Grand circuit details for fun.docx

Embed Size (px)

Citation preview

  • 8/14/2019 Grand circuit details for fun.docx

    1/4

    Grand Circuit Price List & Payment Plan

    [A] Basic Sales Prices

    Accommodation

    Type - Apartment

    Area

    (In Sq. Ft.)

    DPP @

    Rs.2790/- Per Sq.

    Ft.

    FLEXI @

    Rs.2945/- Per Sq.

    Ft.

    CLP @

    Rs.3100/- Per Sq.

    Ft.

    1 Bedroom 625 1743750 1840625 1937500

    2 Bedroom 900 2511000 2650500 2790000

    2 BHK + Study 1155 3222450 3401475 3580500

    3 BHK 1295 3613050 3813775 4014500

    [B] Additional Charges

    Sr. No. Particulars for Apartment

    1. IFMS: Rs.50 per sq. ft.

    2. One Time Lease Rent: Rs.60 per sq. ft.

    3. EDC: Rs.125 per sq. ft.

    4. Electricity Installation Charges: Rs.20000 per KVA (2KVA -Mandatory)

    5. Power Backup: Rs.20000 per KVA (1KVA -Mandatory)

    6. Covered Parking Per Slot Rs. 300000

    7. Club Membership Rs. 100000

    8. Meter Connection charges Rs. 20000 for Single Phase or Rs. 25000 for Three Phase

    [C] Preferential Location Charges

    Location PLC Apartment Rs.

    Ground floor Rs.120

    1st floor Rs.110

    2nd floor Rs. 100

  • 8/14/2019 Grand circuit details for fun.docx

    2/4

    3rd floor Rs. 90

    4th floor Rs. 80

    5th floor Rs. 70

    6th floor Rs. 60

    7th floor Rs. 50

    8th floor Rs. 40

    9th floor Rs. 30

    10th floor Rs. 20

    11th floor Rs. 10

    17th floor Rs. 10

    18th floor Rs. 30

    19th floor Rs. 50

    Beach View PLC (5th Floor onwards ) 5% of BSP

    Expressway View PLC(5th Floor Onwards) 5% of BSP

    Park/Road Facing Rs 25 per sq. Ft

    Corner Apartment Rs 25 per sq. Ft

    Payment Plan

    [A] Down Payment Plan

    Sr. No. Particulars Percentage

    1. At the time of booking 10%

    2. Within 30 days from booking 85%

    3. On offer of possession 05%

  • 8/14/2019 Grand circuit details for fun.docx

    3/4

    [B] Flexi Payment Plan

    Sr. No. Particulars Percentage

    1. At the time of booking 10%

    2. Within 60 days of booking 40%

    3. On Start of foundation Work 09%

    4. On Start of basement roof slab 09%

    5. On Start of second floor roof slab 09%

    6. On Start of sixth floor roof slab 09%

    7. On Start of twelfth floor roof slab 09%

    8. On offer of possession letter 05%

    [C] Construction Linked Plan

    Sr. No. Particulars Percentage

    1. At the time of booking 10%

    2. Within 30 days from booking 10%

    3. On Start of foundation Work 10%

    4. On Start of basement roof slab 08%

    5. On Start of Second roof slab 08%

    6. On Start of fifth floor roof slab 08%

    7. On Start of eighth floor roof slab 08%

    8. On Start of twelfth floor roof slab 08%

    9. On Start of fourteenth floor roof slab 08%

    10. On Start of sixteenth floor roof slab 05%

    11. On Start of eighteenth floor roof slab 06%

    12. On Start of ninetieth third floor roof slab 06%

    13. On offer of possession letter 05%

    Terms and Conditions Price list as or date of booking shall be applicable.

  • 8/14/2019 Grand circuit details for fun.docx

    4/4

    PLCs if any shall be charged along with installments towards basic cost. Cheques/Bank Drafts to be issued in favor of 'SUPERTECH LIMITED' payable at New Delhi/Noida. Out station

    cheques shall not be accepted.

    Maintenance and other charges are extra and shall be collected before the possession. Service tax, VAT & other government levies are extra, as applicable. Registration, Stamp Duty and misc. charges shall be payable at the time of Offer of Possession. Super Area includes the covered area plus the proportionate area under Common Corridor, Passages, Staircases,

    Mumties, Projections, Water Tanks, Lift Wells etc.

    The terms and condition of sale stated herein are indicative and are subject to detailed terms & conditions in the'Agreement to Sell1 / flat Buyer's Agreement1 and are subject to change at sole discretion of the company.

    All building plans, layouts, specifications are subject to changes and modifications as decided by the company,architect or any other competent authority.

    Timely payments of the installments is the essence of the Booking. This Price List supercedes all previous price lists.