Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 2: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 3: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 4: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 5: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 6: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 7: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required
Page 8: Graphic1 - Bhoruka Power · DT operating slab concreting up to EL 442.00 is completed. RCC flood protection wall concreting has been done up to EL 444.40 - almost up to the required