Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Brannan Park
Brannan ParkStormwater
Pump Station
Isaac EvansPark
Auburn RegionalGolf Course
Auburn 40 Plat (Monterey Park Dev.)
Labr
ador
Prop
erty
River Mobile Estates
City of Auburn Property(former Crista Property)
Riverpointe Development
Riverpark Estates Development
Port of SeattleWetland Mitigation
Site
Westport Capital Property
Brannan Park
Brannan ParkStormwater
Pump Station
30th Street NE
26th Street NE
37th Street NE
Isaac EvansPark
Auburn RegionalGolf Course
Auburn 40 Plat (Monterey Park Dev.)
Labr
ador
Prop
erty
River Mobile Estates
City of Auburn Property(former Crista Property)
Riverpointe Development
Riverpark Estates Development
Port of SeattleWetland Mitigation
Site
Gre
en R
iver R
oad
SE
Green River Road SE
RM 29.5RM 29.5
RM 28.5RM 28.5
RM 29.0RM 29.0
Green R
iverG
reen River
Green River
Green River
M S
treet
NE
Aub
urn
Way
N.
REMOVEEXISTING
LEVEE
GRAVELACCESS
ROADWestport Capital Property
43rd Street NE Green River
Green River
STORMWATERSWALE
LEVEE SETBACKALIGNMENT
PROJECT ELEMENTS
135-12539-10001-06/Fig3-1_FINAL_BaseMapandProposedAlignment.ai/Revised file name: 1303_3172m_ReddingtonRev5-small.ai mdev
Reddington Levee Setback
PROPOSED LEVEE
LeveeFootprint
Levee Crest
Minor Contours - 2 foot
River Mile Marker and Number
Parcel Boundaries
Utility Easements
Major Contours - 10 foot
5.1 MR
MaintenanceAccess Zone
Engineered Log Jams
Rock Barbs with Ballasted Wood
500 500 0
Feet