Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
SOUTH AIRPORT APM COMPLEX
BP-11.01 ITF-PDL Concrete Building Foundations
BP-10 Pre-Cast Driven Piles & CIP Foundation Systems
BP-11.02 South Airport APM Complex Auger Cast Piles
BP-13.01 AAF Viaduct Structural Foundations
BP-13A.01 Viaduct Sitework
BP-17.01 Abutment & Surcharge
BP-3.01 South Airport APM Sitework
T-817 Runway Status Lights
V682 OEA Maintenance Building
V867 ARFF Centerfield Administration Building
SOUTH TERMINAL C—PHASE 1 BP-2A STC P1 Early Sitework Enabling Package
BP-5S STC P1 Landside Civil Sitework Package
GMP-2S STC P1 Airfield Civil Package
GMP-4S STC P1 Initial Site Services
GMP-5S.1 STC P1 Auger Cast Piles Test & Production for
LST & GTF
GMP-5S.2 STC P1 Site Utilities Technology (Landside)
GMP-6S BP-3.01 STC P1 Auger Cast Piles for the Airside
Concourse Building
GMP-6S.2 STC P1 Airside Concourse Building Concrete
GMP-9S STC P1 Parking Garage Facility Concrete
STC P1 Low Voltage
STC P1 Preconstruction Survey
Greater Orlando Aviation Authority Project Experience
We’ve completed over 140 total airport projects to date, with 90 of those taking place at the Orlando International Airport. We have been heavily involved with
the APM Complex and South Terminal C areas over the past few years. Our experience with the Greater Orlando Aviation Authority projects includes control, boundary, design, wetland, topographic, utility, and quantity surveys, construction layout, Digital Terrain Models (DTM) and Building Information Models (BIM).
925 S. Denning Drive, Winter Park, Florida 32789
Phone: 407-622-9322 | Fax: 407-622-9325
We are Certified M/BE, LDB and DBE firm with GOAA.
ORLANDO INTERNATIONAL AIRPORT
30" Condenser Water Piping
Airport Cargo Area
ASO-2418 Hurricane Restoration for Runway 35L
BP-037 Airfield Improvements Phase 1
BP-040 North Ramp Improvements
BP-041 Rehabilitation of Taxiways Phase 1
BP-2S 01.07 Temporary Feeder
BP-316 New Building Construction
BP-317 East Airfield ARFF Facility Construction
BP-320 Runway Restriping Construction
BP-352 Jetblue Taxiway Connector
BP-36 Duct Bank
BP-371 Red Satellite Parking Lot Expansion
BP-372 Airfield Pavement Rehabilitation
BP-374 Airsides 2 & 4 Ramp Rehabilitation
BP-383 Highmast Lighting Rehabilitation Construction
BP-408 Cell Lot, Taxi Hold, Bus Hold, and Return to Terminal A
BP-443 Airside 4 Improvements
BP-455 Taxiway C South End Rehabilitation
BP-456 Airside 1 & 3 Apron Rehabilitation
BP-462 Taxiway Area G & H Safety Area Improvements
BP-468 OAR Subconsultant Services
BP-468 Runway 17R-35L Design
BP-469 Loop Road Resurfacing & Related Work
BP-470 South Cell Lot Parking
H-159 Gate 50 Add Insp Lane
H-176 Temporary Taxi & Bus Hold Facility