg

en

cy

Fir

eC

ross

ing

X

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Petro-Canada Service Track

OC691947'OC691947'

OC701040'OC701040'

LPG Tracks

RackTracksRackTracks

PETROCANADA

PETROCANADA

(McP

hers

on

Rd

.)

(AK

A:

12

Mil

eC

reek

)(A

KA

:1

2M

ile

Cre

ek

)

Page 83: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

PSGR

FRT

29

60

95

Appleby

C.I.P.

27.9

R5-27.50-29.60Oakville Sub.04/10/15dmn

OC81 3575'

OC82-1200'

OC80-473'Gerrard

OvalstrappingGerrard

Ovalstrapping

Henderson Paper Products (43655)Henderson Paper Products (43655)

St. LaurentPaperboard Inc.

St. LaurentPaperboard Inc.

27

.83

(EL

27

8)

27

.83

(EL

27

8)

28

.54

Dominion NickelAlloy Ltd.

Dominion NickelAlloy Ltd.

OC92955'OC92955'

OC88775'OC88775'

Plibrico

28

.64

286T1

286T2

286T3

287T1

287T2

287T3

29.0

4S

ho

reacre

sC

reek

Sh

ore

acre

sC

reek

29.5

3W

alk

er'

sL

ine

Walk

er'

sL

ine

Ap

ple

by

Lin

eA

pp

leb

yL

ine

28.2

5

28

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY Note: Psgr. trains Max. = 80 MPH

on No. 1 Track betweenMile 22.1 and Mile 31.8

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Psg

r.T

unnel

Psg

r.T

unnel

Psg

r.T

unnel

Psg

r.T

unnel

RTC: CH8T1, *5-460#

GOStation Parking

GOStation Parking

GOStation Parking

GOStation Parking

Fairview St.Fairview St.

Harvester St.Harvester St.

Page 84: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

30

.82

PSGR

FRT 60

95

303T1

303T2

303T3

30.5

29

.64

Tu

ck

Cre

ek

19

ft.

Tu

ck

Cre

ek

19

ft.

308T1

308T2

308T3

30

.67

30

.81

Ro

sela

nd

Cre

ek

Ro

sela

nd

Cre

ek

Gu

elp

hL

ine

Gu

elp

hL

ine

31 30

31

.28

Dru

ryL

an

eP

ed

est

rian

Bri

dg

eD

rury

Lan

eP

ed

est

rian

Bri

dg

e

31.4

2E

ast

Ram

bo

Cre

ek

East

Ram

bo

Cre

ek

31

.02 OD35

530'OD35530'

BonarBemisBonarBemis

Note: Max. = 45 MPH for PSGRand 30 MPH for FRT trains between

Mile 31.4 and Mile 31.7 on curveon No. 1 track.

Note: Max. = 45 MPH for PSGRand 30 MPH for FRT trains between

Mile 31.4 and Mile 31.7 on curveon No. 1 track.

R8-29.60-31.40Oakville Sub.06/08/11dmn

1

5 7

11

30

.74

30

.67

30

.66

30

.59

30

.57

30

.50

30

.48

30

.41

A

A

A

A

B

B

B

B

ALL

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Future Track 3

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Note: Psgr. trains Max. = 80 MPHon No. 1 Track betweenMile 22.1 and Mile 31.8

Burlington EastBurlington East

RTC: CH8T1, *5-460#

Burlington North ServiceNo. 1 Track

No. 2 Track

No. 3 Track

North Track

South Track

North Track

South Track

Burlington North ServiceBurlington North Service

CT

C

CT

CB

Page 85: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

RTC: CH8T1, *5-460#

31.5

0P

sgr.

Tu

nn

elP

sgr.

Tu

nn

el

FRT 60

Burlington31.5

OutofSe

rvic

e

OutofSe

rvic

e

31.6

7 OD36680'OD36680'

OD381197'OD381197'

493N

493S

31.9

2

Bra

nt

St.

Bra

nt

St.

Pla

ins

Rd

.P

lain

sR

d.

32.3

0

324T1

324T2

Halton

Sub.

49.2

1

OD44 900'

OD47 920'

ALL

OD64 700'

OD63

OD62

OD59695'OD59695'

OD60

OD50

Shed Track

Hercules CanadaHercules Canada

West Legof Wye

West Legof Wye

Reichhold Ltd.Reichhold Ltd.

Sta

tio

nA

ccess

Ro

ad

Sta

tio

nA

ccess

Ro

ad

OD57460'OD57460'

OD56 900'

Burlington West32.2

32.2

Bea

chSpu

r

Bea

chSpu

r

Jct. withHalton Sub.

Jct. withHalton Sub.

32.2 Oakville Sub49.5 Halton Sub

32.2 Oakville Sub49.5 Halton Sub

R13-31.40-32.40Oakville Sub07/01/03dmn

Future No. 3 Track

48.9

7S

pik

ed

31.6

9(S

pik

ed

)

Note: Multi-level auto carriersPROHIBITED

on Halton-Oakville Connecting Track

Note: Multi-level auto carriersPROHIBITED

on Halton-Oakville Connecting Track

Halton-Oakv

ille

Co

nn

ec

ti ng

Halton-Oakv

ille

Co

nn

ec

ti ng

48.92Plains Rd.

75

9 13

44660

32 PSGR 95

31.8

6

31.8

1

32.4

32.4

0

32.3

3

32.2

5

32.2

5

32.1

8

32.1

7

A A

BB

Barton Tubes

0.34 Fairview St.0.34 Fairview St.

Bu

rlin

gto

n

*

A.E

.I.

A.E

.I.

RTC: CH8T2, *5-470#

15A

B

11A

B

3A

B

A

B

324T3

321T1

321T2

321T3

North Track

South Track

Future No. 3 Track

North Track

South Track

Burlington North Service

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

1

Page 86: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Service Track

Service Track

33.1

0In

dia

nC

reek

Ind

ian

Cre

ek

PSGR

FRT 60

95

Aldershot

34.6

32.7

1

32.6

7

Q.E

.W.

OD701055'OD701055'

OntarioHydro

OntarioHydro

Normal positionwhen lined to OD70

Normal positionwhen lined to OD70

R9-32.40-35.33Oakville Sub.06/12/21dmn

333T1

333T2

333

334

334T1

334T2

Aldershot EastAldershot East

33.335.2

535.2

4

34.7

5

33.3

1

33.8

0

Hid

den

Vall

ey

Rd

.H

idd

en

Vall

ey

Rd

.

Wate

rdo

wn

Rd

.W

ate

rdo

wn

Rd

.

Kin

gR

d.

Kin

gR

d.

Gri

nd

sto

ne

Cre

ek

Gri

nd

sto

ne

Cre

ek

(a.k

.a: A

pp

leg

art

h’s

Cre

ek

)

Hag

ar

Cre

ek

Hag

ar

Cre

ek

Falc

on

Cre

ek

Falc

on

Cre

ek

AldershotCold Storage

AldershotCold Storage 3

3.0

35 34 33

44540

AS

HN

&A

SH

S

KA31 7487'

ALL

KA32 7086'

KA33 6509'

KA34-3057'

KA35-2867'

KA36-2690'

KA37-2513'

KA38-2336'

KA39-2336'GO & VIA

Station ParkingGO & VIA

Station Parking G

A

A

B

B

3

XXXXX

XXXXX

1

33.2

4

33.2

9

33.3

1

33.3

5

1

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

Note: No. 1 Crossoverself restores to normal position

after having been used in reverse.See Subdivision footnote.

Note: No. 1 Crossoverself restores to normal position

after having been used in reverse.See Subdivision footnote.

W.I

.L.D

.-A

.E.I

.W

.I.L

.D.-

A.E

.I.

W

RTC: CH8T2, *5-470#

348T1

348T2

348T3

34.9

No. 1 Track

No. 2 Track

ServiceTrack

ServiceTrack

KA32

A

B

5

334T3

333T3

33.2

3

33.1

8

343T31344T3

344

343T2

343T1

Waterdown

34.334.3

4

No. 3 Track

(104.2

(c)

n/a

)

No. 1 Track

No. 2 Track

No. 3 Track W

(104.2

(c)

n/a

)

Page 87: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

36.2

0C

ulv

ert

35.7

0

36

35.3

5

36.6

3

36.6

7

36.6

Lem

on

vil

leR

d.

Lem

on

vil

leR

d.

Pla

ins

Rd

.W

est

HW

YN

o.2

Pla

ins

Rd

.W

est

HW

YN

o.2

Sp

rin

gG

ard

en

Rd

.S

pri

ng

Gard

en

Rd

.(B

eth

Jaco

bC

rt.

Ped

est

rian

bri

dg

e)

(Beth

Jaco

bC

rt.

Ped

est

rian

bri

dg

e)

PSGR

FRT 60

95PSGR

FRT 30

50

36.4

R5-35.33-36.70Oakville Sub.06/12/21dmn

35.35 = 340'36.70 = 303'

A.E

.I.

A.E

.I.

RTC: CH8T2, *5-470#

36.5

0

36.5

4

36.5

8C

ulv

ert

Cu

lvert

Cu

lvert

Cu

lvert

5

9

3

1 7

9

361T2

361T3

361T1

361

A

B

A

B

364T2

364T3

364T1

A

B

A

B

Sp

lit

Po

int

Sel

fre

sto

rin

gD

ual

Co

ntr

ol

Der

ail

Illu

min

ated

Fla

shin

gD

VS

ign

al

No. 1 Track

No. 2 Track

No. 1 Track

No. 2 Track

Snake36.3

Service Track36.1

0

36.1

3

36.2

936.2

8

36.3

6

36.2

236.2

1

36.1

2

36.3

8

36.0

8

36.1

7

35.8

5C

ulv

ert

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

DV

No. 3 Track No. 3 Track

36.3

7S

nak

eR

d.

Sn

ak

eR

d.

Page 88: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

367T136.9

5F

ore

man

'sC

ross

ing

Fore

man

'sC

ross

ing

Foreman'sCrossing

Foreman'sCrossing

37PSGR PSGR

FRT 30

30 50

R10-36.70-37.70Oakville Sub.06/09/29dmn

374N

374S

602-1

602-2

602-3

CP Signals

599-3599-2

376N

376S

Desj

ard

ins

Can

al

73

ft.

Desj

ard

ins

Can

al

73

ft.

37.6

0

CPDesjardins

CPDesjardins

Bayview

36.9

370N

370S

003

373N

373S

006N

006S

373

36.98

Vall

ey

Inn

Rd

.V

all

ey

Inn

Rd

.

Hwy. No. 2Hwy. No. 2CP Hamilton Sub.

Hwy. No. 403Hwy. No. 4030.56

0.20

Dundas S

ub .

Dundas S

ub .

44523CP

Rly.

Hamilton Jct.37.344515

102

102

102 CP Hamilton Sub.514-392-5392

CP Hamilton Sub.514-392-5392

60

.3

0.6

60

.4

0.4

37

.3

60.7

37

.4

60.9

CP

C.N.Rail

0.52

0.48

36.9

0.47

1

3

3 5

7

1

9

4

1

2

3

5

37.5

2

37.4

8

37.4

6

37.4

0

37.3

8

37.3

0

36.8

1Jc

t.S

wt.

Jct.

Sw

t.

Hamilton Sub.Hamilton Sub.

CPHamilton Sub.Hamilton Sub.

Oakville Sub.Oakville Sub.

C.N.Rail

Dundas Sub.Dundas Sub.

36

.70

Cu

lvert

37.70 = 280' 36.70 = 303'

A

B

B

A

B

A

COW

PATH

COW

PATHCN-CP East Connecting TrackCN-CP East Connecting Track

Oakville - Grimsby Connecting TrackOakville - Grimsby Connecting Track

Note: Oakville - Grimsby Connecting TrackCROR Rule 105 (A) Applicable.

Maximum Speed = 15 MPH

Note: Oakville - Grimsby Connecting TrackCROR Rule 105 (A) Applicable.

Maximum Speed = 15 MPH

Oakville SubMain Track

Oakville SubMain Track

CN-CP West Connecting TrackCN-CP West Connecting Track

CT

C

CT

C

TH

ISIS

NO

TA

LE

GA

LD

OC

UM

EN

T-

FO

RIN

TE

RN

AL

CN

INF

OR

MA

TIO

NO

NL

YT

HIS

ISN

OT

AL

EG

AL

DO

CU

ME

NT

-F

OR

INT

ER

NA

LC

NIN

FO

RM

AT

ION

ON

LY

ALLALL

0.6

0.6

RTC: CH8T2, *5-470#

Bayview0.0

365T2

365T3

7

A

B

36.8

0

36.7

3

(10

4.2

(c)

n/a

)

Page 89: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

011T1

011T2

118A3

0.6

6

0.7

5

0.6

8

0.6

1

0.5

6

0.4

3

0.2

5

0.3

1

0.8

0

1.0

0

1.1

2

1.5

11.5

0

OAKVILLE-KINGSTON CONNECTING TRACKS

002SD

002ND

003ND

003SD

John St.West

John St.West

John St.East

John St.East

Bat

hu

rst

St.

Bat

hu

rst

St.

Sp

adin

aA

ve.

Bay

St.

Yo

rkS

t.

Yo

ng

eS

t.

Blu

Jay

sW

ay

(Pete

rS

t.)

Blu

Jay

sW

ay

(Pete

rS

t.)

Ped

est

rian

Ov

erp

ass

Ped

est

rian

Ov

erp

ass

Ped

est

rian

Ov

erp

ass

Ped

est

rian

Ov

erp

ass

US

RC

Em

erg

en

cy

Access

Ro

ad

US

RC

Em

erg

en

cy

Access

Ro

ad

US

RC

Access

Ro

ad

US

RC

Access

Ro

ad

US

RC

Access

Ro

ad

US

RC

Access

Ro

ad

Ped

est

rian

Ov

erp

ass

Ped

est

rian

Ov

erp

ass

Foreman'scrossing

1 1

North Connecting Track

South Connecting Track

USRC

= A2

= A3

No. 3 Track = D1No. 3 Track = D1

No. 4 Track = D2No. 4 Track = D2

TORONTOUNION

STATIONTRAINSHED

001ND

001SD004ND

004SD

009T3

009T496D1

96D2

1

Lock

edw

ith

Spec

ial

Lock

Lock

edw

ith

Spec

ial

Lock

013T1

013T2 118A2

013T3

013T4

013D017D

2

015D

1.5

7O

akvil

leS

ub.

1.5

7O

akvil

leS

ub.

0.1

9

0.1

8

0.0

00.0

0

Western LeadWestern Lead

410

2521

23

19

15

1.8

6-

Oak

-Kin

gC

onn

1.8

6-

Oak

-Kin

gC

onn

1.8

3-

Oak

-Kin

gC

onn

1.8

3-

Oak

-Kin

gC

onn

Str

ach

anA

ve.

Str

ach

anA

ve.

3333ND

3333SD

C.T.C.BeginsC.T.C.BeginsScott St.

(USRC)Scott St.(USRC)

Jarv

isS

t.

US

RC

Access

Ro

ad

US

RC

Access

Ro

ad

No. 1No. 1

No. 2No. 2

USRC to Kingston Sub.

0.0

Page 90: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

42.25

Farm

Xing

.

41.55

Farm

Xing

.

MT

40.44

40.72

42.04

42.35

Main

St. (H

wy.47

)St

ouffv

ille R

d.

19th

Ave.

Town

of M

arkha

m

9th C

once

ssion

Rd.

Town

of M

arkha

m

41.80

42.30

41.40

41.20

40.50 40.30

40.46

40.72

40.76

40.93

LLL

GO StationParking

15251550 PSGRPSGR

FRTFRT

Stouffville End of Track40.6 40.3

41826

42

Stou

ffville

Cree

k

Milla

rd St

.

York-

Durha

m He

ritage

Railw

ay A

ssoc

iation

.Ph

.- 905

-642-0

099

P.O.

# 46

2 Stou

ffville

On.

L4A

7Z7

40.39

R3-40.00-42.36Uxbridge Sub.01/08/01dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Team TrackUA35-800'

GO StorageExtensionUA32-206'

Former Siding

UA32 GO Storage Track - 2500'

Note: PSO ALL TrainsMax. Speed = 15 MPH

Between Mile 40.3 and Mile 41.041.0

R

WaysidePowerAccess Rd.

CRORule 105 CRORule 10541

MT

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rt

40.3

Page 91: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

43.09

Farm

Xing

.

43.65

Farm

Xing

.

44.40

Farm

Xing

.

Main

St.Hw

y. No

. 48

Station St.

GO StationParking

46.95

G

42.47

42.91

Priva

te Rd

.

Farm

Xing

.

43.50

46.31

44.97

LLL

25 2525 50PSGR PSGR

FRT FRT

Markham47.0

41822

4344454647

No H

andra

ilsLit

tle R

ouge

Rive

r75

ft.

CREE

K

18th

Ave.

Elgin

Mills

Rd.

E.

16th

Ave.

Town

of M

arkha

m

17th

Ave.

Major

Mac

kenz

ie Dr

. E.

42.40

42.89

42.99

43.10

44.80

45.40

45.50

45.60

45.65

45.70

45.80

45.85

46.20

46.31

46.70

46.92

43.70

43.80

43.90

43.9544.70

43.40

R1-42.36-47.10Uxbridge Sub.98/01/08dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

46.9 44.0 43.0

PSO Psgr 40

Culve

rt

Culve

rt

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rt

Culve

rtCu

lvert

Culve

rtCu

lvert

Culve

rt

Culve

rt

Culve

rt

Culve

rt

Culve

rts

Page 92: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

49.70

Culve

rt

Culve

rt

Culve

rt

48.17

B

No H

andra

ils

No H

andra

ils

48.18Ga

teFir

e Hyd

rant

47.17

48.38

49.42

49.43

49.85

49.97

GGL LL

Cree

k

Cree

k

Drain

Drain

Drain

CREE

K87

ft.

Roug

e Rive

r87

ft.

Snide

r Dr.

7th Li

ne R

d.Mc

Cowa

n Rd.

Reg.

Rd. 3

Kenn

edy R

d.

Main

St. U

nionv

ille

Eurek

a St.

(Old

Kenn

edy R

d.)

47.6050.01

50.02

49.25 49.10

48.80

47.30

49.60

R2-47.10-50.10Uxbridge Sub99/12/16dmn

UA64-990'

C.I.P.Containers

Station Lane

(Old Unionville)(Mi. 49.8)(41816)

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

47.4Note: PSO Psgr.=25 MPH

Between Mile 49.7 and Mile 50.2

2550PSGR

FRT484950

2525PSGR

FRT

Page 93: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

CTC

CTC

OCS

CTC

CTC OCS

50.8550.95

50.97

Farm

Xing

.

51.05

Farm

Xing

.

51.46

Strea

m

Strea

m

51.10

51.80

51.09

50.951.3

51.99

50.15

Hwy.

No. 7

Hwy.

No. 4

07

CREE

KSt

ream

50.30

50.70

51.50

51.98

14TH

Ave

.

Denis

on S

t.

GGG

GO StationParking

UnionvilleUnderwood Hagerman50.752.1 51.1

5152

Strea

m50

.10

R3-50.10-52.10Uxbridge Sub.01/05/23dmn

1A

1B

3

3

139S

York

Sub.

139N

PB

14.81

509

514

14.3914.26

Warden Ave.(5TH Line)

51.22

Note: Any movement withincircuit limits with No. 1 or No. 3SWT In Hand throw MUST resetcircuit. Entire movement Mustbe clear of circuit limits beforecircuit may be reset.

13.53Kennedy Rd.

(6TH Line)

Uxbridge Sub 499

50.13

No H

andra

ils

142N

142S

UA85 - 1160'

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

(Note: Rule 104.2Not Applicableat Dual ControlSwitches No.s 3)

South Connecting-1340'Max. speed = 15 MPH

Uxbridge to York Sub.Max. speed = 30 MPH

York to Uxbridge Sub.

2525 253550 50PSGRPSGR PSGR

FRTFRT FRT

Note: PSO Psgr.=25 MPHBetween Mile 49.7 and Mile 50.2

Page 94: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt52

.80

52.85

Culve

rt

53.60

Culve

rt53

.40Cu

lvert

Culve

rt

52.40

52.82

53.20

53.61

GGG G

2550PSGR

FRT

Milliken52.7

41812

53

Reg.

Rd. 3

Kenn

edy R

d.

Stee

les A

ve.

Pass

more

Ave.

McNi

coll A

ve.

52.50

52.76

R3-52.10-53.60Uxbridge Sub.99/09/24dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

52.21

Gate

53.34

52.34

UA84-628'522

UB30-670'Ziner Lumber

B

Page 95: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

Culve

rt

Culve

rtCu

lvert

Culve

rt

54.43

55.73

54.88

55.16

55.44

53.89

54.06

UB35

-385'

CNGate

Gate

H.E.

P.C.

CN N

OT TO

OPER

ATE

ON

R GGG L

GO StationParking

Agincourt55.5

41808

Wes

t High

land

Cree

k-44ft

.

Finch

Ave

.

Shep

pard

Ave.

E.

No W

alkwa

y

CP B

ellev

ille S

ub.

Hunti

ngwo

od D

r.

Have

ndale

Rd.

Pede

strian

Cros

sing

Marily

n Ave

.

54.05

55.7055.99

56.00

54.50

54.80

R2-53.60-56.00Uxbridge Sub.99/12/16dmn

UB36-1200'

Atlantic Packaging

Products

Agincourt

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

55.5

5455562540PSGR

FRT 2550PSGR

FRT

Page 96: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

57.25

Culve

rt

Culve

rt

57.90

56.30

57.05

56.87

57.01

56.74

56.60

56.70

L

2540PSGR

FRT57

Wes

t High

land

Cree

k

Wes

t High

land

Cree

k

Hwy.

No. 4

01

Elles

mere

Rd.

T.T.C

.-L.R

.T.To

Sc

arboro

ugh

Town

Cen

tre

Pede

strian

Und

erpas

sTo

L.R.

T. St

ation

Prog

ress A

ve.

Atlantic PackagingProducts Ltd.Th

omas

J. Li

pton

Inc.

Mante

lla

Scep

terMa

nufac

turing

Benfl

eet

57.15

57.16

57.20

R2-56.00-57.90Uxbridge Sub.96/11/04dmn

56.99

56.65

Gate

Gate

57.20

57.86

56.47

Spike

d

UB43-722'

Lansing BuildingSupply

UB52

UB53

UB58

-690'

UB65

-523'

UB47

- 368

'

UB70

-520'

UB56

-929'

UB50-920'

Sunoco

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

EllesmereLRT StationLRT - TTC

FenceFence

Page 97: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

60.10

Culve

rt

Culve

rtCu

lvert

Culve

rt

KennedyLRT Station

Lawrence EastLRT Station

59.51

T.T.C

.

59.94

Pede

strian

Xing

.(C

orvett

e Ave

.)

57.93

58.01

59.74

58.05

59.49

60.18

Traffic LightsInterconnected toCrossing Protection

59.65

RG

5860 59

Flood

way

Lawr

ence

Ave

. E.

Eglin

gton A

ve. E

.

Danfo

rth R

d.

Pede

strian

Und

erpas

sTo

L.R.

T. St

ation

Pede

strian

Und

erpas

s

Pede

strian

Und

erpas

sTo

L.R.

T. St

ation

58.18

58.35

58.95 57.97

R2-57.90-60.50Uxbridge Sub.99/01/04dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

UB69-336'

UB68-672'

SchattTrading

Gec

o Br

anch

Note: PSO ALL TrainsMax. speed = 20 MPH

Within 1600 ft. of crossingDanforth Ave. Mile 60.18Until crossing occupied

Time Table Direction = Eastward

2540PSGR

FRT

Pede

strian

Ove

rpass

(Tara

Ave

.)(M

ooreg

ate A

ve.)

58.79

Fence

M id la n d

Ave .

ToolHouse

MaintainersShack

Page 98: Greater Toronto Area - Maple Leaf Toronto Area... · 2017-10-08 · The Toronto skyline has been built with over 30 accurately modeled towers and buildings. These include some that

CTC

OCS

OCSCTC

325.2Scarborough

324.9

7Mi

dland

Ave

.

60.66

(325.2

0 King

ston S

ub.)

St. C

lair A

ve.

East

Scarborough

60.54

60.70

Uxbri

dge S

ub.

41798

3253

3253T1

3253T2

3253T3

3256N

3256S

1

3

7

5

Uxbridge Sub.

Scarborough Jct. Swt.Mile 325.56 Kingston Sub.Mile 61.03 Uxbridge Sub.

61.0 Uxbridge Sub.

2540PSGR

FRT61

R4-60.50-61.03Uxbridge Sub.01/08/01dmn

THIS

IS N

OT A

LEGA

L DOC

UMEN

T - FO

R IN

TERN

AL C

N IN

FORM

ATIO

N ON

LY

Kingston Sub.to Montreal

No. 1

No. 2

No. 3

Track S350 to "S" Yard

Kingston SubTo

Toronto

325.3

0Ps

gr.

Tunn

el

JCT.

SWT.

XXXXXXXXXXXX

XXXXXXXXXXXX

Swt Indicator